Data sheet
Actuators for three point control
AMV 110 NL, AMV 120 NL
Description
Ordering Actuators
Typ e
AMV 110 NL
AMV 120 NL 12
Note:
Actuators w ith 5 m and 10 m cable length are produced on r equest. Please note this increase s lead time.
The actuators are used together with
automatically balanced combination valve type
AB-QM for DN 10 to DN 32.
Typical applications for that products are:
temperature control and permanent automatic
balancing on terminal units (fan-coils, chilled
ceilings, air-handling units..).
Main data:
• Gap detection at stem up position
• 3 point version
• Force switch-off at stem down position
prevents overload of actuator and valve
• No tools required for mounting
• Maintenance-free lifetime
• Low-noise operation
• Halogen free cables
Supply voltage Speed Cable length Code No,
(V) (s/mm) (m) Single Pack Industry Pack
1,5 082H8056 /
24
24 AC
5,0 082H8080 082H8076
10 082H8090 082H8086
1,5 082H8058 /
5,0 / 082 H8078
10 / 082H8088
DEN-SMT/SI
Spare parts
Typ e
Cable (24 V)
VD.LE.A6.02 © Danfoss 01/2014
Length
(m)
5 082H8052
10 082H8054
Code No.
1
Data sheet Actuators for three point control AMV 110 NL, AMV 120 NL
Technical data
Installation
Typ e AMV 110 NL AMV 120 NL
Power supply V 24 AC, +10 to –15 %
Power consumption
Frequency Hz 50 Hz/60 Hz
Close of force N 130
Stroke mm 5
Speed s/mm 24 12
Relative humidity max. 80 %
Max. medium temperature
Ambient temperature 0 … 55
Storage and transport temperature –40 … 70
Protection class III safet y extra-low voltage
Grade of enclosure IP 42
Weight kg 0,3
- marking in accordance with
standards
running VA 1
standby W 0
°C
Low Voltage Directive (LVD) 2006/95/EC: EN 60730-1, EN 60730-2-14
EMC Directive 2004/108/EC: EN 61000-6 -2, EN 61000- 6-3
Mechanical
The actuator should be mounted with the valve
stem in either horizontal position or pointing
upwards.
The actuator is fixed to the valve body by means
of a mounting ring, which requires no tools for
mounting. The ring should be tightened by hand.
120
Disposal
Wiring
The actuator must be dismantled and the
elements sorted into various material groups
before disposal.
Electrical
Important: It is strongly recommended that the
mechanical installation is completed before the
electrical installation.
Each actuator is supplied with the connecting
cable for the controller.