Contents
The symbols in the left-hand margin of each page of the manual will enable you to carry out the following functions:
Click on this button to display the Contents page.
Click on this button to display the previous page.
Click on this button to display the next page.
Click on this button to display the previous view (use it to return from a reference jump).
Click on this button to display next view (use it to return to a reference jump).
Click this button to print some or all of the document (specic pages can be chosen).
Click this button to exit the user guide.
Press the Esc key to display normal Acrobat© Controls.
!
Page 3
CONTENTS
Exit
Safety Information ......................................7
Unpacking ............................................7
I-Test Overview ........................................8
Suitability .............................................8
I-Test Functional Overview ...............................8
1. Physical Set-up/Installation of I-Test ...................11
1.1 Mounting ...............................................11
1.2 Inlet/exhaust connections .................................12
1.3 Electrical connections & controls ...........................12
1.4 Prior to use ..............................................13
1.4.1 Inspection ..........................................13
1.5 Charging ................................................14
2. Operating I-Test ....................................15
2.1 Gas Monitor Testing Overview ..............................15
2.2 Loading a monitor into an I-Test ............................16
2.3 Test Progress Status Indication .............................17
2.4 Test Result Status Indication ...............................18
2.5 Main menu status icons ...................................19
2.6 Replacing an empty gas cylinder ............................19
2.7 I-Test Safe Shutdown .....................................19
3. I-Test Manager Software .............................20
3.1 Introduction .............................................20
3.2 I-Test Manager system requirements ........................20
3
Page 4
3.3 I-Test Manager installation & setup ..........................21
Exit
3.4 I-Test Manager Functional Overview .........................23
3.4.1 Manage Cylinders ....................................23
3.4.2 Inlet Conguration ...................................23
3.4.3 Actions .............................................23
3.4.4 Field Conguration ..................................23
3.4.5 Reporting/Data Management ...........................23
3.4.6 I-Test Display Settings ................................24
3.4.7 I-Test Conguration Upload/Download Options ............24
3.5 Starting the software ......................................24
3.6 Language selection .......................................25
3.7 Initial Conguration of I-Test ...............................25
3.7.1 Manage cylinders ....................................25
3.7.2 Create a new conguration ............................29
3.7.3 I-Test settings .......................................31
3.7.4 Inlet Conguration ...................................40
3.7.5 Field conguration ...................................41
3.8 I-Test save conguration options ...........................47
3.8.1 Save to I-Test ........................................48
3.8.2 Save to Database .....................................50
3.8.3 Save to USB Memory Stick .............................52
3.9 I-Test Manager Conguration Upload Options .................54
3.9.1 Upload Conguration from I-Test .......................55
3.9.2 Upload Conguration from Database ....................57
3.9.3 Upload Conguration from USB Memory stick ............59
3.10 Data management .......................................61
3.10.1 Import logs from USB memory stick ....................62
3.10.2 View gas monitor log les ............................63
3.10.3 View gas monitor event logs ..........................67
4
Page 5
3.11 Create Reports ..........................................70
Exit
3.11.1 Create Calibration Report .............................70
3.11.2 Create Bump Test Report .............................76
3.12 Exception Reporting .....................................81
3.12.1 Creating an Exception Report .........................81
3.12.2 Exception Report Settings ............................82
3.12.3 Create Exception Report .............................85
3.13 Information and Settings .................................88
3.13.1 About .............................................88
3.13.2 Settings ...........................................89
3.13.3 Support ............................................89
4. Conguring I-Test via Front Panel Keypad ..............90
4.1 Front panel layout ........................................90
4.1.1 Home screen ........................................91
4.1.2 I-Test Safe Shutdown .................................91
4.1.3 Control buttons ......................................92
4.1.4 I-Test charging indicator ...............................92
4.1.5 Test Status indicator ..................................92
4.2 Accessing the I-Test Main menu ............................93
4.3 Inlet setup ...............................................94
4.3.1 Select cylinder prole .................................95
4.3.2 Setting Cylinder Gas Concentrations ....................96
4.3.3 Setting Cylinder Lot Number ...........................97
4.3.4 Setting Cylinder expiry date ...........................98
5
Page 6
4.4 Conguring I-Test Test Sequence ...........................99
Exit
4.4.1 Speedy bump .......................................100
4.4.2 Smart bump ........................................101
4.4.3 Calibration .........................................102
4.4.4 Gas Monitor Log File Transfer to I-Test ..................104
4.4.5 Selection of I-Test Banner ............................105
4.5 USB Memory Stick Functionality ...........................106
4.5.1 Plugging in the memory stick .........................106
4.5.2 Upload I-Test conguration from USB Memory Stick to I-Test ..107
4.5.3 Download I-Test activity log from I-Test to USB Memory stick ..108
4.5.4 Download gas monitor logs from I-Test to USB memory stick . 109
5. I-Test Specication .................................110
6. Service and maintenance ...........................111
7. Accessories ......................................112
8. Standard Target Gas Cylinders .......................113
9. Cross Calibration Cylinders .........................114
10. Troubleshooting ...................................115
Appendix A: Allowable Cylinder Proles .................117
Appendix B: Graph Function Explained ..................118
Appendix C: I-Test Icons ...............................120
Warranty ............................................123
Crowcon contacts ....................................125
6
Page 7

Safety Information

Contents
Exit

Unpacking

Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
• Read and understand all instructions in the operation section of this manual prior to use.
• Before use ensure that the equipment is in good condition, the enclosure is intact has not been damaged in any way.
• If there is any damage to the equipment or it is not working properly, do not use, contact your
local Crowcon ofce or agent for repair/replacement.
• Observe all warnings and instructions marked on the unit and within this manual.
• Observe site health and safety procedures for gases being monitored and evacuation procedures.
• Understand the gas monitor’s screen display and alarm warnings prior to use (see the relevant user & operator manual).
• Ensure maintenance, service and calibration is carried out in accordance with the procedures in the manual and only by trained personnel.
• Any gas monitor that is hazardous area certied must be operated and maintained in strict accordance with its instructions, warnings and label information included in the relevant user & maintenance manual.
Unpacking
Remove the I-Test from the packaging. The standard accessories are under the supporting trays. The following items will be included as standard:
Box contents
• I-Test
• Power Supply
• Pipe Fittings x 2
• Inlet Tubing 1m
• Exhaust Tube 3m
• USB Flash Memory Stick
• CD containing: User & Operator Manual I-Test Manager PC Application
• Packing check List
• Declaration of Conformity
Optional items in the box
• Demand ow regulators
7
Page 8

I-Test Overview

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
I-Test is suitable for small and large eet users alike and offers simple gas monitor bump testing and
calibration, including full data management.
I-Test versions are available for both Gas-Pro and T4.
I-Test can quickly and simply undertake testing and store data either locally to the I-Test or allow
download to a PC or USB memory stick, including download and storage of gas monitor log les.
I-Test provides data management allowing easy reporting of bump test and calibration results across
the eet.
I-Test can also offer simple updating of gas monitor details such as alarm levels with updates being
managed within the eet during regular bump tests.
Using minimal gas and managing sequencing the I-Test ensures sensors are gassed correctly every time.

Suitability

I-Test is suitable for testing and calibrating Gas-Pro and T4 units tted with one or more of the following
sensors: Oxygen, Carbon Monoxide, Hydrogen Sulphide, Carbon Dioxide IR or Methane Pellistor.
I-Test will be functional with Gas-Pro units congured with rmware versions 1V09 & 2V06 onwards. The rmware version of Gas-Pro can be seen as part of the start up screens when the monitor is powered up.
I-Test is functional with rmware versions of T4 from 1V01 upwards.

I-Test Functional Overview

I-Test offers the following main functions and features for the testing, calibration and management of gas monitors.
Speedy bump
A speedy bump will test the monitor sensors to the rst alarm level.
Gas is presented across/over the sensors for a designated time (dependent on sensor gas type)
during which alarm level one should be activated. This will be deemed a pass if the monitor goes into alarm or a failure if the monitor does not go into alarm.
8
Page 9
Smart bump
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
A smart bump will test that the gas monitor responds correctly to a specied level of test gas.
Gas is passed over/across the sensors and a predicted response is expected within a time window
dependant on the sensor response time.
The test is passed if the gas level indicated by the monitor is within pre-specied tolerance limits
within this time window.
Calibration
I-Test can be congured to undertake the routine service calibration of a gas monitor. In this instance
a calibration would be completed without a bump test being required.
I-Test is suitable for routine service calibration of monitors.
If a new sensor has been tted to the monitor then Portables-Pro should be used to calibrate the
monitor not I-Test, otherwise incorrect calibration may occur.
Calibration after bump fail
If any sensor fails a speedy bump or smart bump, I-Test can be congured to perform a ‘calibration
after bump fail, immediately after the bump test failure.
Gas Monitor Field Conguration
During normal operation, whilst performing gas testing, I-Test can be congured to change aspects of the inserted gas monitor conguration, such as sensor alarm levels as well as other aspects of conguration.
Gas Monitor Log Download
During normal operation I-Test can be congured to download either event logs and/or data logs from the monitor under test. These log les are stored locally and can be extracted either via PC or USB ash drive.
Data Management & Reporting
I-Test in conjunction with its PC Application, I-Test Manager, can be utilised for full data management of the bump test and calibration data.
I-Test Manager allows the user to specify exception reports to quickly identify instruments, for example, that have not been bump tested or failed bump test. I-Test Manager will also allow a user
to upload and view monitor log les from the I-Test. Bump test and calibration reports can also be
created, printed and stored.
9
Page 10
Gas Inlets/Exhaust
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
I-Test is available with 2 inlet ports and 1 exhaust port. One inlet is reserved for purge gas (fresh air), and the other inlet is the test gas inlet.
USB Input/Outputs
I-Test offers the ability to upload its conguration settings either via USB connection to a PC or via a
USB Flash Drive inserted into a connector on the side of the I-Test.
DC Input/Battery Backup
I-test is capable of operating from a DC power supply but also able to operate for a short period of time on an internal backup batter pack should the DC supply fail.
Keypad interface
I-Test offers keypad interfaces that will allow a user to change many of the conguration settings
without the need to connect a PC or insert a USB Flash Drive.
10
Page 11

1. Physical Set-up/Installation of I-Test

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication

1.1 Mounting

The I-Test can be used ‘standalone’ or (as recommended) mounted on a standard DIN rail type EN 50022 À (see below).
Figure 1: Mounting the I-Test
À
The recommended length of DIN rail if an I-Test is to be mounted on its own, is 140mm.
If the I-Test is to be used in conjunction with a cylinder holder, the DIN rail should be 250mm
minimum.
11
Page 12

1.2 Inlet/exhaust connections

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
I-Test has three gas ports: the test gas is connected to inlet À, the purge inlet Á should be connected to fresh air, and the gas exhaust outlet  should be connected to a suitable length of pipe that vents to outside air.
Gas cylinders must be used with demand ow regulators.
!
To ensure accurate bump testing and calibration the purge inlet must be connected to
i
fresh air.
Figure 2: Inlet/exhaust connections
Á
À Test gas inlet Á Purge inlet  Exhaust outlet
À
Â

1.3 Electrical connections & controls

Figure 3: Electrical connections & controls
À Memory stick connector Á USB interface connector  On/off pushbutton à Power input socket
12
À
Á
Â
Ã
Page 13

1.4 Prior to use

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication

1.4.1 Inspection

Before use, the I-Test should always be checked for any signs of physical damage. Press the release button À, lower the module’s front ap Á and check the ow gasket Â. Also check the gas inlet pipe à and gas exhaust pipe Ä.
It is recommended that the ow gasket is replaced at regular intervals dependent upon regularity of use.
A damaged or incorrectly tting seal may cause I-Test to incorrectly test/calibrate a
i
gas monitor.
Figure 4: Inspection prior to use
À
Â
Á
Ã
Ä
13
Page 14

1.5 Charging

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Before using the I-test it should be charged for 7 hours as follows:
X Connect the power adapter to a suitable mains outlet and connect its DC connector to the power
input socket on the I-Test (see Figure 3).
X Turn the I-Test on by pressing the on/off pushbutton (see Figure 3). The charging indicator will be
displayed (see below).
When connected to the power adaptor I-Test will be charged even if powered off.
i
Figure 5: Charging indications
À Battery low Á Battery discharging  Battery charging à Battery charged Ä Battery fault
À
Á
Â
Ã
Ä
I-Test must be charged between 0°C and 40°C for correct charging operation.
i
14
Page 15

2. Operating I-Test

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This section details how to operate I-Test to perform the desired testing after I-Test has been fully congured via I-Test Manager (see page 25) or via I-Test Front panel Keypad (see page 90).
Ensure I-Test is installed correctly and that the test gas cylinder is attached as detailed on page 12.
Before operating the I-Test it must be congured via I-Test Manager PC Application and
i
must then be disconnected from the PC USB connection. If I-Test is not disconnected from the PC it will not operate.
Before a test can be undertaken ensure the I-Test display screen is showing the home
i
screen. If the home screen is not shown the congured test will not be initiated.
Ensure the test gas cylinder connected to the inlet, has the same gas mix and
i
concentration as congured in the I-Test (see page 40 or page 94).
When manufactured I-Test is congured with a default gas cylinder and a default expiry
i
date. This expiry date must be changed to that of the actual cylinder to be attached or I-Test will not function correctly as it will report that the cylinder has expired.
To ensure accurate bump testing and calibration the purge inlet MUST be connected to
i
fresh air.
When I-Test is initially powered it will perform a purge cycle for approximately 30
i
seconds, before I-Test can be used.

2.1 Gas Monitor Testing Overview

Once I-Test has been congured to carry out a test or a sequence of tests, proceed as follows:
X Ensure the I-Test is either fully charged and/or connected to a suitable power source (see page 14).
X Ensure the I-Test is NOT connected to the PC via the USB socket.
X Connect the required gas cylinder to the appropriate inlets (see page 12).
X Ensure the purge inlet is connected to fresh air.
X Ensure a suitable length of pipe that vents to outside air is connected to the exhaust outlet.
X Turn the gas monitor on and wait for it to nish its start up routine.
X Turn on I-Test and wait for the start up purge sequence to complete
X Insert the gas monitor into I-Test (see page 16).
X The congured test or test sequence will automatically be performed and I-Test will indicate the
success or failure of the test (see page 18).
15
Page 16

2.2 Loading a monitor into an I-Test

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Before inserting the gas monitor ensure it is not in fault mode.
i
Turn the gas monitor on, wait for it to nish the start up process and then press the release button
À, lower the module’s front ap Á, place the gas monitor into it’s holder  and close the front ap à (see below):
Figure 6: Opening the I-Test
Â
À
Á
Once I-Test has been congured to carry out a test or sequence of test (e.g. bump test or
i
calibration) this will start as soon as the door is closed.
Do not remove the gas monitor from I-Test until the test sequence has completely nished.
The gas monitor audible alarm will be muted for the duration of the test, at the end of the test the audible alarm will be reinstated.
Once a test has completed allow the monitor sensors to recover to ambient levels before a retest. Failure to do so may cause the monitor be tested/calibrated incorrectly.
The rst gas test after a prolonged period of inactivity may not be successful as I-Test will
need to be primed with the test gas, the test should be repeated.
Gas cylinders must be used with demand ow regulators.
!
Ã
16
Page 17

2.3 Test Progress Status Indication

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
I-Test displays a set of progress indications whilst a test is being performed, an example of which can be seen in Figure 7.
Figure 7: Progress indications
13 May 2013 11:16:37
I-Test
The rst status bar indicated by the icon , indicates the progress through the full test sequence
The second status bar status bar indicates the current test being performed, in this example a speedy bump test. .
The third status bar shows further detail of the current test, in this example that inlet 1 is being operated. .
See page 120 for details of all icons.
17
Page 18

2.4 Test Result Status Indication

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
During the process of the test the LED will ash amber. If the test is passed I-Test will display the
following icon and the LED À on the I-Test gas monitor pod will be illuminated green. If the test is failed I-Test will display the following icon and the LED on the I-Test gas monitor pod will be illuminated red (see below).
Figure 8: Result indications
13 May 2013 11:18:42
I-Test
13 May 2013 11:18:42
I-Test
À
I-Test will also display the icon if I-Test was unable to perform the congured test.
This may occur for example if a monitor is inserted with an unsupported sensor/gas tment or if the attached cylinder does not contain a suitable test gas for a specic sensor type in the monitor.
If the monitor is not correctly inserted in the gas monitor pod it may not be recognised by I-Test. This will be indicated by the I-Test gas monitor pod LED red and the icon ashing for a period of
approximately 30 seconds. The monitor must be removed from the I-Test and reinserted.
Note: If a monitor is inserted into I-Test with a specic sensor due bump test (not all sensors may be due a
bump test on the same date) and the attached cylinder does not contain the required gas, I-Test will display the icon and not perform a bump test on any sensors.
If a monitor is inserted into I-Test with a specic sensor(s) not due a bump test and the attached cylinder does not contain that required gas(s) but the cylinder does contain the gas for remaining sensors due a bump test. I-Test will continue to bump test the sensors due and will not bump test the sensor(s) not due.
18
Page 19

2.5 Main menu status icons

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
At certain times (e.g. after bump tests) a status icon À is displayed on the Main menu as shown in
Figure 9 below.
Figure 9: Status Icon
2012 21 Aug 10:25:00
À
These status icons have the following meanings:
• Action successful
• Action failed

2.6 Replacing an empty gas cylinder

If a cylinder connected to the inlet is completely exhausted I-Test will recognised this and the icon will be displayed on the screen.
It will be necessary to physically replace the cylinder and enter the new gas concentrations, Cylinder Lot Number, and Cylinder Expiry Date via either I-Test front panel (see page 97 and page 98) or via I-Test Manager (see page 40 and page 40).
• Gas monitor needs calibration
•
Gas monitor unidentied/Sensor unidentied
If the cylinder was exhausted during a calibration the monitor may indicate a service fault
i
which must be cleared. Remove the monitor from I-Test and cancel all fault indications. Once the cylinder has been replaced the monitor can then be reinserted and test can be repeated.
If I-Test detects an exhausted cylinder and the cylinder is physically changed, a new
i
Cylinder Lot number and Cylinder Expiry Date must be entered. If this process is not followed, I-Test will not allow gas testing to continue and will indicate this on the screen.

2.7 I-Test Safe Shutdown

If it is required to remove power from I-Test either by removing the power lead or switching off via the
on/off push button then the safe shutdown process must be followed.
Please refer to Section 4.1.2 on page 91 for full details.
19
Page 20

3. I-Test Manager Software

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication

3.1 Introduction

Before I-Test can be used for the rst time it must be congured using the I-Test Manager PC software supplied. This allows I-Test to be fully congured to perform bump test or calibration as per
user requirements.
I-Test Manager should now be installed.

3.2 I-Test Manager system requirements

The following are the minimum system requirements that will enable the I-Test Manager software to
run efciently:
• Processor Pentium 4 or equivalent
• Processor speed 2.2 GHz
• Bus Speed 400 mHz
• Memory size 1Gb
• Hard Drive 40 Gb
• CD Rom 48x (CD)
• Monitor 15 inch
• Resolution 800 x 600 minimum
• Operating system Windows XP or later
• USB port 2
• Mouse & Keyboard Yes
20
Page 21

3.3 I-Test Manager installation & setup

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Ensure all previous versions of the software have been uninstalled before proceeding
i
with the software installation.
X Insert the CD supplied into your PC’s CD drive.
X If your PC is set not to allow AutoPlay of CDs, select Run Setup.exe from the dialogue box
shown below.
Figure 10: AutoPlay dialogue box
X The I-Test Manager installation screen will be displayed as shown below:
Figure 11: I-Test Manager installation screen
21
Page 22
X Click on Next and follow the on-screen instructions and the following installation screen will be shown.
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Figure 12: ATEX or UL Region screen
X I-Test Manager needs to be congured for the type of I-Test purchased, either ATEX region or
UL region compatible. This is due to the calculation I-Test will undertake to convert a volume
of ammable gas (%VOL) to a lower explosive limit value LEL, each region has a different
conversion factor.
X Select the I-Test Manager region selection for either ATEX or UL as appropriate then click
Next and follow the on-screen instructions (including the validation of any operating system
notications) until the software is fully installed
Once I-Test Manager is congured to either ATEX or UL region, a matching I-Test must
i
only be used to calibrate or bump test that specic type of gas monitor. For example if I-Test and I-Test Manager are congured for ATEX then UL calibrated gas monitors must
not be tested as they will be incorrectly tested or calibrated.
22
Page 23

3.4 I-Test Manager Functional Overview

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Refer to page 8 and page 9 for descriptions of the I-Test’s main features.
I-Test Manager can be used to congure I-Test to undertake any of these functional aspects.
This section provides an overview of the main features and functions of I-Test Manager, more details
can be found in the specic sections.

3.4.1 Manage Cylinders

Manage cylinders allows the user to setup and dene cylinders of gas of predened nominal values.
Each cylinder can be assigned unique name and stored to a database such that it can be assigned to the inlet of an I-Test at a later date.
3.4.2 Inlet Conguration
Once a cylinder has been dened, Inlet Conguration will allow the cylinder to be assigned to a gas inlet on I-Test. This assumes a specic cylinder of gas will then be physically connected to that inlet
and therefore allows the user to enter the actual concentration of gas, the lot number and the expiry date of the cylinder.

3.4.3 Actions

This section allows the user to congure the operation or sequence of operations that will be undertaken
automatically when a gas monitor is inserted into the I-Test and the door closed. This sequence may
include (amongst others) speedy bump, smart bump, calibration and download of log les.
3.4.4 Field Conguration
During normal operation I-Test can be congured to change aspects of the gas monitor conguration,
this can occur as a stand alone activity or as part of a bump test or calibration. I-Test can change
gas monitor sensor alarm levels, logging interval and condence strategy as well as other aspects of conguration.

3.4.5 Reporting/Data Management

I-Test Manager offers the user a number of ways to manage the data collected by I-Test in normal
use. I-Test Manger can be used to view gas monitor log les uploaded during gas testing.
Bump test and calibration reports can then be generated as appropriate to the tests I-Test was
congured to undertake.
In addition, exception reporting can be utilised to allow the user to identify gas monitors that, for
example, have passed or failed a bump test or calibration in the last ‘x’ days, or are due calibration.
23
Page 24

3.4.6 I-Test Display Settings

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
There are a number of user display settings that can be congured such as date style, backlight
control, and sounder control.
3.4.7 I-Test Conguration Upload/Download Options
I-Test congurations can be created within I-Test Manager and either saved directly to a connected
I-Test, saved to a local database for upload at a later time or saved to a USB Flash Stick that can
then be inserted to an I-Test to upload the conguration.

3.5 Starting the software

When I-Test is initially powered it will perform a purge cycle for approximately 30 seconds, during this
time I-Test Manager cannot be used to connect to I-Test and the message below will be displayed.
Figure 13: System busy message
Double click on the I-Test Manager icon on your PC’s desktop. The Home screen will be displayed (see below).
Figure 14: Home screen
24
Page 25

3.6 Language selection

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
If necessary, select your preferred language from the Select the language drop down list in the centre of the screen.
I-Test Manager is now fully installed and ready to use.
3.7 Initial Conguration of I-Test
This section details how to congure and setup I-Test for initial use. This section steps through each stage required to fully congure I-Test prior to saving this conguration.

3.7.1 Manage cylinders

Prior to conguration of I-Test and assigning a cylinder to the inlet of I-Test, the cylinder prole must rst be dened.
I-Test can congure a number of cylinder proles for potential connection to a gas inlet. These proles are detailed in Appendix A.
I-Test Manager will prevent any combination of cylinder being created other than those listed in Appendix A.
To create or alter a cylinder prole, proceed as follows:
X Select Manage cylinders from the Home page. The Manage cylinders dialogue box will be
displayed (see below).
Figure 15: Manage cylinders dialogue box
25
Page 26
3.7.1.1 Edit or create a new prole
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
To create a new prole or edit an existing one, proceed as follows:
X Click New to create a new prole.
X To edit an existing prole, click on the cylinder prole in the Dened Cylinders list so that it is
highlighted and then click Edit.
Alter the following elds as required:
Cylinder type: To create a new cylinder prole select the required cylinder type from the drop
down list.Cylinder options are tri, quad or quin.
Suitability: Select the use(s) for which this cylinder is suitable by clicking on the relevant
tick boxes. Suitability options are speedy bump, smart bump , calibration and cross calibration. When calibration is selected speedy bump and smart bump are automatically selected. When cross calibration is selected calibration, speedy bump and smart bump are automatically selected.
Note: Smart bump functionality is only applicable to Gas-Pro, T4 will only
undertake a speedy bump test.
Crowcon recommend calibration standard gases are used for calibration functions to
i
ensure accurate calibration of the gas monitor under test.
Two calibration options enable the ammable sensor in the gas monitor to be
tested with either target gas or, if required, the C5H12, C3H8 and C4H10 sensors can be tested with CH4 when the cross calibration option is selected.
Unless the cross calibration option is selected gas monitors must only be bump tested or
i
calibrated with target gas.
Calibration: This option should be selected if ammable sensors in all gas monitors to be
tested by I-Test are to be calibrated with target gas only.
For example if ammable sensors in all the monitors are CH4 and the cylinder
to be used for testing contains CH4, then this option should be selected.
26
Page 27
Cross Calibration: This option should be selected when all the gas monitors to be bump tested
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
or calibrated by an I-Test are not all congured with the same ammable gas
sensor or if the target gas is not available for monitors containing C5H12, C3H8, C4H10 sensors.
For example if the eet contains a mixture of monitors with CH4 and C3H8
sensors both requiring test by I-Test, then the cross calibration option should be selected when conguring the cylinder. This will allow both the CH4 and C3H8 gas monitors to undergo the desired bump or calibration test in the same I-Test unit.
If the cross calibration option is selected, cylinders must be congured with CH4 as the
i
ammable gas. The concentration of CH4 must be 1.2% volume for ATEX/IECEx monitors and 1.5% volume for UL monitors.
For a list of cylinders available from Crowcon please refer to Section 8.
The gas cylinder for cross calibration must have a tolerance no greater than 5%. If the Cross Calibration option is selected this will also allow gas monitors to be bump tested with non target gas in the same manner as described above for calibration.
Note: T4 must only be calibrated with a cylinder containing CH4, the
cross calibration option is not applicable for T4 and will not operate in a T4
congured I-Test.
Gases: Click on a gas in the Gases list and then make a selection from the Gas drop
down list, and enter the standard gas value in the Standard Value eld. Dependant upon cylinder type selected the gas options are CH4, C5H12, C3H8, C4H10, CO, H2S, CO2 & O2 (see Appendix A: Allowable Cylinder Proles). Dependant upon the suitability option chosen, I-Test Manager will restrict the gas value entered to ensure the gas value is appropriate for the Suitability selected.
When dening the standard value of the ammable gas selected, the gas value must be entered in units of %volume. The saved value will be converted to %LEL for internal use in I-Test. Note: T4 must only be bump tested and calibrated with a cylinder containing
CH4. A T4 congured I-Test will not perform the congured test if any other cylinder is connected to I-Test.
X When the alterations have been made, click Update Gas. This will update the entry in the Gases list.
X Repeat this process for each gas to be dened in the cylinder prole.
27
Page 28
Save As: Enables a new cylinder prole to be created.
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Once saved the new cylinder prole will be stored to the database and will be visible in the Dened Cylinders list. The saved cylinder prole name will also be the name shown on the screen of the I-Test when the conguration is transferred and the cylinder assigned to
the gas inlet.
Save: Saves the alterations against the original cylinder prole (Edit prole only).
Cancel: Aborts any changes.
At this stage of I-Test conguration the cylinder prole will contain the standard gas concentrations; the actual level of gas in the cylinder is entered during ‘Inlet Conguration’ see page 40.
Once the cylinders have been dened in the Manage Cylinders section the I-Test can now be fully congured as detailed in the create new conguration section.
Note: When calibrating O2 sensors I-test uses the purge inlet and calibrates on fresh air.
The O2 sensor will then be bump tested with the cylinder O2 gas to ensure correct operation (note
this bump test will only be undertaken on Gas-Pro monitors congured with rmware versions 1V16 & 2V06 onwards).
28
Page 29
3.7.2 Create a new conguration
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option enables a conguration to be created from scratch. This conguration can then be saved
directly from I-Test Manager to an I-Test connected by USB, given a unique name and saved to the database, or (with limited functionality) saved to a memory stick connected to a USB port.
It will be necessary to select if you are to create a T4 I-Test conguration or a Gas-Pro I-Test conguration before selecting the conguration options.
The home screen, as shown below, indicates which conguration is currently selected.
In the example below a Gas-Pro I-Test conguration would now be created.
Figure 16: Gas-Pro conguration
If a T4 I-Test conguration is required then select the ‘Congure of T4’ option and this will allow a T4 I-Test conguration to be created.
Figure 17: T4 conguration
29
Page 30
Once the Gas-Pro or T4 conguration has been selected, to create a new conguration le, proceed
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
as follows:
X Select New Conguration from the Home page. The New conguration overview screen will
then be displayed (see below).
Figure 18: I-Test new conguration overview screen
From this screen the following functionality can be changed:
• I-Test settings (see page 31)
• Inlet conguration (see page 40)
• Field conguration (see page 41)
When all the required changes have been made, select Save Conguration to save the changes (see page 47).
30
Page 31

3.7.3 I-Test settings

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
3.7.3.1 Overview
If I-Test is connected via USB, and Load from I-Test is clicked then this screen displays the serial
number of the I-Test and the rmware version of I-Test.
There are a number functions that can be congured under the I-Test Setting section:
• Display (see below)
• Banners (see page 33)
• Actions (see page 34
• Protection (see page 39)
3.7.3.2 Display
This screen shows the I-Test display screen settings, in the case of a new conguration the elds will
either be at their default setting or blank.
Figure 19: Display screen
Any alterations will cause the relevant eld background to turn yellow.
Alter the following elds as required:
Date Style: This group of elds changes the way the date is displayed on the I-Test
screen. Any changes to these elds will be immediately reected in the example above the elds.
31
Page 32
Sounder: Click the appropriate tick box to activate (ticked) or deactivate (blank) the
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
sounder operation for key presses on the I-Test keypad and/or alerts.
Menu Backlight: Click the tick box to set the I-Test screen backlight permanently on or off whilst
in a menu function or set the required timeout in seconds.
Progress Backlight: Set the required timeout in seconds to set the I-Test screen backlight on whilst
the test progress screen is shown on the display.
Months: There are two methods of changing the month abbreviations that will be
displayed on the I-Test screen. Either click Set Months to update the months to the default settings for the current language or enter directly into the selection boxes the desired month abbreviations.
Menu: Set the required timeout in seconds that will determine the time that the display
will revert back to the password entry screen.
Gas Unit Abbreviations: Key in how the gas units will be displayed on I-Test for the standard units of
ppm, %VOL & %LEL.
Banner Select: This selection determines which banner from the banner set will be displayed
by the I-Test.
Use banner Number to select which of the 6 banners to be displayed on the
I-Test screen.
Banner Set: This selection determines which predened banner set will be uploaded to
I-Test for the banner select to choose from. Tick the Banner Set box and use the drop down box to select which banner set from the database will be uploaded to I-Test. See page 33 for creation of banner sets.
I-Test will need to be power cycled for the changes to take affect, ensure the USB
i
connection to PC is removed before power cycle.
Date and Time: Click this button to synchronise I-Test time and date to that of the connected PC.
This function is only available if I-Test Manager is connected to an I-test via the USB port and unlike the settings above when Set date and time button is pressed, the action is implemented immediately.
When selected Date and Time Set will be displayed at the base of the eld. Note: During testing I-Test will update the time and date of a monitor inserted. This feature could be used to ensure I-Test and all gas monitors are congured to the
correct date and time, for example in the case of daylight saving time changes.
32
Page 33
3.7.3.3 Banners
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
I-Test offers the ability to upload a banner to the I-Test display that can be used to identify the I-Test when in situ.
It is possible to dene a maximum of 6 banners and store this Banner Set to the database; this
allows multiple banner sets to be created which can then be uploaded to the I-Test.
Figure 20: Banners screen
Alter the following elds as required:
Edit Banners: This section allows the creation of banners.
Select the banner number to be created from Number selection and either type in text to the box or Load From File to upload an image le for the banner.
Banners: Shows the banners saved for selected Banner Sets.
Banners Sets: Shows the banner sets that are saved to the database.
New – Allows a new banner set to be created. Load – Loads a previously stored banner set from the database. Save – Saves initial banners set to the database. Save As – Enables a new banner set to be created from a previously created
banner set.
Delete – Deletes selected banner set.
33
Page 34
3.7.3.4 Actions
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This page is the heart of I-Test conguration and is used to dene the test or the sequence of tests
that I-Test will undertake in normal operation.
The selection of Actions will dene the test or sequence of tests that I-Test will undertake when a
gas monitor is inserted and the door closed. This sequence will be fully automated by the I-Test.
The action sequence specied in I-Test Manager will take precedent over the internal setting of Gas-Pro. For example if Gas-Pro is congured for a smart bump but I-Test is congured to
undertake a speedy bump, a speedy bump will be performed. The Gas-Pro settings will remain unaltered.
The action options available for a Gas-Pro and a T4 monitor are as follows.
Gas-Pro offers the following action options
• Speedy bump
• Smart Bump
• Calibration if bump test fail (speedy bump and smart bump)
• Calibration (Standalone)
• Calibrate if expired
Whereas T4 offers the following action options
• Speedy bump
• Calibration if bump test fail (speedy bump only)
• Calibration (Standalone)
• Calibrate if expired
34
Page 35
If load from I-Test is selected this screen shows the current actions and the cylinder expiry policy for
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
the loaded conguration, the Gas-Pro and T4 action screens are shown.
Figure 21: Actions screen Gas-Pro Conguration
Figure 22: Actions screen T4 Conguration
Any alterations will cause the relevant eld background to turn yellow.
35
Page 36
Alter the following elds as required:
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Allow
conguration: I-Test can be congured to upload a new conguration le to the gas monitor
when inserted into I-Test. This allows settings such as sensor alarm levels to be altered. Select the Allow conguration option to enable this functionality. For details on the settings for the conguration le see Field Conguration on
page 41.
Speedy Bump: Select this option to undertake a speedy bump on all sensors when the gas
monitor is inserted into I-Test. A speedy bump will test the gas monitor sensors
to the rst alarm level.
Smart Bump:
(Gas-Pro only) Select this option to undertake smart bump on all sensors when the gas
monitor is inserted into I-Test.
A smart bump will test that the gas monitor responds correctly to a specied level of test gas within a predened time window. These parameters are set in the Inlet Conguration settings, see page 40.
Only one type of bump test can be selected, if speedy bump test is selected then smart
i
bump will be disabled and vice versa.
I-Test will not check calibration before undertaking a bump test and will continue to bump
test a gas monitor if calibration is due on a specic sensor (unless the Calibrate if Expired
option is selected).
Calibration: I-Test offers thee calibration options dependant upon user requirements,
Standalone Calibration, Calibration after Bump Test Fail and Calibrate if Expired.
36
Page 37
Standalone
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Calibration: This option should be selected if I-Test is to be congured to undertake only a
calibration function, on the gas monitor inserted.
This will be indicated in I-Test Manager by the text ‘(Stand alone)’ appearing
after the Calibration option when selected. Standalone calibration will calibrate all sensors in the gas monitor, this will occur even if the sensor was not due a calibration. Standalone calibration cannot be selected when a speedy bump is selected. If standalone calibration is selected with smart bump this will change the functionality of the calibration process as described below in Bump Test Fail Calibration.
Standalone calibration can be selected with Allow conguration, Download
event log, and Download event log.
Bump Test Fail Calibration: This option should be selected if there is a requirement to calibrate a sensor,
should it fail a speedy bump or a smart bump test. If Calibration and Speedy Bump or Smart Bump are selected together, I-Test will not perform a standalone calibration on any sensor that fails the selected bump test.
This will be indicated in I-Test Manager by the text ‘(Bump Test Fail)’ appearing
after the Calibration option when speedy bump or speedy bump or smart bump is also selected. Only sensors that fail the selected bump test will be calibrated, this will occur even if the sensor was not due a calibration. Bump Test Fail Calibration can be selected with Speedy Bump, Smart Bump,
Calibrate if Expired, Allow conguration, Download monitor event log, and
Download monitor data log.
Calibrate if Expired: This option should be selected if it is required that a gas monitor whose
calibration has expired, when inserted into I-Test should be automatically calibrated if an appropriate cylinder is attached. This will override a bump test
action if congured and only a calibration will be undertaken.
37
Page 38
Download monitor
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
event log: Select this option to congure the I-Test to download the event log of the
monitor under test to the I-Test.
If download monitor event log is selected in the sequence it will extend the total test time
i
while the log les are transferred.
If I-Test is congured to download the monitor event log the log will be deleted from the
!
gas monitor after download.
Download monitor data log: Select this option to congure the I-Test to download the data log of the
monitor under test to the I-Test.
If download monitor data log is selected in the sequence it will extend the total test time
i
while the log les are transferred. This could cause the time taken for a speedy bump to be signicantly increased.
If I-Test is congured to download the monitor data log le the log le will be deleted from
!
the gas monitor after download.
Expiry Policy: Expiry policy allows the user to determine how the I-Test should function
should the gas cylinder expiry date be exceeded (see page 40 for the entry of cylinder expiry dates). Reject Cylinder – Select this option if I-Test should reject an expired cylinder and not use the cylinder for the tests. Use Cylinder - Select this option if I-Test should continue to use the cylinder after the expiry date.
It should be noted that I-Test will order the sequence of tests in the following order where
i
appropriate if selected:
Congure, Bump Test (either speedy or smart), Calibration, Log Download.
38
Page 39
3.7.3.5 Protection
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This screen enables the current PIN code to be veried and/or a new one set. The factory default PIN code is set to 000000.
This PIN code is entered via the front panel to gain access to the main menu, see Section 4.2 on
page 93.
This option is only available if I-Test Manager is directly connected to I-Test via the USB port.
i
Figure 23: Protection screen
X To verify the current PIN, key it in to the PIN: eld and click Verify PIN. If the PIN code is correct,
Pin matched will be displayed. If incorrect, No match will be displayed.
X To change the PIN code, key the required code into the New PIN: eld and click Set New PIN.
The message Pin set ok will be displayed.
39
Page 40
3.7.4 Inlet Conguration
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Inlet conguration allows the predened cylinder prole, congured via the Manage Cylinders
functionality (see page 25), to be assigned to the gas inlet.
The screen shown below will enable the user to fully dene the physical cylinder to be connected to
I-Test including actual gas values, Lot number and expiry date.
Figure 24: Inlet screen
Any alterations will cause the relevant eld background to turn yellow.
Choose Cylinder: Select the required cylinder prole from the drop down list.
This list will show all cylinder proles previously saved to the database
Gases: The gas or gases for a multi-gas cylinder prole will be displayed in the Gases
list along with the standard value(s).
Actual Gas Value: The actual gas value is the concentration of the gas in the physical cylinder to
be connected to I-Test. This should be read from the label on the cylinder Click on each gas in turn, enter the actual gas values in the Actual Value eld and click Update Value. The entered value will be displayed in the Gases list.
Lot #: This is the Lot number of the physical cylinder to be connected to I-Test. This
should be read from the label on the cylinder.
Expiry Date: This is the expiry date of the physical cylinder to be connected to I-Test. This
should be read from the label on the cylinder.
Enter the correct date in the by clicking the calendar button to the right of the eld.
40
Page 41
Bump Test
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Due Increment: If I-Test undertakes a successful bump test on the inserted gas monitor the
bump test due date will be incremented within the gas monitor. This will ensure the gas monitor alerts the user when the next bump test is due. Bump Test Due Increment is the increment in days that will be added to the current date in the gas monitor to indicate when the next bump test is due. When entering the actual gas value also enter the bump test due increment then click on update gas value. The entered value will be displayed in the Gases list. This option is only enabled if the selected cylinder is suitable for speedy bump or smart bump.
Smart bump tolerance +/-: A smart bump will test that the inserted gas monitor sensors respond correctly
to the applied level of gas. Smart bump will be deemed a pass if the sensors reach the applied level of gas with a given tolerance. This tolerance is the Smart bump tolerance and is a percentage band of the applied gas level.
The gases previously dened in the cylinder will contain the Crowcon default smart bump tolerance. This can be seen in the Gases list under ‘Bump +/- %‘.
If required this tolerance can be increased by entering a value in the Smart bump tolerance +/- eld. This will be added to the default value. The minimum and maximum pass values for the smart bump test per sensor can be seen in the Gases list under ‘Min’ and ‘Max’ respectively. This option is only enabled if the selected cylinder is suitable for smart bump.
Actual gas values, expiry date & Lot number, bump test intermittent interval & bump test
i
deviation can only be saved directly to an I-Test via the USB connector or to the database.
If this conguration is to be saved to USB memory stick these values are not saved.
3.7.5 Field conguration
During normal operation, whilst performing gas testing, I-Test can be congured to change aspects of the inserted gas monitor conguration, such as sensor alarm levels as well as other aspects of conguration.
Field conguration denes the functionality of an instrument conguration le that can be uploaded to
the gas monitor via the I-Test.
There are two main functional areas where gas monitor conguration can be changed; gas monitor and sensors. Gas monitor settings are specic to the specied type of gas monitor and sensor settings relate to specic gas sensors independent of gas monitor type.
41
Page 42
3.7.5.1 Gas monitor
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
The screens shown below enable gas monitor functionality to be specied when congured by
the I-Test.
Figure 25: T4 Monitor screen
Figure 26: Gas-Pro Monitor screen
42
Page 43
Select Instrument: To enable any eld conguration update to be applied to the gas monitor the
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Apply Changes On check box must be ticked. If this tick box is not ticked no changes will be made to the gas monitor.
The ‘Allow conguration tick box in the ‘Actions’ page must also be
i
selected to perform a eld conguration.
Apply Changes On: This allows the user to determine the date from which it is required to update
the conguration on the gas monitor. If a date in the future is chosen I-Test will continue to operate as normal until
that date, at that point I-Test will then update the conguration each time the
gas monitor is inserted.
Enter the required start date for the gas monitor conguration by changing each value in the eld or clicking the calendar button to the right of the eld.
Condence
Strategy: Condence strategy is how the gas monitor indicates to the user that it is
functioning normally.
If it is required to change the condence strategy setting on the gas monitor activate the Condence Strategy tick box and from the drop down box select
one of the following options:
Off: No indications. Sounder: The gas monitor sounder beeps at preset intervals. LED: The gas monitor LED’s ash at preset intervals. Sounder + LED: The gas monitor sounder beeps and the condence LED’s
ash at preset intervals.
T4 Conguration has two further options
Positive Safety: The gas monitor will activate positive safety (+ve safety)
functionality which is an easy indication of operating status of T4 indicated by a front mounted LED. Please refer to the T4 User & Operator Manual for further details.
Positive Safety + sounder: The gas monitor will activate positive safety
functionality plus the addition of the sounder when the positive safety LED is illuminated.
Interval: This eld sets the time interval in seconds for the Condence Strategy
indications. Select the required interval from a minimum interval of 5 seconds
to a maximum interval of 60 seconds.
43
Page 44
Action On Startup: This eld determines the functionality of the gas monitor when powered up
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
with regard to the built in ‘Clean air’ zero function. If it is required to change the Action on Startup setting on the gas monitor activate the Action on Startup tick box and from the drop down box select one of the following options: No action: No ‘Clean air’ zero action at startup.
Conrm zero: This setting allows the ‘Clean air’ zero to be carried out at the
user’s discretion.
Always zero: This setting means a ‘Clean air’ zero will always be carried out
at startup.
Logging Interval: This eld determines the interval at which the gas monitor will record gas
readings to its internal log le.
If it is required to change the logging interval activate the logging interval tick box and set the required time interval in seconds. Minimum interval 1 of
second and maximum interval of 32400 seconds between log readings.
Calibration Due Increment: If a gas monitor is congured to undertake either a Bump Test Fail Calibration
or a Stand alone Calibration, and the calibration is successful, the calibration due date will be incremented within the gas monitor.
The increment interval (in days) is precongured within the gas monitor at factory, typically 30 days.
It is possible to change this increment by uploading a new conguration le to
the gas monitor.
Activate the Calibration Due Increment tick box and set the required interval in
days (minimum 1, maximum 720) between calibrating the monitor
Once I-Test has been congured to apply a monitor eld conguration le, it will continue
i
to do this to each and every monitor inserted into I-Test. If it is required to stop the
conguration update it is necessary to deselect the ‘Apply Changes On’ tick box and save this conguration to I-Test.
44
Page 45
3.7.5.2 Sensors
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
The screen shown below enables gas monitor sensors settings to be congured by the I-Test.
Figure 27: Sensors screen
Sensor: Use the drop down box to select the sensor to which the conguration will be
changed.
Apply Changes On: This allows the user to determine the date from which it is required to update
the conguration of the sensors of the gas monitor. If a date in the future is chosen I-Test will continue to operate as normal until
that date, at that point I-Test will then update the conguration each time the
gas monitor is inserted.
Enter the required start date for the sensor conguration by changing each value in the eld or clicking the calendar button to the right of the eld.
45
Page 46
Alarm One: Activate this tick box to change the alarm level one settings of a specic sensor.
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Threshold: Enter the required gas level that will trigger alarm level one in the gas monitor. Direction: Activate this tick box and then set the direction in which monitored gas should be changing in order to trigger the monitor into the Alarm one state.
Latching: Activate this tick box and then set this eld to either Non-Latching, Latched or Latch Accept (only available for Gas-Pro congurations). Please
see Gas-Pro and T4 User & Operator manuals for further details.
Alarm Two: Activate this tick box to change the alarm level two settings of a specic
sensor. Threshold: Enter the required gas level that will trigger alarm level two in the gas monitor. Direction: Activate this tick box and then set the direction in which monitored gas should be changing in order to trigger the monitor into the Alarm two state.
Once I-Test has been congured to apply a sensor eld conguration le, it will continue
i
to do this to each and every monitor inserted into I-Test. If it is required to stop the
conguration update it is necessary to deselect the ‘Apply Changes On’ tick box for each sensor and save this conguration to I-Test.
46
Page 47
3.8 I-Test save conguration options
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
When I-Test is initially powered it will perform a purge cycle for approximately 30 seconds, during this
time I-Test Manager cannot be used to connect to I-Test and the message below will be displayed.
Figure 28: System busy message
Once the full I-Test conguration has been created it can be saved by clicking on Save Conguration.
There are three save options available (see Figure 29):
• Save to I-Test (see page 48)
• Save to database (see page 50)
• Save to USB Memory Stick (see page 52)
At this point, clicking the Back button will revert back to the conguration le.
i
Figure 29: Save Conguration screen
47
Page 48

3.8.1 Save to I-Test

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option will allow the full conguration to be saved directly to an I-Test connected via the USB
port (downloaded).
The save conguration screen will show an icon for the connected I-Test and also display the serial
number.
X Click Save to I-Test. The Select items to save dialogue box will be displayed (see Figure 30).
X The user can then determine which conguration items should be saved to I-Test.
X If it is required to maintain some of the current settings in I-Test, this option will allow selected
conguration items to be uploaded whilst preserving other settings.
Figure 30: Select items to save screen
X The selectable items to save correspond to each of the I-Test conguration pages. Activate each
tick box to select which conguration items are to be saved to I-Test.
De-select All: Will deselect all individual tick boxes.
Select All: Will select all individual tick boxes.
48
Page 49
X When all selections have been made click Save Selected Items to download the conguration le
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
to I-Test, or Cancel to abort the download. The Save Conguration screen will be displayed.
X If the save conguration process fails the following message will be displayed and the download
must be repeated.
Figure 31: Save conguration to I-Test failed message
X If it is also required to save this conguration to the database, click Save to Database (see page
50).
X If it is also required to save this conguration to a USB Memory Stick connected to the I-Test USB
port, click Save to USB Memory Stick (see page 52).
X Otherwise click Finish to return to the Home screen or click Back to return to the conguration le.
If the Save conguration to I-Test failed – check connection message is displayed at any
i
point during a conguration download, the download MUST be repeated. If a successful
download is not undertaken I-Test may not function correctly.
After a conguration upload before I-Test can be used it must be disconnected from the
i
PC and restarted.
When an I-Test conguration is uploaded to I-Test Manager from an I-Test, not all
i
conguration data is uploaded (see page 56). It is therefore strongly recommended that upon download of a conguration to I-Test a copy of this conguration is saved to the database and stored as the master conguration for the specic I-Test as a future reference of the conguration downloaded.
It should also be noted that a user has the ability to change a limited set of I-Test
conguration settings via the I-Test keypad in the eld. Therefore the master copy of the database conguration may not entirely match the conguration uploaded to I-Test
Manager from I-Test at a later date, as changes may have been made directly on I-Test in the eld (see page 90).
49
Page 50

3.8.2 Save to Database

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option will allow the full conguration to be saved to the database, all conguration items will be
saved to the database.
X Click Save to Database. The Save Conguration to Database dialogue box will be displayed
(see Figure 32).
If the original conguration le was loaded from the database, the option to Save to existing
conguration will be accessible.
If the original conguration le was loaded from an I-Test or USB Memory stick, only the Save to
new conguration option will be accessible.
Figure 32: Save Conguration to Database screen
X Either select Save to existing database (if accessible) and click Save, or click Save to new
conguration then enter the required conguration name in the New name eld and click Save.
This will save the conguration to the database and I-Test Manager will return to the Save
Conguration screen.
X If it is also required to save this conguration to an I-Test connected via the USB port, click Save
to I-Test (see page 48).
X If it is also required to save this conguration to a USB Memory Stick connected to the I-Test USB
port, click Save to USB Memory Stick (see page 52).
50
Page 51
X Otherwise click Finish to return to the Home screen or click Back to return to the conguration le.
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
When an I-Test conguration is uploaded to I-Test Manager from an I-Test, not all
i
conguration data is uploaded (see page 56). It is therefore strongly recommended that upon download of a conguration to I-Test a copy of this conguration is saved to the database and stored as the master conguration for the specic I-Test as a future reference of the conguration downloaded.
It should also be noted that a user has the ability to change a limited set of I-Test
conguration settings via the I-Test keypad in the eld. Therefore the master copy of the database conguration may not entirely match the conguration uploaded to I-Test
Manager from I-Test at a later date, as changes may have been made directly on I-Test in the eld (see page 90).
51
Page 52

3.8.3 Save to USB Memory Stick

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option will allow a restricted set of conguration items to be saved to the USB memory stick.
It is possible to save both a single Gas-Pro I-Test conguration and a single T4 I-Test conguration
to one memory stick.
Note: for ease of use Crowcon recommend the use of individual USB memory sticks, one for Gas-
Pro I-Test and one for T4 I-Test.
Gas-Pro I-Test will extract the Gas-Pro conguration whilst a T4 I-Test will extract a T4 conguration
when the USB Memory stick is inserted into the I-Test.
It should be noted that ‘Sensor’ settings in the ‘Field Conguration’ options (refer to Section 3.7.5.2), the ‘Display’ settings (refer to Section 3.7.3.2) and the ‘Banner’ settings (refer to Section 3.7.3.3) are common to both types of I-Test. The ‘Sensor’ settings and the ‘Display’ settings for the last conguration to be saved to the USB Memory Stick will be used by both the T4 I-Test and Gas-Pro I-Test when the conguration is uploaded to the I-Test.
It is not possible to save the Inlet Congurations to the USB Memory Stick, it is only possible to upload Inlet Conguration les directly to an I-Test that is connected via the USB port
X Click Save to USB Memory Stick. The Select items to save dialogue box will be displayed (see
Figure 33).
Figure 33: Select items to save dialogue box
X The user can then determine which conguration items should be saved to the USB memory stick
If it is required to maintain some of the current settings in I-Test, this option will allow selected
conguration items to be uploaded whilst preserving the other settings. The selectable items to save correspond to each of the I-Test conguration pages (with the exception of the inlet conguration).
52
Page 53
X Activate each tick box to select which conguration items are to be saved to USB memory stick.
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
De-select All: Will deselect all individual tick boxes Select All: Will select all individual tick boxes Select destination drive: Species which USB memory connected to the PC will be utilised to
store I-Test conguration.
X Select the appropriate drive letter for the USB memory stick from the Select destination drive list.
X When the selections have been made click Save Selected Items to upload the conguration le
to the USB memory stick, or Cancel to abort the upload. This will save the conguration to the USB memory stick and I-Test Manager will return to the Save Conguration screen.
If it is also required to save this conguration to the database, click Save to Database (see page 50).
If it is also required to save this conguration an I-Test connected via the USB port, click Save to
I-Test (see page 48).
Otherwise click Finish to return to the Home screen or click Back to return to the conguration le.
Not all the I-Test conguration data is saved by this process.
i
The following items will not be saved to USB Memory Stick:
Banner Sets: The banner number (relating to the banner I-Test will display) is saved to the
USB Memory Stick but the banner set will not be saved.
Inlet conguration: It is not possible to save Inlet conguration to USB Memory Stick
Inlet conguration can only be congured by a direct save to I-Test via I-Test
Manager or via the I-Test front panel keypad.
When an I-Test conguration is uploaded to I-Test Manager from an I-Test, not all
i
conguration data is uploaded (see page 56). It is therefore is strongly recommended that upon download of a conguration to I-Test a copy of this conguration is saved to the database and stored as the master conguration for the specic I-Test as a future reference of the conguration downloaded.
It should also be noted that a user has the ability to change a limited set of I-Test
conguration settings via the I-Test keypad in the eld. Therefore the master copy of the database conguration may not entirely match the conguration uploaded to I-Test
Manager from I-Test at a later date, as changes may have been made directly on I-Test in the eld (see page 90).
53
Page 54
3.9 I-Test Manager Conguration Upload Options
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
There are a number of options for loading predened I-Test congurations into I-Test Manager, these are:
• Upload an existing conguration from an I-Test (see page 55)
• Upload an existing conguration from the database (see page 57)
• Upload an existing conguration from a USB memory stick (see page 59)
Figure 34: I-Test Home page
54
Page 55
3.9.1 Upload Conguration from I-Test
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option enables a conguration to be uploaded from an I-Test unit connected to the PC via a USB port.
The conguration can then be altered as required and saved back to the original I-Test (see
page 48), given a unique name and saved to the database (see page 50), or (with limited
functionality) saved to a USB Memory Stick connected to a USB port (see page 52).
To upload a conguration le from an I-Test, proceed as follows:
Ensure the I-Test is turned on, connected to the PC via a USB port, and either fully
i
charged (see page 14) or powered by the mains adapter.
When I-Test is initially powered it will perform a purge cycle for approximately 30 seconds, during this
time I-Test Manager cannot be used to connect to I-Test and the message below will be displayed.
Figure 35: System busy message
X Select Load from I-Test to upload the full conguration from the connected I-Test to I-Test
Manager. The Overview screen will be displayed (see below).
Figure 36: I-Test overview screen
From this screen the following functionality can be changed:
• I-Test settings (see page 31)
• Inlet conguration (see page 40)
• Field conguration (see page 41)
55
Page 56
X When all the required changes have been made, select Save Conguration to save the changes
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
(see page 47).
It should be noted that not all the I-Test conguration data is uploaded by this process.
i
The following items will not be uploaded:
Banner & Banner Sets: The banner number (relating to the banner I-Test was displaying from the
installed banner set) will be uploaded, but the banner set will not be uploaded.
To determine the details of the specic banner from the banner set, review the copy of the I-Test conguration that was stored to the database.
Inlet conguration: Bump Test Due Increment and Smart bump tolerance will not be uploaded
from the I-Test. To determine the details of the Bump Test Due Increment and Smart bump
tolerance review the copy of the I-Test conguration that was stored to the
database.
It should also be noted that a user has the ability to change a limited set of I-Test
i
conguration settings via the I-Test keypad in the eld. Therefore the master copy of the database conguration may not entirely match the conguration uploaded to I-Test
Manager from I-Test at a later date, as changes may have been made directly on I-Test in
the eld (see page 90).
It is important to note that the cylinder denitions, created in Manage Cylinders (see
i
page 25), are stored in I-Test Manager’s database, this is the master record for cylinder
denitions. When a conguration is uploaded from an I-Test, the cylinder assigned to an
inlet is cross referenced to the this database record to enable the correct cylinder to be displayed on the inlet within I-Test Manager.
When a conguration is uploaded from an I-Test, the cylinder assigned to an inlet is cross
i
referenced to the this database record to enable the correct cylinder to be displayed on the inlet within I-Test Manager.
For the correct cylinder to be displayed in I-Test Manager following an upload from I-Test,
i
the current database must same database from which the cylinder was originally dened
otherwise the cylinder displayed may be incorrect.
56
Page 57
3.9.2 Upload Conguration from Database
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option enables a conguration to be uploaded from the database.
This conguration can then be altered as required and saved to an I-Test (see page 48), renamed
and then saved to the database or (with limited functionality) saved to a USB Memory Stick connected to a USB port (see page 52).
To load a conguration le from the database, proceed as follows:
X Select Load from Database from the Home page. The Select conguration dialogue box will be
displayed (see below).
Figure 37: Select conguration dialogue box
X Click on the required conguration so that it is highlighted and then click Select. The Overview
screen will then be displayed (see Figure 38).
The dialogue box will show saved congurations for the monitor type I-Test manager is currently congured for. To see saved congurations for all monitors click the Show All tick box.
From this screen the following functionality can be changed:
• I-Test settings (see page 31)
• Inlet conguration (see page 40)
• Field conguration (see page 41)
57
Page 58
X When all the required changes have been made, select Save Conguration to save the changes
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
(see page 47).
Figure 38: Database overview screen
3.9.2.1 Rename
This option can be used to rename congurations already stored in the database.
X Click Rename, the New Name dialogue box will be displayed (see Figure 39).
X Enter the name you wish to change the saved conguration to and click OK.
Figure 39: Enter Name dialogue box
58
Page 59
3.9.2.2 Delete
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option can be used to delete congurations already stored in the database.
3.9.3 Upload Conguration from USB Memory stick
This option options enables a conguration saved to a USB Memory Stick to be uploaded to I-Test Manager.
Gas-Pro I-Test will extract the Gas-Pro conguration whilst a T4 I-Test will extract a T4 conguration when the
USB Memory stick is inserted into the I-Test.
It should be noted that ‘Sensor’ settings in the ‘Field Conguration’ options (refer to Section 3.7.5.2), the ‘Display’ settings (refer to Section 3.7.3.2) and the ‘Banner’ settings (refer to Section 3.7.3.3) are common to both types of I-Test. The ‘Sensor’ settings and the ‘Display’ settings for the last conguration to be saved to the USB Memory Stick will be used by both the T4 I-Test and Gas-Pro I-Test when the conguration is uploaded to the I-Test.
To upload a conguration le from the USB Memory Stick, proceed as follows:
X Select Load from USB Memory Stick from the Home page.
X The Available USB Memory Stick dialogue box will be shown (see Figure 40).
Figure 40: Available USB Memory Stick dialogue box
59
Page 60
3.9.3.1 Select
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This allows a specic drive to be selected.
X Click on the required drive so that it is highlighted and then click Select. The Overview screen will
then be displayed (see Figure 41).
Figure 41: USB Flash Stick overview screen
X From this screen the following functionality can be changed:
• I-Test settings (see page 31)
• Field conguration (see page 41)
X When all the required changes have been made, select Save Conguration to save the changes
(see page 47).
60
Page 61

3.10 Data management

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
I-Test offers a number of data management options with regard to the data collected during normal operation of I-Test.
This allows full management of a eet of gas monitors
Data Management is available from the Home screen as shown in Figure 34.
X Click on Data Management and the screen will be shown as can be seen in Figure 42.
Figure 42: Data Management Screen
The following Data Management functions can be selected from this screen:
• Import logs from USB Memory Stick (see page 62)
• View Gas Monitor log les (see page 63)
• Create Reports (see page 70)
• Exception Reporting (see page 81)
• Report Customisation (see page 82)
61
Page 62

3.10.1 Import logs from USB memory stick

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
I-Test can be congured to allow gas monitor and I-Test activity log les to be downloaded to a USB
Memory Stick, see page 106.
In order to create calibration or bump test reports, I-Test action logs must be imported to
i
I-Test Manager.
Limited exception reports can be produced from importing I-Test action logs but for full exception report functionality gas monitor event logs must also be imported to I-Test Manager.
Once the required log les have been transferred to the USB Memory Stick they can be imported to
I-Test by the following process.
X From the Data Management screen select Import Logs > Import logs from USB memory stick.
X When selected, this option will cause the following screen to be displayed:
Figure 43: Select USB drive screen
X Click on the appropriate drive letter and click on Select. A screen will be displayed as the log les
are imported showing the import progress
X When the import is complete, the logs will be available in I-Test Manager for viewing/review.
62
Page 63
3.10.2 View gas monitor log les
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option provides the functionality to view gas monitor log les that have been imported from the USB Memory Stick. This may be gas monitor data log les or gas monitor event log les, dependent upon the conguration setting of the I-Test from which the log les were downloaded (see page 38).
When selected, this option will cause the following screen to be displayed:
Figure 44: Gas monitor log les screen
3.10.2.1 View gas monitor data Logs
X Select View gas monitor data logs to view the imported gas monitor data log les
X When selected, this option will cause the following screen to be displayed:
Figure 45: View Gas Monitor Logs screen
This screen offers the following functions:
63
Page 64
3.10.2.2 Gas Monitor Serial Numbers
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This shows the serial numbers of all gas monitors that have had data log les imported to I-Test
Manager.
X To view the data log les available for a specic gas monitor click the appropriate serial number.
This will then show all the log les available for this monitor by date reference.
X If the full data set is to be viewed then the serial number should be highlighted and the logged
data will be show in the graph as shown in Figure 46.
X If it is required to view only the data from a specic date in the list highlight the appropriate data
and the graph will be updated accordingly.
Figure 46: Gas data log graph
The graph shows all gas data which has been downloaded from the monitor.
The x-axis shows date and time, the left y-axis shows % (bundling together both LEL and VOL), and
the right y-axis shows ppm.
To the top-right of the graph is the information area. This is headed with the serial number of the
monitor, and the date/time that the data was retrieved from the device.
X The Gas Readings box enables individual data series to be shown or hidden by clicking the
appropriate checkboxes. By moving the mouse pointer over the graph area, the gas readings for
each data series will be shown in the gas readings box, along with the date/time.
64
Page 65
X To zoom in on the data, click and drag a box over the required data area.
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This will only zoom the x-axis; the y-axes must be zoomed using the axis controls area.
i
Entering a value in any of the text boxes will adjust the graph immediately with your new values. Alternatively you may use the buttons in the axis controls area to zoom.
X To reset an axis, use the reset x / % / ppm buttons. This will effectively undo all zoom operations
so all data can be viewed.
X To create a ‘comma separated value’ (CSV) le of the event data, click the Export to CSV button,
name the le, navigate to the required destination and save it to disk.
For a full explanation of the data log screen, see Appendix B: Graph Function Explained on page 118.
3.10.2.3 Date From/To
This option allows the user to select by date the gas monitor log les to be shown, these can then be
selected to view in the graphing function.
X Enter the required Date From and To by changing each value in the eld or clicking the calendar
button to the right of the eld.
The eld will be highlighted yellow to indicate a reduced set of available data is being
i
displayed.
3.10.2.4 Serial From/to
This option allows the user to select by serial number the gas monitor log les to be shown that can
then be selected to view in the graphing function.
X Enter the required Serial From and To by changing each value in the eld.
The eld will be highlighted yellow to indicate a reduced set of available data is being
i
displayed.
65
Page 66
3.10.2.5 Print
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
The print option allows a report to be printed for the selected serial number.
X To print a report select Print and the following screen will be shown.
Figure 47: Data log print screen
X It is now possible to print this report to a standard network printer by selecting the print icon.
66
Page 67

3.10.3 View gas monitor event logs

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
X Select View as monitor event logs to view the imported gas monitor event les. The following
screen to be displayed:
Figure 48: View gas monitor events logs Screen
This screen offers the following functions
67
Page 68
3.10.3.1 Gas Monitor Serial Numbers
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This shows the serial numbers of all gas monitors that have had an event log le imported into I-Test
Manager.
X To view the event log les available for a specic gas monitor click the appropriate serial number.
This will then show all the events recorded for this monitor as shown in Figure 49.
Figure 49: Gas Monitor Event Log Screen
3.10.3.2 Date From/To
This option allows the user to select by date the gas monitor event les to be shown that can then be
selected to view.
X Enter the required Date From and To by changing each value in the eld or clicking the calendar
button to the right of the eld.
The eld will be highlighted yellow to indicate a reduced set of available data is being
i
displayed.
68
Page 69
3.10.3.3 Serial From/To
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option allows the user to select by serial number the gas monitor event log les to be shown
that can then be selected to view.
X Enter the required Serial From and To by changing each value in the eld.
The eld will be highlighted yellow to indicate a reduced set of available data is being
i
displayed.
3.10.3.4 Print
The print option allows a report to be printed for the selected serial number.
X To print a report select Print and the following screen will be shown.
Figure 50: Gas monitor event log print
X It is now possible to print this report to a standard network printer by selecting the print icon.
69
Page 70

3.11 Create Reports

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This function allows calibration and bump test reports to be created from the data imported.
When selected, this option will cause the following screen to be displayed:
Figure 51: Create Reports Screen

3.11.1 Create Calibration Report

X Select Create calibration report to view all calibration data imported from I-Test units.
When selected, this option will cause the following screen to be displayed:
Figure 52: Instrument Calibration Summary Screen
This screen offers the following functions
70
Page 71
3.11.1.1 Gas Monitor Serial Numbers
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This shows the serial numbers of all gas monitors that have had calibration data imported into I-Test Manager.
X To view all calibrations for a specic gas monitor click the appropriate serial number. This will then
show a list of all the calibrations recorded for this monitor as shown in Figure 53.
Figure 53: Calibrations by serial number screen
3.11.1.2 Date From/To
This option allows the user to select, by date, gas monitors with calibration data such that these can then be selected and a calibration report created.
X Enter the required Date From and To by changing each value in the eld or clicking the calendar
button to the right of the eld.
The eld will be highlighted yellow to indicate a reduced set of available data is being
i
displayed.
71
Page 72
3.11.1.3 Serial From/To
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This option allows the user to select, by serial number, gas monitors with calibration data such that these can then be selected and a calibration report created.
X Enter the required Serial From and To by changing each value in the eld.
The eld will be highlighted yellow to indicate a reduced set of available data is being
i
displayed.
3.11.1.4 Print
There are three calibration report print functions:
Calibration Summary Report: To print an overview of all calibrations performed on all the gas monitors
selected as described above, ensure Gas monitor serial numbers is highlighted and press print and a screen showing a summary of all calibrations on all gas monitors will be displayed (see Figure 54):
The calibration summary report shows the following information for each calibration:
• Date of calibration
• Time of calibration
• Monitor Serial Number
• Monitor Type
• Event Type
• Overall Pass/Fail Result of Calibration
• I-Test Serial Number
• Print date of report
It is then possible to print this report to a standard network printer by selecting the print icon.
Figure 54: Calibration summary report
72
Page 73
Gas Monitor
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Calibration Summary Report To print an overview of all calibrations performed on a specic gas monitor,
ensure the required gas monitor serial numbers is highlighted and press print
and a screen showing a summary of all calibrations on a specic gas monitor
will be displayed (see Figure 55):
The gas monitor calibration summary report shows the following information for each calibration for
the specied gas monitor.
• Date of calibration
• Time of calibration
• Monitor Serial Number
• Monitor Type
It is then possible to print this report to a standard network printer by selecting the print icon.
Figure 55: Gas monitor calibration summary report
• Event Type
• Overall Pass/Fail Result of Calibration
• I-Test Serial Number
• Print date of report
73
Page 74
Gas Monitor
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Calibration Report: To print a calibration report for a specic calibration of a specic gas monitor on a
specic date, ensure the required date for the specic gas monitor serial number
is highlighted. The screen shown in Figure 56 will be displayed automatically.
The calibration report shows the following information
• Monitor Type
• Monitor Date (internal monitor date when tested)
• Monitor Time (internal monitor time when tested)
• Monitor Serial Number
• Date of Calibration
• Time of Calibration
• Overall Pass/Fail Result of Calibration
• Next Calibration Due Date
Note: If the gas cylinder used for the calibration had the cross calibration option selected (see page
27) two % LEL values will be shown in the calibration report for the ammable gas sensor. The
rst value is the equivalent % LEL level of the gas used to determine a pass or fail result, the second value is the actual % LEL level of CH4 in the cylinder.
It is then possible to print this report to a standard network printer by selecting the print icon.
• Sensors Types Tested
• Gas Level Applied
• Units of applied gas
• Cylinder Expiry Date
• Cylinder Lot Number
• Sensor Calibration Due Date
• Sensor Pass/Fail Result
A T4 gas monitor calibration report and a Gas-Pro gas monitor calibration report are shown on page 75.
Please note that theT4 gas monitor calibration report indicates FLAM gas congured and its correction factor, in this case ‘Methane, 1.00’. Please refer to Portables-Pro 2.0 User Manual for further details on congured gas types for T4.
74
Page 75
Figure 56: T4 Gas monitor calibration report
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Figure 57: Gas-Pro Gas monitor calibration report
75
Page 76

3.11.2 Create Bump Test Report

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
X Select Create bump test report to view all bump test data imported from I-Test units.
When selected, this option will cause the following screen to be displayed:
Figure 58: Instrument Bump Test Summary Screen
This screen offers the following functions:
76
Page 77
3.11.2.1 Gas Monitor Serial Numbers
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This shows the serial numbers of all gas monitors that have bump test data imported to I-Test Manager.
X To view all bump tests for a specic gas monitor click the appropriate serial number. This will then
show a list of all the bump tests recorded for this monitor as shown in Figure 59.
Figure 59: Bump test by serial numbers screen
3.11.2.2 Date From/To
This option allows the user to select, by date, gas monitors with bump test data such that these can then be selected and a bump test report created.
X Enter the required Date From and To by changing each value in the eld or clicking the calendar
button to the right of the eld.
The eld will be highlighted yellow to indicate a reduced set of available data is being
i
displayed.
3.11.2.3 Serial From/To
This option allows the user to select, by serial number, gas monitors with bump test data such that these can then be selected and a bump test report created.
X Enter the required Serial From and To by changing each value in the eld.
The eld will be highlighted yellow to indicate a reduced set of available data is being
i
displayed.
77
Page 78
3.11.2.4 Print
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
There are three Bump test report print functions:
Bump Test Summary Report: To print an overview of all bump tests performed on all the gas monitors,
selected as described above, ensure Gas monitor serial numbers is highlighted and press print. A screen showing a summary of all bump tests performed on all gas monitors will be displayed (see Figure 60):
The calibration summary report shows the following information for each calibration:
• Date of bump test
• Time of bump test
• Monitor Serial Number
• Monitor Type
It is then possible to print this report to a standard network printer by selecting the print icon.
Figure 60: Bump test summary report
• Event Type
• Overall Pass/Fail Result of bump test
• I-Test Serial Number
• Print date of report
78
Page 79
Gas Monitor Bump
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Test Summary Report: To print an overview of all bump tests performed on a specic gas monitor,
ensure the required gas monitor serial number is highlighted and press print
and a screen showing a summary of all bump tests undertaken on a specic
gas monitor will be displayed (see Figure 61).
The gas monitor bump test summary report shows the following information for each bump test for
the specied gas monitor:
• Date of bump test
• Time of bump test
• Monitor Serial Number
• Monitor Type
It is then possible to print this report to a standard network printer by selecting the print icon.
Figure 61: Gas monitor bump test summary report
• Event Type
• Overall Pass/Fail Result of bump test
• I-Test Serial Number
• Print date of report
79
Page 80
Gas Monitor Bump
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Test Report: To print a bump test report for a specic bump test of a specic gas monitor on a
specic date, ensure the required date for the specic gas monitor serial number
is highlighted. The screen shown in Figure 62 will be displayed automatically.
The bump test report shows the following information:
• Monitor Type
• Monitor Date (internal monitor date when tested)
• Monitor Time (internal monitor time when tested)
• Monitor Serial Number
• Date of bump test
• Time of bump test
• Overall Pass/Fail Result of bump test
• Next bump test Due Date
Note: If the gas cylinder used for the bump test had the cross calibration option selected (see page
27) two % LEL values will be shown in the bump test report report for the ammable gas sensor. The
rst value is the equivalent % LEL level of the gas used to determine a pass or fail result, the second value is the actual % LEL level of CH4 in the cylinder.
It is then possible to print this report to a standard network printer by selecting the print icon.
Figure 62: Gas monitor bump test report
• Sensors Types Tested
• Gas Level Applied
• Units of applied gas
• Cylinder Expiry Date
• Cylinder Lot Number
• Sensor Pass/Fail Result of bump test
• Sensor Pass/Fail bump test
80
Page 81

3.12 Exception Reporting

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Exception reports provide the ability to review and co-ordinate data with regard to the management
of a eet of gas monitors.
Once the relevant data has been collected from I-Test and imported into I-Test Manager it is possible to produce a selection of exception reports with various criteria.
It is for example possible to create an exception report that will list all gas monitors that have passed a bump test, or produce a report that lists all gas monitors that have failed a calibration. There are many variants of exception report that can be produced, this section details this process.

3.12.1 Creating an Exception Report

Exception reports can only be created for gas monitors that have been inserted into an I-Test and then (dependant upon requirements of exception report) had I-Test Action log and gas monitor event log, extracted from I-Test and imported to I-Test Manager.
X Select Exception Reporting to create an exception report.
When selected, this option will cause the following screen to be displayed:
Figure 63: Exception Reporting Screen
The following Exception Reporting Screen functions can be selected from this screen:
• Exception Report Settings (see page 82)
• Create Exception Report (see page 85)
• Monitor Status (see page 86)
81
Page 82

3.12.2 Exception Report Settings

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
These settings control the parameters of the exception report produced.
X Select Exception Report Settings and the following screen will be displayed.
Figure 64: Exception Report Settings screen
These settings control the gas monitors that will appear in the report when the exception report is created.
3.12.2.1 Gas Test Reporting
For an instrument to appear in the exception report for the following settings the I-Test
i
Action log les must have been downloaded from I-Test and imported into I-Test Manager.
Bump Test
Pass: If this tick box is selected gas monitors that have passed either a speedy or a
smart bump will appear in the exception report.
Fail: If this tick box is selected gas monitors that have failed either a speedy or a
smart bump will appear in the exception report.
Not Seen: Select this tick box and enter a value in the days eld and any gas monitors
that have not had a bump test in the specied number of days will appear in
the exception report.
82
Page 83
Calibration
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Pass: If this tick box is selected gas monitors that have passed either a standalone
calibration or a bump test fail calibration will appear in the exception report.
Fail: If this tick box is selected gas monitors that have failed either a standalone
calibration or a bump test fail calibration will appear in the exception report.
Cal Due in
Select this tick box and enter a value in the days eld and gas monitors that are due a calibration in the specied number of days will appear in the exception report.
Alarm Reporting
For an instrument to appear in the exception report for the following settings the I-Test
i
Action log les, and gas monitor event log les must have been downloaded from I-Test
and imported into I-Test Manager.
Alarm 1
If this tick box is selected gas monitors that have been exposed to a gas level exceeding the alarm level one threshold, will appear in the exception report.
TWA Alarm
If this tick box is selected gas monitors that have been exposed to a gas level exceeding the TWA threshold will appear in the exception report.
Alarm 2
If this tick box is selected gas monitors that have been exposed to a gas level exceeding the alarm level two threshold, will appear in the exception report.
Faults
If this tick box is selected gas monitors that have logged a fault will appear in the exception report.
83
Page 84
Dates
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
All: If this tick box is selected all gas monitors that meet the requirements of the
previous settings will appear in the exception report.
This year: If this tick box is selected all gas monitors inserted into the I-Test within the last
year and that meet the requirements of the previous settings will appear in the exception report.
Last month: If this tick box is selected all gas monitors inserted into the I-Test within the last
month and that meet the requirements of the previous settings will appear in the exception report.
Last number of days: If this tick box is selected all gas monitors inserted into the I-Test within the
time period entered in the days box and that meet the requirements of the previous settings will appear in the exception report.
Range of dates: This option allows the user to select the date range over which date all
gas monitors inserted into the I-Test and that meet the requirements of the previous settings will appear in the exception report.
Enter the required Date From and To by changing each value in the eld or
clicking the calendar button to the right of the eld.
Save Settings
Save: Once all the required selections have been made the exception report button
can be selected, however if it is required to save these settings such that future reports will implement the same selections press Save.
84
Page 85

3.12.3 Create Exception Report

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Once all the required selections have been made select create exception report to create the exception report. The following screen will be displayed dependant upon settings made.
Figure 65: Exception Report
85
Page 86
3.12.3.1 Monitor Status
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
These settings control the gas monitors that will appear in the exception report produced.
This function allows instruments to be removed from the exceptions reports, this may be necessary if for example instruments are lost or damaged and will prevent instruments not required being continually reported as not been bump tested or calibrated.
X Select Monitor Status and the following screen will be displayed:
Figure 66: Monitor Status
This will show a status summary of all gas monitors listed by serial number.
This list of serial numbers represents all instruments that if meeting the requirements of the exception reporting settings will appear in the exception report.
86
Page 87
X To remove an instrument from appearing in the exception report simply highlight the required
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
instrument and press delete. The following screen will then be shown.
Figure 67: Reason for Deletion Screen
This allows a reason for deletion to be inserted for future reference.
X Once a reason has been entered select OK and the screen will return to the Monitor Status
screen and the selected serial number will now be removed.
Any further exception reports produced will now not include this monitor.
3.12.3.2 Show deleted serial numbers
If this tick box is selected then instruments previously deleted can be seen in the Monitor Status screen including the comment for deletion.
3.12.3.3 Re-instate
If a monitor is deleted but at a later date is required to be included once again in the exception reports, this can be achieved as follows:
X Select the serial number of the deleted device and press Re-instate.
X Click OK when asked to conrm re-instating the monitor.
87
Page 88

3.13 Information and Settings

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
When the Information and settings function is selected, the following screen will be displayed:
Figure 68: Information and settings screen
The following functions can be selected from this screen:
• About (see below)
• Settings (see page 89)
• Support (see page 89)

3.13.1 About

Selecting About will return the display to the screen shown above.
88
Page 89

3.13.2 Settings

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This function enables the database settings to be changed as follows:
X Select Settings from the menu. The screen shown below will be displayed.
Figure 69: Settings screen

3.13.3 Support

When this option is selected, the following screen will be displayed:
Figure 70: Support screen
89
Page 90
4. Conguring I-Test via Front Panel Keypad
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
It is possible to congure I-Test to perform the desired test actions by creating a conguration in
I-Test Manager and uploading to I-Test , either directly via the USB port (see page 48) or via a the USB Flash Stick (see page 52), or via the selections available via the I-Test keypad on the front panel.
This section describes the features and functions available to congure the I-Test via the I-Test
keypad on the front panel

4.1 Front panel layout

Figure 71: Front panel
À Display screen Á Control buttons  Charging indicator à Test Status indicator
À
Á
Â
Ã
90
Page 91

4.1.1 Home screen

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
The I-Test display screen is divided into the following areas:
Figure 72: Display screen areas
À
À Date & time Á Banner  Icon area
Á
13 May 2013 11:30:45
I-Test
Â

4.1.2 I-Test Safe Shutdown

If it is required to remove power from I-Test either by removing the power lead or switching off via the
on/off push button, then the following process must be followed to safely power down I-Test.
The safe shutdown icon can be seen on the home screen
When the icon indicates a cross then I-Test should not be switched off or have power removed.
To switch off I-Test use the arrow keys to navigate to the safe shutdown icon.
Press the
safely have the power removed or be switched off (ashing tick indicates time out for safe shutdown
about to expire).
The icon will revert back to the after approximately 15 seconds if the
I-Test must not be switched off or have power removed whilst the is shown
OK
key and the icon will change to display a tick this indicates that I-Test can now
OK
is not pressed.
i
91
Page 92

4.1.3 Control buttons

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
The 5 control buttons (shown below) on the I-test front panel are used for navigation and the selection of functions, and are also used to increment and decrement values in certain contexts (e.g.
entering the PIN code).
Figure 73: Control buttons
OK
The icon will display the previous menu screen.
i

4.1.4 I-Test charging indicator

The charging indicator indicates the current charging status as follows:
• Solid green – Running on External Mains Power
• Solid Yellow - Running on internal battery
• Solid red - Internal battery low

4.1.5 Test Status indicator

The test status indicator shows the current state of the test in progress or the result of the last test undertaken
• Solid green: Test Passed
• Flashing Yellow: Test in progress
• Solid red: Test Failed
The status of the last test is also shown on I-Test front panel (see page 18).
92
Page 93

4.2 Accessing the I-Test Main menu

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
To access the I-Test main menu, the PIN code has to be entered as follows:
X When the I-Test is turned on, the Home screen À will be displayed.
X Press
Figure 74: PIN entry
OK
to enter the PIN code entry screen Á.
13 May 2013 11:30:45
I-Test
13 May 2013 11:30:45
I-Test
13 May 2013 11:30:54
I-Test
OK
À
X Use the and keys to increment or decrement the rst digit of the PIN code until the
correct number is displayed.
X Press the key to move to the next digit and repeat the above procedure until the next
number is correctly displayed.
X Carry on until all 6 numbers are displayed correctly and press
displayed.
Note: The default PIN code as manufactured is 000000, this can be changed if required
i
please refer to Section 3.7.3.5 on page 39.
If the I-Test is left idle, after a preset time (see page 31) the Home screen will be
i
displayed.
Á Â
OK
. The Main menu  will be
93
Page 94

4.3 Inlet setup

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This functionality allows the user to select a specic predened cylinder prole to be allocated to the
gas inlet that will be used during normal operation of the I-Test,
A cylinder prole can only created with the Manage Cylinders function in I-Test Manager (see page
25) but once uploaded to I-Test, a specic cylinder prole can be assigned to an inlet.
Before a gas monitor can be tested the predened cylinder must be congured to be assigned to the inlet and have parameters dened such as actual gas value, Lot number and expiry date.
To fully dene cylinder proceed as follows:
X Access the Main menu (see page 93). X From the Main menu use the arrow keys to highlight the inlet setup icon À.
X Press the X Use the arrow keys to highlight the required inlet to set up  and press
screen will be displayed Ã.
Figure 75: Inlet setup functions
13 May 2013 11:30:45
OK
key. The Inlet Function screen Á will be displayed.
13 May 2013 11:30:45
I-Test
I-Test
OK
. The Inlet Setup
13 May 2013 11:30:54
I-Test
Â
OK
OK
À
Á
Ã
X The following options are available:
• This function allows the cylinder prole to be selected from a list of predened
cylinders uploaded via I-Test Manager (see page 95)
• This function enables the user to enter the actual concentration of the gas in the physical cylinder to be connected to I-Test. This should be read from the label on the cylinder (see page 96)
• This function enables the user to enter the Lot number of the physical cylinder to be connected to I-Test. This should be read from the label on the cylinder (see page 97)
• This function enables the user to enter to enter expiry date of the physical cylinder to be connected to I-Test. This should be read from the label on the cylinder (see page 98)
94
Page 95
4.3.1 Select cylinder prole
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
X From the Inlet Setup screen use the arrow keys to highlight the cylinder type icon À.
X Press the X Use the and keys to highlight the required cylinder prole  (quad shown) and press
OK
X If whilst the Cylinder prole screen is displayed the selection is to be aborted, press the key.
Figure 76: Cylinder prole selection
OK
key. The Cylinder prole selection screen Á will be displayed.
. The cylinder type will be selected and the Inlet Setup screen will be redisplayed.
13 May 2013 11:30:45 13 May 2013 11:30:45
I-Test
I-Test
Â
À
OK
Á
95
Page 96

4.3.2 Setting Cylinder Gas Concentrations

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
For the selected cylinder prole the actual gas concentration of each gas dened within the cylinder
must be checked against the physical cylinder to be connected to I-Test and, if necessary, adjusted.
X From the Inlet Setup screen use the arrow keys to highlight the cylinder concentration icon À.
X Press the
If a multiple gas cylinder has been set for the selected inlet, a choice of gases will be
i
displayed. Use the selection process described on page 95 to select the required gas and then continue.
X Use the and keys to highlight the required value to adjust Â
X Use the and keys to increase or decrease the value.
X Repeat this to adjust all the relevant values and press
The Gas concentration will be set and the Inlet Setup screen will be redisplayed or, if a multiple gas cylinder has been selected for the inlet, the choice of gases will be redisplayed.
X If whilst the Gas Concentration setting screen is displayed the adjustment is to be aborted, press
the key.
Figure 77: Gas Concentration setting screen
OK
key. The Gas Concentration setting screen Á will be displayed.
OK
when the adjustment is complete.
13 May 2013 11:30:45 13 May 2013 11:30:45
I-Test
I-Test
À
OK
96
0 1 8 0 . 0 0 0
Á
%VOL
Â
Page 97

4.3.3 Setting Cylinder Lot Number

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
For the selected cylinder prole the cylinder lot number must be checked against the physical
cylinder to be connected to I-Test and, if necessary, adjusted.
X From the Inlet Setup screen use the arrow keys to highlight the cylinder lot number icon À.
X Press the X Use the and keys to highlight the required number to set Â
X Use the and keys to select the desired number or letter.
X Repeat this to adjust all the relevant digits and press
lot number will be set and the Inlet Setup screen will be redisplayed.
X If whilst the Cylinder Lot Number setting screen is displayed the adjustment is to be aborted,
press the key.
Figure 78: Cylinder Lot Number screen
OK
key. The Cylinder Lot Number screen Á will be displayed.
OK
when the adjustment is complete. The
13 May 2013 11:30:45 13 May 2013 11:30:45
I-Test
I-Test
À
OK
K]mes---------------
Â
Á
97
Page 98

4.3.4 Setting Cylinder expiry date

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
For the selected cylinder prole the cylinder expiry date must be checked against the physical
cylinder to be connected to I-Test and, if necessary, adjusted.
X From the Inlet Setup screen use the arrow keys to highlight the cylinder expiry date icon À.
key.
OK
key. The Cylinder Expiry Date screen Á will be displayed.
OK
when the adjustment is complete. The
13 May 2013 11:30:45 13 May 2013 11:30:45
I-Test
I-Test
X Press the X Use the and keys to highlight the required number to set Â
X Use the and keys to increase or decrease the value.
X Repeat this to adjust all the relevant digits and press
expiry date will be set and the Inlet Setup screen will be redisplayed.
X If whilst the Cylinder Expiry Date screen is displayed the adjustment is to be aborted, press the
Figure 79: Cylinder Expiry Date screen
OK
2012 10 26
À
Â
Á
98
Page 99
4.4 Conguring I-Test Test Sequence
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
This functionality allows the user to dene the test, or the sequence of tests that I-Test will undertake
in normal operation.
This selection will dene the test or sequence of tests I-Test will undertake when a gas monitor is
inserted and the door closed. This sequence will be fully automated by the I-Test.
I-Test can be congured via the front panel key pad to undertake the following tests:
• Speedy bump (see page 100)
• Smart bump (see page 101)
• Calibration (see page 102)
• Download Monitor log Files (see page 104)
To manually carry out a test and/or a calibration on a gas monitor mounted in the I-Test, proceed
as follows:
X Access the Main menu (see page 93). X From the Main menu use the arrow keys to highlight the Enable Test Stages icon À.
X Press the X Use the and keys to highlight the Test icon  and press
displayed Ã.
Note: Smart bump functionality is only applicable to Gas-Pro, a T4 I-Test test screen will not display
the smart bump icon .
OK
key. The Enable Test Stages screen Á will be displayed.
OK
. The Tests screen will be
Figure 80: Test Sequence Screen Selection
13 May 2013 11:30:45 13 May 2013 11:30:45
I-Test
I-Test
13 May 2013 11:30:45
I-Test
À
OK
Â
OK
Á Ã
To select a test use the arrow keys to navigate to the required icon then press
A box will now appear around the icon indicating this function has been selected this test will be performed if a gas monitor is inserted into the I-Test.
OK
If the selected and will not be performed if a gas monitor is inserted into the I-Test.
button is pressed again this will deselect the icon and the function will no longer be
OK
to highlight the icon.
99
Page 100

4.4.1 Speedy bump

Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Conguring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specication
Select this option to undertake a speedy bump on all sensors when the gas monitor is inserted into I-Test.
A speedy bump will test the gas monitor sensors to the rst alarm level.
X To select a Speedy Bump in the sequence, from the Test Sequence screen use the arrow keys to
navigate to the Speedy Bump icon then press
X A box will now appear around the icon indicating that Speedy Bump function has been selected
and this test will be performed if a gas monitor is inserted into the I-Test.
X Press to return to Test Settings screen and then press again to return to main menu
screen.
Note: Smart bump functionality is only applicable to Gas-Pro, a T4 I-Test test screen will not display
the smart bump icon .
Figure 81: Speedy Bump screen
13 May 2013 11:30:45
OK
to highlight the Speedy Bump icon À.