Danfoss DMT Installation guide

Danfoss DMT Installation guide

Installation guide

ELIMINATOR® Hermetic filter drier

Type DMT

<![if ! IE]>

<![endif]>023R9546

 

 

 

 

Maximum working pressure

PS/MWP: 140 bar/2030 psig

 

Refrigerant R744 (CO2)

 

 

 

 

Refrigerant temperature

 

 

Tmin.: -40 °C / -40 °F

 

 

 

 

 

 

 

 

 

 

Tmax.:  100 °C / 212 °F

 

 

 

 

Flare / flare o-ring / flare NPT

 

GC

copper plated solder versions

CCMT

 

 

Connection: All sizes

 

 

 

 

CCMT

 

 

DMT

 

 

AKVP

 

DMSC

MT

 

 

AKVP

 

DMSC

LT

Min. 5% Ag

 

 

 

Keep flames away

 

 

4

from body

3

6

5

 

X2

 

 

 

 

2

 

 

 

1

 

 

 

 

 

Paint

 

Customer best practice will still be needed:

 

 

<![if ! IE]>

<![endif]>Danfoss 23Z91

 

 

 

1. Use wet wrap when installing.

 

 

 

2. Braze the joints.

 

 

 

3. Let them cool down.

 

 

 

4. Clean the welding area after the installation (remove remaining flux with a brush).

 

 

 

This is an important operation and needs to be done with great care to remove all remaining flux.

5.Paint / Anti-corrosive needs to cover all open steel parts, areas where the black original paint has been burnt due to brazing and at least 3 cm approx of the copper.

6.Paint the joints twice.

<![if ! IE]>

<![endif]>023R9546

© Danfoss | Climate Solutions | 2019.10

AN142486434962en-000302

Loading...