High Suction System ..................................................................... 36
Vac Plus System.............................................................................37
Orientations about ergonomy
0,50
0,50
0,50
A
sewer
0,15
1,50
12
6
39
1,00
0,50
1,40
2,90
minimum
0,60
B
C
20
140
99
sewer
the patient´s
mouth
140
15
sewer
99
the patient´s
mouth
15
140
99
sewer
the patient´s
mouth
Before starting the installation, make sure the sewer, air, water and electric power points are disposed in such a way
as to enable the office to be installed in a space that is in accordance with the ergonomy orientations.
For installation of the equipment in the office, ISO/FDI decided to divide the office in areas. To limit these areas,
imagine the hands of a clock, where the center is the axis of the hands and corresponds to the mouth of a patient
lying on the dental chair positioned horizontally.
Around this center, draw three concentric circles, A, B and C of radiuses of 0.5; 1.0; and 1.5 meters respectively.
The 12 o’clock position is always indicated by the patient’s head, i.e., behind the chair. In this way, the 6-12 o’clock
axis divides the office into two areas: one on the left of the chair (the dentist’s area) and the other on the right of the
chair (the assistant’s area).
The area limited by the A circle, with a radius of 0.5 meters, corresponds to the Transfer Zone, where everything that
is transferred to the patient’s mouth should be located, such as the instruments and the handpieces of the delivery
unit. This area should accomodate both the dentist’s and his assistant’s stools.
The B circle of 1.0 meter radius limits the Useful Working Area (maximum space that can be occupied), which can be
reached with the movement of a stretched arm. In this area the auxiliary table and the delivery unit should be placed.
The C circle of 1.5 meter radius limits the total office area, which should not, therefore, be more than 3 meters wide
in order not to be unergonomical. This area should accomodate the fixed cabinets and the sinks, and the drawers,
when opened, should be kept inside the B circle.
Illustrative drawing of orientations about ergonomy
Layout of the dental office
minimum 0,60
using the Galla model chair
(measurement unit in meters).
Position of the sewer point in relation to the chairs in the work position (measurement unit in cm)
Galla chairCroma chairVersa chair
the patient´s
mouth
the patient´s
mouth
the patient´s
mouth
01
sewer
face of base
18
03
40
102
Specifications of the installation points
Compressed air (tube of copper internal diam. 1/4” to 10 cm above the finished floor) - coming from the
A
compressed air supply line.
B
Electric (corrugated flexible electroduct diam. 20 mm ending 10 cm above de finished floor and 3x2,50 mm²
wires of different colors 20 cm above the electroduct) - supplied from the electric power line.
Water (weldable PVC tube diam. 20 mm, ending with 90° weldable PVC knee and brass bushing 20x1/2” 5mm
C
above the finished floor) - connected to the water supply line.
D
Sewer (weldable PVC tube diam. 40 mm, ending with a 90° weldable reducing knee and with a brass bushing
25x3/4” 5 mm above the finished floor) - connected to the siphoned box of the sewer line.
E
Comand of aspirators of High Potency - optional (corrugated flexible electroduct diam. 20 mm ending 10 cm
above the finished floor with 3x0,75 mm² wires of different colors 20 cm above the electroduct) - connected to
the vacuum pump.
F
High power suction - optional (weldable PVC tube diam. 25 mm, ending with a 90° weldable knee and with a
brash bushing 25x3/4” 5 mm above the finished floor) - connected to the vacuum pump.
Location of the installation points in relation to the bases of the chairs
(unit in centimeters)
figure 01
face of base
Chair base set
B
E
A
C
F
D
Position of the connection points
Gauge
Use the gauge for positioning the chair in the office, location of the
installation points on the floor and the holes for fixing the chair to the
floor. (fig. 01)
The Dabi Atlante dental office has good stability in normal conditions of
use, there being no need to fix the chair base to the floor.
Note: In order to meet the “CE” norm, all offices are packaged with the kit for
fixing the base to the floor.
02
Dental Office Items
1
6
5
figure 02
2
3
4
1
2
3
4
5
6
01 - Chair Upholstery Items
• Seat upholstery
• Backrest upholstery
• Conventional headrest upholstery
• Cervical headrest upholstery (optional)
• High cervical support upholstery (optional
• Low cervical support upholstery (optional)
02 - Delivery unit head items
Chair Upholstery (fig. 02)
Delivery Unit Head (fig. 02)
Delivery Unit Arm (fig. 02)
Chair:Carton box - Croma and Galla SF (fig. 02)
• Plastic tray (Techno Delivery unit and Hasteflex)
• PET reservoir
• Aluminum tray (Techno Delivery unit and Hasteflex)
• Instrument support (optional Techno Delivery unit
and Hasteflex)
• Leveling bushing (Techno Delivery unit and Hasteflex)
• Delivery unit tube (Techno and Hasteflex)
• Kit
03 - Delivery Unit Arm Items
• Delivery unit arm
• Kit
• Cuspidor
• Bowl
• Bowl pipe (Techno unit)
• Cup holder pipe (optionalTechno unit)
• Kit
06 - Light Reflector Items
• Light tubehead
• Light Reflector arm
• Transparent protector
• Kit
03
03
figure 03
Titanium Chair 200 Installation
Open the superior cover carefully, this will avoid damaging the internal
parts. (fig. 03)
Remove the carton releasing the
staple on the wood platform.
(fig. 04 and 05)
figure 04
figure 06
figure 05
Select the voltage as your local
electrical net (fig. 06 and 07)
All chairs leave the Dabi plant
connected in 220 V.
figure 07
Remove the chair from the platform wood and put it at the installation
place.
Disconnect the main key and put it as it was indicated in the fig. 08, there
is one correct position, pay attention .
figure 08
figure 09
When you are going to install the
main key , please have a look at
the cables connections.
(fig. 09 and 10)
figure 10
04
figure 11
Finished the connection of the cables on the key , connect the key cable
on the transformer entrance. (fig. 11)
After you have connected the
desired voltage take the chair up
removing the lateral woods and
the motor cover and the foam as
well. (fig. 12 and 13)
figure 12
figure 14
figure 13
Remove the reflector post using
the correct tools (fig. 14 and 15),
be careful when you are
removing the wood for not
damage the painting or the post
itself . Put away the post in the
safe place , so it can not fall off
in any time .
figure 15
Take the seat up , release the nuts which are on the platform wood. Take
the rubber cover out and release the nuts. (fig. 16)
figure 16
figure 17
There are 2 on the rear part and 1
on the front part of the base.
(fig.17 and 18)
figure 18
05
Release the headrest mechanism.
(fig. 19 and 20)
4 Chromed Screws 5/16’’ allen to
fix the headrest on the GallaChair . For Croma Chair will be
4 screws ½’’ with nuts ½’’ .
figure 19
figure 21
figure 20
Install the headrest Galla chair
using the allen key 5/16". (fig. 21
and 22)
figure 22
For Croma Chair use 4 Sixthed
Zinced Screws 5/16‘’ x 1 ½’’
(27160-028/0) e 4 nuts (27410-006/
3) Sixthed 5/16 x ½ use ½” key.
(fig. 23 and 24)
figure 23
figure 25
1
2
3
4
5
figure 24
Support Y
The support is inside the box (fig.
25) and the installation kit is
together (fig. 26).
figure 26
6
7
8
4
9
Fixation itens kits. (fig. 27 and 28)
figure 27figure 28
06
Item
1
2
3
4
5
6
7
8
9
figure 29
Quant
1
3
1
1
4
1
3
1
1
Description
Celerom attrition Bushing 10 mm
Screw Zinced Plan Screw 3/16 x 1/2 (delivery unit alignment)
Gib Constrain Arm
Round 1/8 x 3/16 (setting finishing washer)
Black Allen Screw 5/16" x 1.1/2"
Zinced Hexagonal Screw 3/8"x1"
Hexagonal Screw 3/16 x 5/8 (setting on the arm)
Zinced Nut 3/8" x 9/16"
Finishing Ring 50 x 32 mm
Support Y Installation
Put the support on the chair as is showing the figures below , using the 4
black allen screws 5/16’’ x 1 ½’’. (fig. 29)
Put the Chromed washer 50 x 32
on the support and then put the
delivery unit arm as figures
below. (fig. 30 and 31)
figure 31
Put the finishing screw with the correct nut and filler . This screw will
limit the movements of the arm (the spin). (fig. 32)
figure 33
Take the cables through support.
(fig. 33 and 34)
figure 34
07
Take the cables to the inside the
chair. (fig. 35 and 36)
figure 35
figure 37
figure 36
Take the cables to the chair rear.
(fig. 37 and 38)
figure 38
Return the cables upper the
motor support and so take them
out of the chair from the front.
(fig. 39 and 40)
figure 39
figure 40
08
4
1
5
6
Techno Chair
Installation - Cuspidor
2
23
figure 41
The water bottles codes 26304-202/5 e 26289-003/0 are localizated on the delivery unit and not in the Cuspidor .
The water bottle 1 litre has the code 26304-202/5.
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
Quant
1
1
1
1
1
1
1
1
1
1
1
1
6
7
8
11
12
13
1
9
10
figure 42
Description
Pipe Cup Unit Auxiliary
Basin of the Unit
Base Supported Reflector Unit / Reflector Set
Separating Support of Debris
Bushing Cuspidor Pipe/Cuspidor Pipe
Instruction Manual
Box Euro
Kit for System of Suction (it depends on the configuration)
Unit Inferior Body
Suction System Hoses (it depends of the configuration)
Cup filler Plastic grid
Control Panel
Panel Cover
Mambrane PAD Panel
Support Set Chair/ Versátil Cuspidor/ Reflector
When you open the cuspidor box
(fig. 41 and 42) , you will have on
the box the follow items:
On the kit you have some parts which are essential for install the chair
independently of the suction configuration that you have in your chair.
(fig. 43)
In this case we are showing two high suction.
7
8
9
Two high suction kit. (fig. 44)
10
Item 3 can be 1 or 2 depend on the suction configuration.
Item description.
09
Item
1
2
3
4
5
6
7
8
9
10
figure 45
Quant
4
2
1
1
2
2
1
1
1
1
Kit Description
Cylindrical Head Allen Screw 1/4" x 2"
Cylindrical Head Allen Screw 5/16" x 1.1/2"
Separating Cup
Regulating Valve
Zinced Hexagonal Screw 3/16" x 3/8"
Brass Round Head Plan Screw 5/32" x 3/8"
Sewer Standard Box
Cuspidor Thin
Finishing Reflector Pipe
Cover thin Cuspidor
Cuspidor Installation
Put the cuspidor on the soft superficies this will avoid some damage .
After that, put the support and get through the hose inside the support.
(fig. 45 and 46 Techno 200 / fig. 47 Versatil)
In the Delivery Unit carton (fig. 79) you can have the follow items.
G
LJ
figure 79
Item
A
B*
C*
D
E
F
G
H
I**
J
L
Quant
1
2
2
6
4
4
4
15
1
1
1
Kit Description
Four Ways ref AMP 626390/0
Male Terminal AMP 6,3 BA 626377-1
Female Terminal AMP 6,3-444334-1
Steel Plan Screw 3/16" x 1/2"
Steel Head Star Screw 1/8" x 3/4" nickel-plated
Bushing setting hose diam 3,3
Smooth Washer 3,7 x 8 x 0,5 chromiun plating
Bushing setting hose diam. 1,6
Zinced Bar Bolt
Label Reservoir of the Spray
Green label Description Connecting Spray reservoir
* For Delivery Unit with Scaler or Fibre Optic
** Only EL Delivery Unit
Get through with the washer in
the reflector post. (fig. 106 and
107)
figure 107
Put the post in the appropriated hole on the Cuspidor. (fig. 108)
figure 109
Release the arm. (fig. 109)
20
Put the gib for secure the Head
and then down the plastic
finishing washer. (fig. 110 and
111)
figure 110
figure 112
figure 111
Connect the power supply cables
and the ground (depend on the
Reflector). (fig. 112 and 113)
figure 113
Close the reflector tube correctly . (fig. 114)
figure 114
figure 115
Down the chair you have to
connect the another extremity of
the reflector and ground. They
have to go inside the cuspidor
support . They don´t have to be
hanging or showing.
(fig. 115 and 116)
figure 116
21
figure 117
figure 118
Procedures for the Galla Chair
Assemble the left arm of the chair and fix it using a 3/16” Allen wrench.
(fig. 117)
Fix the backrest upholstery to the frame with 4 Phillips screws and 4 flat
washers using a medium Phillips screwdriver. (fig. 118)
figure 119
figure 121
figure 120
figure 122
Fix the backrest cover with 4
Phillips screws and 4 fixing and
finishing bushings using a medium
Phillips screwdriver. (fig. 119)
Attach the 4 finishing plugs to the
fixing points of the backrest cover.
(fig .120)
Assemble the upholstery by fitting
the rear locks of the upholstery in
the supports located on the seat
plate and push the upholstery in
the direction indicated by the
arrows (fig. 121). Make sure that
the fixing screws located in the
central part of the upholstery
fitted in the openings of the seat
reclining plate. Fix the upholstery
with 2 knobs and tighten manually.
(fig. 122)
22
figure 123
figure 124
Procedures for the Croma Chair
Assemble the left arm of the chair and fix it with one Allen screw using a
3/16”. Allen wrench attach the screw finishing plug. (fig. 123)
Fix the backrest upholstery to the frame with 4 Phillips screws and 4 flat
washers using a Phillips screwdriver. (fig. 124)
figure 125figure 126
Attach the upholstery to the seat plate by fitting the fixing screws into
the respective holes. (fig. 127)
figure 127
Fix the backrest cover with 4
Phillips screws and 4 fixing
bushings using a medium
Phillips screwdriver. (fig. 125)
Attach the 4 finishing plugs to
the fixing points of the backrest
cover. (fig. 126)
figure 128
Fix the upholstery with 2 knobs to the rear side and 2 knobs in the central
part of the upholstery. Tighten manually. (fig. 128)
23
Chip Blower Drawing
24
Connection scheme for the Techno Delivery Unit to the Techno Unit distributor
TRANSPARENT PU TUBE
GRAY PU DUCT Ø1,6 FLAT SIDE
I
H
A
B
C
D
E
F
G
OUT TO
ASSISTANT
UNIT
OUT TO THE
DELIVERY
UNIT
GRAY PU DUCT Ø1,6 FLAT SIDE
GRAY DUCT Ø3,3 GROOVED SIDE
GRAY DUCT Ø1,6 GROOVED SIDE
BLUE PU TUBE Ø3,3
GRAY DUCT Ø1,6 GROOVED SIDE
GRAY PU DUCT Ø3,3 FLAT SIDE
BLACK DUCT Ø1,6 GROOVED SIDE
BLACK DUCT Ø1,6 FLAT SIDE
GRAY PU DUCT
GRAY PU DUCT
Ø1,6 GROOVED SIDE
Ø1,6 GROOVED SIDE
1
2
RED PU DUCT PU Ø1,6
BLUE PU TUBE Ø3,3
GREEN PU TUBE Ø1,6
BLUE PU TUBE Ø3,3
RED PU TUBE Ø1,6
GRAY PU TUBE Ø1,6
GRAY PU TUBE Ø3,3
BLACK PU DUCT Ø1,6 GROOVED SIDE
BLACK PU DUCT Ø1,6 FLAT SIDE
GREEN PU TUBE Ø1,6
3
4
5
6
GREEN PU TUBE Ø1,6
GRAY PU DUCT Ø1,6 GROOVED SIDE
GRAY PU DUCT Ø1,6 FLAT SIDE
CONTROL BOX
diagram 01
Hose Identification
40 PSI air for the Delivery Unit syringe
A
80 PSI air for the pilots
B
80 PSI air of the foot control for the Sodium Bicarbonate Jet
C
80 PSI air of the foot control return for the PDB
D
80 PSI air for the chip blower
E
F
80 PSI air for the water block
G
40 PSI water for the syringe
H
40 PSI liquid for the flush
I
40 PSI water for the peristaltic pump
Notes:
When the Unit has no syringe, nipples number 1 and 2 are substituted for plugs.
When the delivery unit has no sodium bicarbonate jet, nipples number 3 and 4 are
substituted for simple nipples
Nipples number 5 and 6 should be connected only when the delivery unit has a chip blower.
For the Techno Cart Delivery Uni only the “I” and “G” hoses are used.
25
Connection scheme of the Techno Delivery Unit with 1 Venturi aspirator and 1 Vac Plus aspirator
"A"
6
4
1
5
2
GRAY TUBE Ø3,3
GRAY TUBE Ø3,3
3
7
GRAY PVC TUBE Ø7
BLUE PU TUBE Ø3,3
4
16
8
BLUE TUBE Ø 3,3
7
15
GRAY PU DUCT Ø3,3
GRAY PVC TUBE Ø 7
GRAY PU DUCT Ø 1,6
2
9
16
10
"D"
GRAY HOSE EVA Ø1/2”
GRAY PU DUCT Ø3,3
"C"
15
GRAY PU DUCT GRIS Ø1,6
GRAY HOSE EVA Ø 3/4”
11
GRAY PVC TUBE Ø7 RAYON
12
FLAT SIDE
13
FOOT
CONTROL
14
FLAT SIDE
GROOVED SIDE
OUT TO
TECHNO
UNIT
diagram 02
Hose Identification
Point “A” - air from the supply line
Point “B” - water from the supply line
Point “C” - sewer inlet
1
80 PSI air - foot control
2
80 PSI air - Vac Plus aspirator
3
80 PSI air - supply line inlet
4
40 PSI air - valve
5
80 PSI air - Cuspidor distributor box
6
40 PSI air - Cuspidor distributor box
7
Hose for Venturi and Vac Plus aspirators
8
40 PSI air - Venturi ejector
9
Venturi sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Cuspidor foot control
13
80 PSI air - Chip blower
14
80 PSI air - Water block
15
Vac Plus sewer hose
16
80 PSI air - valve pilots
Note:
The “13” and “14” nipples are used only for Delivery Units with a chip blower.
26
Connection scheme for the Versatil Unit with 2 Venturi
4
6
1
5
2
"A"
2
GRAY PU TUBE Ø 3,3
3
GRAY PVC TUBE Ø7
7
8
GRAY PVC TUBE Ø7
RED PU TUBE Ø1,6
GRAY PVC TUBE Ø3,3
7
8
GRAY PVC TUBE Ø7
GRAY PVC TUBE Ø7
GRAY PVC TUBE Ø3,3
BLUE PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
10
9
"D"
"C"
9
GRAY HOSE EVA Ø 3/4”
11
BLUE HOSE Ø10 X Ø7
GREEN TUBE Ø1,6
14
13
12
15
FOOT CONTROL
DELIVERY UNIT
CUSPIDOR
ASPIRATORS
diagram 03
Hose identification
Point “A” - air from the supply line
Point “C” - water from the supply line
Point “D” - sewer inlet
1
80 PSI air - foot control
2
80 PSI air - Unit valve
3
80 PSI air - supply line inlet
4
40 PSI air - Cuspidor
5
80 PSI air - Delivery Unit
6
40 PSI air - Delivery Unit
7
Hose for Venturi aspirators
8
40 PSI air - Venturi ejectors
9
Venturi sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Delivery Unit foot control
13
80 PSI air - Chip blower
14
80 PSI air - Water block
15
Water hose for syringe
Note:
The “13” and “14” nipples are used only for Delivery Units with a chip blower.
27
Connection scheme for Techno Unit with 1 Venturi aspirator
"A"
5
BLUE PU TUBE Ø 3,3
4
1
GRAY PU TUBE Ø 3,3
BLUE PU TUBE Ø 3,3
"C"
2
GRAY PU TUBE Ø 3,3
3
6
4
GRAY PU TUBE Ø 3,3
14
GRAY PVC TUBE Ø 7
GRAY PU TUBE 2 DUCTS Ø1,6 (FLAT SIDE)
10
11
12
13
FOOT
CONTROL
7
8
BLUES HOSE Ø10 X Ø7
CUSPIDOR
9
ASPIRATOR
GRAY PVC TUBE Ø7
"D"
GRAY HOSE EVA Ø 3/4”
diagram 04
Hose identification
Point “A” - air from the supply line
Point “C” - water from the supply line
Point “D” - sewer inlet
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - valve
5
40 PSI air - Cuspidor distributor box
6
Hose for Venturi aspirators
7
40 PSI air - Venturi ejectors
8
Venturi sewer hose
9
Bowl sewer hose
10
Water inlet hose
11
80 PSI air - Cuspidor foot control
12
80 PSI air - Chip blower
13
80 PSI air - Water block
14
80 PSI air - valve pilot
Note:
The “13” e “14” nipples are used only for Delivery Units with a chip blower.
28
Connection scheme for the Versatil Unit with 1 Venturi
BLUE PU TUBE Ø 3,3
4
6
BLUE PU TUBE Ø 3,3
"A"
3
diagram 05
2
GRAY PU TUBE Ø 3,3
1
5
7
8
GRAY PVC TUBE Ø7
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
GRAY PVC TUBE Ø 7
GRAY PU TUBE Ø 3,3
9
"D"
"C"
10
11
BLUE HOSE Ø10 X Ø7
GRAY HOSE EVA Ø 3/4”
13
12
15
GREEN TUBE Ø1,6
FOOT CONTROL
14
DELIVERY UNIT
PILOTS
CUSPIDOR
8
ASPIRATOR
Hose identification
Point “A” - air from the supply line
Point “C” - water from the supply line
Point “D” - sewer inlet
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - for the Cuspidor
5
80 PSI air - for the delivery unit
6
40 PSI air - for the delivery unit
7
Hose for Venturi aspirators
8
60 PSI air for Venturi ejector
9
Venturi sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Delivery unit foot control
13
80 PSI air - Chip blower
14
80 PSI air - Water block
15
Water hose for syringe
Note:
The “13” e “14” nipples are used only for Delivery Units with a chip blower
29
Connection scheme for the Techno Unit with 1 Venturi and 1 High Suction
"A"
17
GRAY PU TUBE Ø 1,6
16
6
4
1
2
GRAY PU TUBE Ø 3,3
3
7
BLUE PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
BLUE PU TUBE Ø 3,3
4
GRAY PU TUBE Ø 3,3
5
GRAY PVC TUBE Ø 7
GRAY PU TUBE Ø 1,6
GRAY HOSE EVA Ø 1/2”
7
15
"C"
GRAY HOSE EVA Ø 3/4”
11
12
13
14
FOOT
CONTROL
8
"F"
15
BLUE HOSE Ø 10 X Ø 7
CUSPIDOR
9
10
GRAY PVC TUBE Ø 7
"D"
GRAY HOSE EVA Ø 3/4”
diagram 06
Hose identification
Point “A” - air from the supply line
Point “C” - water from the supply line
Point “D” - sewer inlet
Point “F” - High power suction
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - valve
5
80 PSI air - valve pilot
6
40 PSI air - Cuspidor distributor box
7
Hose for Venturi and Vac Plus aspirators
8
40 PSI air - Venturi ejector
9
Venturi sewer hose
Bowl sewer hose
10
Water inlet hose
11
80 PSI air - Cuspidor foot control
12
80 PSI air - Chip blower
13
80 PSI air - Water block
14
Vac Plus sewer hose
15
40 PSI air - electropneumatic valve
16
80 PSI air - electropneumatic valve pilot
17
Note
The “13” e “14” are used only for Delivery Units with a Chip blower.
30
Connection scheme for Versatil Unit with 1 Venturi and 1 High Suction
4
BLUE PU TUBE Ø 3,3
5
"C"
BLUE PU TUBE Ø 3,3
GRAY PU TUBE Ø 1,6
GRAY PVC TUBE Ø 7
GRAY PU TUBE Ø 3,3
11
GRAY PU TUBE Ø 3,3
GRAY HOSE EVA Ø 1/2”
7
16
GRAY PU
TUBE Ø 3/4”
"F"
13
12
15
GREEN TUBE Ø 1,6
14
FOOT
CONTROL
DELIVERY UNIT
"A"
6
1
2
GRAY PU TUBE Ø 3,3
3
7
8
PILOTS
CUSPIDOR
8
9
GRAY PVC TUBE Ø 7
"D"
diagram 07
Hose identification
Point “A” - air from the supply line
Point “C” - water from the supply line
Point “D” - sewer inlet
Point “F” - High power suction
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - for the Cuspidor
5
80 PSI air - for the Delivery Unit
6
40 PSI air - for the Delivery Unit
7
Hose for Venturi aspirators/High Power
8
60 PSI air - Venturi ejector
10
GRAY HOSE EVA Ø 3/4”
9
Venturi sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Cuspidor foot control
13
80 PSI air - Chip blower
14
80 PSI air - Water block
15
Hose of water for syringe
16
High Power sewer hose
ASPIRATORS
Note
The “13” e “14” nipples are used only for Delivery Units with a chip blower..
31
Connection scheme for Versatil Unit with 1 Venturi and 2 High Suction
GRAY PU TUBE Ø 1,6
6
5
4
BLUE PU TUBE Ø 3,3
"A"
"D"
10
1
2
GRAY PU TUBE Ø 3,3
3
GRAY HOSE EVA Ø 1/2”
GRAY HOSE EVA Ø 3/4”
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
9
"C"
"F"
7
8
GRAY HOSE EVA Ø 1/2”
GRAY PVC TUBE Ø 7
GRAY HOSE EVA Ø 3/4”
11
0XØ7
BLUE HOSE Ø 1
12
1314
FOOT
CONTROL
CUSPIDOR
diagram 08
Hose identification
Point “A” - air from the supply line
Point “C” - water from the supply line
Point “D” - sewer inlet
Point “F” - High power suction
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - Cuspidor distributor box
5
40 PSI air - Electropneumatic valve
6
80 PSI air - Electropneumatic valve pilot
7
High power blood suction
8
High power saliva suction
9
Aspirators sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Cuspidor distr.box foot control
13
80 PSI air - Chip Blower
14
80 PSI air - Chip Blower
Note
The “13” e “14” nipples are used only for Delivery Units with a chip blower..
32
Connection scheme for the Versatil Unit with 2 High Power
BLUE PU TUBE Ø 3,3
BLUE PU TUBE Ø 3,3
"C"
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 1,6
11
BLUE HOSE Ø 10 X Ø 7
12
"A"
5
4
1
2
GRAY PU TUBE Ø 3,3
3
13
14
FOOT
CONTROL
DELIVERY UNIT
GRAY HOSE EVA Ø 1/2”
GRAY HOSE EVA Ø 3/4”
10
GRAY HOSE EVA Ø 3/4”
"D"
diagram 09
Hose identification
Point “A” - air from the supply line
Point “C” - water from the supplyline
Point “D” - sewer inlet
Point “F” - High power suction
7
6
8
9
"F"
GREEN TUBE Ø 1,6
CUSPIDOR
1
80 PSI air - foot control
2
80 PSI air - for Delivery Unit
3
80 PSI air - supply line inlet
4
40 PSI air - for the Cuspidor
5
40 PSI air - for Delivery Unit
6
Syringe water hose
7
High power blood suction
8
High power saliva suction
9
Aspirators sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Delivery Unit foot control
13
80 PSI air - Chip Blower
14
80 PSI air - Chip Blower
Note
The “13” e “14” nipples are used only for the Delivery Units with a chip blower.
33
Connection scheme for the Techno Unit with 1 Vac Plus and l High Suction
"A"
16
GRAY PU TUBE Ø 1,6
15
4
1
GRAY PU TUBE Ø 3,3
2
5
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
BLUE PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
7
GRAY PU
TUBE Ø 3/4”
GRAY HOSE EVA Ø 1/2”
6
"C"
"F"
11
12
13
14
FOOT
CONTROL
3
7
8
9
10
5
BLUEHOSEØ10XØ7
GRAY HOSE EVA Ø 1/2”
GRAY PU TUBE Ø 1,6
CUSPIDOR
GRAY PU TUBE Ø 3/4”
"D"
GRAY HOSE EVA Ø 3/4”
diagram 10
Hose identification
Point “A” - air from the supplyline
Point “C” - water from the supply line
Point “D” - sewer inlet
Point “F” - High power suction
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - Cuspidor distributor box
5
80 PSI air - Vac Plus ejector
6
High Power sewer hose
7
Vac Plus/High Power aspirators hose
8
80 PSI air - pilot
9
Vac Plus sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Cuspidor foot control
13
80 PSI air - Chip Blower
14
80 PSI air - Water block
15
40 PSI air - Electropneumatic valve
16
80 PSI air - Electropneumatic valve pilot
Note
The “13” e “14” nipples are used only for Delivery Units with a chip blower..
34
Connection scheme for the Versatil Unit with l Vac Plus and 1 High Suction
BLUE PU TUBE Ø 3,3
6
4
BLUE PU TUBE Ø 3,3
"A"
diagram 11
1
2
2
GRAY PU TUBE Ø 3,3
3
GRAY PU TUBE Ø 3,3
7
9
GRAY PU TUBE Ø 3/4”
5
GRAY PU TUBE Ø 3,3
8
2
10
"D"
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 1,6
GRAY HOSE EVA Ø 1/2”
7
15
GRAY PU
TUBE Ø 3/4”
"C"
GRAY HOSE EVA Ø 1/2”
"F"
11
GRAY PU TUBE Ø 1,6
GRAY HOSE EVA Ø 3/4”
12
13
14
FOOT
CONTROL
DELIVERY UNIT
ASPIRATOR
PILOTS
CUSPIDOR
8
Hose identification
Point “A” - air from the supply line
Point “C” - water from the supply line
Point “D” - sewer inlet
Point “F” - High Power suction
1
80 PSI air - foot control
2
80 PSI air - valve and Vac Plus ejector
3
80 PSI air - supply line inlet
4
40 PSI air - for Cuspidor
5
80 PSI air - for Delivery Unit
6
40 PSI air - for Delivery Unit
7
Vac Plus/High suction aspirators hose
8
Pilot air return
9
Vac Plus sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Delivery Unit foot control
13
80 PSI air - Chip Blower
14
80 PSI air - Water block
15
High suction sewer hose
Note:
The “13” e “14” nipples are used only for Delivery Units with a chip blower.
35
Suction System
Venturi System
High Suction System
36
Vac Plus System
37
MARTINS DESIGN - DEZ/2006
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.