![](/html/ff/ff57/ff571f7f88a2e6310b6fa8b39a20eff92c457093b0f159ac3bbad54ed41e7976/bg1.png)
Model INTEGRA PRE-INSTALLATION CHECKLIST
THIS FORM MUST BE COMPLETED AND SUBMITTED TO CONCORDIA BEFORE INSTALLATION WILL BE SCHEDULED
FAX #425.453.1490 - ATTENTION INSTALLATION COORDINATOR
The installation visit includes the following: Set-up, test, calibration and customer training. If more than one visit is required to complete
the installation due to unprepared site, return visits will be billable at $200.00 each.
Company Name
Contact Name
Site Address
Billing Address
Phone
Fax
SITE PHYSICAL REQUIREMENTS
LOCATION: The countertop must support at least 300lbs. Minimum
countertop space: 25" (64cm) W x 29" (74cm) D x 40" (102cm) H.
Actual machine dimensions are smaller, extra space is required
for Service Access. Access holes for the drain and water hoses must
be cut into the countertop. See Access Holes Diagram.
For Cabinet Installations: Proper air circulation, ventilation, and
accessibility needs must be met. The air going into the machine
must not exceed 82ºF (27.7ºC). The machine must be moveable. If
you are installing the IBS in a cabinet or other enclosed space,
please contact Concordia prior to installation.
ELECTRICAL: NEMA L6-30R receptacle. Minimum 208VAC on
dedicated 30AMP circuit. Must be located within 5 feet of machine.
WATER: Cold water source with a female 1/4" or 3/8” NPT fitting and
shut-off valve. Min. 30psi, Max. 100psi, 25gpm. If your location has a
Reverse Osmosis System, a freshwater bypass is required. Water
hardness must not exceed 3gpg.
WATER TREATMENT SYSTEM: Space must be available to install
water treatment system. Must be located within 5 feet (1.5 meters) of
machine. Dimensions: 11.5” (29cm) W x 5” (13cm) D x 20.5” (52cm)
H. Unit is mounted on the wall.
DRAIN: Connection for a 3/4" (1.9cm) ID drain hose. Must be located
within 5 feet (1.5 meters) of machine.
AMBIENT AIR TEMPERATURE: The air temperature around the
machine must not exceed 82ºF (27.7ºC), to ensure the refrigeration
unit and the machine operate properly.
CUSTOMER SUPPLIED CONSUMABLES
BEANS
MILK
CUPS
I HAVE READ AND UNDERSTAND THIS DOCUMENT & CONFIRM THESE REQUIREMENTS HAVE BEEN MET. Make copy for your records.
Whole espresso beans (regular and decaf). Minimum 5lbs
each.
1 gallon milk (e.g.2%, 1%, or non-fat )
Two sizes (e.g. 8oz/240mL and 12oz/360mL). Minimum 30
each.
IF APPLICABLE, PLEASE SUPPLY
Construction Company Name
Construction Contact Name
Phone
Fax
INTEGRA INSTALLATION DIMENSIONS
ELECTRICAL
GROUND
WATER TREATMENT SYSTEM DIMENSIONS
25”
64cm
40”
102cm
29”
74cm
NEMA L6-
RECEPTAC
TERMIN
30R
LE
PHASE
ALS
Customer Name (Print):
Customer Signature:
For Assistance Call: 800.778.0990 6000-071B
_________________________________________________ Title: ______________________________
___________________________________________________Date: ________________________
![](/html/ff/ff57/ff571f7f88a2e6310b6fa8b39a20eff92c457093b0f159ac3bbad54ed41e7976/bg2.png)
Access Holes Diagram
For Assistance Call: 800.778.0990 6000-071B