Cisco SG350-8PD, SG350-28P, SG350-10, SG350-10P, SG350-28 User Manual

...
4 (1)

Quick Start Guide

Cisco 350 Series Managed Switches

Welcome

Thank you for choosing the Cisco 350 Series Managed Switches. The switches are designed to be operational right out-of-the-box as standard layer 2 and 3 switches. Using the default configuration, your switch forwards packets between the connecting devices after power up.

This guide familiarizes you with the switch layout and describes how to deploy the switch in your network. For additional information, see www.cisco.com/go/350switches.

Package Contents

Your Cisco 350 Series Managed Switch

Power Cord

Rack-Mount Kit and Rubber Feet

Wall Mounting Package for SG350-10, SG350-10P, SG350-10MP

DB-9 to RJ45 Serial Cable

Quick Start Guide

Pointer Card with China RoHS

Technical Support Contacts

EU Directives 1999/5/EC Compliance Information (for EU SKU only)

1 Before You Begin

Before you begin the installation, make sure that you have the following:

Category 5e or higher RJ-45 Ethernet cables for connecting network devices.

Console cable for using the console port to manage your switch.

Tools for installing the hardware. The rack-mount kit packed with the switch contains four rubber feet for desktop placement, and two brackets and twelve screws for rack-mounting. If the supplied screws are lost, use replacement screws in the following size:

Diameter of the screw head: 6.9 mm

Length of face of screw head to base of screw: 5.9 mm

Shaft diameter: 3.94 mm

The wall mount kit includes screws and anchors. If the supplied screws are lost, use replacement screws in the following size:

2

Cisco 350 Series Managed Switches

Diameter of the screw head: 6.8 mm

Length of face of screw head to base of screw: 16 mm

Shaft diameter: 3.5 x 1.3 mm

Computer with Internet Explorer (version 9.0, 10.0, 11.0), or Firefox (version 36.0, 37.0, or higher), or Chrome (version 40,41,42 or higher) for using the web-based interface or the console port to manage your switch.

2 Mounting the Cisco 350 Series Switches

Depending on your switch, there are two or three ways to install the switch:

Place the switch on a flat surface. To place the switch on a desktop, install the four rubber feet (included) on the bottom of the switch.

Mount the switch in a standard rack (1 rack unit high).

Most of the 350 Series Cisco switches include wall-mounting slots on the bottom of the device.

Placement Tips

Do not deploy the switch in a location where any of the following conditions exist:

Ambient Temperature—To prevent the switch from overheating, do not operate it in an area that exceeds an ambient temperature of 122°F (50°C).

Air Flow—Be sure that there is adequate air flow around the switch.

Mechanical Loading—Be sure that the switch is level and stable to avoid any hazardous conditions.

Circuit Overloading—Adding the switch to the power outlet must not overload that circuit.

Rack Mounting

You can mount the switches in any standard size, 19-inch (about 48 cm) wide rack. The switch requires 1 rack unit (RU) of space, which is 1.75 inches (44.45 mm) high.

CAUTION For stability, load the rack from the bottom to the top, with the heaviest devices on the bottom. A top-heavy rack is likely to be unstable and might tip over.

Cisco 350 Series Managed Switches

3

Cisco SG350-8PD, SG350-28P, SG350-10, SG350-10P, SG350-28 User Manual

To install the switch into a 19-inch standard chassis:

STEP 1 Place one of the supplied brackets on the side of the switch so that the four holes of the brackets align to the screw holes, and then use the four supplied screws to secure it.

STEP 2 Repeat the previous step to attach the other bracket to the opposite side of the switch.

STEP 3 After the brackets are securely attached, the switch is now ready to be installed into a standard 19-inch rack.

400925

Wall Mounting

Most of the 350 Series Cisco switches include wall-mounting slots on the bottom of the device. The SG355-10P cannot be wall-mounted.

WARNING Insecure mounting may damage the device or cause injury. Cisco is not responsible for damages incurred by insecure wall or ceiling mounting.

To mount your switch to a wall:

STEP 1 Determine where you want to mount the device. Verify that the surface is smooth, flat, dry, and sturdy.

STEP 2 Drill two pilot holes into the surface of the wall 94 mm apart.

STEP 3 Insert a screw into each hole, leaving a gap between the surface and the base of the screw head.

4

Cisco 350 Series Managed Switches

STEP 4 Place the bottom of the switch over the screws and slide the switch down until the screws fit snugly into the slots.

3 Connecting Network Devices

To connect the switch to the network:

STEP 1 Connect an Ethernet cable to the Ethernet port of a computer, printer, network storage, or other network devices.

STEP 2 Connect the other end of the Ethernet cable to one of the numbered Ethernet ports of the switch.

The Ethernet port light turns green when the connection is active. Refer to Cisco 350 Series Switch Features for details about the different ports and LEDs on each switch.

STEP 3 Repeat Step 1 and Step 2 for each device that you want to connect to the switch.

NOTE A category 5e and higher cable is required for all ports. When you connect your network devices, do not exceed the maximum cabling distance of 100 meters (328 feet). It can take up to one minute for the attached devices or the LAN to be operational after it is connected. This behavior is normal.

Power over Ethernet Considerations

WARNING The switch is to be connected only to PoE networks without routing to the outside plant.

If your switch is one of the Power over Ethernet (PoE) models, consider the following power requirement:

350 Switches with Power Over Ethernet

Model

Power

Number of Ports

PoE Standard

 

Dedicated

Supporting PoE

Supported

 

to PoE

 

 

 

 

 

 

SF350-48P

382 Watts

1–48

802.3af/at

 

 

*60-Watt PoE: port

60-Watt PoE 802.3af/at,

 

 

1,2,3,4,25,26,27,28

 

 

4-pair PoE

 

 

 

 

 

 

 

Cisco 350 Series Managed Switches

5

Loading...
+ 11 hidden pages