DABIATLANTE Galla200, Croma200 Installation Manual

Summary
Orientations about Ergonomy..................................................... 01
Position of the sewer point in relation to the chairs in the work
position ......................................................................................... 01
Specifications of the installation points .................................... 02
Gauge ............................................................................................ 02
Dental Office Items ....................................................................... 03
Chair Upholstery Items................................................................. 03
Delivery Unit Arm Items ............................................................... 03
Chair Items “SF” ........................................................................... 03
Light Reflector Items .................................................................... 03
Titanium Chair 200 Installation.................................................... 04
Support Y ...................................................................................... 06
Support Y Installation .................................................................. 07
Techno Chair Installation - Cuspidor ........................................... 09
Cuspidor Installation .................................................................... 10
Techno Chair 200 Suction System............................................... 11
PAD Connection Assistent Arm ........................................................ 12
Final Procedures ........................................................................... 14
Techno Chair 200 - Delivery Unit .................................................. 15
Delivery Unit Installation ............................................................. 15
Connection of the Delivery Unit Hoses and Cables.................... 17
Optional Chip Blower .................................................................... 17
Optional Sodium Bicarbonate Jet ................................................. 17
Optional Flush ............................................................................... 18
Optional .........................................................................................18
Techno Chair 200 Reflector .......................................................... 20
Reflector Installation.................................................................... 20
Procedures for the Galla Chair .................................................... 22
Procedures for the Croma Chair.................................................. 23
Chip Blower Drawing ................................................................... 24
Connection scheme for the Techno Delivery Unit to the Techno
Unit distributor ............................................................................. 25
Connection scheme of the Techno Delivery Unit with 1 Venturi
aspirator and 1 Vac Plus aspirator .................................................. 26
Connection scheme for the Versatil Unit with 2 Venturi ........... 27
Connection scheme for Techno Unit with 1 Venturi aspirator ...... 28
Connection scheme for the Versatil Unit with 1 Venturi ........... 29
Connection scheme for the Techno Unit with 1 Venturi and 1 High
Suction .......................................................................................... 30
Connection scheme for Versatil Unit with 1 Venturi and 1 High
Suction .......................................................................................... 31
Connection scheme for Versatil Unit with 1 Venturi and 2 High
Suction .......................................................................................... 32
Connection scheme for the Versatil Unit with 2 High Power .... 33
Connection scheme for the Techno Unit with 1 Vac Plus and l High
Suction .......................................................................................... 34
Connection scheme for the Versatil Unit with l Vac Plus and 1 High
Suction .......................................................................................... 35
Suction System ............................................................................. 36
Venturi System..............................................................................36
High Suction System ..................................................................... 36
Vac Plus System.............................................................................37
Orientations about ergonomy
0,50
0,50
0,50
A
sewer
0,15
1,50
12
6
39
1,00
0,50
1,40
2,90
minimum
0,60
B
C
20
140
99
sewer
the patient´s mouth
140
15
sewer
99
the patient´s mouth
15
140
99
sewer
the patient´s mouth
Before starting the installation, make sure the sewer, air, water and electric power points are disposed in such a way as to enable the office to be installed in a space that is in accordance with the ergonomy orientations.
For installation of the equipment in the office, ISO/FDI decided to divide the office in areas. To limit these areas, imagine the hands of a clock, where the center is the axis of the hands and corresponds to the mouth of a patient lying on the dental chair positioned horizontally.
Around this center, draw three concentric circles, A, B and C of radiuses of 0.5; 1.0; and 1.5 meters respectively. The 12 o’clock position is always indicated by the patient’s head, i.e., behind the chair. In this way, the 6-12 o’clock
axis divides the office into two areas: one on the left of the chair (the dentist’s area) and the other on the right of the chair (the assistant’s area).
The area limited by the A circle, with a radius of 0.5 meters, corresponds to the Transfer Zone, where everything that is transferred to the patient’s mouth should be located, such as the instruments and the handpieces of the delivery unit. This area should accomodate both the dentist’s and his assistant’s stools.
The B circle of 1.0 meter radius limits the Useful Working Area (maximum space that can be occupied), which can be reached with the movement of a stretched arm. In this area the auxiliary table and the delivery unit should be placed.
The C circle of 1.5 meter radius limits the total office area, which should not, therefore, be more than 3 meters wide in order not to be unergonomical. This area should accomodate the fixed cabinets and the sinks, and the drawers, when opened, should be kept inside the B circle.
Illustrative drawing of orientations about ergonomy
Layout of the dental office
minimum 0,60
using the Galla model chair (measurement unit in meters).
Position of the sewer point in relation to the chairs in the work position (measurement unit in cm)
Galla chair Croma chair Versa chair
the patient´s mouth
the patient´s mouth
the patient´s mouth
01
sewer
face of base
18
03
40
102
Specifications of the installation points
Compressed air (tube of copper internal diam. 1/4” to 10 cm above the finished floor) - coming from the
A
compressed air supply line.
B
Electric (corrugated flexible electroduct diam. 20 mm ending 10 cm above de finished floor and 3x2,50 mm² wires of different colors 20 cm above the electroduct) - supplied from the electric power line.
Water (weldable PVC tube diam. 20 mm, ending with 90° weldable PVC knee and brass bushing 20x1/2” 5mm
C
above the finished floor) - connected to the water supply line.
D
Sewer (weldable PVC tube diam. 40 mm, ending with a 90° weldable reducing knee and with a brass bushing 25x3/4” 5 mm above the finished floor) - connected to the siphoned box of the sewer line.
E
Comand of aspirators of High Potency - optional (corrugated flexible electroduct diam. 20 mm ending 10 cm above the finished floor with 3x0,75 mm² wires of different colors 20 cm above the electroduct) - connected to the vacuum pump.
F
High power suction - optional (weldable PVC tube diam. 25 mm, ending with a 90° weldable knee and with a brash bushing 25x3/4” 5 mm above the finished floor) - connected to the vacuum pump.
Location of the installation points in relation to the bases of the chairs (unit in centimeters)
figure 01
face of base
Chair base set
B
E
A
C
F
D
Position of the connection points
Gauge
Use the gauge for positioning the chair in the office, location of the installation points on the floor and the holes for fixing the chair to the floor. (fig. 01)
The Dabi Atlante dental office has good stability in normal conditions of use, there being no need to fix the chair base to the floor.
Note: In order to meet the “CE” norm, all offices are packaged with the kit for fixing the base to the floor.
02
Dental Office Items
1
6
5
figure 02
2
3
4
1 2 3 4
5 6
01 - Chair Upholstery Items
• Seat upholstery
• Backrest upholstery
• Conventional headrest upholstery
• Cervical headrest upholstery (optional)
• High cervical support upholstery (optional
• Low cervical support upholstery (optional)
02 - Delivery unit head items
Chair Upholstery (fig. 02) Delivery Unit Head (fig. 02) Delivery Unit Arm (fig. 02) Chair: Carton box - Croma and Galla SF (fig. 02)
Wooden box - Versa Cuspidor (fig. 02) Light (fig. 02)
04 - Chair Items “SF”
• Headrest and headrest cover
• Chair arm
• Backrest cover and frame
• Rug
• Motor cover
• Delivery unit / Unit support
05 - Cuspidor items
• Head
• Plastic tray (Techno Delivery unit and Hasteflex)
• PET reservoir
• Aluminum tray (Techno Delivery unit and Hasteflex)
• Instrument support (optional Techno Delivery unit and Hasteflex)
• Leveling bushing (Techno Delivery unit and Hasteflex)
• Delivery unit tube (Techno and Hasteflex)
• Kit
03 - Delivery Unit Arm Items
• Delivery unit arm
• Kit
• Cuspidor
• Bowl
• Bowl pipe (Techno unit)
• Cup holder pipe (optionalTechno unit)
• Kit
06 - Light Reflector Items
• Light tubehead
• Light Reflector arm
• Transparent protector
• Kit
03
03
figure 03
Titanium Chair 200 Installation
Open the superior cover carefully, this will avoid damaging the internal parts. (fig. 03)
Remove the carton releasing the staple on the wood platform.
(fig. 04 and 05)
figure 04
figure 06
figure 05
Select the voltage as your local electrical net (fig. 06 and 07)
All chairs leave the Dabi plant connected in 220 V.
figure 07
Remove the chair from the platform wood and put it at the installation place.
Disconnect the main key and put it as it was indicated in the fig. 08, there is one correct position, pay attention .
figure 08
figure 09
When you are going to install the main key , please have a look at the cables connections.
(fig. 09 and 10)
figure 10
04
figure 11
Finished the connection of the cables on the key , connect the key cable on the transformer entrance. (fig. 11)
After you have connected the desired voltage take the chair up removing the lateral woods and the motor cover and the foam as well. (fig. 12 and 13)
figure 12
figure 14
figure 13
Remove the reflector post using the correct tools (fig. 14 and 15), be careful when you are removing the wood for not damage the painting or the post itself . Put away the post in the safe place , so it can not fall off in any time .
figure 15
Take the seat up , release the nuts which are on the platform wood. Take the rubber cover out and release the nuts. (fig. 16)
figure 16
figure 17
There are 2 on the rear part and 1 on the front part of the base. (fig.17 and 18)
figure 18
05
Release the headrest mechanism. (fig. 19 and 20)
4 Chromed Screws 5/16’’ allen to fix the headrest on the Galla Chair . For Croma Chair will be 4 screws ½’’ with nuts ½’’ .
figure 19
figure 21
figure 20
Install the headrest Galla chair using the allen key 5/16". (fig. 21 and 22)
figure 22
For Croma Chair use 4 Sixthed Zinced Screws 5/16‘’ x 1 ½’’ (27160-028/0) e 4 nuts (27410-006/
3) Sixthed 5/16 x ½ use ½” key. (fig. 23 and 24)
figure 23
figure 25
1
2 3
4
5
figure 24
Support Y
The support is inside the box (fig.
25) and the installation kit is together (fig. 26).
figure 26
6 7
8
4
9
Fixation itens kits. (fig. 27 and 28)
figure 27 figure 28
06
Item
1
2
3 4 5 6 7 8 9
figure 29
Quant
1 3 1 1 4 1 3 1 1
Description
Celerom attrition Bushing 10 mm Screw Zinced Plan Screw 3/16 x 1/2 (delivery unit alignment) Gib Constrain Arm Round 1/8 x 3/16 (setting finishing washer) Black Allen Screw 5/16" x 1.1/2" Zinced Hexagonal Screw 3/8"x1" Hexagonal Screw 3/16 x 5/8 (setting on the arm) Zinced Nut 3/8" x 9/16" Finishing Ring 50 x 32 mm
Support Y Installation
Put the support on the chair as is showing the figures below , using the 4 black allen screws 5/16’’ x 1 ½’’. (fig. 29)
Code
20132-006/9 27120-010/0 20869-005/3 27130-002/3 27190-024/2 20132-005/1 27160-004/9 27420-003/6 20236-206/0
figure 30
figure 32
Put the Chromed washer 50 x 32 on the support and then put the delivery unit arm as figures below. (fig. 30 and 31)
figure 31
Put the finishing screw with the correct nut and filler . This screw will limit the movements of the arm (the spin). (fig. 32)
figure 33
Take the cables through support. (fig. 33 and 34)
figure 34
07
Take the cables to the inside the
chair. (fig. 35 and 36)
figure 35
figure 37
figure 36
Take the cables to the chair rear. (fig. 37 and 38)
figure 38
Return the cables upper the motor support and so take them out of the chair from the front. (fig. 39 and 40)
figure 39
figure 40
08
4
1
5
6
Techno Chair Installation - Cuspidor
2
23
figure 41
The water bottles codes 26304-202/5 e 26289-003/0 are localizated on the delivery unit and not in the Cuspidor . The water bottle 1 litre has the code 26304-202/5.
Item
1 2 3
4 5 6 7 8
9 10 11 12
13
Quant
1 1 1 1 1 1 1 1 1
1 1
1
6
7
8
11
12
13
1
9
10
figure 42
Description
Pipe Cup Unit Auxiliary Basin of the Unit Base Supported Reflector Unit / Reflector Set Separating Support of Debris Bushing Cuspidor Pipe/Cuspidor Pipe Instruction Manual Box Euro Kit for System of Suction (it depends on the configuration) Unit Inferior Body Suction System Hoses (it depends of the configuration) Cup filler Plastic grid Control Panel Panel Cover Mambrane PAD Panel Support Set Chair/ Versátil Cuspidor/ Reflector
When you open the cuspidor box (fig. 41 and 42) , you will have on the box the follow items:
Code
42630-001/3 26301-201/4 41304-200/3 42213-201/9 20304-200/0 - 21003-200/9 26164-059/3 20304-202/4
20304-210/6
20630-002/4 26304-209/6 26304-210/7 26304-211/4 41307-201/4
figure 43
figure 44
1 2
3
4
5 6
On the kit you have some parts which are essential for install the chair independently of the suction configuration that you have in your chair. (fig. 43)
In this case we are showing two high suction.
7
8
9
Two high suction kit. (fig. 44)
10
Item 3 can be 1 or 2 depend on the suction configuration. Item description.
09
Item
1 2 3 4 5 6 7 8 9
10
figure 45
Quant
4 2 1 1 2 2 1 1 1 1
Kit Description
Cylindrical Head Allen Screw 1/4" x 2" Cylindrical Head Allen Screw 5/16" x 1.1/2" Separating Cup Regulating Valve Zinced Hexagonal Screw 3/16" x 3/8" Brass Round Head Plan Screw 5/32" x 3/8" Sewer Standard Box Cuspidor Thin Finishing Reflector Pipe Cover thin Cuspidor
Cuspidor Installation
Put the cuspidor on the soft superficies this will avoid some damage . After that, put the support and get through the hose inside the support. (fig. 45 and 46 Techno 200 / fig. 47 Versatil)
Code
27190-077/6 27190-024/2 42003-209/8 42300-200/7 27160-002/4 27120-019/7 42304-200/5 26302-012/1 26304-201/8 26560-013/7
figure 46
figure 48
figure 47
Fix the support in the system chair using the 4 allen screws ¼” x 2" (fig. 48) e key ¼” (fig. 49).
figure 49
Now fix the support on the chair using 2 allen screws 5/16 “ x 1. ½“ stainless steel and key 1/2”. (fig. 50 and 51)
figure 50
figure 51
10
Using the Allen screwdriwer 1/4” to fix (fig. 52 and 53).
figure 52
figure 54
figure 53
Techno Chair 200 Suction System
Remove the chair rear cover. (fig. 54 and 55)
figure 55
Take the hoses and cables to inside the chair . (fig. 56)
figure 56
figure 57
Take the hoses and cables to the rear place. (fig. 57 and 58)
figure 58
Return the hose to the chair front using the motor support.
(fig. 59 and 60)
figure 59
figure 60
11
Pull the hoses and the cables out the chair (fig. 61 and 62).Finally put the rear cover back .
figure 61
figure 63
figure 62
Following put the bowl , water tubes and cup tube.Put the finishing rubber in the reflector post so fit the reflector post.
(fig. 63, 64, 65 and 66)
figure 64
figure 65
figure 67
figure 66
PAD Connection Assistent Arm
You have to respect the common side, please connect the pad as are showing the figures. (fig. 67, 68, 69 and 70)
figure 68
Cuspidor PAD.
figure 69
figure 70
12
Connect the black and the white wires in the chair board , they will activate the Cuspidor Solenoids. (fig. 71 and 72)
figure 71
figure 72
13
figure 73
figure 75 figure 76
figure 74
Final Procedures
Illustrative pictures for representation of the layout and positioning of the components for built-in connections. (fig. 73 and 74)
Refer to schemes starting on page 24.
Fix the air regulator with a 3/16” hexagonal head screw using a fixed or a 5/16” box wrench.
(fig. 75) Fix the support of the debris
separator to the base of the chair with 2 3/16” hexagonal head screws, using a fixed or a 5/16” box wrench. (fig. 76)
figure 77
Install the motor cover and fix it with 2 Phillips screws, using a medium Phillips screwdriver. (fig. 77)
Install the cover(s) of the debris separator(s)
If the Unit has only one debris separator, use the rubber lid that is included in the kit to cover the extra hole on the motor cover.
14
1 12 3
figure 78
Techno Chair 200 - Delivery Unit
Inside the Box you will have (fig. 78) :
654
Item
1 2 3 4 5 6
Quant
4 1 1 1 1 1
B
Delivery Unit Description
Plastic Bottle Chip Blower Pedal Light Bulb Techno / hastflex 4 pins Manual Installation Kit Warranty Certificate
C
D
A
E
H
F
I
In the Delivery Unit carton (fig. 79) you can have the follow items.
G
LJ
figure 79
Item
A B* C* D E F G H I** J L
Quant
1 2 2 6 4 4 4 15 1 1 1
Kit Description
Four Ways ref AMP 626390/0 Male Terminal AMP 6,3 BA 626377-1 Female Terminal AMP 6,3-444334-1 Steel Plan Screw 3/16" x 1/2" Steel Head Star Screw 1/8" x 3/4" nickel-plated Bushing setting hose diam 3,3 Smooth Washer 3,7 x 8 x 0,5 chromiun plating Bushing setting hose diam. 1,6 Zinced Bar Bolt Label Reservoir of the Spray Green label Description Connecting Spray reservoir
* For Delivery Unit with Scaler or Fibre Optic ** Only EL Delivery Unit
Code
41951-003/0 41951-001/0 - 41902-012/0 26015-205/7 - 26047-106/9 26265-201/1 configuração 26164-059/3
Código
26083-009/1 26030-034/2 26030-003/6 27210-010/0 20289-007/9 20003-001/3 20560-014/3 20001-021/7 26164-016/6 26003-217/5 26003-222/5
figure 80
Delivery Unit Installation
Taking out the 6 3/16" x ½” Screws then remove the delivery unit cover. (fig. 80 and 81)
figure 81
15
figure 82
Remove the foams of the arms carefully. (fig. 82)
Get the hoses from the arm and get through them hole on the delivery unit. (fig. 83 and 84)
figure 83
figure 85
figure 84
Hang the delivery unit putting 3 sixth screws . (fig. 85 and 86)
figure 86
Put the gib and the little screw on the finishing washer. (fig. 87 and 88)
figure 87
figure 89
figure 88
With the 2 red cables 24V put on it the terminals. (fig. 89 and 90)
figure 90
16
figure 91
figure 92
Connection of the Delivery Unit Hoses and Cables
Optional Chip Blower
Connect the green hose identified by the letter “G” and the black hose identified by the letter “F” to the double valve.
Note: according to the configuration of the Delivery Unit, somehoses will not be connected.
Optional Chip Blower
Connect the black hose, identified by the letter “E” to the retention valve.
(fig. 92)
figure 93
figure 94
Connect the red hose identified by the letter “B” to the air distributor.
(fig. 93)
Connect the blue hose identified by the letter “A” to the syringe gray hose.
(fig. 94)
Optional Sodium Bicarbonate Jet
figure 95
Connect the red hose identified by the letter “C” to the Sodium Bicarbonate Jet valve.
(fig. 95)
17
figure 96
figure 97
Connect the red hose identified by the letter “J” to the arm lock valve.
(fig. 96)
Optional Flush
Connect the green hose identified by the letter “H” to the flush valve. (fig. 97)
Optional
figure 98
figure 99
Connect the transparent hose identified by the letter “I” to the peristaltic pump. (fig. 98)
Note: the Techno Delivery Unit was used; the same procedure to be adopted for the Flex and Hasteflex.models.
Connect those 2 red cables on the 2 white cables which are on the chair 24V. (fig. 99)
figure 100
On the another red cables extremity put the grey connector 4 holes. Put the wires on the 1
st
and the 3rd holes. (fig. 100)
18
Following connect this extremity on the distribution board inside the delivery unit. (fig. 101 and
102)
figure 101
figure 103
figure 102
Install the upper cover of the Delivery Unit and fix it with 6 Phillips screws, using a small Phillips screwdriver. (fig. 103)
19
1 2
Techno Chair 200 Reflector
3
4
figure 104
Item
1 2 3* 4 5 6
Quant
1 1 1 1 1 1
Reflector Description
Owner’s Manual Warranty Certificate Reflector Head (The Reflector dependes)* Reflector Arm Nickel Finishing washer Support Constraint Head
*Depend on the Reflector:
60350-200/3 – Versa Head 60350-201/8 – Reflex LD 60350-202/8 – Reflex
5
figure 105
The reflector box has the follows
6
items. (fig. 104 and 105)
Code
26760-016/4 26164-059/3
63350-200/9 20760-003/5 20450-003/3
Reflector Installation
figure 106
figure 108
Get through with the washer in the reflector post. (fig. 106 and
107)
figure 107
Put the post in the appropriated hole on the Cuspidor. (fig. 108)
figure 109
Release the arm. (fig. 109)
20
Put the gib for secure the Head and then down the plastic finishing washer. (fig. 110 and
111)
figure 110
figure 112
figure 111
Connect the power supply cables and the ground (depend on the Reflector). (fig. 112 and 113)
figure 113
Close the reflector tube correctly . (fig. 114)
figure 114
figure 115
Down the chair you have to connect the another extremity of the reflector and ground. They have to go inside the cuspidor support . They don´t have to be hanging or showing.
(fig. 115 and 116)
figure 116
21
figure 117
figure 118
Procedures for the Galla Chair
Assemble the left arm of the chair and fix it using a 3/16 Allen wrench.
(fig. 117)
Fix the backrest upholstery to the frame with 4 Phillips screws and 4 flat washers using a medium Phillips screwdriver. (fig. 118)
figure 119
figure 121
figure 120
figure 122
Fix the backrest cover with 4 Phillips screws and 4 fixing and finishing bushings using a medium Phillips screwdriver. (fig. 119)
Attach the 4 finishing plugs to the fixing points of the backrest cover. (fig .120)
Assemble the upholstery by fitting the rear locks of the upholstery in the supports located on the seat plate and push the upholstery in the direction indicated by the arrows (fig. 121). Make sure that the fixing screws located in the central part of the upholstery fitted in the openings of the seat reclining plate. Fix the upholstery with 2 knobs and tighten manually.
(fig. 122)
22
figure 123
figure 124
Procedures for the Croma Chair
Assemble the left arm of the chair and fix it with one Allen screw using a 3/16”. Allen wrench attach the screw finishing plug. (fig. 123)
Fix the backrest upholstery to the frame with 4 Phillips screws and 4 flat washers using a Phillips screwdriver. (fig. 124)
figure 125 figure 126
Attach the upholstery to the seat plate by fitting the fixing screws into the respective holes. (fig. 127)
figure 127
Fix the backrest cover with 4 Phillips screws and 4 fixing bushings using a medium Phillips screwdriver. (fig. 125)
Attach the 4 finishing plugs to the fixing points of the backrest cover. (fig. 126)
figure 128
Fix the upholstery with 2 knobs to the rear side and 2 knobs in the central part of the upholstery. Tighten manually. (fig. 128)
23
Chip Blower Drawing
24
Connection scheme for the Techno Delivery Unit to the Techno Unit distributor
TRANSPARENT PU TUBE
GRAY PU DUCT Ø1,6 FLAT SIDE
I
H A
B
C
D
E F
G
OUT TO ASSISTANT UNIT
OUT TO THE DELIVERY UNIT
GRAY PU DUCT Ø1,6 FLAT SIDE
GRAY DUCT Ø3,3 GROOVED SIDE
GRAY DUCT Ø1,6 GROOVED SIDE
BLUE PU TUBE Ø3,3
GRAY DUCT Ø1,6 GROOVED SIDE
GRAY PU DUCT Ø3,3 FLAT SIDE
BLACK DUCT Ø1,6 GROOVED SIDE
BLACK DUCT Ø1,6 FLAT SIDE
GRAY PU DUCT
GRAY PU DUCT
Ø1,6 GROOVED SIDE
Ø1,6 GROOVED SIDE
1
2
RED PU DUCT PU Ø1,6
BLUE PU TUBE Ø3,3
GREEN PU TUBE Ø1,6
BLUE PU TUBE Ø3,3
RED PU TUBE Ø1,6
GRAY PU TUBE Ø1,6
GRAY PU TUBE Ø3,3
BLACK PU DUCT Ø1,6 GROOVED SIDE
BLACK PU DUCT Ø1,6 FLAT SIDE
GREEN PU TUBE Ø1,6
3
4
5 6
GREEN PU TUBE Ø1,6
GRAY PU DUCT Ø1,6 GROOVED SIDE
GRAY PU DUCT Ø1,6 FLAT SIDE
CONTROL BOX
diagram 01
Hose Identification
40 PSI air for the Delivery Unit syringe
A
80 PSI air for the pilots
B
80 PSI air of the foot control for the Sodium Bicarbonate Jet
C
80 PSI air of the foot control return for the PDB
D
80 PSI air for the chip blower
E
F
80 PSI air for the water block
G
40 PSI water for the syringe
H
40 PSI liquid for the flush
I
40 PSI water for the peristaltic pump
Notes:
When the Unit has no syringe, nipples number 1 and 2 are substituted for plugs. When the delivery unit has no sodium bicarbonate jet, nipples number 3 and 4 are substituted for simple nipples Nipples number 5 and 6 should be connected only when the delivery unit has a chip blower. For the Techno Cart Delivery Uni only the “I” and “G” hoses are used.
25
Connection scheme of the Techno Delivery Unit with 1 Venturi aspirator and 1 Vac Plus aspirator
"A"
6
4
1
5
2
GRAY TUBE Ø3,3
GRAY TUBE Ø3,3
3
7
GRAY PVC TUBE Ø7
BLUE PU TUBE Ø3,3
4
16
8
BLUE TUBE Ø 3,3
7
15
GRAY PU DUCT Ø3,3
GRAY PVC TUBE Ø 7
GRAY PU DUCT Ø 1,6
2
9
16
10
"D"
GRAY HOSE EVA Ø1/2”
GRAY PU DUCT Ø3,3
"C"
15
GRAY PU DUCT GRIS Ø1,6
GRAY HOSE EVA Ø 3/4”
11
GRAY PVC TUBE Ø7 RAYON
12
FLAT SIDE
13
FOOT CONTROL
14
FLAT SIDE
GROOVED SIDE
OUT TO TECHNO UNIT
diagram 02
Hose Identification
Point “A” - air from the supply line Point “B” - water from the supply line Point “C” - sewer inlet
1
80 PSI air - foot control
2
80 PSI air - Vac Plus aspirator
3
80 PSI air - supply line inlet
4
40 PSI air - valve
5
80 PSI air - Cuspidor distributor box
6
40 PSI air - Cuspidor distributor box
7
Hose for Venturi and Vac Plus aspirators
8
40 PSI air - Venturi ejector
9
Venturi sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Cuspidor foot control
13
80 PSI air - Chip blower
14
80 PSI air - Water block
15
Vac Plus sewer hose
16
80 PSI air - valve pilots
Note:
The “13” and “14” nipples are used only for Delivery Units with a chip blower.
26
Connection scheme for the Versatil Unit with 2 Venturi
4
6
1
5
2
"A"
2
GRAY PU TUBE Ø 3,3
3
GRAY PVC TUBE Ø7
7
8
GRAY PVC TUBE Ø7
RED PU TUBE Ø1,6
GRAY PVC TUBE Ø3,3
7
8
GRAY PVC TUBE Ø7
GRAY PVC TUBE Ø7
GRAY PVC TUBE Ø3,3
BLUE PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
10
9
"D"
"C"
9
GRAY HOSE EVA Ø 3/4”
11
BLUE HOSE Ø10 X Ø7
GREEN TUBE Ø1,6
14
13
12
15
FOOT CONTROL
DELIVERY UNIT
CUSPIDOR
ASPIRATORS
diagram 03
Hose identification
Point “A” - air from the supply line Point “C” - water from the supply line Point “D” - sewer inlet
1
80 PSI air - foot control
2
80 PSI air - Unit valve
3
80 PSI air - supply line inlet
4
40 PSI air - Cuspidor
5
80 PSI air - Delivery Unit
6
40 PSI air - Delivery Unit
7
Hose for Venturi aspirators
8
40 PSI air - Venturi ejectors
9
Venturi sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Delivery Unit foot control
13
80 PSI air - Chip blower
14
80 PSI air - Water block
15
Water hose for syringe
Note:
The “13” and “14” nipples are used only for Delivery Units with a chip blower.
27
Connection scheme for Techno Unit with 1 Venturi aspirator
"A"
5
BLUE PU TUBE Ø 3,3
4
1
GRAY PU TUBE Ø 3,3
BLUE PU TUBE Ø 3,3
"C"
2
GRAY PU TUBE Ø 3,3
3
6
4
GRAY PU TUBE Ø 3,3
14
GRAY PVC TUBE Ø 7
GRAY PU TUBE 2 DUCTS Ø1,6 (FLAT SIDE)
10
11
12
13
FOOT CONTROL
7
8
BLUES HOSE Ø10 X Ø7
CUSPIDOR
9
ASPIRATOR
GRAY PVC TUBE Ø7
"D"
GRAY HOSE EVA Ø 3/4”
diagram 04
Hose identification
Point “A” - air from the supply line Point “C” - water from the supply line Point “D” - sewer inlet
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - valve
5
40 PSI air - Cuspidor distributor box
6
Hose for Venturi aspirators
7
40 PSI air - Venturi ejectors
8
Venturi sewer hose
9
Bowl sewer hose
10
Water inlet hose
11
80 PSI air - Cuspidor foot control
12
80 PSI air - Chip blower
13
80 PSI air - Water block
14
80 PSI air - valve pilot
Note:
The “13” e “14” nipples are used only for Delivery Units with a chip blower.
28
Connection scheme for the Versatil Unit with 1 Venturi
BLUE PU TUBE Ø 3,3
4
6
BLUE PU TUBE Ø 3,3
"A"
3
diagram 05
2
GRAY PU TUBE Ø 3,3
1
5
7
8
GRAY PVC TUBE Ø7
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
GRAY PVC TUBE Ø 7
GRAY PU TUBE Ø 3,3
9
"D"
"C"
10
11
BLUE HOSE Ø10 X Ø7
GRAY HOSE EVA Ø 3/4”
13
12
15
GREEN TUBE Ø1,6
FOOT CONTROL
14
DELIVERY UNIT
PILOTS
CUSPIDOR
8
ASPIRATOR
Hose identification
Point “A” - air from the supply line Point “C” - water from the supply line Point “D” - sewer inlet
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - for the Cuspidor
5
80 PSI air - for the delivery unit
6
40 PSI air - for the delivery unit
7
Hose for Venturi aspirators
8
60 PSI air for Venturi ejector
9
Venturi sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Delivery unit foot control
13
80 PSI air - Chip blower
14
80 PSI air - Water block
15
Water hose for syringe
Note:
The “13” e “14” nipples are used only for Delivery Units with a chip blower
29
Connection scheme for the Techno Unit with 1 Venturi and 1 High Suction
"A"
17
GRAY PU TUBE Ø 1,6
16
6
4
1
2
GRAY PU TUBE Ø 3,3
3
7
BLUE PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
BLUE PU TUBE Ø 3,3
4
GRAY PU TUBE Ø 3,3
5
GRAY PVC TUBE Ø 7
GRAY PU TUBE Ø 1,6
GRAY HOSE EVA Ø 1/2”
7
15
"C"
GRAY HOSE EVA Ø 3/4”
11
12
13
14
FOOT CONTROL
8
"F"
15
BLUE HOSE Ø 10 X Ø 7
CUSPIDOR
9
10
GRAY PVC TUBE Ø 7
"D"
GRAY HOSE EVA Ø 3/4”
diagram 06
Hose identification
Point “A” - air from the supply line Point “C” - water from the supply line Point “D” - sewer inlet Point “F” - High power suction
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - valve
5
80 PSI air - valve pilot
6
40 PSI air - Cuspidor distributor box
7
Hose for Venturi and Vac Plus aspirators
8
40 PSI air - Venturi ejector
9
Venturi sewer hose
Bowl sewer hose
10
Water inlet hose
11
80 PSI air - Cuspidor foot control
12
80 PSI air - Chip blower
13
80 PSI air - Water block
14
Vac Plus sewer hose
15
40 PSI air - electropneumatic valve
16
80 PSI air - electropneumatic valve pilot
17
Note
The “13” e “14” are used only for Delivery Units with a Chip blower.
30
Connection scheme for Versatil Unit with 1 Venturi and 1 High Suction
4
BLUE PU TUBE Ø 3,3
5
"C"
BLUE PU TUBE Ø 3,3
GRAY PU TUBE Ø 1,6
GRAY PVC TUBE Ø 7
GRAY PU TUBE Ø 3,3
11
GRAY PU TUBE Ø 3,3
GRAY HOSE EVA Ø 1/2”
7
16
GRAY PU TUBE Ø 3/4”
"F"
13
12
15
GREEN TUBE Ø 1,6
14
FOOT CONTROL
DELIVERY UNIT
"A"
6
1
2
GRAY PU TUBE Ø 3,3
3
7
8
PILOTS
CUSPIDOR
8
9
GRAY PVC TUBE Ø 7
"D"
diagram 07
Hose identification
Point “A” - air from the supply line Point “C” - water from the supply line Point “D” - sewer inlet Point “F” - High power suction
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - for the Cuspidor
5
80 PSI air - for the Delivery Unit
6
40 PSI air - for the Delivery Unit
7
Hose for Venturi aspirators/High Power
8
60 PSI air - Venturi ejector
10
GRAY HOSE EVA Ø 3/4”
9
Venturi sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Cuspidor foot control
13
80 PSI air - Chip blower
14
80 PSI air - Water block
15
Hose of water for syringe
16
High Power sewer hose
ASPIRATORS
Note
The “13” e “14” nipples are used only for Delivery Units with a chip blower..
31
Connection scheme for Versatil Unit with 1 Venturi and 2 High Suction
GRAY PU TUBE Ø 1,6
6
5
4
BLUE PU TUBE Ø 3,3
"A"
"D"
10
1
2
GRAY PU TUBE Ø 3,3
3
GRAY HOSE EVA Ø 1/2”
GRAY HOSE EVA Ø 3/4”
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
9
"C"
"F"
7
8
GRAY HOSE EVA Ø 1/2”
GRAY PVC TUBE Ø 7
GRAY HOSE EVA Ø 3/4”
11
0XØ7
BLUE HOSE Ø 1
12
13 14
FOOT CONTROL
CUSPIDOR
diagram 08
Hose identification
Point “A” - air from the supply line Point “C” - water from the supply line Point “D” - sewer inlet Point “F” - High power suction
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - Cuspidor distributor box
5
40 PSI air - Electropneumatic valve
6
80 PSI air - Electropneumatic valve pilot
7
High power blood suction
8
High power saliva suction
9
Aspirators sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Cuspidor distr.box foot control
13
80 PSI air - Chip Blower
14
80 PSI air - Chip Blower
Note
The “13” e “14” nipples are used only for Delivery Units with a chip blower..
32
Connection scheme for the Versatil Unit with 2 High Power
BLUE PU TUBE Ø 3,3
BLUE PU TUBE Ø 3,3
"C"
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 1,6
11
BLUE HOSE Ø 10 X Ø 7
12
"A"
5
4
1
2
GRAY PU TUBE Ø 3,3
3
13
14
FOOT CONTROL
DELIVERY UNIT
GRAY HOSE EVA Ø 1/2”
GRAY HOSE EVA Ø 3/4”
10
GRAY HOSE EVA Ø 3/4”
"D"
diagram 09
Hose identification
Point “A” - air from the supply line Point “C” - water from the supplyline Point “D” - sewer inlet Point “F” - High power suction
7
6
8
9
"F"
GREEN TUBE Ø 1,6
CUSPIDOR
1
80 PSI air - foot control
2
80 PSI air - for Delivery Unit
3
80 PSI air - supply line inlet
4
40 PSI air - for the Cuspidor
5
40 PSI air - for Delivery Unit
6
Syringe water hose
7
High power blood suction
8
High power saliva suction
9
Aspirators sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Delivery Unit foot control
13
80 PSI air - Chip Blower
14
80 PSI air - Chip Blower
Note
The “13” e “14” nipples are used only for the Delivery Units with a chip blower.
33
Connection scheme for the Techno Unit with 1 Vac Plus and l High Suction
"A"
16
GRAY PU TUBE Ø 1,6
15
4
1
GRAY PU TUBE Ø 3,3
2
5
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
BLUE PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 3,3
7
GRAY PU TUBE Ø 3/4”
GRAY HOSE EVA Ø 1/2”
6
"C"
"F"
11
12
13
14
FOOT CONTROL
3
7
8
9
10
5
BLUEHOSEØ10XØ7
GRAY HOSE EVA Ø 1/2”
GRAY PU TUBE Ø 1,6
CUSPIDOR
GRAY PU TUBE Ø 3/4”
"D"
GRAY HOSE EVA Ø 3/4”
diagram 10
Hose identification
Point “A” - air from the supplyline Point “C” - water from the supply line Point “D” - sewer inlet Point “F” - High power suction
1
80 PSI air - foot control
2
80 PSI air - Cuspidor distributor box
3
80 PSI air - supply line inlet
4
40 PSI air - Cuspidor distributor box
5
80 PSI air - Vac Plus ejector
6
High Power sewer hose
7
Vac Plus/High Power aspirators hose
8
80 PSI air - pilot
9
Vac Plus sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Cuspidor foot control
13
80 PSI air - Chip Blower
14
80 PSI air - Water block
15
40 PSI air - Electropneumatic valve
16
80 PSI air - Electropneumatic valve pilot
Note
The “13” e “14” nipples are used only for Delivery Units with a chip blower..
34
Connection scheme for the Versatil Unit with l Vac Plus and 1 High Suction
BLUE PU TUBE Ø 3,3
6
4
BLUE PU TUBE Ø 3,3
"A"
diagram 11
1
2
2
GRAY PU TUBE Ø 3,3
3
GRAY PU TUBE Ø 3,3
7
9
GRAY PU TUBE Ø 3/4”
5
GRAY PU TUBE Ø 3,3
8
2
10
"D"
GRAY PU TUBE Ø 3,3
GRAY PU TUBE Ø 1,6
GRAY HOSE EVA Ø 1/2”
7
15
GRAY PU TUBE Ø 3/4”
"C"
GRAY HOSE EVA Ø 1/2”
"F"
11
GRAY PU TUBE Ø 1,6
GRAY HOSE EVA Ø 3/4”
12
13
14
FOOT CONTROL
DELIVERY UNIT
ASPIRATOR
PILOTS
CUSPIDOR
8
Hose identification
Point “A” - air from the supply line Point “C” - water from the supply line Point “D” - sewer inlet Point “F” - High Power suction
1
80 PSI air - foot control
2
80 PSI air - valve and Vac Plus ejector
3
80 PSI air - supply line inlet
4
40 PSI air - for Cuspidor
5
80 PSI air - for Delivery Unit
6
40 PSI air - for Delivery Unit
7
Vac Plus/High suction aspirators hose
8
Pilot air return
9
Vac Plus sewer hose
10
Bowl sewer hose
11
Water inlet hose
12
80 PSI air - Delivery Unit foot control
13
80 PSI air - Chip Blower
14
80 PSI air - Water block
15
High suction sewer hose
Note:
The “13” e “14” nipples are used only for Delivery Units with a chip blower.
35
Suction System
Venturi System
High Suction System
36
Vac Plus System
37
MARTINS DESIGN - DEZ/2006
Loading...