Cisco Systems MGX 8850 System User Manual

Installing Plastic Motherboard Insulator in an MGX 8850 System

Installing Backplane Plastic Insulating Cover

Use the following procedure to install the insulating cover over a system’s backplane. This procedure may be done without powering down the system.
Step 1 Open the plastic grill on the front side of the intake plenum, located directly underneath the card cage
or the fan space, using a flat blade screw driver to loosen the two recessed screws. Tilt the plastic grill forward about 45 degrees, then lift out and set it aside.
Step 2 Hold the plastic cover, shown in the drawing below, so that the 16 short tabs are facing towards you.
Short tabs
3 Tabs
43776
Corporate Headquarters: Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706. USA
Copyright © 2000. Cisco Systems, Inc. All rights reserved.
78-10389-01
Step 3 The next illustration shows the clear plastic backplane cover viewed from the bottom toward the top of
the cabinet.
43777
Underside of chassis
Step 4 Slide the clear plastic backplane cover underneath the card cage and toward the bottom of the
backplane; the flange with the 3 tabs and 2 cutouts will face the backplane.
Installing Plastic Motherboard Insulator in an MGX 8850 System
2
78-10389-01
Loading...
+ 2 hidden pages