NOTE: FIELD WIRING MUST BE SUITABLE FOR 75 DEGREES CELCIUS.
Every Cecilware product has been carefully inspected before shipment. The finest of materials and the highest
standards of workmanship have been but into the equipment.
Within 1 year of purchase, should any Cecilware product show defect in factory workmanship or material, we agree to
Repair, at our option or replace without cost to user such parts which prove upon factory inspection to have been so
defective. All equipment must be shipped transportation charges prepaid for acceptance. This warranty covers
replacement parts only, labor charges are covered for 90 days after installation.
This warranty does not apply under the following conditions:
Every Cecilware urn body is covered for three years. This warranty covers the stainless steel body and stainless steel
liners only.
Portable equipment such as Electric Fryers, Food Warmers, Electric Stoves, Dispensers, Plug-In Urns, Coffee
Brewers and Warmers must be returned to the factory or brought to an authorized service station for repair.
UNPACKING INSTRUCTION: Carefully unpack the water boiler and inspect immediately for
shipping damages. Your automatic water boiler was shipped in a carton designed to give maximum
protection in normal handling. It was thoroughly inspected before leaving the factory and the carrier
accepted and signed for it. File any claims for shipping damage or irregularities directly with the
carrier.
FIELD
WIRING SIZE
CECILWARE CORPORATION
43-05 20th AVENUE, LONG ISLAND CITY, N.Y. 11105 • 718-932-1414 • FAX 718-932-7860
N796A-10/98
ASSEMBLY: The four legs, faucet, float ball, and vent cap drain are packed
separately with the water boiler. Install legs by tilting the water boiler on its side
and screwing the legs into the leg supports until hand tight Carefully right the unit
and install it in its permanent location, being sure to leave at lest 6" on the right
side of the water boiler for access to the controls. Level the unit by adjusting the
bottom pad of the legs. Screw the ball float (36) onto the end of the water inlet
valve rod (35). Place the vent cap (30) into the recess in the top of the unit. Mount
the faucet assembly onto the shank (13).
GENERAL SPECIFICATIONS
MODEL NO.
ME-10E10.0141622.525.545
ME-15E15.0141627.530.550
ME-30E30.0291422.525.595
WATER CAP. IN
GALLONS
DIMENSIONS (INCH)
ABCD
SHIPP.
WT.(LB)
2
CECILWARE CORPORATION
INSTALLATION INSTRUCTION FOR WATER BOILERS
Water boilers are shipped with the thermostats in the OFF position. Do not turn the thermostat
on before filling the water boiler with water.
NOTE: When positioning the unit, leave a minimumof 6" clearance on the right side of the
water boiler for ease of service.
WATER HOOK-UP PROCEDURE:
Use ¼” outside diameter copper tubing to connect the unit to the water supply line. The water
line must have a shut-off valve (supplied by a plumber). At the unit, connect the tubing to the
compression water inlet valve at the upper right hand side of the unit.
NOTE: Connecting the water boiler to a warm water supply will speed up heating and
recovery times.
ELECTRICAL HOOK-UP PROCEDURES:
NOTE: Always check the rating plate of the unit for proper voltage and current requirements.
1. 120V water boilers are provided with a 120V/15A grounded plug. Units must have a
separate 120V/15A outlet.
2. 208/240V water boilers are provided with a terminal block inside the control box. Field
wiring must be performed by a qualified serviceman.
1 and 3 phase hook-up:
Remove the fasteners on the cover and slide off cover. Install a suitable conduit and
connect copper wires to terminal L1 and L2 (and L3 for 3 phase unit only) and a #14
AWG ground wire to the ground lug.
PRIMING AND FILLING A UNIT:
Connect unit to power line (plug cord into line for 120V unit or turn on switch for the 208/ 240V
units). Turn on the water supply. The unit fills at the rate of 1 gallon/minute. When the water
level becomes visible in the sight gage turn the thermostat clockwise to maximum position.
The unit will now automatically fill to capacity and heat the water.
CLEANING INSTRUCTIONS:
DAILY: Wipe the outside of the unit with a damp cloth, using soap solution or a non-abrasive
compound when required.
SANITIZING THE UNIT:
With power to the unit disconnected, fill unit to capacity. Add 1 ounce of CLOROX BLEACH
(5.25%) for every gallon of water in the unit (400 PPM). Let the solution stand in the unit for 15
minutes, then drain all water from the unit slowly. If the unit is not to be used again
immediately after sanitizing — do not rinse with water. If the unit is to be used immediately
after sanitizing — rinse with water before refilling the unit for further use.
3
SERVICE PROCEDURES
FOR QUALIFIED SERVICE PERSONNEL ONLY
TO REPLACE HEATING ELEMENT
1. Shut off electrical power to unit.
2. Shut off water supply to unit.
3. Drain water from unit by tilting the unit toward at the end of the drain cycle.
4. Remove control box cover and disconnect electric wire from electrical connection to the
heating element(s).
5. Remove (4) screws and pull out heating element(s) with gasket.
6. Install new heating element(s) with gasket.
7. Connect electrical wires to elements).
8. Repeat priming instructions.
TO REPLACE THERMOSTAT
1. Shut off electrical power to unit.
2. Remove control box cover and thermostat knob.
3. Disconnect electrical wires from thermostat.
4. Loosen small capillary nut, then the packing nut from boiler.
5. Remove (2) screws holding thermostat to side box.
6. Remove thermostat and pull out thermostat bulb from boiler. Note position of compression
ring on capillary tube.
7. Install new thermostat. Position capillary end of thermostat bulb two (2) inches from inside
wall.
8. Tighten large packing nut, then small capillary nut — DO NOT over tighten since this could
damage the controls.
9. Remount thermostat to control box side.
10. Re-connect electrical wires to thermostat.
11. Replace thermostat knob.
12. Repeat priming instruction.
13. Recalibrate control if required. Water temperature should be 195 to 205 degree F
maximum.
TO REPLACE HI-LIMIT CONTROL
1. Shut off electrical power to unit.
2. Remove control box cover and disconnect (4) electrical wires form control.
3. Loosen and remove (2) retaining nuts.
4. Install new control in reverse order.
REPLACING WATER INLET CONTROL VALVE
1. Shut off water supply to unit.
2. Disconnect water line from control valve.
3. Unscrew floatball.
4. Remove hex nut and washer while holding the valve/float arm assembly with the other
hand.
5. Install replacement valve in reverse order.
REPLACING FLOATBALL
1. Shut off water supply to unit.
2. Unscrew float ball. Check for water leaks by shaking the ball.
3. Replace defective float ball.
4
TROUBLE SHOOTING PROCEDURES FOR QUALIFIED
of
eplace
If
depress red button. Still no
SERVICE PERSONNEL ONLY
PROBLEMPOSSIBLE CAUSESSOLUTIONS OR REMEDIES
Water fails to heat
Line Fuse or Circuit Breaker
Hi-Limit SwitchIf Hi-Limit switch opens when water temp.
No voltage reading at element
a. Defective
thermostat
b. Defective Hi-
Limit switch
Thermostat Pilot light should be on when thermostat
Check for circuit overload before resetting
breaker or replacing fuse.
reaches 200 degree F, replace switch.
Check voltage across terminals 1 and 3
Hi-Limit switch. If no reading r
thermostat.
Check voltage across terminals 2 and 4.
no reading —
reading — replace Hi-Limit switch.
is in the full on position (#5 position). If
not — replace thermostat and recalibrate
(see calibration). Power supply should
meet or exceed power requirements of
water boiler. Check data label on control
box for power requirements.
CONVERSION INSTRUCTIONS FOR ME-10E and ME-15E WATER BOILERS
Conversion from 208 volts or 240 volts to 120 volts
To convert to 120 volt 15 amp outlet application simply connect a 120 volt 15 amp line cord equipped with 2 prong grounding cap to
terminal as follows.
1. Connect white lead to terminal block marked (L1).
2. Connect black lead to terminal block marked (L2).
3. Connect green lead to copper ground terminal marked GND.
4. Secure cord to terminal box with a strain relief clamp.
5. Change Marketings on Rating Label to reflect the voltage change.
8
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.