Cutler Hammer, Div of Eaton Corp GC, GHC, GD, GMCP Installation Instructions

I.L. 15569C
Installation Instructions for Vari-Depth Handle Mechanism on
GC/GHC/GD and GMCP Circuit Breakers
WARNING
TO PREVENT ELECTRICAL SHOCK, DISCONNECT FROM POWER SOURCE BEFORE INSTALLING OR SERVICING. INSTALL IN SUITABLE ENCLOSURE. KEEP FREE FROM CONT AMINANTS. TURN OFF AND LOCK-OFF ALL POWER SOURCES. FAILURE TO DO SO CAN RESULT IN DEATH, SEVERE PERSONAL INJURY, OR SUBSTANTIAL PROPERTY DAMAGE.
G-FRAME VARI-DEPTH HANDLE MECHANISM
Complete Cat. #
HRGCV11L Black HRGSL HRGCV1 NEMA 1 GC/GHC/GD HRGCV31L Yellow HRGSL HRGCV1 NEMA 1 GC/GHC/GD HRGCV14L Black HRGSL HRGCV1 NEMA 3R/12/4 GC/GHC/GD HRGCV34L Yellow HRGSL HRGCV1 NEMA 3R/12/4 GC/GHC/GD HRGMV11L Black HRGSL HRGMV1 NEMA 1 GMCP HRGMV31L Yellow HRGSL HRGMV1 NEMA 1 GMCP HRGMV14L Black HRGSL HRGMV1 NEMA 3R/12/4 GMCP HRGMV34L Yellow HRGSL HRGMV1 NEMA 3R/12/4 GMCP Black Handle NEMA 1 Cat # HRG11
Consisting of: For Use With: HandleShaft Operator Enclosure Breaker
Black Handle NEMA 3R/12/4 Cat # HRG14 Yellow Handle NEMA 1 Cat # HRG31 Yellow Handle NEMA 3R/12/4 Cat # HRG34
ITEM DESCRIPTION BACK
1 SHAFT SUPPORT ASSEMBLY 1 1 2 PAN HEAD SCREW 6-32 X 3.25 LG 40 3 LOCK WASHER #6 4 0 4 SHAFT 1 1 5 ALLEN WRENCH 1 1 6 HI-LO SCREW 6-19 X 1.75 LG 04
For DIN Rail or Snap-In Base Plate Application, carefully remove the exist-
ing cover screws from the circuit breaker without breaking the catalog war­ranty nameplate and replace with Item 6.
Do not exceed a torque of 2.0 lb.-in.Do not exceed a torque of 4.0 lb.-in.
DINRAIL OR SNAP-IN
PAN
BASE PLATE
HANDLE FEATURES Handle Off - Open or Close Enclosure
Effective November 1997
Handle On - Open or Close Enclosure
Lock Handle Off With Enclosure Door Interlock
Page 2
Lock Handle On With Enclosure Door Interlock
I.L. 15569C
2. Cut shaft to length.
BREAKER MOUNTING LENGTH OF SHAFT

INSTALLATION INSTRUCTIONS

1. Place circuit breaker in off position. Position the shaft support assembly in the Off position by turning the mechanism counterclockwise until at a solid stop. Place the mechanism onto the circuit breaker such that the slot on the slider on the mechanism mates into the breaker handle. Mount the breaker and mechanism per the customer's application using the necessary hardware (as shown in the chart on page
1). Evenly tighten the screws to the giv en torques (as shown below chart on page 1).
NOTE: Before mounting the shaft support assembly and breaker to the back pan, see installation instruc­tion item 4 to be certain to acquire minimum front panel dimensions for door clearance.
If mounting the breaker directly to the back of the pan, see the figure on page 1 for mounting hole dimensions.
CAUTION
BE CERTAIN TO CORRECTLY ASSEMBLE SHAFT SUPPORT TO THE CIRCUIT BREAKER. FAILURE TO DO THIS WILL CAUSE IMPROPER OPERATION AND BREAKAGE OF PANS.
DO NOT EXCEED TORQUE LIMITS ON SCREWS. HIGHER TORQUES COULD CAUSE CRACKING ON THE SHAFT SUPPORT ASSEMBLY AND IMPROPER OPERATION.
SCREW INTO BACK PAN L = C -106
L = C - 4 3/16 IN.
DIN RAIL L = C -119 MM
L = C - 4 11/16 IN.
SNAP-IN BASE PLATE L = C -108 MM
L = C - 4 1/4 IN.
Note: Dimension C is the measurement from the back pan to the top surface of the front panel.
3. Place the shaft into the shaft support assembly as shown on page 1 and tighten the set screw on the collar.
4. Measure the distance from the hinge to the center of the shaft. Measure the distance perpendicular to the last measurement from the center of the shaft to one of the sides of the enclosure. With the front panel door open, mark the inside panel door with these measurements and drill a 5/16 Dia. hole. Carefully close the panel door and check to see if the hole is center to shaft. From inspection of the 5/16 dia. hole, drill a 3/8 Dia. (35mm) hole.
MM
Effective November 1997