Chaffoteaux & Maury Dua 120, Dua 150, Duo 200 Installation And Maintenance Instruction Manual

Supplied By www.heating spares.co Tel. 0161 620 6677
Installation and Maintenance
Instruction Manual
Including User Instructions
CaNI
CHAFFOTEAUX8Md”RY
Supplied By www.heating spares.co Tel. 0161 620 6677
Chaffoteaux & Maury Ltd., as a leading manufacturer of domestic and commercial water heating appliances, as well as domestic unvented direct and indirect storage cylinders, is committed to providing high quality products and a first class after sales service. If it is necessary to contact an engineer, then telephone your local Chaffoteaux Service Centre.
LOCAL CHAFFOTEAUX SERVICE CENTRE
Tel: 0807 243 0224
Advice on installation or servicing can also be obtained by contacting the Chaffoteaux Customer Services Department.
The guarantee will be invalidated if the factory fitted temperature and pressure relief valve is tampered with or removed. The Manufacturer or Distributors cannot be held responsible for any damage howsoever caused and which is a consequence of the removal or tampering.
The guarantee may also be invalidated if the appliance is not installed by a competent person in accordance with the recommendations made herein, current standards, regulations or in a manner not approved by the manufacturer, modified in any way, subjected to frost, misuse or neglect and that factory fitted parts have had unauthorised repairs or replacements carried out.
Evidence of purchase and the date of supply must be
made available at the time of any claim.
CUSTOMER SERVICES DEPARTMENT
Tel : 01952 222288 Fax. 01952 22402
The manufacturer’s guarantee against faulty construction or materials for the cylinder is 5 years and for the electrical components, thermal controls and safety valves is for
12 months, from the date of purchase.
Installation must be carried out by a suitably qualified installer and in accordance with current regulations and codes of practice.
Only the safety valves supplied with the cylinder should be used.
The cylinder must not be used without the safety
valves and expansion vessels. The cylinder must not be used with a boiler without
thermostatic control. The cylinder and ancillary controls must be adequately
maintained.
To assist us in providing you with an efficient after sales service, please return the guarantee registration card enclosed with the cylinder without delay.
l
The installation must have a sufficient and constant supply of mains fed cold water.
l
No valve should be fitted between the expansion relief
valve and the storage cylinder.
l
Only Chaffoteaux and Maury approved replacement parts should be used.
l
The discharge pipe must be terminated where it is visible and will not cause danger to people in the vicinity of the discharge.
Note: The discharge could consist of scalding water and steam.
1
m
C&M
Supplied By www.heating spares.co Tel. 0161 620 6677
page
iwe
Customer Care and Safety
Notice Contents Table
of Figures..
Introduction
..................................................
........................................................
...................................................
Specifications Dimensions
...................................................
Location of Components
The Cylinder..
Installation
Planning ..............................................................
Installation Fitting Safety Components
Discharge Pipes .................................................
.....................................................
...........................................................
Guarantee..
...........................................
................................................
...............................
.....................................................
.................................
...................
Wiring
.I
1
.2
............................................................
Direct System Indirect system Britony System Plus Boiler Britony System Boiler
.2
Commissioning..
.3 .3 .4
.5
.5
.7
7 7
.7
.7
Filling the Cylinder.. Check the operation of the safety valves Direct Heating Indirect Heating
Post Commissioning
Handing Over to the Householder..
Maintenance
Routine Maintenance
Fault Finding Charts Spare Parts Spare Parts Short List User’s Instructions..
......................................................
....................................................
..................................
.........................................
...........................................
...........................................
..........
..........................................
Units
.................................................
....................................
...................
.................................................
........................................
.....................................
List.. ..........................................
..................................
......................................
.8
8 9
9
11
12
12 12 12 12
12
12
13
13
14
17 17
18
Fig. 1 Fig. 2 Fig. 3
Fig. 4 Fig. 5 Fig. 6 Fig. 7 Fig. 8 Fig. 9 Fig. 10
Dimensions.. Combination safety control valves Cylinder connected to System
Plus Boiler Cylinder connected to System Boiler.. Discharge pipe arrangement
Discharge pipe sizing Wiring for electrical element Thermostat connections Thermostat re-set button
Electrical box detail on boiler..
............................................
........... 5
...............................................
...................
..............................
....................
..........................
.........................
................. 9
paw
4
5
..... 6
7 7 8 9 9
Fig. 11
Fig. 12 Fig. 13
Fig. 14 Fig. 15 Fig. 16 Fig. 17
paw
Hot water on constant and central heating timed
Hot water and heating timed Britony System boiler using
2 x two port valves 11 Deteriorating flow from taps Cold water from taps Discharge from expansion relief valve.. 15 Discharge from temperature and
pressure relief valve
10 10
14 14
16
2
Supplied By www.heating spares.co Tel. 0161 620 6677
The Chaffoteaux & Maury DUO 120, 150 and 200 are designed for use as unvented storage cylinders to be heated indirectly by a sealed system boiler or directly by the ceramic core electrical element included with them. The cylinders are enamelled steel with a high power coil. They are contained within a white case insulated with CFC free polyurethane foam. There is a magnesium anode to protect the cylinders against corrosion.
The unvented storage cylinders will provide the advantages of mains pressure and higher flow rates to taps and showers.
Supplied directly from the main water supply they do not need a separate feed cistern or vent pipe in the loft
space. They can benefit from the high efficiency and fast recovery provided by modern low water content sealed system boilers and particularly when used in conjunction with Chaffoteaux & Maury BRITONY SYSTEM, SYSTEM PLUS, or COMBI BOILERS. A better flow rate at main pressure can usually be achieved when compared with vented or instantaneous systems. The cylinders have been tested and approved by the WRc as meeting with the requirements of EN 60335
2.21. EN 60529. The cylinders should be stored and installed in an upright
position and be protected from extremes of temperature and humidity at all times. They must never be lifted or carried by the flow and return pipes or connections.
DUO Cylinders
Storage Capacity ltrs Weight of unit when empty Weight of unit when full
Maximum operating pressure Expansion vessel charge pressure Expansion relief valve setting Maximum primary working pressure
Set opening pressure of temperature and pressure
relief valve
Set opening temperature of temperature and pressure
relief valve Draw-off rate
Consumption per day to maintain 65°C in kW per 24h
Electrical protection index
Indirect System
Capacity of primary coil
Heating area primary coil Heating duration (Domestic water raised from 15°C to 65°C) Indirect heating power (primary flow temp. 82°C @ 900Vhr)
120 150
113 140 58kg
171kg 212kg 6bar 6bar 3bar 3bar 6bar 6bar
3.5bar 3.5bar
7bar 7bar
92°C 92°C 301tr 301tr
1.2
IPX3 IPX3
71tr 1 Oltr
0.83m2 1.15m2
18min 17min 21kW 27.2kW
72kg
1.55
200
190 83kg 273kg 6bar 3bar 6bar
3.5bar
7bar
92°C 301tr
1.75
IPX3
1 Oltr
1.15m2
22min
27.2kW
Direct System
Electrical power Nominal current Heating duration (Domestic water raised from 10°C to 65°C) Efficiency
3kW 3kW
12.5A 12.5A
2h 45
0.89 0.91
3h 20
3kW
12.5A
4h 30
0.93
Supplied By www.heating spares.co Tel. 0161 620 6677
Minimum clearance 500mm
Domestic hot water outlet M 3/4” G
c
f
nl
v
ll4
1
Cold water inlet M 3/4” G
Flow from heating boiler M 1” G
----. t
280
-
J
1
Drain point M 3/4” G
\
-y--I---yq-q---
Minimum clearance 600mm
+0550-i
, 230 ,
.
Fig. 1 - Dimensions
A B
re and pressure / I= ‘2/J” G
C D 120 I 150 I 1150mm
200 I
960mm
1435mm
935mm 1125mm 300mm 1401mm
300mm
300mm
350mm 500mm 500mm
4
Supplied By www.heating spares.co Tel. 0161 620 6677
The Cylinder
To enable the cylinder to comply with the current regulations, it is supplied with a safety controls pack. This comprises:
1. Cold water inlet
2. Pressure reducing valve with integral strainer
3. Check valve (non return valve)
4. Expansion relief valve
5. Cylinder thermostat and overheat thermostat beneath cover
6. Temperature and pressure relief valve
7. Expansion vessel
8. Tundish
9. Drain valve
10. Two port motorized safety cut-off valve
11. Balanced cold water supply
12. Connecting pipe to expansion vessel
13. Cold water inlet pipe to cylinder
14. Hot water outlet pipe
15. Flow from boiler to cylinder coil
16. Return from coil to boiler
17. Electrical supply for direct element
18. Cover for electrical element and thermostat
19. Discharge pipe
20. Flow to central heating
21. Gas supply
22. Return from central heating
23. Electrical connection from cylinder thermostat to boiler
24. Central heating zone valve
2
Fig. 2 - Combination safety control valves
4
Fig. 3 - Cylinder connected to System Plus Boiler
5
23
m
C&M
c.y~.“x.“y”