cashco FL-200 Maintenance & Assembly Instructions

MAINTENANCE & ASSEMBLY INSTRUCTIONS
IOM-FL 200
12-04
Model FL-200
Inline Thermal Check Valve
INSTRUCTION NO. IOM-FL200
REFERENCE DATA:
FL-200 Series Assembly Drawing No. A88-60200-00.
INSTALLATION:
1. Clean the piping of all foreign material including chips, welding scale, oil, grease and dirt before installing the thermal trip valve.
3. Flow Direction: Install so the flow direction matches the flow arrow on the body of the thermal trip valve.
PRINCIPLE OF OPERATION:
1. When the valve is installed it is open.
2. This valve will stay open until it is actuated by the fusible link.
3. This will cause the valve to close.
MAINTENANCE:
1. All valves are leak tested at the factory at 200 PSIG and should be externally leak tight after installation. If after pro­ longed ser vice the valve should leak externally, it is recommended that the valve be replaced or sent to the factory for rebuilding.
THERMAL CHECK VALVE
FL-200 SERIES
Fusible Link
NOTES:
1. Maximum pressure rating 130 psig (896 kPa) WOG.
2. No changes shall be made to parts, material or manufacturing process without prior ap prov al by Factory Mutual Research Corporation.
3. All valves to be assembled, inspected and test ed in strict accordance with Cashco Standard S-1549.
4. Link shown 17° out of position.
Cashco, Inc. P.O. Box 6 Ellsworth, KS 67439-0006 PH (785) 472-4461 Fax. # (785) 472-3539 www.cashco.com email: sales@cashco.com
Printed in U.S.A. FL 200-IOM
2
IOM-FL 200
Loading...