Danfoss AK-CM 102 Installation guide [da]

Danfoss AK-CM 102 Installation guide

Instructions

AK-CM 102

Communication module

24 V a.c./d.c. 2 VA

 

-20°< tamb

< 55°C

 

-0°F < tamb

< 130°F

 

0 - 95% RH, non condensing

 

IP10 / VBG4

 

UL: E357029

 

080Z0064

 

 

Princip

 

 

Prinzip

 

 

Principe

 

 

 

In

Out

Montering

 

 

Mounting

Warning

Montage

 

AK-CM 102

Ensure power is disconnected before adding or removing modules.

Controller configuration must be carried out when adding or removing modules.

AK-XM _ _ _

RI8PQ252    09-2018

Effektbehov

Power Requirements

Leistungsbedarf

Puissance requise

Max. 32 VA

Max. 20 VA

Max. 20 VA

Datakommunikation

Data communication

Datenübertragung

Transmission de données

Address = 001

TERM = on

Cable:

ANSI/TIA 568 B/C CAT5 UTP cable w/ RJ45 connectors

Strømforsyning = 24 V a.c. eller 18-36 V d.c.

Sørg for, at den yder tilstrækkelig effekt til alle modulopstillingerne. Klasse II er påkrævet.

Klemmerne 2,3 må ikke jordes.

Power supply = 24 V a.c. or 18-36 V d.c.

Insure that it provides sufficient power for all the modules in the lineup. Class II is required.

The terminals 2,3 must not be earthed.

Stromversorgung = 24 V a.c. oder 18-36 V d.c.

Die Stromversorgung muss für sämtliche Module in der Anordnung ausreichend sein.

Klasse II ist erfordert.

Die Klemmen 2,3 dürfen nicht geerdet werden.

Alimentation = 24 V c.a. ou 18-36 V c.c.

S'assurer que l'alimentation fournit suffisamment de puissance pour tous les modules de l'alignement.

La class II est indiquée.

Il ne faut pas relier les bornes 2,3 à la terre.

Address = 001

TERM = off

Address = 002

TERM = on

<![if ! IE]>

<![endif]>The Product contains electrical components And may not be disposed together with domestic waste. Equipment must be separate collected with Electrical and Electronic waste. According to Local and currently valid legislation.

2

Instructions  RI8PQ252  ©  Danfoss  09/2018

AK-CM 102

Loading...