Comnet NetWave NW8, NetWave NW8E Quick Start Manual

QUICK START GUIDE
INDUSTRIAL OUTDOOR 802.11A/B/G/N DUAL RADIO WIRELESS ETHERNET
This manual serves the following ComNet Model Numbers:
NW8 NW8E
Thank you for purchasing NetWave® from ComNet. This quick start guide is designed to walk you through installation.
NW8: Industrial Multipoint, FCC Version, User Configurable NW8E: Industrial Multipoint, ETSI Version, User Configurable
An easy to read LED array displays unit operational status along with received signal strength for Radio 1 ensuring optimal installation and operation. See Figure 2 on Page 2 for LED Indicator explanations.
See Figures 3 through 6 beginning on Page 3 for mounting instructions.
INS_NW8_NW8E_QS_REV– 05/20/13 PAGE 1
QUICK START USER GUIDE NW8/NW8E
FIGURE 1 – INDUSTRIAL DUAL RADIO WIRELESS ETHERNET DEVICE
RJ-45 PORT 1 RJ-45 PORT 2
FIGURE 2 – STATUS LED INDICATIONS
LED VISUAL CUE INDICATION
POWER
POWER
ETHERNET / RSSI2
SIGNAL STRENGTH:
RSSI3
ETHERNET / RSSI2
RSSI34 / STATUS
RSSI3 SOLID GREEN Good signal strength
RSSI4 / STATUS
BACKFRONT
SOLID GREEN Power is supplied to the NW8/NW8E
OFF No power is supplied to the NW8/NW8E
FLASH GREEN Ethernet connection is established
SOLID YELLOW Ethernet connection is established and there is activity present
RSSI Level is > Yellow LED Threshold
OFF No Ethernet connection established. RSSI Level is < Yellow LED Threshold
FLASH GREEN Unit is booting up
SOLID GREEN Excellent signal strength
(Advisable to check Status Page to confirm RSSI is <70)
MINIMUM SIGNAL MAXIMUM SIGNAL
TECH SUPPORT: 1.888.678.9427
INS_NW8_NW8E_QS_REV– 05/20/13 PAGE 2
QUICK START USER GUIDE NW8/NW8E
FIGURE 3 – INSTALLATION INSTRUCTIONS
Step 1.
Unpack the mounting hardware from the box. Determine if this will be a pole or wall mount application. The included Mounting kit is designed to support poles up to 3 in (7.6 cm) in diameter. If surface or wall mounting, the optional NWBKT1 hardware will be required.
Step 2.
A. Route the RJ45 connectorized Ethernet cable through the
weather tight gland connection as shown at left.
Note: The slit rubber washer allows a pre-terminated
Ethernet cable to be used.
Once the cable has been routed through the weather
connection as shown above, push the split rubber gasket into place and loosely screw the cap that goes over the rubber washer.
A B
B. Snap the RJ-45 connector in place as shown
Step 3.
Slide the weather proof assembly over the cable so it can be screwed into the enclosure gland. Make sure the rubber sealing ring is in place as shown in step 2B.
Tighten the weather proof assembly into the enclosure and also tighten the cap that squeezes the rubber washer over the Ethernet cable as shown.
Step 4.
A. Connect one end of an RJ-45 Ethernet cable to the OUT
port of the Power Injection Module (PIM) and the other end
Ethernet Network
B
A
E
C
E
P2P1
D
E
to LAN of the access point.
Maximum length of the RJ-45 CAT5 cable is 100 meters when powering only the Access Point. Maximum length is 30 meters if Access Point powers an external Powered Device.*
B. Connect the RJ-45 Ethernet cable attached to the PIM to a
network device, such as to a switch or to the PC you will use to configure the access point.
C. Connect the power cord to the main electrical supply and
the IEC plug into the socket of the PIM.
PoE power input: Passive PoE (range 48 to 57 VDC) The NW8[E] can also be powered by a suitable IEEE
802.3af/at PSE device such as a PoE switch or the included CNGE1IPS injector.
D. Connect the RJ-45 cable from Port 2 on the access point to
an external PoE device, typically a camera as shown.
E. A Drip Loop is recommended as additional precaution
against moisture.
* Up to 200mW radio. For higher power radio upgrade to higher rating
power adapter.
TECH SUPPORT: 1.888.678.9427
INS_NW8_NW8E_QS_REV– 05/20/13 PAGE 3
Loading...
+ 6 hidden pages