DOMESTIC HEA TING CONTROLS ARE EASY
P ART 1 - THE BASICS
T oday’s inescap able need to improve energy efficiency in UK homes has brought installers many opportunities to
make extra earnings through the upgrading of heating and DHW controls. Often, however, misunderst andings and
technical ‘mystique’ surrounding some of these products inhibits installers from fitting the most appropriate energy
saving devices that can cut household heating bills and reduce carbon dioxide emissions into the atmosphere.
This series aims to remove some of the doubts and show that domestic heating controls really are easy .
THE CONTROLLED ‘WET’ SYSTEM
The majority of UK centrally heated homes rely on gas, oil or lpg boilers to supply heated water for radiators and
DHW primaries. This publication concentrates on these ‘wet’ systems, where home comfort levels and fuel economy
are usually maintained by:
a) simple automatic On/Off boiler control to meet demands for heat
b) directing heated water to cylinder and radiators only when and to where needed.
For optimum efficiency , systems should be correctly sized, hydraulically balanced and fitted with controls that will: -
●maintain heating and stored DHW temperatures at preset levels
●enable radiators to be heated only when and where required
●ensure boilers fire only when heating or DHW are calling
●permit the boiler to achieve its full SEDBUK performance (see BUILDING REGULA TIONS)
BUILDING REGULATIONS
There are things in our work that we just have to do. For health, safety and environmental reasons, the Building
Regulations impose statutory provisions on most aspects of construction work. Unless these requirements are
met, premises and installations cannot be legally handed over .
From August 2001, Part L1, Conservation of Fuel and Power in Dwellings, applies both to new premises and to
existing dwellings whenever a ‘controlled service or fitting’ is being supplied or replaced.
For heating installers, this means in effect that, when replacing boilers and hot water cylinders, it is necessary
often to upgrade unsatisfactory timing, temperature and interlock controls so that the boiler’s declared SEDBUK
performance can be fully achieved.
Key requirements of the latest version of Part L1 are: -
1. Applies not only to new build installations but also when boiler or cylinder replacement work is carried out in
existing premises; and could require additional or new controls.
2. All replacement boilers must be high ef ficiency types with the appropriate SEDBUK ratings (78% for most gas
boilers), and supported by relevant controls to enable the full SEDBUK performance to be achieved.
Page 2
3. Separate timing and temperature control for space heating and hot water , except with combination boilers and
solid fuel appliances.
4. Zone control of space heating to provide separate time and temperature control in areas that have different
requirements such as living and sleeping areas, i.e. TRVs or separate room thermostats with motorised valves.
5. DHW cylinders with suitably sized heat exchangers (to BS 1566 minimum) only should be used to prevent
wasteful boiler cycling.
6. Cylinders must be insulated to a minimum standard, as well as the first metre of pipe leading from the cylinder .
7. Boiler interlock is required for gas and oil fired systems to switch the boiler off when there is no demand for
heat. Thermostats should be fully interlocked with the boiler .
8. Systems that use only TRV’s should be fitted with a Boiler Energy Control, or a room thermostat electrically
interlocked to prevent unnecessary boiler cycling.
9. Heating and hot water systems must be inspected and commissioned after installation to ensure they operate
efficiently.
10. The building owner and/or occupier must be given a suitable set of operating and maintenance instructions for
their systems.
MINIMUM ACCEPT ABLE CONTROLS
The minimum acceptable level of control that allows users adequate operational choice with a single-zone, fully
pumped system comprises:-
a) a time control – to provide independent time control of heating and DHW
b) a room thermostat – to control space heating temperatures
c) a cylinder thermostat – to limit the temperature of stored DHW
d) motorised valve(s) – to regulate the flow of heated water to radiators and DHW coil
e) electrical interlock system - to prevent the boiler firing if there is no call for heat
The addition of radiator thermostats (TRVs) and an automatic by-pass valve can increase energy savings and
enhance a system’s seasonal efficiency .
However, controls can succeed only if the system it self allows them to. For instance, what is the point of fitting
a programmer that offers independent control of heating and DHW if these two circuits are not individually
controllable? Also, full energy efficiency cannot be achieved with gravity and semi-gravity systems, or where
pipework errors exist. It is important, therefore, that every installation provides the basic system requirements for
optimum energy saving performance – before any attempt is made to fit controls.
GETTING THE PIPEWORK RIGHT
A disciplined approach to system layout will pay dividends. By following the simple 3-T’s Rule (Fig. 1), and
properly positioning the boiler, feed and vent (Fig. 2), inst allers can ensure a hydraulically correct system and
help prevent pumping over, reverse circulation and short circuiting.
Page 3
3-T’s Rule
The simple 3-T’s Rule shows how the various take-off and return T’s should be connected in order to avoid costly
problems and call-backs arising from incorrect system circulation.
Flow
2nd ‘T’
Cylinder
2nd ‘T’
Cylinder
3rdT
Radiators
Return
3rdT
Radiators
1st‘T’
Vent
Boiler
1st‘T’
Cold
Feed
Fig.1 – the 3-T’s rule
Remember, numbered from the boiler , the correct order of the pairs of flow and return T’s is as follows:-
1)Vent and Cold Feed
2)DHW Cylinder
3)Radiators (zone 1)
Where there are additional heating zones, the same simple logic applies, i.e. heating zone two – 4th pair of T’s;
heating zone three – 5th pair of T’s; etc.
Boiler, Feed and Vent Positions
Correct. The traditional positioning of boiler , cold feed and vent is shown in Fig. 2. It is by far the best arrangement
Able to vent
steam and feed
Cold feed
Boiler
for the vast majority of domestic systems.
Incorrect. The feed and vent arrangements illustrated in Figs. 3 and 4 are unsatisfactory and will almost certainly
give rise to problems for the reasons shown
Most of circuit
may be below
atmospheric
pressure risk of
corrosion from air
ingress
Neutral Point
coldwater
Vent
Fig. 2 – Traditional boiler, feed
and vent positions
Pumping over
occurs
Fig. 3Fig. 4
Page 4
High Pressure Boilers. Sometimes, with high-pressure boilers, close-coupled feed and vent arrangements (150mm
max. between vent and feed) in the flow are permissible subject to the boiler manufacturer’s recommendations
and the use of additional safety controls such as overheat protection.
Boiler with high
temperature
cut-out
150mmmax
Close coupled
feed and vent
(subject toboiler
manufacturer approval)
Fig. 5 – High pressure-drop boiler with close-coupled feed and vent
Combined feed and vent systems. The following diagrams (Fig. 6 & 7) show combined feed and vent layouts,
where the feed and vent pipes are connected to each other before connection to the system. Not as intrinsically
safe as the other arrangements, these options should only be used if recommended by the boiler manufacturer .
Notwithoutboiler
Boiler with high
temperature
cut-out
22mm
Fig. 6 – Combined feed and vent arrangement (1)
manufacturer
approval!
Not without boiler
Boiler with high
temperature
cut-out
manufacturer
approval!
Fig. 7 – Combined feed and vent arrangement (2)
BOILER SIZING
The operating efficiency of boilers decreases with low heating loads. Boilers running constantly at part capacity
will most surely waste fuel. Over-sizing, therefore, should be avoided.
Domestic boiler sizing is best based on the BRECSU Whole House method rather than by adding up the final
radiator sizes, a practice that can produce significant over-sizing.
Page 5
SYSTEMS WITH CONVENTIONAL BOILERS
Gravity circulation and semi-gravity systems
These systems cannot achieve full energy efficiency due to their slow response and consequent low controllability .
The most cost effective way of improving their energy efficiency is to convert them to fully pumped. The cost of
adding controls (programmer, cylinder thermostat and two-port motorised valve (see Fig. 8) is almost as much as
conversion to fully pumped – without the benefits.
SEMI-GRAVITY SYSTEM UPGRADE
FP715 Full programmer with 1812 spacer box
RMT Room thermostat
ATCCylinder thermostat
HP28C 2 port Motorised Valve with SPDT aux. sw.
Junction
box
Fig. 8 – Semi-gravity system with controls upgrade
Fully pumped systems
The well-known systems in Figs. 9 & 10 permit fully flexible, independent time and temperature control of heating
and DHW. Programmers and thermostat s are not shown. The 3-T’s rule has been observed, and the pump, feed
and vent are correctly positioned. Attempting a shortcut, e.g. connecting the return from the first floor radiators to
the cylinder return, could lead to reverse circulation – heated water entering the radiators from the return - when the
heating valve is closed.
FULLY PUMPED SYSTEM
2 x 2 port motorised valves
3 Tees rule observed, circul ation
correct
OPEN
CLOSED
Fig. 9 – Two 2-port motorised valves
Page 6
FULLY PUMPED SYSTEM
3 port motorised valve
3 Tees rule observed,circulation correct
Fig. 7 – Mid-position valve system
COMBINATION BOILER SYSTEMS
Over 50% of all new central heating installations now have combination boilers. They do not require feed and vent
systems, or DHW cylinders. Therefore, the 3-T’s rule as such does not apply . Nevertheless, care is still required
to avoid reverse circulation and/or short-circuiting.
DHW CYLINDERS
These require sufficiently large coils (minimum to BS1566) to allow the cylinder to absorb heat quickly. Larger
coils have particular benefits with condensing boilers.
A WORD ABOUT THE ELECTRICS
Most installers should find making the simple electrical connections required for domestic heating controls well
within their capabilities. Full instructions are invariably included with every new control device or pack and this
series of publications will deal elsewhere with the wiring of individual controls and control systems. However , it is
strongly recommended that those intending to do their own wiring and commissioning should attend a suitable
electrical training course.
A) Field (First-fix) Wiring
In practice, installers will be wiring each component back to a wiring centre or junction box. It is, therefore,
important to know the number of cores that are required for each cable. Manufacturers usually present this
information as a Field Wiring Diagram as shown below (Fig. 8). The cables are usually presented as, for
example, “3+E”, which means that three cores are required from the connection, plus an earth if the component requires it. Double insulated components do not require an earth, but it is good practice to leave an earth
conductor available.
Page 7
Boiler
&
Pump
Mains
Supply
2 +
3 +
3 +
Cylinder
Thermostat
Wiring
Centre
Programmer
5 +
3 +
Room
Thermostat
MV
4 +
4 +
MV
Fig. 8
B) Mains Connection
To comply with the latest wiring regulations, mains power for the boiler, pump and controls should be connected to a domestic heating system via a double-pole, switched and fused (3A) fixed spur with an On/Off
indicator.
C) System Tests
Four basic tests should always be carried out on any appliance or control system before connection to the
mains – earth continuity, short circuit check, resistance-to-earth and polarity. Failure in any one test means
that the appliance should not be connected.
1) Earth Continuity Check
This test ensures that all the metal parts of the system are correctly bonded to the earth leading away to
the supply . Failure means that, in the event of a fault, the appliance could remain live and this would not be
detected until someone received an electrical shock
A suitable meter should be used to measure the resistance in Ohms (Ω) from the earth connection of the
double pole isolation switch to all metal parts of the case, pump, etc
The reading should be less than 1Ω. A higher valve represents failure and the appliance should not be
connected.
2) Short Circuit Check
A short circuit in the system will immediately blow a fuse when connected and possibly damage some of
the components
A suitable meter should be used to measure the resistance in Ohms between the neutral and live terminals.
Because of the large number of potential live circuits that may be electrically isolated when powered down
(switches open) this test should be carried out on the wiring or terminal block
The testing between the neutral and various live or switched live terminals should always read greater than
1Ω. A lower value indicates short circuit failure
Page 8
3) Resistance-to-Earth Check
This ensures that the appliance or system does not have a leakage to earth The basic test uses a suitable
meter to measure the resistance between Earth and the live or switched live terminals. The meter must read
infinite resistance at its highest ohms range, lower than this indicates a fault or failure This test is best done
at a wiring or terminal block since this gives best access to most switched live circuits
4) Polarity Check
The aim of this test is to detect whether the boiler or system’s live, neutral and earth are connected the
correct way round.
The mains supply is connected and a suitable meter used to measure the voltages across the L, N and E
terminals. The meter should be set to a suitable AC V olts scale (normally 300V ac or higher) and the results
should be in accordance with the following.
●L-N meter should read approx 240 V ac
●L-E meter should read approx 240 V ac
●N-E meter should read approx 0-15 V ac
Any other readings indicate a polarity check failure and that the appliance should be disconnected.
D) Pipework Bonding
Pipework bonding is an important requirement of the electrical regulations. Gas and water pipes should already
be bonded to the earth in the main electricity distribution box. In addition, radiators and pipework in the
bathroom should be bonded directly to the main electricity distribution box
IT’S EASY!
Hopefully , this guide will have shown that getting a heating system right comes down to plain commonsense - not
obscure, mysterious skills that only a few can learn. Anyone with basic plumbing training can do it – it’s easy . This
series will go on to show this applies also to the operation, selection and installation of heating and DHW controls.
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.