Cobra 150GTL Alignment Procedure

150GTL ALIGNMENT REVISION: 1.0 BURKE
ALIGNMENT PROCEDURE
MODEL: 150GTL
REVISION: 1.1
DATE: 02/14/06
Total Pages: 6 pages
Page:1 print date: 2/14/06
150GTL ALIGNMENT REVISION: 1.0 BURKE
150GTL ALIGNMENT INSTRUCTION
1 TEST CONDITION:
1.0. TEST TEMPERTAURE: 77 ±9 °F
1.1. STANDARD DC POWER: 13.8VDC
1.2. STANDARD AUDIO LOADING: 8
1.3. ANTENNA IMPEDANCE: 50
1.4. STANDARD REF. MODULATION: AM 30% FM 2.5KHz
1.5. PULSE GENERATOR: 1µS pulse @ 100mS and 1V peak-to-peak amplitude, with rise and fall time of less than 10nS.
1.6. TEST EQUIPMENT SETUP AS BELOW: A. TX test equipment setup:
Power
Supply
Modulation
Meter
RF
Wattmeter
Dummy
Load
150 GTL
Generator
Audio
Page:2 print date: 2/14/06
150GTL ALIGNMENT REVISION: 1.0 BURKE
RF Signal
B. RX test equipment setup:
AC
VTVM
Generator
Oscilloscope
150GTL
Power
Supply
8 ohm Load
Noise Pulse
Generator
2.0
MAIN ALIGNMENT
2.1 PLL Alignment
STEP PRESET TO CONNECTIONS ADJUST PROCEDURE
RX mode, AM,
1
28.000MHz
2 Change to Band D Oscilloscope to TP1
Oscilloscope to TP1 T712
DC level should be < 6V
Check for range of 0.2 to 7VDC, then set to 2.8V
3 Same as step 1 Oscilloscope to TP2 T713 Adjust for maximum output
4 Same as step 1
5 Same as step 1
2.2 Carrier Alignment
STEP PRESET TO CONNECTIONS ADJUST PROCEDURE
TX mode, AM,
1
28.000MHz
Page:3 print date: 2/14/06
Oscilloscope to 4th test point of CON2 Frequency counter to TP3
Frequency counter to TP3
T717 Adjust for maximum output
CT1
CT2 Adjust for 28.000MHz
Adjust for 17.305MHz (frequency – 10.695)
Loading...
+ 4 hidden pages