Centro Theatre Set 2 Assembly Instructions Manual

Page 1
Centro Theatre Set 2
Assembly Instructions
Page 2
Page 3
1
Stand base assembly on the ground. Loosen grub screws and slide both connector bars half way out of channel and retighten. Repeat for other base assembly.
2 3
Fully join posts and tighten remaining grub screws to make assembly secure. Repeat for other base post.
Align acrylic cap notches in upper 8-way post assembly with protruding connectors at stage 1.
Page 4
4.1 4.2.1 4.2.2
4.2.3
The horizontal (H, H1 and H2) and vertical (V and V1) frame profiles are joined in a similar manner to the posts
4.1) Loosen grub screws and slide connector bars halfway out of the channel.
4.2) Join profiles ensuring graphic fixing strips are aligned and the expanding clamps are at either end of the assembled profiles.
Page 5
4.2i) Centre vertical ‘V1’ differs due to the presence of twin graphic fixing strips.
4.2ii) Bottom horizontal ‘H2’ differs with the introduction of the adjustable thumb screw foot in the centre.
4.3) Tighten grub screws to make secure.
4.2i 4.2ii 4.3
Page 6
5.1
5.2 5.3
Connect two vertical (V) 1531mm assembly rails at 90º to each end of the 1500mm horizontal rail (H2) ensuring that the graphic fixing strip is outermost and the verticals are flush with the end of the 1500mm rail. Bottom horizontal 1500mm rail (H2) should have an adjustable thumbscrew foot in the middle of a 260mm connector bar. Connect middle vertical rail (V1- with twin graphic fixing strips) to centre of the assembled horizontal (H2) using the expanding clamp. Tighten 3 bottom grub screws in expanding clamps on verticals to secure to horizontal.
Page 7
6.1 6.2 6.3
Connect second horizontal 1500mm rail assembly (H), using the expanding clamps, to top of assembled verticals (V, V1 and V) ensuring that the graphic fixing strip is at the bottom. Tighten grub screws on vertical rails to secure. This completes the bottom section of the framework.
Page 8
7.1 7.2 7.3
For the top section of the framework, connect the two 220mm profiles, with expanding clamps at both ends and the single fixing strip, at 90º flush to each end of the third 1500mm horizontal rail (H). Ensure that the graphic fixing strip on the verticals are outermost and the graphic fixing strip on the horizontal 1500mm rail is at the top. Affix 220mm vertical profile, with expanding clamps at both ends and twin fixing strip, to middle of 1500mm horizontal. Tighten lower grub screws adjacent to horizontal rail assembly to secure 220mm verticals.
Page 9
8.1 8.2 8.3
Slot final top horizontal 1500mm rail assembly (H1) to the 220mm verticals, ensuring that the graphic fixing strip is at the top. Tighten grub screws on verticals to secure framework. This completes the top section of the framework.
Page 10
9.1 9.2
Slot the bottom section framework into the channel of the assembled post at 90º to the base plate. Ensure framework is equidistant from the base plate, adjustable foot rests on the ground, and graphic fixing strip is adjacent to the floor. Tighten both grub screws in the horizontals (H2 and H) to secure.
Page 11
Slot open end of framework into other assembled post, at 90º to the base plate. Ensure bottom section is equidistant from the floor at both ends and the adjustable foot rests on the floor. Tighten remaining grub screws in horizontals (H2 and H) to secure bottom section framework to both post assemblies.
10.1 10.2
Page 12
Affix the top section framework into the same channel as the bottom section ensuring graphic fixing strips are all on the same side of the system. Leave a gap of 60mm in between bottom and top framework assemblies and tighten all grub screws in horizontals (H and H1) to secure to post.
11.1 11.2
Page 13
Prepare and cut aperture in graphic according to the graphic spec appropriate to the desired screen size. Apply magnetic tape to rear of graphic panels in locations shown on graphic spec and affix completed panels to framework.
12.1 12.2
13
Unpack the LCD/Plasma Screen Mounting Bracket, 4 off 260mm connector bars, and 4 suitable screws and washers to thread into connector bars.
Page 14
14.1 14.2 14.3
14.4
Insert 2 screws through upper corner mount holes as shown and clearance holes in 2 off connector bars. Position mount centrally over upper horizontal rail in aperture and screw (not fully) into other 2 off 260mm connector bars, situated on the other side of the horizontal rail, to hold in position.
Page 15
15.1 15.2 15.3
Raise screen mount so bottom holes are above the lower horizontal rail in aperture. Insert remaining 2 screws through lower mount holes (4 openings from either end of the screen mount) and clearance holes in 2 off 260mm connector bars adjacent to mount.
Page 16
16.1 16.2
Align other 2 off 260mm connector bars, located behind horizontal rails, and screw into threaded holes. Ensure bottom screws rest on lower horizontal rail, mount is in centre of aperture, and tighten all 4 screws to secure assembly.
Page 17
18
Position screen centrally above bracket and lower until top of both mounting arms hook over mount.
17
With the elongated holes on the mounting arms uppermost, align arms centrally with 4 off fixing points on rear of screen equidistant from the top. Insert 4 off screws with suitable washers and tighten.
Page 18
19.1
Slide locking bar between the mounting arms and the plasma mounting bracket if desired. For extra security, there is a facility to add a padlock to the locking bar.
19.2
Page 19
20
To complete Centro Theatre Set 2 display, please affix podium table to the front of one of the posts.
Loading...