DrillerToggle® New Installation Instructions - October 7, 2020
1
4
2-5/8"
MIN.
INSTRUCTIONS :
"
2
MIN.
2
5
3
1. - Using a screwdriver, push the tip of the DrillerToggle® into drywall and turn clockwise until
the threads go through the wall.
2. - Push the DrillerToggle® until the helix is flush with the wall and the arrow at 7 o’clock
(as shown in picture 3).
3. - Turn clockwise until the DrillerToggle® head is flush with wall and the arrow at 12 o’clock.
4. - Insert the screw through the object you need to affix and into the DrillerToggle® and push
until you feel a resistance.
5. - Turn the screw clockwise until firmly in place.
WARNINGS :
• Do not use in insulated drywall.
• To deploy properly, the anchor needs a MINIMUM clearance of 2-5/8” behind the gypsum board.
• Be sure to install the anchor at a MINIMUM distance of 2” from the wood studs behind the gypsum board.