Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883
Text Part Number: OL-13017-01
THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE. ALL
STATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT
WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCTS.
THE SOFTWARE LICENSE AND LIMITED WARRANTY FOR THE ACCOMPANYING PRODUCT ARE SET FORTH IN THE INFORMATION PACKET THAT
SHIPPED WITH THE PRODUCT AND ARE INCORPORATED HEREIN BY THIS REFERENCE. IF YOU ARE UNABLE TO LOCATE THE SOFTWARE LICENSE
OR LIMITED WARRANTY, CONTACT YOUR CISCO REPRESENTATIVE FOR A COPY.
The following inform ation is for FCC compliance of Class A devices: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant
to part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial
environment. This equipment generates, uses, and can radiate radio-frequency energy and, if not installed and used in accordance with the instruction manual, may cause
harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case users will be required
to correct the interference at their own expense.
The following information is for FCC compliance of Class B devices: The equipment described in this manual generates and may radiate radio-frequency energy. If it is not
installed in accordance with Cisco’s installation instructions, it may cause interference with radio and television reception. This equipment has been tested and found to
comply with the limits for a Class B digital device in accordance with the specifications in part 15 of the FCC rules. These specifications are designed to provide reasonable
protection against such interference in a residential installation. However, there is no guarantee that interference will not occur in a particular installation.
Modifying the equipment without Cisco’s written authorization may result in the equipment no longer complying with FCC requirements for Class A or Class B digital
devices. In that event, your right to use the equipment may be limited by FCC regulations, and you may be required to correct any interference to radio or television
communications at your own expense.
You can determine whether your equipment is causing interference by turning it off. If the interference stops, it was probably caused by the Cisco equipment or one of its
peripheral devices. If the equipment causes interference to radio or television reception, try to correct the interference by using one or more of the following measures:
• Turn the television or radio antenna until the interference stops.
• Move the equipment to one side or the other of the television or radio.
• Move the equipment farther away from the television or radio.
• Plug the equipment into an outlet that is on a different circuit from the television or radio. (That is, make certain the equipment and the television or radio are on circuits
controlled by different circuit breakers or fuses.)
Modifications to this product not authorized by Cisco Systems, Inc. could void the FCC approval and negate your authority to operate the product.
NOTWITHSTANDING ANY OTHER WARRANTY HEREIN, ALL DOCUMENT FILES AND SOFTWARE OF THESE SUPPLIERS ARE PROVIDED “AS IS” WITH
ALL FAULTS. CISCO AND THE ABOVE-NAMED SUPPLIERS DISCLAIM ALL WARRANTIES, EXPRESSED OR
LIMITATION, THOSE OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT OR ARISING FROM A COURSE OF
DEALING, USAGE, OR TRADE PRACTICE.
IN NO EVENT SHALL CISCO OR ITS SUPPLIERS BE LIABLE FOR ANY INDIRECT, SPECIAL, CONSEQUENTIAL, OR INCIDENTAL DAMAGES, INCLUDING,
WITHOUT LIMITATION, LOST PROFITS OR LOSS OR DAMAGE TO DATA ARISING OUT OF THE USE OR INABILITY TO USE THIS MANUAL, EVEN IF CISCO
OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
CCDE, CCENT, Cisco Eos, Cisco Lumin, Cisco StadiumVision, the Cisco logo, DCE, and Welcome to the Human Network are trademarks; Changing the Way We Work,
Live, Play, and Learn is a service mark; and Access Registrar, Aironet, AsyncOS, Bringing the Meeting To You, Catalyst, CCDA, CCDP, CCIE, CCIP, CCNA, CCNP, CCSP,
CCVP, Cisco, the Cisco
Collaboration Without Limitation, EtherFast, EtherSwitch, Event Center, Fast Step, Follow Me Browsing, FormShare, GigaDrive, HomeLink, Internet Quotient, IOS, iPhone,
iQ Expertise, the iQ logo, iQ Net Readiness Scorecard, iQuick Study, IronPort, the IronPort
Networking Academy, Network Registrar, PCNow, PIX, PowerPanels, ProConnect, ScriptShare, SenderBase, SMARTnet, Spectrum Expert, StackWise, The Fastest Way to
Increase Your Internet Quotient, TransPath, WebEx, and the WebEx
other countries.
All other trademarks mentioned in this document or Website are the property of their respective owners. The use of the word partner does not imply a partnership relationship
between Cisco and any other company. (0804R)
Any Internet Protocol (IP) addresses used in this document are not intended to be actual addresses. Any examples, command display output, and figures included in the
document are shown for illustrative purposes only. Any use of actual IP addresses in illustrative content is unintentional and coincidental.
Installing or Removing the Compact Flash Memory Card2-10
Verifying Switch Operation2-11
Connecting a PC or a Terminal to the Console Port2-12
Connecting the Protective Ground and DC Power2-13
Grounding the Switch2-13
Wiring the DC Power Source2-16
Attach the Power and Relay Connector to the Switch2-21
Running POST2-22
Power On the Switch2-22
Verify POST Results2-22
Disconnect Power2-22
Installing the Switch2-23
Installing the Switch on a DIN Rail2-23
Installing the Switch on the Wall2-27
Installing the Switch in a Rack2-29
Removing the Switch from a DIN Rail or a Rack2-31
Connecting Power and Alarm Circuits2-32
Wiring the Protective Ground and DC Power2-32
Wiring the External Alarms2-33
Connecting Destination Ports2-36
Connecting to 10/100 and 10/100/1000 Ports2-36
Installing and Removing SFP Modules2-37
Installing SFP Modules into SFP Module Slots2-38
Removing SFP Modules from SFP Module Slots2-40
Connecting to SFP Modules2-41
Connecting to a Dual-Purpose Port2-42
Connecting to 100BASE-FX Ports2-43
Connecting the Switch to the Power Converter2-44
Attaching the Power Converter to the Switch2-45
Installing the Power Converter on a DIN Rail, Wall, or Rack Adapter2-46
Connecting the DC Power Clip2-46
Connecting the Power Converter to an AC Power Source2-47
Cisco IE 3000 Switch Hardware Installation Guide
iv
OL-13017-01
Preparing the AC Power Cord2-47
Connecting the AC Power Cord to the Power Converter2-48
Connecting the Power Converter to a DC Power Source2-51
Applying Power to the Power Converter2-53
Where to Go Next2-53
Contents
CHAPTER
3Troubleshooting3-1
Diagnosing Problems3-1
Verify Switch POST Results3-1
Verify Switch LEDs3-2
Verify Switch Connections3-2
Bad or Damaged Cable3-2
Ethernet and Fiber Cables3-2
Link Status3-3
Transceiver Issues3-3
Port and Interface Settings3-3
Ping End Device3-3
Spanning Tree Loops3-4
Verify Switch Performance3-4
Speed, Duplex, and Autonegotiation3-4
Autonegotiation and NIC3-4
Cabling Distance3-5
How to Clear the Switch IP Address and Configuration3-5
How to Recover Passwords3-5
APPENDIX
APPENDIX
OL-13017-01
Finding the Switch Serial Number3-6
ATechnical SpecificationsA-1
BInstallation In a Hazardous EnvironmentB-1
Preparing for InstallationB-1
WarningsB-2
North American Hazardous Location ApprovalB-5
EMC Environmental Conditions for Products Installed in the European UnionB-5
Installation GuidelinesB-5
Installing or Removing the Compact Flash Memory CardB-13
Verifying Switch OperationB-14
Connecting a PC or a Terminal to the Console PortB-15
Connecting the Protective Ground and DC PowerB-16
Grounding the SwitchB-17
Wiring the DC Power SourceB-19
Attach the Power and Relay Connector to the SwitchB-24
Running POSTB-25
Power On the SwitchB-25
Verify POST ResultsB-25
Disconnect PowerB-25
Installing the SwitchB-26
Installing the Switch on a DIN RailB-27
Installing the Switch on a WallB-31
Installing the Switch in a RackB-33
Removing the Switch from a DIN Rail or a RackB-35
Connecting Power and Alarm CircuitsB-36
Information about the Sealed Relay DeviceB-37
Wiring the Protective Ground and DC PowerB-37
Wiring the External AlarmsB-38
Connecting Destination PortsB-41
Connecting to 10/100 and 10/100/1000 PortsB-41
Installing and Removing SFP ModulesB-42
Installing SFP Modules into SFP Module SlotsB-43
Removing SFP Modules from SFP Module SlotsB-44
Connecting to SFP ModulesB-45
Connecting to a Dual-Purpose PortB-46
Connecting to 100BASE-FX PortsB-48
Connecting the Switch to the Power ConverterB-49
Attaching the Power Converter to the SwitchB-49
Installing the Power Converter on a DIN Rail, Wall, or Rack AdapterB-52
Connecting the DC Power ClipB-52
Connecting the Power Converter to an AC Power SourceB-53
Preparing the AC Power CordB-53
Connecting the AC Power Cord to the Power ConverterB-54
Connecting the Power Converter to a DC Power SourceB-57
Applying Power to the Power ConverterB-59
Cisco IE 3000 Switch Hardware Installation Guide
vi
OL-13017-01
Where to Go NextB-59
Contents
APPENDIX
CCable and ConnectorsC-1
Connector SpecificationsC-1
10/100 PortsC-1
Connecting to 10BASE-T- and 100BASE-TX-Compatible DevicesC-1
SFP Module Cable SpecificationsC-4
Two Twisted-Pair Cable PinoutsC-5
Four Twisted-Pair Cable Pinouts for 1000BASE-T PortsC-6
Crossover Cable and Adapter PinoutsC-7
Identifying a Crossover CableC-7
Four Twisted-Pair Cable Pinouts for 1000BASE-T PortsC-7
Adapter PinoutsC-8
APPENDIX
I
NDEX
DConfiguring the Switch with the CLI-Based Setup ProgramD-1
Accessing the CLI from the Console PortD-1
Entering the Initial Configuration InformationD-2
IP SettingsD-2
Completing the Setup ProgramD-2
OL-13017-01
Cisco IE 3000 Switch Hardware Installation Guide
vii
Contents
Cisco IE 3000 Switch Hardware Installation Guide
viii
OL-13017-01
Audience
Purpose
Preface
This guide is for the networking or computer technician responsible for installing Cisco IE 3000 series
switches. We assume that you are familiar with the concepts and terminology of Ethernet and local area
networking.
This guide documents the hardware features of the Cisco IE 3000 switches. It describes the physical and
performance characteristics of each switch, explains how to install a switch, and provides
troubleshooting information.
This guide does not describe system messages that you might receive or how to configure your switch.
For more information, see the switch getting started guide, the switch software configuration guide, the
switch command reference, and the switch system message guide on the Cisco.comTechnical Support
and Documentation home page. For information about the standard Cisco IOS Release
commands, see the Cisco
Technical Support and Documentation > Documentation. On the Cisco Documentation home page,
select Release 12.1 or 12.2 from the Cisco IOS Software drop-down list.
Conventions
This document uses the following conventions and symbols for notes, cautions, and warnings.
NoteMeans reader take note. Notes contain helpful suggestions or references to materials not contained in
this manual.
CautionMeans reader be careful. In this situation, you might do something that could result in equipment
damage or loss of data.
12.1 or 12.2
IOS documentation set from the Cisco.com home page at
OL-13017-01
Cisco IE 3000 Switch Hardware Installation Guide
ix
Preface
Warning
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you
work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar
with standard practices for preventing accidents. Use the statement number provided at the end of
each warning to locate its translation in the translated safety warnings that accompanied this device.
Statement 1071
The safety warnings for this product are translated into several languages in the Regulatory Compliance
and Safety Information for the Cisco IE 3000 Switch that ships with the product. The EMC regulatory
statements are also included in that guide.
Related Publications
Before installing, configuring, or upgrading the switch, see the release notes on Cisco.com for the latest
information.
These documents provide complete information about the switch and are available on Cisco.com:
•Cisco IE 3000 Switch Getting Started Guide
•Regulatory Compliance and Safety Information for the Cisco IE 3000 Switch
•Cisco Gigabit Ethernet Transceiver Modules Compatibility Matrix (not orderable but available on
Cisco.com)
•Cisco Small Form-Factor Pluggable Modules Compatibility Matrix (not orderable but available on
Cisco.com)
Obtaining Documentation, Obtaining Support, and Security
Guidelines
For information on obtaining documentation, obtaining support, providing documentation feedback,
security guidelines, and also recommended aliases and general Cisco
What’s
New in Cisco Product Documentation, which also lists all new and revised Cisco technical
This chapter provides these topics that describe the Cisco Industrial Ethernet (IE) 3000 switch, hereafter
referred to as the switch.
This chapter provides a functional overview of the switches and covers these topics:
•Overview, page 1-1
•Switch Models, page 1-2
•Front-Panel Description, page 1-2
•Compact Flash Memory Card, page 1-11
•Rear-Panel Description, page 1-12
•Power Converter (Optional), page 1-13
•Management Options, page 1-14
•Network Configurations, page 1-15
Overview
NoteThe switch does not have cooling fans.
OL-13017-01
The Cisco IE 3000 switch provides a rugged and secure switching infrastructure for harsh environments.
It is suitable for industrial Ethernet applications, including factory automation, intelligent transportation
systems (ITSs), substations, and other deployments in harsh environments.
You can connect these switches to office networking devices like Cisco IP Phones, Cisco Wireless
Access Points workstations, and other devices such as servers, routers, and other switches. In industrial
environments, you can connect any Ethernet-enabled industrial communication devices, including
programmable logic controllers (PLCs), human-machine interfaces (HMIs), drives, sensors, traffic
signal controllers, and intelligent electronic devices (IEDs).
You can mount the switch on a DIN rail in an industrial enclosure, on a wall or panel, and with some
restrictions, in a standard 19-inch rack. Its components are designed to withstand extremes in
temperature, vibration, and shock that are common in an industrial environment.
Cisco IE 3000 Switch Hardware Installation Guide
1-1
Switch Models
Switch Models
Table 1-1 describes the switch and the expansion modules. The Cisco IE-3000-4TC and
the Cisco IE-3000-8TC are the switch models, and the Cisco IEM-3000-8TM and the
Cisco IEM-3000-8FM are expansion modules that you can connect to increase the number of ports. For
instructions on how to connect the expansion modules to the switch, see the
Switch” section on page 2-5.
.
Ta b l e 1-1Cisco IE 3000 Switch Models
Switch ModelDescription
Cisco IE-3000-4TC4 10/100BASE-T Ethernet ports and 2 dual-purpose ports, each with a
Cisco IE-3000-8TC8 10/100BASE-T Ethernet ports and 2 dual-purpose ports
Cisco IEM-3000-8TMExpansion module with 8 10/100BASE-T copper Ethernet ports
Cisco IEM-3000-8FMExpansion module with 8 100BASE-FX fiber-optic Ethernet ports
Chapter 1 Overview
“Adding Modules to the
10/100/1000BASE-T copper port and an SFP (small form-factor pluggable)
module slot
Front-Panel Description
This section describes the front panel and includes these sections:
•10/100 Ports, page 1-5
•Dual-Purpose Ports, page 1-5
•100BASE-FX Ports, page 1-5
•Power and Relay Connector, page 1-5
•Console Port, page 1-6
•LEDs, page 1-6
The switch front panel contains the ports, the LEDs, and the power and relay connectors. Figure 1-1 to
Figure 1-4 show the switch and expansion module front panels.
Cisco IE 3000 Switch Hardware Installation Guide
1-2
OL-13017-01
Chapter 1 Overview
Figure 1-1Cisco IE-3000-8TC Switch
1
2
3
4
5
Front-Panel Description
201699
1Power and relay connectors410/100 ports
2Console port5Protective ground connection
3Dual-purpose ports
Figure 1-2Cisco IE-3000-4TC Switch
1
2
201700
3
4
5
1Power and relay connectors410/100 ports
2Console port5Protective ground connection
3Dual-purpose ports
OL-13017-01
Cisco IE 3000 Switch Hardware Installation Guide
1-3
Front-Panel Description
Chapter 1 Overview
Figure 1-3Cisco IEM-3000-8TM Module
201702
1
110/100 ports
Figure 1-4Cisco IEM-3000-8FM Module
1
1100BASE-FX ports
201701
Cisco IE 3000 Switch Hardware Installation Guide
1-4
OL-13017-01
Chapter 1 Overview
10/100 Ports
Front-Panel Description
You can set the 10/100 ports to operate at 10 or 100 Mb/s in full-duplex or half-duplex mode. You can
also set these ports for speed and duplex autonegotiation in compliance with IEEE
default setting is autonegotiate.) When set for autonegotiation, the port senses the speed and duplex
settings of the attached device and advertises its own capabilities. If the connected device also supports
autonegotiation, the switch port negotiates the best connection (that is, the fastest line speed that both
devices support and full-duplex transmission if the attached device supports it) and configures itself
accordingly. In all cases, the attached device must be within 328 feet (100
requires Category
When connecting the switch to workstations, servers, routers, and Cisco IP Phones, be sure that the cable
is a straight-through cable.
You can use the mdix auto interface configuration command in the command-line interface (CLI) to
enable the automatic medium-dependent interface crossover (auto-MDIX) feature. When the
auto-MDIX feature is enabled, the switch detects the required cable type for copper Ethernet connections
and configures the interfaces accordingly. For configuration information for this feature, see the switch
software configuration guide or the switch command reference.
5 cable. 10BASE-T traffic can use Category 3 or Category 4 cables.
meters). 100BASE-TX traffic
802.3AB. (The
Dual-Purpose Ports
A dual-purpose port can be configured as either a 10/100/1000 port or as an SFP module port. Only one
port can be active at a time. If both ports are connected, the SFP module port has priority.
You can set the 10/100/1000 ports to operate at 10, 100, or 1000 Mb/s in full-duplex or half-duplex
mode. You can configure them as fixed 10, 100, or 1000 Mb/s (Gigabit) Ethernet ports and can configure
the duplex setting. (See the switch software configuration for more information.)
You can use Gigabit Ethernet SFP modules to establish fiber-optic connections to other switches. These
transceiver modules are field-replaceable, providing the uplink interfaces when inserted in an SFP
module slot. You use fiber-optic cables with LC connectors to connect to a fiber-optic SFP module.
For more information about these SFP modules, see your SFP module documentation or the release note
for your switch software.
100BASE-FX Ports
The IEEE 802.3u 100BASE-FX ports provide full-duplex 100 Mb/s connectivity over multimode fiber
(MMF) cables. These ports use a small-form-factor fixed (SFF) fiber-optic transceiver module that
accepts a dual LC connector. The cable can be up to 1.24 miles (2 km) in length.
Power and Relay Connector
You connect the DC power and alarm signals to the switch through two front panel connectors. One
connector provides primary DC power (supply A) and the major alarm signal, and a second connector
(supply B) provides secondary power and the minor alarm signal. The two connectors are physically
identical and are in the upper left side of the front panel. See
OL-13017-01
Figure 1-2.
Cisco IE 3000 Switch Hardware Installation Guide
1-5
Front-Panel Description
Chapter 1 Overview
The switch accessory pack includes the mating power and relay connectors. These connectors provide
screw terminals for terminating the DC power and alarm wire and the connector plugs into the power
and relay receptacles on the front panel. The positive DC power connection is labeled V, and the return
connection is labeled RT (see
Figure 1-5Power and Relay Connector
V
RT
A
A
The switch can operate with a single power source or with dual power sources. When both power sources
are operational, the switch draws power from the DC source with the higher voltage. If one of the two
power sources fail, the other continues to power the switch.
The power and relay connectors also provide an interface for two independent alarm relays: the major
and the minor alarms. The relays can be activated for environmental, power supply, and port status alarm
conditions and can be configured to indicate an alarm with either open or closed contacts. The relay itself
is normally open, so under power failure conditions, the contacts are open. From the CLI, you can
associate any alarm condition with one or with both alarm relays.
Alarm relays often control an external alarm device, such as a bell or a light. To connect an external
alarm device to the relay, you must connect two relay contact wires to complete an electrical circuit. Both
alarm terminals on the power and relay connector are labeled A, and you can connect them without
regard to polarity.
Figure 1-5).
201815
Console Port
LEDs
See the switch software configuration guide for instructions on configuring the alarm relays.
For more information about the power and relay connector, see Appendix C, “Cable and Connectors.”
You can get replacement power and relay connectors (PWR-IE3000-CNCT=) by calling Cisco Technical
Support.
You can connect a switch to a PC through the console port and the supplied RJ-45-to-DB-9 adapter cable.
If you want to connect a switch to a terminal, you need to provide an RJ-45-to-DB-25 female DTE
adapter. You can order a kit (part number ACS-DSBUASYN=) with that adapter from Cisco Systems.
For console-port and adapter-pinout information, see the
“Two Twisted-Pair Cable Pinouts” section on
page C-5.
You can use the LEDs to monitor the switch status, activity, and performance. Figure 1-6 to Figure 1-9
show the front panel LEDs, and the following sections describe them.
All LEDs are visible through the GUI management applications—the Cisco Network Assistant
application for multiple switches and the device manager GUI for a single switch. The switch software
configuration guide describes how to use the CLI to configure and to monitor individual switches and
switch clusters.
Cisco IE 3000 Switch Hardware Installation Guide
1-6
OL-13017-01
Chapter 1 Overview
Figure 1-6LEDs on the Cisco IE 3000 Switch
1
2
3
4
Front-Panel Description
6
7
85
1Express setup button5Dual-purpose uplink port LED
2System LED6Pwr B LED
3Alarm LED7Pwr A LED
4Setup LED8Port LED
Figure 1-7LEDs on the Cisco IEM-3000-8TM Module
201703
1
110/100 port LED
OL-13017-01
201706
Cisco IE 3000 Switch Hardware Installation Guide
1-7
Front-Panel Description
Chapter 1 Overview
Figure 1-8LEDs on the Cisco IEM-3000-8FM Module
Setup LED
1
201705
1 100BASE -FX port LEDs
The Setup LED displays the express setup mode for the initial configuration. Tabl e 1-2 lists the LED
colors and their meanings.
Ta b l e 1-2Setup LED
ColorSetup Status
Off (dark)Switch is configured as a managed switch.
Solid greenSwitch is in initial setup.
Blinking greenSwitch is in initial setup, in recovery, or initial setup is
incomplete.
Solid redSwitch failed to start initial setup or recovery because
there is no available switch port to which to connect the
management station. Disconnect a device from a switch
port, and then press the Express Setup button.
Cisco IE 3000 Switch Hardware Installation Guide
1-8
OL-13017-01
Chapter 1 Overview
System LED
Alarm LED
Front-Panel Description
The System LED shows whether the system is receiving power and is functioning properly.
Table 1-3 lists the system LED colors and their meanings.
Ta b l e 1-3System LED
ColorSystem Status
OffSystem is not powered on.
GreenSystem is operating normally.
RedSwitch is not functioning properly.
Table 1-4 lists the alarm LED colors and their meanings.
Ta b l e 1-4Alarm Status LED
Power Status LED
ColorSystem Status
OffAlarms are not configured, or the switch is off.
GreenAlarms are configured.
Blinking redSwitch has detected a major alarm.
RedSwitch has detected a minor alarm.
The switch can operate with one or two DC power sources. Each DC input has an associated LED that
shows the status of the corresponding DC input. If power is present on the circuit, the LED is green. If
power is not present, the LED color depends on the alarm configuration. If alarms are configured, the
LED is red when power is not present; otherwise, the LED is off.
If the switch has dual power sources, the switch draws power from the power source with the higher
voltage. If the one of the DC sources fails, the alternate DC source powers the switch, and the
corresponding power status LED is green. The power status for the failed DC source is either off or red,
depending on the alarm configuration.
Table 1-5 lists the power status LED colors and meanings.
Ta b l e 1-5Power Status LEDs
ColorSystem Status
OffPower is not present on the circuit, or the system is not powered up.
GreenPower is present on the associated circuit.
RedPower is not present on the associated circuit, and the power supply alarm is
configured.
OL-13017-01
Cisco IE 3000 Switch Hardware Installation Guide
1-9
Front-Panel Description
NoteThe Pwr A and Pwr B LEDs show that power is not present on the switch if the power input drops below
the low valid level. The power status LEDs only show that power is present if the voltage at the switch
input exceeds the valid level. The difference, or hysteresis, ensures that the power status LEDs do not
oscillate at values near 18 V.
For information about the power LED colors during the power-on self-test (POST), see the “Verifying
Switch Operation” section on page 2-11.
10/100 Port Status LEDs
Each 10/100 port has a port status LED, also called a port LED, as shown in Figure 1-6, Figure 1-7, and
Figure 1-8. Ta ble 1-6 displays LED information about the switch and the individual ports.
Ta b l e 1-610/100 Port Status LEDs
ColorSystem Status
OffNo link.
Solid greenLink present.
Blinking green Activity. Port is sending or receiving data.
Blinking
amber
Alternating
green-amber
Solid amberPort is not forwarding. Port was disabled by management, an
Chapter 1 Overview
A link blocked by Spanning Tree Protocol (STP) is
sending or receiving data.
Link fault. Error frames can affect connectivity, and errors
such as excessive collisions, CRC errors, and alignment and
jabber errors are monitored for a link-fault indication.
address violation, or STP.
100Base-FX Port Status LEDs
These LEDs display information about the individual ports. See Tab le 1-7.
Ta b l e 1-7100BASE-FX MM Uplink Port Status LEDs
ColorSystem Status
OffNo link.
Solid greenLink is present.
Blinking greenActivity. Port is sending or receiving data.
Blinking amberA link blocked by Spanning Tree Protocol (STP) is sending or receiving
Alternating green-amberLink is faulty.
Solid amberLink is disabled.
Cisco IE 3000 Switch Hardware Installation Guide
1-10
NoteAfter a port is reconfigured, the port LED can remain
amber for up to 30 seconds while STP checks the
switch for possible loops.
data.
OL-13017-01
Chapter 1 Overview
Dual-Purpose Port LEDs
Figure 1-9 shows the LEDs on a dual-purpose port. You can configure each port as either a 10/100/1000
port through the RJ-45 connector or as an SFP module, but not both at the same time. The LEDs show
how the port is being used (Ethernet or SFP module).
The LED colors have the same meanings as described in Table 1-6.
Figure 1-9Dual-Purpose Port LEDs
Compact Flash Memory Card
23
1
1RJ-45 connector3SFP module port in-use LED
2RJ-45 port in-use LED 4SFP module slot
41
203660
Compact Flash Memory Card
The switch supports a compact flash memory card that makes it possible to replace a failed switch
without reconfiguring the new switch. The slot for the compact flash memory card is on the bottom of
the switch. See
NoteFor more information on inserting and removing the compact flash memory card, see the “Installing or
Removing the Compact Flash Memory Card” section on page 2-10.
Figure 1-10.
OL-13017-01
Cisco IE 3000 Switch Hardware Installation Guide
1-11
Rear-Panel Description
Figure 1-10Compact Flash Memory Card Slot
201832
Bottom
1
of switch
Chapter 1 Overview
NoteYou can obtain replacement flash memory cards (CF-IE3000=) by calling Cisco Technical Support.
Rear-Panel Description
The rear panel of the switch, modules, and power converter have latches for installation on either a DIN
rail or a wall. See
inward to secure the switch to a DIN rail. The feet stabilize the switch when it is mounted on the wall.
Figure 1-11. The latches slide outward to position the switch over a DIN rail and slide
Cisco IE 3000 Switch Hardware Installation Guide
1-12
OL-13017-01
Chapter 1 Overview
Figure 1-11Cisco IE 3000 Switch Rear Panel
2
1
Power Converter (Optional)
201697
1DIN rail latch2Foot in recessed position
Power Converter (Optional)
The switch can be used with an optional AC/DC power converter. The power converter
(PWR-IE3000-AC) can supply 24-VDC power to one switch and up to two modules. The power
converter is mounted on the side of a switch and provides power to the switch through a preassembled
power cable.
NoteThe power converter (PWR-IE3000-AC=) is sold separately.
You can get a replacement power cable (PWR-IE3000-CLP=) by calling Cisco Technical Support.
For installation and connection procedures for the power converter, see the “Connecting the Switch to
the Power Converter” section on page 2-44.
OL-13017-01
Cisco IE 3000 Switch Hardware Installation Guide
1-13
Management Options
Chapter 1 Overview
Figure 1-12 displays the power converter.
Figure 1-12Cisco IE 3000 Switch AC/DC Power Converter
1
2
3
202314
1DC output connector3AC/DC input power connector
2Status LED
Management Options
The switch supports these management options:
•Cisco Network Assistant
Cisco Network Assistant is a PC-based network management GUI application optimized for LANs
of small and medium-sized businesses. Through a GUI, users can configure and manage switch
clusters or standalone switches. Cisco Network Assistant is available at no cost and can be
downloaded from this URL:
http://www.cisco.com/go/networkassistant
For information on starting the Cisco Network Assistant application, see the Getting Started with Cisco Network Assistant guide on Cisco.com.
•Device Manager
You can use the device manager, which is in the switch memory, to manage individual and
standalone switches. This web interface offers quick configuration and monitoring. You can access
the device manager from anywhere in your network through a web browser. For more information,
see the getting started guide and the device manager online help.
•Cisco IOS CLI
The switch CLI is based on Cisco IOS software and is enhanced to support desktop-switching
features. You can fully configure and monitor the switch. You can access the CLI either by
connecting your management station directly to the switch management port, or a console port, or
by using Telnet from a remote management station. See the switch command reference on
Cisco.com for more information.
Cisco IE 3000 Switch Hardware Installation Guide
1-14
OL-13017-01
Chapter 1 Overview
Network Configurations
•CiscoWorks application
The CiscoWorks device-management application displays the switch image that you can use to set
configuration parameters and to view the switch status and performance information. The
CiscoView application, which you purchase separately, can be a standalone application or part of a
Simple Network Management Protocol (SNMP) platform. See the CiscoView documentation for
more information.
•SNMP network management
You can manage switches from a SNMP-compatible management station that is running platforms
such as HP OpenView or SunNet Manager. The switch supports a comprehensive set of Management
Information Base (MIB) extensions and four Remote Monitoring (RMON) groups. See the switch
software configuration guide on Cisco.com and the documentation that came with your SNMP
application for more information.
•Common Industrial Protocol
The Common Industrial Protocol (CIP) management objects are supported. The Cisco IE 3000 can
be managed by CIP-based management tools, allowing the user to manage an entire industrial
automation system with one tool.
Network Configurations
See the switch software configuration guide on Cisco.com for network configuration concepts and
examples of using the switch to create dedicated network segments and interconnecting the segments
through Gigabit Ethernet connections.
OL-13017-01
Cisco IE 3000 Switch Hardware Installation Guide
1-15
Network Configurations
Chapter 1 Overview
Cisco IE 3000 Switch Hardware Installation Guide
1-16
OL-13017-01
CHA PTER
2
Switch Installation
This chapter describes how to install your switch, interpret the power-on self-test (POST), and connect
the switch to other devices.
CautionIf your installation is in a hazardous environment, see Appendix B, “Installation In a Hazardous
Environment” for instructions.
Read these topics, and perform the procedures in this order:
•Preparing for Installation, page 2-1
•Adding Modules to the Switch, page 2-5
•Installing or Removing the Compact Flash Memory Card, page 2-10
•Verifying Switch Operation, page 2-11
•Installing the Switch, page 2-23
•Connecting Power and Alarm Circuits, page 2-32
•Connecting Destination Ports, page 2-36
•Connecting the Switch to the Power Converter, page 2-44
•Where to Go Next, page 2-53
Preparing for Installation
This section provides information about these topics:
•Warnings, page 2-2
•Installation Guidelines, page 2-3
•Verifying Package Contents, page 2-5
OL-13017-01
Cisco IE 3000 Switch Hardware Installation Guide
2-1
Preparing for Installation
Warnings
Chapter 2 Switch Installation
These warnings are translated into several languages in the Regulatory Compliance and Safety
Information Guide.
Warning
Warning
Warning
Warning
Warning
Warning
Before working on equipment that is connected to power lines, remove jewelry (including rings,
necklaces, and watches). Metal objects will heat up when connected to power and ground and can
cause serious burns or weld the metal object to the terminals.
Statement 43
Do not work on the system or connect or disconnect cables during periods of lightning activity.
Statement 1001
Before performing any of the following procedures, ensure that power is removed from the DC circuit.
Statement 1003
Read the installation instructions before you connect the system to its power source.
Statement 1004
This unit is intended for installation in restricted access areas. A restricted access area can be
accessed only through the use of a special tool, lock and key, or other means of security.
Statement 1017
This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the
absence of a suitably installed ground conductor. Contact the appropriate electrical inspection
authority or an electrician if you are uncertain that suitable grounding is available.
Statement 1024
Warning
This unit might have more than one power supply connection. All connections must be removed to
de-energize the unit.
Warning
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Statement 1030
Warning
Ultimate disposal of this product should be handled according to all national laws and regulations.
Statement 1040
Warning
For connections outside the building where the equipment is installed, the following ports must be
connected through an approved network termination unit with integral circuit protection.
10/100/1000 Ethernet
Cisco IE 3000 Switch Hardware Installation Guide
2-2
Statement 1028
Statement 1044
OL-13017-01
Chapter 2 Switch Installation
Preparing for Installation
Warning
Warning
Warning
To prevent the system from overheating, do not operate it in an area that exceeds the maximum
recommended ambient temperature of:
140°F (60°C)
Installation of the equipment must comply with local and national electrical codes.
To prevent airflow restriction, allow clearance around the ventilation openings to be at least:
4.13 in. (105 mm).
Statement 1047
Statement 1076
Installation Guidelines
When determining where to place the switch, observe these guidelines.
Environment and Enclosure Guidelines:
Review these environmental and enclosure guidelines before installation:
•This equipment is intended for use in a Pollution Degree 2 industrial environment, in overvoltage
Category II applications (as defined in IEC publication 60664-1), at altitudes up to 9842 ft (3 km)
without derating.
Statement 1074
Other Guidelines
CautionProper ESD protection is required whenever you handle Cisco equipment. Installation and
•This equipment is considered Group 1, Class A industrial equipment, according to IEC/CISPR
Publication 11. Without appropriate precautions, there may be potential difficulties ensuring
electromagnetic compatibility in other environments due to conducted as well as radiated
disturbance.
•This equipment is supplied as open-type equipment. It must be mounted within an enclosure that is
suitably designed for those specific environmental conditions that will be present and appropriately
designed to prevent personal injury resulting from accessibility to live parts. The enclosure must
have suitable flame-retardant properties to prevent or minimize the spread of flame, complying with
a flame-spread rating of 5VA, V2, V1, V0 (or equivalent) if nonmetallic. The interior of the
enclosure must be accessible only by the use of a tool. Subsequent sections of this publication might
contain additional information regarding specific enclosure-type ratings that are required to comply
with certain product safety certifications.
These are other installation guidelines:
maintenance personnel should be properly grounded by using ground straps to eliminate the risk of
ESD damage to the switch.
Do not touch connectors or pins on component boards. Do not touch circuit components inside the
switch. When not in use, store the equipment in appropriate static-safe packaging.
OL-13017-01
Cisco IE 3000 Switch Hardware Installation Guide
2-3
Preparing for Installation
Chapter 2 Switch Installation
•Personnel responsible for the application of safety-related programmable electronic systems (PES)
shall be aware of the safety requirements in the application of the system and shall be trained in
using the system.
•This product is grounded through the DIN rail to chassis ground. Use zinc-plated yellow-chromate
steel DIN rail to assure proper grounding. The use of other DIN rail materials (such as aluminum,
plastic, and so on) that can corrode, oxidize, or are poor conductors can result in improper or
intermittent grounding. Secure the DIN rail to the mounting surface approximately every 7.8 in. (200
mm), and use end-anchors appropriately.
When determining where to place the switch, observe these guidelines:
•Before installing the switch, first verify that the switch is operational by powering it on and running
POST. Follow the procedures in the
•For 10/100 ports and 10/100/1000 ports, the cable length from a switch to an attached device cannot
exceed 328 feet (100 meters).
•For 100BASE-FX fiber-optic ports, the cable length from a switch to an attached device cannot
exceed 6562 ft (2 km).
•Operating environment is within the ranges listed in Appendix A, “Technical Specifications.”
•Clearance to front and rear panels meets these conditions:
“Verifying Switch Operation” section on page 2-11.
–
Front-panel LEDs can be easily read.
–
Access to ports is sufficient for unrestricted cabling.
–
Front-panel direct current (DC) power and relay connector is within reach of the connection to
the DC power source.
•Airflow around the switch and through the vents is unrestricted. To prevent the switch from
overheating, there must be the following minimum clearances:
–
Top and bottom: 4.13 in. (105 mm)
–
Exposed side (not connected to the module): 3.54 in. (90 mm)
–
Front: 2.56 in. (65 mm)
•Temperature surrounding the unit does not exceed 140°F (60°C).
NoteWhen the switch is installed in an industrial enclosure, the temperature within the enclosure
is greater than normal room temperature outside the enclosure.
The temperature inside the enclosure cannot exceed 140°F (60°C), the maximum ambient
enclosure temperature of the switch.
•Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent
lighting fixtures.
•Connect the unit only to a Class 2 DC power source.
CautionThis equipment is only suitable for use in Class I, Division 2, Groups A, B, C, D, or nonhazardous
locations.
Cisco IE 3000 Switch Hardware Installation Guide
2-4
OL-13017-01
Loading...
+ 140 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.