Daikin 3MKS75KVM, 3MKS75EVMA, 2MXS18GVJU, 3MXS68EVMA, 3MXS68KVM Service Manual

...
REMOVAL
PROCEDURE
SERVICE MANUAL
6.8/7.5 kW Class 18000 Btu/h Class
Outdoor Unit
Inverter
Si121175
Service Manual Removal Procedure
Outdoor Unit
Applicable Models
zCooling Only zHeat Pump
3MKS75EVMA 2MXS18GVJU
3MKS75KVM 3MXS68EVMA
3MXS68KVM
Si121175
Removal Procedure 1
Table of Contents
1. Removal of Outer Panels........................................................................2
2. Removal of Electrical Box (Pattern 1) .....................................................3
3. Removal of Electrical Box (Pattern 2) .....................................................7
4. Removal of PCBs (Pattern 1)................................................................12
5. Removal of PCBs (Pattern 2)................................................................16
6. Removal of Fan Motor...........................................................................19
7. Removal of Sound Blankets..................................................................20
8. Removal of Coils / Thermistors.............................................................22
9. Removal of Four Way Valve / Defrost Solenoid Valve..........................24
10.Removal of Distributor...........................................................................26
11.Removal of Compressor .......................................................................27
Note:
The illustrations may be slightly different depending on the model.
The illustrations are for heat pump models as representative.
Removal of Outer Panels Si121175
2 Removal Procedure
1. Removal of Outer Panels
Procedure Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure Points
1
External appearance
2
Remove the 4 screws of the top panel and the 6 screws of the front panel.
3
Remove the 4 screws of the discharge grille.
4
Remove the 2 screws of the piping cover.
(R2159)
Top panel
Discharge grille
Front panel
(R10351)
(R10352)
Piping cover
Si121175 Removal of Electrical Box (Pattern 1)
Removal Procedure 3
2. Removal of Electrical Box (Pattern 1)
Procedure Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure Points
1. Remove the connecting wires.
1
The figure shows the connecting wires.
2
Remove the terminal board fixing screw.
Match the colors of the connection wires to A, B and C ports as follows. (1) Black: Power supply (2) White: Power supply (3) Red: Transmission
The wires are fixed to the terminal board with screws.
Electrical box
Electronic expansion valve coils
Service monitor PCB
A port
B port
C port
Service port
(R3063)
Outdoor temperature thermistor
Liquid pipe
Gas pipe
(R2163)
Terminal board fixing screw
Power supply (L)–White (N)–Black
A port
Earth / ground wire
Wire fixing plate
B port
C port
(R17637)
Removal of Electrical Box (Pattern 1) Si121175
4 Removal Procedure
2. Remove the harnesses.
1
Disconnect the connectors for the electronic expansion valve coils. [S20] [S21] [S22].
2
Remove the connector for the four way valve coil [S80].
3
Disconnect the connectors for the thermistors [S90] [S92] [S93] and the connector for the overload protector [S40].
[S40]: Overload protector [S90]: Thermistor
(outdoor temperature, outdoor heat exchanger,
discharge pipe) [S92]: Gas pipe thermistor [S93]: Liquid pipe thermistor
4
Disconnect the relay connector of the compressor.
Step
Procedure Points
[S20] [S21] [S22]
(R16025)
(R11729)
[S80]
[S40]
(R2168)
[S90] [S92] [S93]
(R2169)
Si121175 Removal of Electrical Box (Pattern 1)
Removal Procedure 5
5
Remove the reactor lead wires.
3. Remove the wire fixing plate.
1
Remove the 2 screws of the wire fixing plate.
4. Remove the electrical box.
1
Remove the screw of the electrical box.
2
Remove the screw of the electrical box.
Step
Procedure Points
Reactor
(R2170)
(R11309)
Wire fixing plate
(R2172)
(R2173)
Removal of Electrical Box (Pattern 1) Si121175
6 Removal Procedure
3
Remove the drip proof cover.
4
Disconnect the connector for the fan motor [S70] from the inverter PCB.
5
Lift up the electrical box and dismount it.
Step
Procedure Points
Drip proof cover
(R2174)
Inverter PCB
[S70]
(R2175)
(R2176)
Si121175 Removal of Electrical Box (Pattern 2)
Removal Procedure 7
3. Removal of Electrical Box (Pattern 2)
Procedure Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure Points
1. Disconnect the connecting wires.
The US model has a protection plate on the right side panel. Remove the 2 screws to remove the protection plate.
1
Remove the terminal board fixing screw.
The wires are fixed to the terminal board with screws.
2
Remove all the screws of the connecting wires and the power supply wires.
3
Remove the screw of the ground wire.
2. Remove the harnesses.
[S20]: White [S21]: Red
Bundle the harnesses of the electronic expansion valve coil with clamp.
Pull out the clamp.
When reassembling, insert the clamp into one of the holes.
1
Disconnect the 2 connectors for the electronic expansion valve coil [S20] [S21].
Liquid (room A)
Liquid (room B)
Gas (room A)
Gas (room B)
(R17343)
Electronic expansion
valve coil
Conduit
Lock nut
Conduit mounting plate
Screw
(R17395)
Protection plate
R
oom
A
R
oom
B
Terminal board fixing screw
Power supply
Ground wire
(R17344)
[S20] [S21]
(R17400)
For the electronic expansion valve coil
(R17396)
Removal of Electrical Box (Pattern 2) Si121175
8 Removal Procedure
2
Disconnect the connector for the four way valve coil [S80].
When reassembling, insert the clamp into the hole as below.
3
Disconnect the connectors for the thermistors [S90] [S92] [S93] and the overload protector [S40].
[S40]: overload protector [S90]: thermistors
(outdoor temperature,
outdoor heat exchanger,
discharge pipe) [S92]: gas pipe thermistors [S93]: liquid pipe thermistors
Pull out the clamp.
When reassembling, insert each clamp of the thermistors into one of the holes as below.
When reassembling, insert each clamp into the holes.
When reassembling, the thermistor harness should be placed between the electrical box and the reactor harness as below.
Step
Procedure Points
(R17398)
[S80]
Clamp
(R17397)
[S40]
[S90] [S92] [S93]
(R17399)
[S92]
[S93]
(R17401)
Reactor harness
Thermistor ASSY
(R17093)
Reactor harness
Thermistor ASSY
Loading...
+ 22 hidden pages