Installing and servicing heating equipment can be hazardous due to
gas and electrical components. Only trained and qualified personnel should install, repair, or service heating equipment. Untrained
personnel can perform basic maintenance functions such as cleaning and replacing air filters. All other operations must be performed by trained service personnel. When working on heating
equipment, observe precautions in literature, on tags, and on labels
attached to or shipped with unit and other safety precautions that
may apply.
Follow all safety codes. In the United States, follow all safety
codes including the National Fuel Gas Code (NFGC) NFPA No.
54-1999/ANSI Z223.1-1999 and the Installation Standards, Warm
Air Heating and Air Conditioning Systems (NFPA 90B)
ANSI/NFPA 90B. In Canada, refer to the current edition of the
CAN/CGA-B149.1- and .2-M95 National Standard of Canada,
Natural Gas and Propane Installation Codes (NSCNGPIC). Wear
safety glasses and work gloves. Have a fire extinguisher available
during start-up and adjustment procedures and service calls.
Recognize safety information. This is the safety-alert symbol
When you see this symbol on unit or in instructions and manuals,
be alert to potential for personal injury.
Understand the signal words DANGER, WARNING, and CAUTION. These words are used with safety-alert symbol. DANGER
identifies the most serious hazards which will result in severe
personal injury or death. WARNING signifies hazards which
could result in personal injury or death. CAUTION is used to
identify unsafe practices which would result in minor personal
injury or product and property damage. NOTE is used to highlight
suggestions which will result in enhanced installation, reliability,
or operation.
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS
Electrostatic discharge can affect electronic components.
Take precautions during furnace installation and servicing to
protect the furnace electronic control. Precautions will prevent electrostatic discharges from personnel and hand tools
which are held during the procedure. These precautions will
help to avoid exposing the control to electrostatic discharge
by putting the furnace, the control, and the person at the same
electrostatic potential.
1. Disconnect all power to the furnace. DO NOT TOUCH THE
CONTROL OR ANY WIRE CONNECTED TO THE CONTROL PRIOR TO DISCHARGING YOUR BODY’S ELECTROSTATIC CHARGE TO GROUND.
2. Firmly touch a clean, unpainted, metal surface of the furnace
chassis which is close to the control. Tools held in a person’s
hand during grounding will be satisfactorily discharged.
3. After touching the chassis you may proceed to service the
control or connecting wires as long as you do nothing that
recharges your body with static electricity (for example; DO
NOT move or shuffle your feet, DO NOT touch ungrounded
objects, etc.).
4. If you touch ungrounded objects (recharge your body with
static electricity), firmly touch furnace again before touching
control or wires.
5. Use this procedure for installed and uninstalled (ungrounded)
furnaces.
6. Before removing a new control from its container, discharge
your body’s electrostatic charge to ground to protect the
control from damage. If the control is to be installed in a
furnace, follow items 1 through 5 before bringing the control
or yourself into contact with the furnace. Put all used AND
new controls into containers before touching ungrounded
objects.
7. An ESD service kit (available from commercial sources) may
also be used to prevent ESD damage.
INTRODUCTION
The 58MVP Multipoise Condensing Gas-Fired Furnaces are CSA
(A.G.A. and C.G.A.) certified for natural and propane gases and
for installation in alcoves, attics, basements, closets, utility rooms,
crawlspaces, and garages. The furnace is factory-shipped for use
with natural gas. A manufacturer’s accessory gas conversion kit is
required to convert furnace for use with propane gas.
These furnaces SHALL NOT be installed directly on carpeting,
tile, or any other combustible material other than wood flooring. In
downflow installations, a manufacturers accessory floor base
MUST be used when installed on combustible materials and wood
.
flooring. Special base is not required when this furnace is installed
on manufacturer’s Coil Assembly Part No. CD5 or CK5, or when
Coil Box Part No. KCAKC is used. The design of this furnace line
is not CSA (A.G.A. and C.G.A.) certified for installation in mobile
homes, recreation vehicles, or outdoors. These furnaces are suitable for installation in a residence built on site or a manufactured
residence completed at final site.
These furnaces are shipped with the drain and pressure tubes
connected for UPFLOW applications. Minor modifications are
required when used in DOWNFLOW, HORIZONTAL RIGHT, or
HORIZONTAL LEFT (supply-air discharge direction) applications as shown in Fig. 1. See details in Applications section.
These furnaces are shipped with the following materials to assist in
proper furnace installation. These materials are shipped in the main
blower compartment.
Installer Packet includes:
Installation, Start-Up, and Operating Instructions
Service and Maintenance Instructions
User’s Information Manual
Warranty Certificate
Loose Parts Bag includes:Quantity
Pressure tube extension1
Collector box or condensate trap extension tube1
Inducer housing drain tube1
1/2-in. CPVC street elbow2
Drain tube coupling1
Drain tube coupling grommet1
Vent and combustion-air pipe support2
Combustion-air pipe perforated disk assembly1
Condensate trap hole filler plug3
Vent and combustion-air intake hole filler plug2
This furnace must be installed with a direct-vent (combustion air
and flue) system and a factory accessory termination kit. In a
direct-vent system, all air for combustion is taken directly from the
outside atmosphere and all flue products are discharged to the
outside atmosphere. See furnace and factory accessory termination
kit instructions for proper installation.
Before installing the furnace in the United States, refer to the
current edition of the NFGC and the NFPA 90B. For copies of the
NFGC and NFPA 90B, contact the National Fire Protetion
NOTES: 1. Minimum return-air openings at furnace, based on metal duct. If flex duct is used,
see flex duct manufacturer’s recommendations for equivalent diameters.
2. Minimum return-air opening at furnace:
a. For 800 CFM–16-in. round or 141/2
x 12-in. rectangle.
b. For 1200 CFM–20-in. round or 141/2
x 191/2
-in. rectangle.
c. For 1600 CFM–22-in. round or 141/2
x 231/4
-in. rectangle.
d. For airflow requirements above 1800 CFM, see Air Delivery table in Product Data
literature for specific use of single side inlets. The use of both side inlets, a
combination of 1 side and the bottom, or the bottom only will ensure adequate
return air openings for airflow requirements above 1800 CFM.
9 7⁄16"
TYP
26 15⁄16" TYP
CONDENSATE
DRAIN LOCATION
(UPFLOW)
30 1⁄2"
9
⁄16"
TYP
CONDENSATE
DRAIN LOCATION
(UPFLOW)
26 1⁄4"
26 1⁄4"
3
Page 4
Association Inc., Batterymarch Park, Quincy, MA 02269; or
American Gas Association, 1515 Wilson Boulevard, Arlington,
VA 22209.
Before installing the furnace in Canada, refer to the current edition
of the NSCNGPIC. Contact Standard Sales CSA International, 178
Rexdale Boulevard, Etobicoke, (Toronto) Ontario, Canada M9W
1R3.
Installation must comply with regulations of serving gas supplier
and local building, heating, plumbing or other codes in effect in the
area in which installation is made. In absence of local codes,
installation must comply with the NFGC in the United States and
the NSCNGPIC in Canada.
These instructions cover minimum requirements for a safe installation and conform to existing national standards and safety codes.
In some instances, these instructions exceed certain local codes
and ordinances, especially those that may not have kept pace with
changing residential construction practices. We require these
instructions as a minimum for a safe installation.
Application of this furnace should be indoors with special
attention given to vent sizing and material, gas input rate, air
temperature rise, unit leveling, and unit sizing. Improper
installation or misapplication of furnace can require excessive
servicing or cause premature component failure.
Improper installation, adjustment, alteration, service, maintenance, or use can cause carbon monoxide poisoning, explosion, fire, electrical shock, or other conditions which may
cause personal injury or property damage. Consult a qualified
installer, service agency, local gas supplier, or your distributor or branch for information or assistance. The qualified
installer or agency must use only factory-authorized and
listed kits or accessories when modifying this product. Failure
to follow this warning could result in electrical shock, fire,
personal injury, or death.
For accessory installation details, refer to applicable installation
literature.
INSTALLATION
This forced air furnace is equipped for use with natural gas at altitudes 0 - 10,000 ft (0 - 3,050m).
An accessory kit, supplied b y the manufacturer, shall be used to convert to propane gas use or may be required for some natural
gas applications.
This furnace is for indoor installation in a building constructed on site . This furnace may be installed in a manufactured (mobile)
home when stated on rating plate and using factory authorized kit.
This furnace ma y be installed on com bustible flooring in alcove or closet at minimum clearance from combustible material.
This appliance requires a special venting system . Refer to the installation instructions for parts list and method of installation. This
furnace is for use with schedule-40 PVC, PVC-DWV, or ABS-DWV pipe, and must not be vented in common with other gas-fired
appliances. Construction through which vent/air intake pipes may be installed is maximum 24 inches (600 mm), minimum 3/4 inches
(19 mm) thickness (including roofing materials).
Furnac e m ust be installed le ve l, or
pitched forward within 1/2 inch of level
for proper drainage. Failure will result in
equipment or property dam age. See
Installation Man ual for IMPOR TANT unit
support details on horizontal
applications.
UPFLOW OR
DOWNFLOW
MINIMUM INCHES CLEARANCE TO
COMBUSTIBLE CONSTRUCTION
ALL POSITIONS:
Mimimum front cle arance for service 30 inches
*
(762mm).
DOWNFLOW POSITIONS:
For installation on co m b ustible floors only when
†
installed on special base No. KGASB0201ALL, Coil
Assembly, Part No. CD5 or CK5, or Coil Casing, Part
No. KCAKC.
HORIZO NTAL POSITIONS:
Clearance shown is for air in let and air outlet en d.
§
Line contact is perm issible only between lines
formed by intersections of top and two sides of furnace
jacket, and building joists, studs, or framing.
120 size Furnace require 1 inch bottom clearance to
Ø
combustible materials.
LEVEL (0")
TO
1/2" MAX
FRONT
This furnace is approved for UPFLOW, DOWN F LO W and
HORIZONTAL installations.
Clearance arrows
do not change with
furnace orientation.
0"
§
LEVEL (0")
TO
1/2" MAX
FRONT
HORIZONTAL
1"
B
A
C
K
E
D
I
S
0"
TOP/PLENUM
E
C
A
N
R
U
F
T
N
O
R
F
S
F
R
O
N
T
3"
§
0"
E
D
I
S
E
R
V
I
C
E
*
30
MIN
325400-201 REV. A
(LIT. TOP )
Clearance in inches.
Fig. 3—Clearances to Combustibles
4
BOTTOM
0"
Ø
†
Vent clearance to
combustibles 0".
A99103
Page 5
BLOWER SHELF
CONDENSATE
TRAP (INSIDE)
ALTERNATE DRAIN
TUBE LOCATION
CONDENSATE TRAP
DRAIN TUBE LOCATION
UPFLOW APPLICATIONS
FURNACE
DOOR
FIELD
DRAIN
CONN
EXTERNAL UPFLOW APPLICATIONS
SLOT FOR SCREW
HORIZONTAL
APPLICATION
(OPTIONAL)
1
1
2
3
4
WIRE TIE
GUIDES
(WHEN USED)
CONDENSATE
TRAP
FURNACE
SIDE
7
4
8
1
26
4
1
1
2
FURNACE
DOOR
FIELD
DRAIN
CONN
FURNACE
SIDE
4
3
5
4
4
1
26
4
3
5
3
4
SIDE VIEWFRONT VIEWEND VIEWFRONT VIEW
DOWNFLOW AND ALTERNATE
1
7
8
3
1
4
7
8
1
42
1
⁄4 OD
COLLECTOR BOX TO
TRAP RELIEF PORT
1
⁄2 OD
INDUCER HOUSING
DRAIN CONNECTION
5
⁄8 OD
COLLECTOR BOX
DRAIN CONNECTION
SCREW HOLE FOR
UPFLOW OR DOWNFLOW APPLICATIONS
(OPTIONAL)
1
⁄2-IN. PVC OR CPVC
HORIZONTAL
APPLICATIONS
4
FRONT VIEWSIDE VIEW
Fig. 4—Condensate Trap
APPLICATIONS
Step 1—General
Some assembly and modifications are required for furnaces
installed in any of the 4 applications shown in Fig. 1. All drain and
pressure tubes are connected as shown in Fig. 5. See appropriate
application instructions for these procedures.
Step 2—Upflow Applications
An upflow furnace application is where furnace blower is located
below combustion and controls section of furnace, and conditioned
air is discharged upwards.
The condensate trap is factory installed in the blower shelf and
factory connected for UPFLOW applications. A factory-supplied
tube is used to extend the condensate trap drain connection to the
desired furnace side for field drain attachment. See Condensate
Trap Tubing (Factory-Shipped Orientation) section for drain tube
extension details.
These tubes should be factory attached to condensate trap and
pressure switch ready for use in UPFLOW applications. These
tubes can be identified by their connection location and also
by a color label on each tube. These tubes are identified as
follows: collector box drain tube (blue label), inducer housing
drain tube (violet label or molded), relief port tube (green
label), and pressure switch tube (pink label).
2. Condensate Trap Drain Tube
The condensate trap drain connection must be extended for
field attachment by doing the following:
a. Determine location of field drain connection. (See Fig. 2 or
5.)
NOTE: If internal filter or side filter/media cabinet is used, drain
tube should be located to opposite side of casing of return duct
attachment to assist in filter removal.
b. Remove and discard casing drain hole plug button from
desired side.
c. Install drain tube coupling grommet (factory-supplied in
loose parts bag) in selected casing hole.
d. Slide drain tube coupling (factory-supplied in loose parts
bag) through grommet so long end of coupling faces
blower.
5
Page 6
PLUG
CAP
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
TUBE (PINK)
PLUG
CAP
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
TUBE (PINK)
COLLECTOR BOX
TUBE (GREEN)
INDUCER HOUSING
(MOLDED) DRAIN
TUBE (BEHIND
COLLECTOR BOX
DRAIN TUBE)
COLLECTOR BOX
DRAIN TUBE (BLUE)
COLLECTOR BOX
TUBE (GREEN)
FIELD-INSTALLED
FACTORY-SUPPLIED
DRAIN TUBE
COUPLING (LEFT
DRAIN OPTION)
FIELD-INSTALLED
FACTORY-SUPPLIED
DRAIN TUBE
FIELD-INSTALLED
FACTORY-SUPPLIED
1
⁄2 -IN. CPVC STREET
ELBOWS (2) FOR
LEFT DRAIN OPTION
FIELD-INSTALLED
FACTORY-SUPPLIED
COUPLING (RIGHT
CONDENSATE
TRAP
DRAIN TUBE
DRAIN OPTION)
A94213
Fig. 5—Factory-Shipped Upflow Tube Configuration
(Shown With Blower Access Panel Removed)
e. Cement 2 factory-supplied 1/2-in. street CPVC elbows to
rigid drain tube connection on condensate trap. (See Fig. 5.)
These elbows must be cemented together and cemented to
condensate trap drain connection.
NOTE: Failure to use CPVC elbows may allow drain to kink,
preventing draining.
f. Connect larger diameter drain tube and clamp (factory-
supplied in loose parts bag) to condensate trap and clamp
securely.
g. Route tube to coupling and cut to appropriate length.
h. Attach tube to coupling and clamp securely.
An alternate location for the condensate trap is the left-hand side
of casing. (See Fig. 2 and 6.)
NOTE: If the alternate left-hand side of casing location is used,
the factory-connected drain and relief port tubes must be disconnected and modified for attachment. See Condensate Trap Tubing
(Alternate Upflow Orientation) section for tubing attachment.
To relocate condensate trap to the left-hand side, perform the
following:
1. Remove 3 tubes connected to condensate trap.
COLLECTOR BOX
DRAIN TUBE (GREEN)
CONDENSATE
TRAP
INDUCER
HOUSING
DRAIN TUBE
(VIOLET)
A94214
Fig. 6—Alternate Upflow Tube Configuration and
Trap Location
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
3. Install casing hole filler cap (factory-supplied in loose parts
bag) into blower shelf hole where trap was removed.
4. Install casing hole filler cap into blower shelf hole where trap
was removed.
5. Fill unused condenstate trap casing holes with placstic filler
caps (factory-supplied in loose parts bag).
NOTE: On 17-1/2-in. wide furnaces ONLY, cut tube between
corrugated sections to prevent kinks.
2. Inducer Housing Drain Tube
a. Remove and discard LOWER (molded) inducer housing
drain tube which was previously connected to condensate
trap.
6
Page 7
COLLECTOR BOX
DRAIN TUBE (BLUE)
CAP
PLUG
COLLECTOR BOX
TUBE (GREEN)
COLLECTOR BOX
TUBE (PINK)
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
EXTENSION TUBE
CONDENSATE
TRAP
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
TUBE (GREEN)
PLUG
CAP
COLLECTOR BOX
DRAIN TUBE (BLUE)
COLLECTOR BOX
TUBE (PINK)
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
EXTENSION TUBE
INDUCER HOUSING
DRAIN TUBE
(VIOLET)
CONDENSATE
TRAP
COLLECTOR BOX
EXTENSION
DRAIN TUBE
DRAIN TUBE
COUPLING
A94215
Fig. 7—Downflow Tube Configuration
(Left-Hand Trap Installation)
b. Use inducer housing drain extension tube (violet label and
factory-supplied in loose parts bag) to connect LOWER
inducer housing drain connection to condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
a. Connect relief port tube (green label) to condensate trap.
b. Extend this tube (if required) by splicing to small diameter
tube (factory-supplied in loose parts bag).
c. Determine appropriate length, cut, and connect tube.
CONDENSATE TRAP FIELD DRAIN ATTACHMENT
Refer to Condensate Drain section for recommendations and
procedures.
PRESSURE SWITCH TUBING
The LOWER collector box pressure tube (pink label) is factory
connected to the pressure switch and should not require any
modification.
NOTE: See Fig. 5 or 6 or tube routing label on main furnace door
to check for proper connections.
UPPER COLLECTOR BOX AND INDUCER HOUSING (UNUSED) DRAIN CONNECTIONS
Upper Collector Box Drain Connection
Attached to the UPPER collector box drain connection is a
factory-installed corrugated, plugged tube (blue and white striped
label). This tube is plugged to prevent condensate leakage in this
application. Ensure this tube is plugged.
NOTE: See Fig. 5 or 6 or tube routing label on main furnace door
to check for proper connections.
A94216
Fig. 8—Downflow Tube Configuration
(Right-Hand Trap Installation)
Upper Inducer Housing Drain Connection
Attached to the UPPER (unused) inducer housing drain connection
is a cap and clamp. This cap is used to prevent condensate leakage
in this application. Ensure this connection is capped.
NOTE: See Fig. 5 or 6 or tube routing label on main furnace door
to check for proper connections.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
Step 3—Downflow Applications
A downflow furnace application is where furnace blower is located
above combustion and controls section of furnace, and conditioned
air is discharged downwards.
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed
blower shelf location and relocated in selected application location
as shown in Fig. 2, 7, or 8.
To relocate condensate trap from the blower shelf to desired
location, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
3. Install casing hole filler cap (factory-supplied in loose parts
bag) into blower shelf hole where trap was removed.
4. Install casing hole filler cap into blower shelf hole where trap
was removed.
5. Fill unused condenstate trap casing holes with placstic filler
caps (factory-supplied in loose parts bag).
7
Page 8
CONDENSATE TRAP TUBING
NOTE: See Fig. 7 or 8 or tube routing label on main furnace door
to check for proper connections.
1. Collector Box Drain Tube
a. Remove factory-installed plug from LOWER collector box
drain tube (blue and white striped label).
b. Install removed clamp and plug into UPPER collector box
drain tube (blue label) which was connected to condensate
trap.
c. Connect LOWER collector box drain connection to con-
densate trap.
(1.) Condensate Trap Located on Left Side of Casing
(a.) Connect LOWER collector box drain tube (blue
and white striped label) to condensate trap. Tube
does not need to be cut.
(b.) Clamp tube to prevent any condensate leakage.
(2.) Condensate Trap Located on Right Side of Casing
(a.) Install drain tube coupling (factory-supplied in
loose parts bag) into collector box drain tube
(blue and white striped label) which was previously plugged.
(b.) Connect larger diameter drain tube (factory-
supplied in loose parts bag) to drain tube coupling, extending collector box drain tube for
connection to condensate trap.
(c.) Route extended collector box drain tube between
gas valve and inlet housing as shown in Fig. 8.
(d.) Determine appropriate length and cut.
(e.) Connect to condensate trap.
(f.) Clamp tube to prevent any condensate leakage.
2. Inducer Housing Drain Tube
a. Remove factory-installed cap and clamp from LOWER
inducer housing drain connection.
b. Remove and discard UPPER (molded) inducer housing
drain tube which was previously connected to condensate
trap.
c. Install cap and clamp on UPPER inducer housing drain
connection where molded drain tube was removed.
d. Use inducer housing drain tube (violet label and factory-
supplied in loose parts bag) to connect LOWER inducer
housing drain connection to the condensate trap.
e. Connect inducer housing drain connection to condensate
trap.
(1.) Condensate Trap Located on Left Side of Casing
(a.) Determine appropriate length and cut.
(b.) Connect tube to condensate trap.
(c.) Clamp tube to prevent any condensate leakage.
(2.) Condensate Trap Located on Right Side of Casing
trap.
(b.) Determine appropriate length and cut.
(c.) Connect tube to condensate trap.
(d.) Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
Refer to Pressure Switch Tubing section for connection
procedure.
CONDENSATE TRAP FIELD DRAIN ATTACHMENT
Refer to Condensate Drain section for recommendations and
procedures.
PRESSURE SWITCH TUBING
One collector box pressure tube (pink label) is factory connected to
the pressure switch for use when furnace is installed in UPFLOW
or HORIZONTAL LEFT applications. This tube MUST be disconnected and used for the condensate trap relief port tube. The
other collector box pressure tube (green label) which was factory
connected to the condensate trap relief port connection MUST be
connected to the pressure switch in DOWNFLOW or HORIZONTAL RIGHT applications.
NOTE: See Fig. 7 or 8 or tube routing label on main furnace door
to check for proper connections.
2. Extend collector box pressure tube (green label) which was
previously connected to condensate trap relief port connection
by splicing to small diameter tube (factory-supplied in loose
parts bag).
4. Extend collector box pressure tube (pink label) which was
previously connected to pressure switch by splicing to remaining small diameter tube (factory-supplied in loose parts bag).
5. Route this extended tube (pink label) to condensate trap relief
port connection.
6. Determine appropriate length, cut, and connect tube.
7. Clamp tube to relief port connection.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
Step 4—Horizontal Left (Supply-Air Discharge)
Applications
A horizontal left furnace application is where furnace blower is
located to the right of combustion and controls section of furnace,
and conditioned air is discharged to the left.
Local codes may require a drain pan under entire furnace and
condensate trap when a condensing furnace is used in an attic
application or over a finished ceiling.
NOTE: In Canada, installations shall be in accordance with
current NSCNGPIC and/or local codes.
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed
blower shelf location and relocated in selected application location
as shown in Fig. 2 or 9.
To relocate condensate trap from the blower shelf to desired
location, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
3. Install casing hole filler cap (factory-supplied in loose parts
bag) into blower shelf hole where trap was removed.
4. Install casing hole filler cap into blower shelf hole where trap
was removed.
8
Page 9
PLUG
AUXILIARY "J" BOX
CAP
COLLECTOR BOX
DRAIN TUBE
(BLUE AND WHITE STRIPED)
CONDENSATE
TRAP
COLLECTOR
BOX EXTENSION
DRAIN TUBE
COLLECTOR BOX
EXTENSION TUBE
RELOCATE TUBE BETWEEN BLOWER SHELF AND INDUCER HOUSING FOR
040, 060, AND 080 HEATING INPUT FURNACES
Fig. 9—Horizontal Left Tube Configuration
5. Fill unused condenstate trap casing holes with placstic filler
caps (factory-supplied in loose parts bag).
CONDENSATE TRAP TUBING
NOTE: See Fig. 9 or tube routing label on main furnace door to
check for proper connections.
1. Collector Box Drain Tube
a. Install drain tube coupling (factory-supplied in loose parts
bag) into collector box drain tube (blue label) which was
previously connected to condensate trap.
b. Connect large diameter drain tube and clamp (factory-
supplied in loose parts bag) to drain tube coupling, extending collector box drain tube.
c. Route extended tube (blue label) to condensate trap and cut
to appropriate length.
d. Clamp tube to prevent any condensate leakage.
2. Inducer Housing Drain Tube
a. Remove and discard LOWER (molded) inducer housing
drain tube which was previously connected to condensate
trap.
b. Use inducer housing drain extension tube (violet label and
factory-supplied in loose parts bag) to connect LOWER
inducer housing drain connection to condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
a. Extend collector box tube (green label) which was previ-
ously connected to condensate trap by splicing to small
diameter tube (factory-supplied in loose parts bag).
COLLECTOR BOX
TUBE (GREEN)
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
DRAIN TUBE (BLUE)
DRAIN TUBE COUPLING
COLLECTOR BOX TUBE (PINK)
A00215
b. Route extended collector box pressure tube to relief port
connection on condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
CONDENSATE TRAP FIELD DRAIN ATTACHMENT
Refer to Condensate Drain section for recommendations and
procedures.
PRESSURE SWITCH TUBING
The LOWER collector box pressure tube (pink label) is factory
connected to the pressure switch and should not require any
modification.
NOTE: See Fig. 9 or tube routing label on main furnace door to
check for proper connections.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
CONSTRUCT A WORKING PLATFORM
Construct working platform where all required furnace clearances
are met. (See Fig. 3 and 10.)
The condensate trap MUST be installed below furnace. See
Fig. 4 for dimensions. The drain connection to condensate
trap must also be properly sloped to an open drain.
NOTE: Combustion-air and vent pipes are restricted to a minimum length of 5 ft. (See Table 6.)
9
Page 10
MANUAL
SHUTOFF
GAS VALVE
COMBUSTION – AIR
SEDIMENT
TRAP
INTAKE
3
5
⁄4″
CONDENSATE
TRAP
VENT
30″ MIN
WORK AREA
DRAIN
A 12-IN. MIN HORIZONTAL PIPE
SECTION IS RECOMMENDED WITH
SHORT (5 TO 8 FT) VENT SYSTEMS
TO REDUCE EXCESSIVE
CONDENSATE DROPLETS FROM
EXITING THE VENT PIPE.
ACCESS OPENING
FOR TRAP
NOTE: LOCAL CODES MAY REQUIRE A DRAIN PAN UNDER THE
FURNACE AND CONDENSATE TRAP WHEN A CONDENSING
FURNACE IS INSTALLED ABOVE FINISHED CEILINGS.
Fig. 10—Attic Location and Working Platform
NOTE: A 12-in. minimum offset pipe section is recommended
with short (5 to 8 ft) vent systems. This recommendation is to
reduce excessive condensate droplets from exiting the vent pipe.
(See Fig. 10 or 32.)
Step 5—Horizontal Right (Supply-Air Discharge)
Applications
A horizontal right furnace application is where furnace blower is
located to the left of combustion and controls section of furnace,
and conditioned air is discharged to the right.
Local codes may require a drain pan under entire furnace and
condensate trap when a condensing furnace is used in attic
application or over a finished ceiling.
NOTE: In Canada, installations shall be in accordance with
current NSCNGPIC Installation Codes and/or local codes.
NOTE: The auxiliary junction box (J-box) MUST be relocated to
opposite side of furnace casing. (See Fig. 11.) See Electrical
Connection section for J-box relocation.
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed
blower shelf location and relocated in selected application location
as shown in Fig. 2 or 11.
To relocate condensate trap from the blower shelf to desired
location, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
A93031
3. Install casing hole filler cap (factory-supplied in loose parts
bag) into blower shelf hole where trap was removed.
4. Install casing hole filler cap into blower shelf hole where trap
was removed.
5. Fill unused condenstate trap casing holes with placstic filler
caps (factory-supplied in loose parts bag).
CONDENSATE TRAP TUBING
NOTE: See Fig. 11 or tube routing label on main furnace door to
check for proper connections.
1. Collector Box Drain Tube
a. Remove factory-installed plug from LOWER collector box
drain tube (blue and white striped label).
b. Install removed clamp and plug into UPPER collector box
drain tube (blue label) which was previously connected to
condensate trap.
c. Connect LOWER collector box drain tube (blue and white
striped label) to condensate trap. Tube does not need to be
cut.
d. Clamp tube to prevent any condensate leakage.
2. Inducer Housing Drain Tube
a. Remove factory-installed cap and clamp from LOWER
inducer housing drain connection.
b. Remove and discard UPPER (molded) inducer housing
drain tube which was previously connected to condensate
trap.
c. Install cap and clamp on UPPER inducer housing drain
connection where molded drain tube was removed.
10
Page 11
CAP
PLUG
COLLECTOR BOX DRAIN TUBE
(BLUE AND WHITE STRIPED)
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
EXTENSION TUBE
Fig. 11—Horizontal Right Tube Configuration
COLLECTOR BOX DRAIN TUBE (BLUE)
COLLECTOR BOX TUBE (GREEN)
COLLECTOR BOX EXTENSION TUBE
COLLECTOR BOX TUBE (PINK)
AUXILARY “J” BOX RELOCATED HERE
CONDENSATE
TRAP
A00214
d. Use inducer housing drain extension tube (violet label and
factory-supplied in loose parts bag) to connect LOWER
inducer housing drain connection to condensate trap.
e. Determine appropriate length, cut, and connect tube to
condensate trap.
f. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
Refer to Pressure Switch Tubing section for connection
procedure.
CONDENSATE TRAP FIELD DRAIN ATTACHMENT
Refer to Condensate Drain section for recommendations and
procedures.
PRESSURE SWITCH TUBING
One collector box pressure tube (pink label) is factory connected to
the pressure switch for use when furnace is installed in UPFLOW
or HORIZONTAL LEFT applications. This tube MUST be disconnected and used for the condensate trap relief port tube. The
other collector box pressure tube (green label) which was factory
connected to the condensate trap relief port connection MUST be
connected to the pressure switch in DOWNFLOW or HORIZONTAL RIGHT applications.
NOTE: See Fig. 11 or tube routing label on main furnace door to
check for proper connections.
2. Extend collector box pressure tube (green label) which was
previously connected to condensate trap relief port connection
by splicing to small diameter tube (factory-supplied in loose
parts bag).
4. Use remaining small diameter tube (factory-supplied in loose
parts bag) to extend collector box pressure tube (pink label)
which was previously connected to pressure switch.
5. Route this extended tube (pink label) to condensate trap relief
port connection.
6. Determine appropriate length, cut, and connect tube.
7. Clamp tube to relief port connection.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
CONSTRUCT A WORKING PLATFORM
Construct working platform where all required furnace clearances
are met. (See Fig. 3 and 10.)
The condensate trap MUST be installed below furnace. See
Fig. 4 for dimensions. The drain connection to condensate
trap must also be properly sloped to an open drain.
NOTE: Combustion-air and vent pipes are restricted to a minimum length of 5 ft. (See Table 6.)
NOTE: A 12-in. minimum offset pipe section is recommended
with short (5 to 8 ft) vent systems. This recommendation is to
reduce excessive condensate droplets from exiting the vent pipe.
(See Fig. 10 or 29.)
LOCATION
Step 1—General
When a furnace is installed so that supply ducts carry air to areas
outside the space containing the furnace, return air must also be
handled by ducts sealed to furnace casing. The ducts terminate
outside the space containing the furnace to ensure there will not be
a negative pressure condition within equipment room or space.
11
Page 12
Furnace may be located in a confined space without special
provisions for dilution or ventilation air. This furnace must be
installed so electrical components are protected from water.
LEVEL (0″)
TO
1
⁄2″ MAX
UPFLOW OR DOWNFLOWHORIZONTAL
FRONT
LEVEL (0″)
TO
1
⁄2″ MAX
FRONT
A93025
NOTE: For proper furnace operation, install furnace so that it is
level or pitched forward within 1/2 in. to ensure proper condensate
drainage from secondary heat exchangers.
If these furnaces are used during construction when adhesives, sealers, and/or new carpets are being installed, make
sure all combustion and circulating air requirements are
followed. If operation of furnace is required during construction, use clean outside air for combustion and ventilation.
Compounds of chlorine and fluorine, when burned with
combustion air, form acids which will cause corrosion of heat
exchangers. Some of these compounds are found in paneling,
dry wall adhesives, paints, thinners, masonry cleaning materials, and many other solvents commonly used in the construction process.
Excessive exposure to contaminated combustion air will
result in safety and performance related problems.
Provide ample space for servicing and cleaning. Always comply
with minimum fire protection clearances shown on unit’s clearance to combustibles label. (See Fig. 3.) Locate furnace where
available electric power and gas supplies meet specifications on
furnace rating plate.
FRONT
A93042
NOTE: These furnaces are designed for a minimum continuous
return-air temperature of 60°F or intermittent operation down to 55°F
such as when used with a night setback thermostat. Return-air
temperature must not exceed a maximum of 85°F. Failure to follow
these return-air temperature limits may affect reliability of heat
exchangers, motors, and controls.
Locate furnace as close to center of air distribution system as
possible.
Locate furnace so combustion-air pipe lengths are not exceeded.
Refer to Table 6.
B
A
C
K
BACK
FRONT
A93043
Do not install furnace on its back. Safety control operation
will be adversely affected. Never connect return-air ducts to
back of furnace. Failure to follow this warning could result in
fire, personal injury, or death.
12
Page 13
32°F MINIMUM INSTALLED
AMBIENT OR FREEZE
PROTECTION REQUIRED
A93058
If these furnaces are installed in an unconditioned space
where ambient temperatures may be 32°F or lower, freeze
protection measures must be taken.
Step 2—Low-Fire Only Installation
This 58MVP furnace can be installed to operate in the low-fire
only heating mode when sized using the low-fire heating capacity.
This is accomplished by placing setup switch SW-2 in the ON
position to provide only low-fire-heat operation. See Fig. 25 and
Table 10. With this setup, high-fire operation will not occur.
When the model no. on the furnace rating plate is followed by an
asterisk (*), the furnace has an alternate low-fire only efficiency
rating as listed in the GAMA and CEC directories. This alternate
rating will be listed as the furnace model number followed by an
(-L) suffix.
18-IN. MINIMUM
TO BURNERS
A93044
When furnace is installed in a residential garage, it must be
installed so that burners and ignition sources are located a
minimum of 18 in. above floor. The furnace must be located
or protected to avoid physical damage by vehicles. When
furnace is installed in a public garage, airplane hangar, or
other building having a hazardous atmosphere, unit must be
installed in accordance with requirements of National Fire
Protection Association, Inc.
5
⁄16″
5
⁄16″
1 3⁄4″
3
⁄4″
1
The furnace can operate in the high-fire mode when certain
fault conditions occur. The following precautions should be
taken:
1. Size gas piping based on the high-fire input.
2. Check the high-fire input and adjust it per the main
literature instructions.
NEVER assume the high-fire input rate is not important for
low-fire-only installation.
Step 3—Furnace Location Relative to Cooling
Equipment
The cooling coil must be installed parallel with or on downstream
side of furnace to avoid condensation in heat exchanger. When
installed parallel with a furnace, dampers or other means used to
control flow of air must prevent chilled air from entering furnace.
If dampers are manually operated, they must be equipped with a
means to prevent operation of either unit unless damper is in
full-heat or full-cool position.
Step 4—Hazardous Locations
INSTALLATION
Step 1—Leveling Legs (If Desired)
When furnace is used in upflow position with side inlet(s), leveling
legs may be desired. (See Fig. 12.) Install field-supplied,
corrosion-resistant 5/16-in. machine bolts and nuts.
5
⁄16″
5
⁄16″
1 3⁄4″
1 3⁄4″
Fig. 12—Leveling Legs
NOTE: The maximum length of bolt should not exceed 1-1/2 in.
1. Position furnace on its back. Locate and drill a 5/16-in.
diameter hole in each bottom corner of furnace. (See Fig. 12.)
Holes in bottom closure panel may be used as guide locations.
2. For each hole, install nut on bolt and then install bolt and nut
in hole. (Install flat washer if desired.)
3. Install another nut on other side of furnace base. (Install flat
washer if desired.)
4. Adjust outside nut to provide desired height, and tighten inside
nut to secure arrangement.
13
A89014
Page 14
NOTE: Bottom closure must be used when leveling legs are used.
See Bottom Closure Panel section.
Step 2—Installation in Upflow or Downflow
Applications
NOTE: This furnace is approved for use on combustible flooring
whenmanufacturer’saccessoryfloorbase,PartNo.
KGASB0201ALL, is used. Manufacturers accessory floor base in
not required when this furnace is installed on manufacturer’s Coil
Assembly Part No. CD5 or CK5, or Coil Box Part No. KCAKC is
used.
1. Determine application being installed from Table 1.
2. Construct hole in floor per dimensions specified in Table 1
and Fig. 13.
3. Construct plenum to dimensions specified in Table 1 and Fig.
13.
4. If downflow subbase (KGASB) is used, install as shown in
Fig. 14.
If coil assembly CD5 or CK5 or Coil Box KCAKC is used,
install as shown in Fig. 15.
NOTE: Remove furnace perforated, discharge duct flanges when
they interfere with mating flanges on coil on downflow subbase.
To remove furnace perforated, discharge duct flange, use wide
duct pliers or duct flange tool to bend flange back and forth until
it breaks off. Be careful of sharp edges. (See Fig. 16.)
Do not bend duct flanges inward as shown in Fig. 16. This
will affect airflow across heat exchangers and may cause limit
cycling or premature heat exchanger failure. Remove duct
flange completely or bend it inward a minimum of 210° as
shown in Fig. 16.
Step 3—Installation in Horizontal Applications
These furnaces can be installed horizontally in either horizontal
left or right discharge position. In a crawlspace, furnace can either
be hung from floor joist or installed on suitable blocks or pad.
Furnace can be suspended from each corner by hanger bolts and
angle iron supports. (See Fig. 17.) Cut hanger bolts (4 each 3/8-in.
all-thread rod) to desired length. Use 1 X 3/8-in. flat washers,
3/8-in. lockwashers, and 3/8-in. nuts on hanger rods as shown in
Fig. 17. Dimples are provided for hole locations. (See Fig. 2.)
The entire length of furnace MUST be supported when
furnace is used in a horizontal position to ensure proper
draining. When suspended, bottom brace supports sides and
center blower shelf. When unit is supported from the ground,
blocks or pad should support sides and center blower shelf
area.
AIR DUCTS
Step 1—General Requirements
The duct system should be designed and sized according to
accepted national standards such as those published by: Air
Conditioning Contractors Association (ACCA), Sheet Metal and
Air Conditioning Contractors National Association (SMACNA) or
American Society of Heating, Refrigerating and Air Conditioning
Engineers (ASHRAE). Or consult factory The Air Systems DesignGuidelines reference tables available from your local distributor.
The duct system should be sized to handle the required system
design CFM at the design static pressure.
When a furnace is installed so that the supply ducts carry air to
areas outside the space containing the furnace, the return air must
also be handled by a duct(s) sealed to the furnace casing and
terminating outside the space containing the furnace.
Secure ductwork with proper fasteners for type of ductwork used.
Seal supply- and return-duct connections to furnace with code
approved tape or duct sealer.
Flexible connections should be used between ductwork and
furnace to prevent transmission of vibration. Ductwork passing
through unconditioned space should be insulated to enhance
system performance. When air conditioning is used, a vapor
barrier is recommended.
Maintain a 1-in. clearance from combustible materials to supply air
ductwork for a distance of 36 in. horizontally from the furnace. See
NFPA 90B or local code for further requirements.
Step 2—Ductwork Acoustical Treatment
Metal duct systems that do not have a 90 degree elbow and 10 ft
of main duct to the first branch take-off may require internal
acoustical lining. As an alternative, fibrous ductwork may be used
if constructed and installed in accordance with the latest edition of
SMACNA construction standard on fibrous glass ducts. Both
acoustical lining and fibrous ductwork shall comply with NFPA
90B as tested by UL Standard 181 for Class 1 Rigid air ducts.
Step 3—Supply Air Connections
UPFLOW FURNACES
Connect supply-air duct to 3/4-in. flange on furnace supply-air
outlet. The supply-air duct attachment must ONLY be connected
to furnace supply-/outlet-air duct flanges or air conditioning coil
casing (when used). DO NOT cut main furnace casing to attach
supply side air duct, humidifier, or other accessories. All accessories MUST be connected external to furnace main casing.
DOWNFLOW FURNACES
Connect supply-air duct to supply-air opening on furnace. The
supply-air duct attachment must ONLY be connected to furnace
supply/outlet or air conditioning coil casing (when used), when
installed on non-combustible material. When installed on combustible material, supply-air duct attachment must ONLY be connected to an accessory subbase or factory approved air conditioning coil casing. DO NOT cut main furnace casing to attach supply
side air duct, humidifier, or other accessories. All accessories
MUST be connected external to furnace main casing.
HORIZONTAL FURNACES
Connect supply-air duct to supply air opening on furnace. The
supply-air duct attachment must ONLY be connected to furnace
supply/outlet or air conditioning coil casing (when used). DO NOT
cut main furnace casing to attach supply side air duct, humidifier,
or other accessories. All accessories MUST be connected external
to furnace main casing.
Step 4—Return Air Connections
UPFLOW FURNACES
The return-air duct must be connected to bottom , sides (left or
right), or a combination of bottom and side(s) of main furnace
casing as shown in Fig. 1. Bypass humidifier may be attached into
unused side return air portion of the furnace casing. DO NOT
connect any portion of return-air duct to back of furnace casing.
DOWNFLOW AND HORIZONTAL FURNACES
The return-air duct must be connected to return-air opening
provided as shown in Fig. 1. DO NOT cut into casing sides or back
to attach any portion of return-air duct. Bypass humidifier connections should be made at ductwork or coil casing sides exterior to
furnace.
14
Page 15
A
PLENUM
OPENING
B
C
FLOOR
OPENING
D
A96283
Fig. 13—Floor and Plenum Opening Dimensions
FURNACE
(OR COIL CASING
WHEN USED)
COMBUSTIBLE
FLOORING
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
FLOOR
OPENING
A96285
Fig. 14—Furnace, Plenum, and Subbase
Installed on a Combustible Floor
Table 1—Opening Dimensions (In.)
FURNACE
CASING
WIDTH
17-1/2
21
24-1/2
Downflow Applications on Non-Combustible Flooring15-7/81916-1/219-5/8
Downflow Applications on Combustible Flooring Using KGASB Subbase
Furnace with or without CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Combustible Flooring NOT Using KGASB Subbase
Furnace with CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Non-Combustible Flooring19-3/8192019-5/8
Downflow Applications on Combustible Flooring Using KGASB Subbase
Furnace with or without CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Combustible Flooring NOT Using KGASB Subbase
Furnace with CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Non-Combustible Flooring22-7/81923-1/219-5/8
Downflow Applications on Combustible Flooring Using KGASB Subbase
Furnace with or without CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Combustible Flooring NOT Using KGASB Subbase
Furnace with CD5 or CK5 Coil Assembly or KCAKC Coil Box
APPLICATION
Upflow Applications1624-1/816-5/824-3/4
Upflow Applications19-1/224-1/820-1/824-3/4
Upflow Applications2324-1/823-5/824-3/4
FURNACE
CD5 OR CK5
COIL ASSEMBLY
OR KCAKC
COIL BOX
COMBUSTIBLE
FLOORING
SHEET METAL
PLENUM
FLOOR
OPENING
A96284
Fig. 15—Furnace, Plenum, and Coil
Assembly or Coil Box Installed
on a Combustible Floor
PLENUM OPENINGFLOOR OPENING
ABCD
15-1/81916-3/420-3/8
15-1/21916-1/220
18-5/81920-1/420-3/8
19192020
22-1/81923-3/420-3/8
22-1/21923-1/220
15
Page 16
PERFORATED
DISCHARGE DUCT
FLANGE
Fig. 16—Duct Flanges
210°
MIN
NO
YES
YES
A93029
Step 5—Filter Arrangement
Never operate unit without a filter or with filter access door
removed. Failure to follow this warning can cause fire,
personal injury, or death.
The air filter arrangement will vary due to application and filter
type. The filter may be installed in an external Filter/Media cabinet
(if provided) or the furnace blower compartment. Factory supplied
washable filters are shipped in the blower compartment.
If a factory-supplied external Filter/Media cabinet is provided,
instructions for its application, assembly, and installation are
packaged with the cabinet. The Filter/Media cabinet can be used
with the factory-supplied washable filter or a factory-specified
high-efficiency disposable filter (see cabinet instructions).
If installing the filter in the furnace blower compartment, determine location for filter and relocate filter retaining wire if
necessary. See Table 2 to determine correct filter size for desired
filter location. Table 2 indicates filter size, location, and quantity
shipped with this furnace. See Fig. 2 for location and size of
bottom and side return-air openings.
ANGLE
IRON OR
EQUIVALENT
(B)
(A) ROD LOCATION
USING DIMPLE
LOCATORS
(SEE DIMENSIONAL
DWG FOR
LOCATIONS)
(A) PREFERRED ROD LOCATION
(B) ALTERNATE ROD LOCATION
3
5
⁄
″
4
(B)
(A)
DRAIN
(A)
(B)
13
3
/8-IN. HEX NUT
& WASHER (4)
REQD PER ROD
NOTES:
(A)
1. A 1 In. clearance minimum between top of
furnace and combustible material.
2. The entire length of furnace must be
supported when furnace is used in horizontal
position to ensure proper drainage.
(B)
/16-IN. MAX
ALTERNATE SUPPORT
LOCATION FROM BACK
Fig. 17—Crawlspace Horizontal Application
16
3
⁄8-IN. ROD
ALTERNATE SUPPORT
LOCATION 4-IN. MIN
8-IN. MAX
A93304
Page 17
Table 2—Filter Information
FURNACE
CASING
WIDTH (IN.)
17-1/2(1)16X25X1†(1)16X25X1†Cleanable
21(1)16X25X1(1)20X25X1†Cleanable
24-1/2(1or2)16X25X1 (1)24X25X1†Cleanable
* Filters may be field modified by cutting filter material and support rods (3) in
filters. Alternate sizes can be ordered from your distributor or dealer.
† Factory-provided with furnace.
Use care when cutting support rods in filters to protect against
flying pieces and sharp rod ends. Wear safety glasses, gloves,
and appropiate protective clothing. Failure to follow this
caution could result in personal injury.
For airflow requirements above 1800 CFM, see Air Delivery
table in Product Data literature for specific use of single side
inlets. The use of both side inlets, a combination of 1 side and
the bottom, or the bottom only will ensure adequate return air
openings for airflow requirements above 1800 CFM.
NOTE: Side return-air openings can ONLY be used in UPFLOW
configurations. Install filter(s) as shown in Fig. 18.
For bottom return-air applications, filter may need to be cut to fit
some furnace widths. Install filter as shown in Fig. 19.
NOTE: Remove and discard bottom closure panel when bottom
inlet is used.
Step 6—Bottom Closure Panel
These furnaces are shipped with bottom closure panel installed in
bottom return-air opening. This panel MUST be in place when side
return air is used.
To remove bottom closure panel, perform following:
1. Tilt or raise furnace and remove 2 screws holding front filler
panel. (See Fig. 20.)
2. Rotate front filler panel downward to release holding tabs.
3. Remove bottom closure panel.
4. Reinstall front filler panel and screws.
Step 7—Gas Piping
Gas piping must be installed in accordance with national and local
codes. Refer to current edition of NFGC. Canadian installations
must be made in accordance with NSCNGPIC and all authorities
FILTER SIZE (IN.)*
Side ReturnBottom Return
FILTER TYPE
FRAMED
171⁄2-IN. WIDE
CASINGS ONLY:
INSTALL FIELD-SUPPLIED
FILTER FILLER STRIP
UNDER FILTER.
3″
1
24
/2″
1″
FILTER
SUPPORT
21-IN. WIDE
CASINGS ONLY:
SUPPORT RODS (3)
EXTEND 1/4" ON EACH
SIDE OF FILTER AND
REST ON CASING FLANGE
FILTER
RETAINER
Fig. 19—Bottom Filter Arrangement
WASHABLE
FILTER
A00290
WASHABLE
FILTER
Fig. 18—Filter Installed for Side Inlet
FILTER
RETAINER
A93045
BOTTOM
CLOSURE
PANEL
FRONT FILLER
PANEL
Fig. 20—Removing Bottom Closure Panel
having jurisdiction. Gas supply line should be a separate line
running directly from meter to furnace, if possible. Refer to Table
3 for recommended gas pipe sizing. Risers must be used to connect
to furnace and to meter. Support all gas piping with appropriate
17
A93047
Page 18
straps, hangers, etc. Use a minimum of 1 hanger every 6 ft. Joint
compound (pipe dope) should be applied sparingly and only to
male threads of joints. Pipe dope must be resistant to propane gas.
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and
a pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas). Ref:
Table 10-2 NFPA 54-1999.
INTERNAL
DIAMETER
(IN.)
Connect gas pipe to furnace using a backup wrench to avoid
damaging gas controls.
Gas valve shutoff switch MUST be facing forward or tilted
upward. Failure to follow this warning could result in
property damage or death.
LENGTH OF PIPE (FT)
1020304050
GAS
SUPPLY
MANUAL
SHUTOFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
A93324
Fig. 21—Typical Gas Pipe Arrangement
from furnace and capped before pressure test. If test pressure is
equal to or less than 0.5 psig (14-in. wc), turn off electric shutoff
switch located on gas valve before test. It is recommended that
ground joint union be loosened before pressure testing. After all
connections have been made, purge lines and check for leakage.
ELECTRICAL CONNECTIONS
Never purge a gas line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition for
purpose of checking leakage. Use a soap-and-water solution
to check for leakage. A failure to follow this warning could
result in fire, explosion, personal injury, or death.
Use proper length of pipe to avoid stress on gas control
manifold. Failure to follow this warning could result in a gas
leak resulting in fire, explosion, personal injury, or death.
Install a sediment trap in riser leading to furnace. Trap can be
installed by connecting a tee to riser leading to furnace so
straight-through section of tee is vertical. Then connect a capped
nipple into lower end of tee. Capped nipple should extend below
level of gas controls. Place a ground joint union between gas
control manifold and manual gas shutoff valve. (See Fig. 21.)
If a flexible connector is required or allowed by authority
having jurisdiction, black iron pipe shall be installed at gas
valve and extend a minimum of 2 in. outside furnace casing.
An accessible manual shutoff valve MUST be installed upstream
of furnace gas controls and within 6 ft of furnace. A 1/8-in. NPT
plugged tapping, accessible for test gage connection, MUST be
installed immediately upstream of gas supply connection to
furnace and downstream of manual shutoff valve.
NOTE: The gas valve inlet press tap connection is suitable to use
as test gage connection providing test pressure DOES NOT exceed
maximum 0.5 psig (14-in. wc) stated on gas valve. (See Fig. 50.)
Piping should be pressure tested in accordance with local and
national plumbing and gas codes before furnace has been attached.
In Canada, refer to current edition of NSCNGPIC. If pressure
exceeds 0.5 psig (14-in. wc), gas supply pipe must be disconnected
See Fig. 22 for field wiring diagram showing typical field 115-v
and 24-v wiring. Check all factory and field electrical connections
for tightness.
Blower access panel door switch opens 115-v power to
control center. No component operation can occur. Do not
bypass or close switch with panel removed. Failure to follow
this warning could result in personal injury or death.
Furnace control must be grounded for proper operation or
control will lock out. Control is grounded through green wire
routed to gas valve and burner box screw.
Step 1—115-v Wiring
Before proceeding with electrical connections, make certain that
voltage, frequency, and phase correspond to that specified on unit
rating plate. Also, check to be sure that service provided by utility
is sufficient to handle load imposed by this equipment. Refer to
rating plate or Table 4 for equipment electrical specifications.
Make all electrical connections in accordance with NEC
ANSI/NFPA 70-1999 and any local codes or ordinances that might
apply. For Canadian installations, all electrical connections must
be made in accordance with Canadian Electrical Code CSA C22.1
or subauthorities having jurisdiction.
Use a separate, fused branch electrical circuit containing a properly
sized fuse or circuit breaker for this furnace. See Table 4 for wire
size and fuse specifications. A disconnecting means must be
located within sight from and readily accessible to furnace.
NOTE: Proper polarity must be maintained for 115-v wiring. If
polarity is incorrect, control center fault code indicator light will
flash rapidly and furnace will NOT operate.
18
Page 19
115-V
SINGLE
PHASE
115-V
FIELD-SUPPLIED
DISCONNECT
SWITCH
FURNACE
CONTROL
FIELD 24-V WIRING
FIELD 115-, 208/230-, 460-V WIRING
FACTORY 24-V WIRING
FACTORY 115-, 208/230-, 460-V WIRING
FIVE
WIRE
THREE-WIRE
NOTE 5
WCRGY
THERMOSTAT
TERMINALS
FIELD-SUPPLIED
HEATING
ONLY
AUXILIARY
J-BOX
W/W1
W2
Y/Y2
24-V
R
G
C
NOTE
3
NOTE 1
TWO WIRE
GND
GND
CONDENSING
UNIT
TERMINAL
CENTER
BLOCK
NOTES:
1.
Connect Y or Y/Y2 terminal as shown for proper cooling operation.
2.
Proper polarity must be maintained for 115-v wiring.
3.
Use W2 with 2-stage thermostat when zoning.
4.
If any of the original wire, as supplied, must be replaced, use
same type or equivalent wire.
5.
Some thermostats require a "C" terminal connection as shown.
Fig. 22—Heating and Cooling Application Wiring Diagram
DISCONNECT
208/230- OR
460-V
THREE PHASE
GND
208/230-V
SINGLE
PHASE
GND
A98325
ELECTRIC
DISCONNECT
SWITCH
COPPER
WIRE ONLY
ALUMINUM
WIRE
A93033
Do not connect aluminum wire between disconnect switch
and furnace. Use only copper wire.
The cabinet MUST have an uninterrupted or unbroken ground
according to NEC ANSI/NFPA 70-1999 and Canadian Electrical Code CSA C22.1 or local codes to minimize personal
injury if an electrical fault should occur. This may consist of
electrical wire or conduit approved for electrical ground when
installed in accordance with existing electrical codes. Do not
use gas piping as an electrical ground. Failure to follow this
warning could result in electric shock, fire, or death.
J-Box Relocation
1. Remove 2 screws holding auxiliary J-box. (See Fig. 23.)
2. Rotate J-box 180° and attach box to right side, using holes
provided.
ALTERNATE
FIELD
LOCATION
FACTORY
INSTALLED
LOCATION
A00212
Fig. 23—Relocating J-Box
If manual disconnect switch is to be mounted on furnace,
select a location where a drill or fastener will not contact
electrical or gas components.
Step 2—24-v Wiring
Make field 24-v thermostat connections at 24-v terminal block on
control center. Y wire from thermostat MUST be connected to Y
terminal on control center, as shown in Fig. 22, for proper cooling
operation. The 24-v terminal board is marked for easy connection
of field wiring. (See Fig. 24.) The 24-v circuit contains a 3-amp,
automotive-type fuse located on control center. (See Fig. 25.) Any
electrical shorts of 24-v wiring during installation, service, or
maintenance may cause fuse to blow. If fuse replacement is
required, use only a fuse of identical size (3 amp).
19
Page 20
→Fig. 24—Unit Wiring Diagram
A00350
FRSLS
ALS
FSE
GV
C
M
P
HI
NOTE #3
3
PL1
PL7
12104 6
12
ORN
BRN
YEL
GRN
YEL
3
PL9
HSI
12
1.5 AMP
EAC1
EAC2
2
1
PL4
1
2
3
7
8
4
5
6
YEL
ORN
BRN
GRN
BLU
BRN
RED
1011
B2
RED
9
5
PL3
5BLU
4YEL
3VIO
2ORN
1RED
RED
ORN
VIO
YEL
WHT
BLK
RED
ORN
VIO
YEL
9876 4321
PL10
1
PL11
5
IND.
NOTE
#7
PL11
PL12
12543
3
16
8
14
1
RED
ORN
VIO
YEL
GRN/YEL
YEL
BLU
MTR2
6
PL13
POS.
A/C AND CF
SELECT. CHART
SWITCH
POS.
A/C AND CF
A/CCF
A/CCF
DEFAULTDEFAULT
1-1/2
TON
2
TON
2-1/2
TON
1000
CFM
800
CFM
3
TON
1200
CFM
3-1/2
TON
1400
CFM
4
TON
1600
CFM
5
TON
2000
CFM
PCB
PL6
FU1
LEDS
(1-4)
SW
(1-8)
FUSE
24VAC-3A
1
234
CFA/C
123
123
12345
6
7
8
FLT
LOW HEAT
BPH
EMER. HEATMZCOMP. TEST
BLOWER
OFF-DELAY
PL5
321
654
BLOWER
OFF-DELAY
SELECTION CHART
90
SEC.
135
SEC.
180
SEC.
225
SEC.
78
OFF
NOTE
#6
78
OFF
78
OFF
7
8
OFF
SEC-2
SEC-1
DEHUM
HUM
G
R
Y/Y2
W/W1
C
W2
12 34
PL2
L2
L1
P2
P1
YEL
NO
C
LPS
TRAN
HPS
C
NO
ILK
BLK
WHT
FU2
FUSED DISCONNECT SWITCH
(WHEN REQ’D)
NOTE #2
MTR1
A/CAIR CON DITIONIN G (ADJUSTABLE T ONNAGE)
ALSAUXILIARY LIMIT SWTICH OVERTEMP - MANUAL RESET SPST-(N.C)
CFCONTINUOUS FAN (ADJUSTABLE CFM)
CPU1MAIN MICROPROCESSOR & CIRCUITRY
CPU2IGNITION MICROPROCESSOR & CIRCUITRY
DEDEHU MIDIFY ENABLE - IF DE CONNECTION PROV IDED REMO VE
JUNCTION
UNMARKED TERMINAL
PCB TERMINAL (FAC TORY CONNECTED)
FACTORY WIRING (115 VAC)
FACTORY WIRING (24 VAC)
FIELD WIRING (115 VAC)
CONDUCTOR ON PCB
FIELD WIRING SCREW TERMINAL
TERMINA L BLO CK - M AR KE D TER M INA L
FIELD EARTH GROUND
EQUIPMENT GROUND
FIELD SPLICE
PCB TERMINAL (FIELD CON NECTION)
PLUG RECEPTACLE
NOTE #2
L1
L2
L2
L1
EQUIPMENT GROUND
PL1
654
PL7
MTR1
12
6
4
1
2
10
D.C.
POWER
SUPPLY
PCB
NOTE #5
SW - 4
EMER. HEAT
SCHEMATIC DIAGRAM
(NATURAL GAS & PROPANE )
PL13
CPU1
CPU2
PL3
12345
B17
6
1
2
3
4
5
PL11
PL10
IND
NOTE #7
B2
PL11
PL12
6
14
8
16
3
5
4
3
2
1
MTR2
HSIR
EAC
FRS
LS
ALS
PL1-9
EAC-1 EAC-2
PL4
PL9
HSI
NOTE #6
FU1
SEC-1
24VAC
SEC-2
TRAN
P1
115VA C
P2
PL1-11
PCB
NOTE #5
HUMR
D.C . POWER
SUPPLY
DEHUM
HUM
R
G
Y/Y2
W2
W/W1
C
PL1-1
PL2-1
PL2-2
PL2-4
PL1-10
PL1-2
EAC
GVR
GV
P
C
M
HI
NOTE #3
HPS
NO
C
PL1-7
FSE
LPS
CPU2
CPU1
NOTES:
HUMR
HSIR
GVR
OM
T 2
T 1
T 2
T 1
213
OFF
213
OFF
213
OFF
213
OFF
213
OFF
213
OFF
213
OFF
213
OFF
1
C
NO
2
1
2
1
TO 115 VAC FIELD DISCONNECT
B1
ILK
MODEL
JUMPERS
1-4 2-5 3-6
X
X
XX
X
042040
042060
042080
060100
SIZE
060080
060120
XX
XX
ORN
BRN
LGPS
(WHEN
USED)
ORN
NOTE #11
NOTE #11
LGPS
NOTE #11
(WHEN USED)
NOTE #11
BLK
WHT
RED
BLU
DE
BLK
WHT
SELECT. CHART
CFM
600
WHT
OM
DE
(WHEN USED)
BLK
WHT
WHT
BLK
WHT
BLK
BLU
RED
WHT
BLK
RED
BLK
WHT
YEL
ORN
BRN
SWITCH
WHT
BLK
RED
RED
GRN / YEL
GRN/YEL
BRN
BLU
LEGEND
1. If any of the original equi pment wire is replaced use wire rated for 105°C.
2. Use only copper wire between the disconnect switch and the furnace junction box (JB).
3. This wire must be connected to furnace sheet metal for control to prove flame.
4. Symbols are electrical representation only.
5. Solid lines, inside circuit board PCB are printed circuit board traces and are no t dep icted as s ho wn in the legend.
6. Replace only with a 3 AMP fuse.
7. Inductor used on all 060 or -20 airflow units.
8. Blower-on delay, gas heating 60 seconds low heat, 35 seconds high heat, cooling or heat pump 2 seconds..
9. Blower-off delay, gas heating 90, 135, 180 or 225 seconds, cooling or heat pump 90 seconds.
10. Ignition -loc k out will occur after four consecutive unsuc cess ful trials-for-ignition. Control will auto-reset after three hours.
* Permissible limits of voltage range at which unit will operate satisfactorily.
† Unit ampacity = 125 percent of largest operating component’s full load amps plus 100 percent of all other potential operating components’ (EAC, humidifier, etc.) full
load amps.
‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.
** Time-delay type is recommended.
VOLTS—
HERTZ—
PHASE
OPERATING
VOLTAGE RANGE
Maximum*Minimum*
MAXIMUM
UNIT
AMPS
UNIT
AMPACITY†
MINIMUM
WIRE
SIZE
MAXIMUM WIRE
LENGTH (FT)‡
MAXIMUM FUSE OR
CKT BKR AMPS**
NOTE: Use AWG No. 18 color-coded copper thermostat wire for
lengths up to 100 ft. For wire lengths over 100 ft, use AWG No.
16 wire.
NOTE: For 2-speed applications, refer to Sequence of Operation
section.
Step 3—Accessories
1. Electronic Air Cleaner (EAC)
The control center EAC terminals are energized with 115v
(1.5-amp maximum) during blower operation.
a. Two extension leads are connected to the control center
EAC terminals to assist field installation of an EAC. (See
Fig. 25.) To use these leads, proceed with the following:
(1.) Strip EAC power lead insulation approximately 1/4 in.
(2.) Insert stripped end into factory-supplied black lead’s
butt connector and crimp to secure.
EAC-ELECTRONIC AIR
CLEANER TERMINALS
(115-VAC 1 AMP MAX)
MAIN BLOWER
CONTROL WIRE
CONNECTOR
TRANSFORMER
24-V CONNECTORS
(3.) Strip EAC neutral lead insulation approximately 1/4
in.
(4.) Insert stripped end into factory-supplied white leads’s
butt connector and crimp to secure.
NOTE: If desired, cut butt connectors off factory leads and strip
insulation approximately 1/4 in and use field-supplied wire nuts to
connect.
b. An alternate method to attach EAC lead to control center is
the following procedure:
(1.) Remove 2 screws securing the control box to furnace
blower shelf.
(2.) Remove and discard 2 factory-supplied leads from
control center EAC terminals.
(3.) Strip EAC power leads insulation approximately 1/8
in.
HOT SURFACE
IGNITOR CONNECTOR
HUM
RG
W/W1 Y/Y2
COM
W2
115-V
CONNECTORS
PRESSURE SWITCH
CONNECTOR
HUM-HUMIDIFIER
TERMINAL
(24-VAC 0.5 AMP MAX)
24-V THERMOST AT
TERMINALS
24V
DEHUMIDIFY ENABLE (DE)
DEHUMIDIFIER (DEHUM)
CONNECTOR
3-AMP FUSE
STATUS AND DIAGNOSTIC
LED LIGHTS
CONTINUOUS
FAN (CF) SETUP
SWITCHES
AIR CONDITIONING
(A/C) SETUP SWITCH
SETUP SWITCHES
(SW) AND BLOWER
OFF DELAY SETUP
SWITCHES
MODEL PLUG
COMMUNICATION
CONNECTOR
A99097
Fig. 25—Control Center
21
Page 22
EAC1
EAC2
A93053
Fig. 26—EAC Terminals on Control Center
NOTE: The control center EAC terminals are sized for 12 gage
maximum, solid or stranded wire.
(4.) Route EAC leads through right-hand wire grommet.
(5.) Insert EAC stripped leads into control center EAC
terminals by depressing terminal’s arm with a screwdriver or finger. (See Fig. 26.)
(6.) Reinstall control box to furnace blower shelf using 2
screws removed earlier.
2. Humidifier (HUM)
Screw terminals (HUM and C
humidifier connection. (See Fig. 24.) HUM terminal is energized with 24v (0.5-amp maximum) after inducer motor
prepurge period.
OM) are provided for 24-v
NOTE: A field-supplied, 115-v controlled relay connected to
EAC terminals may be added if humidifier operation is desired
during blower operation.
3. Dehumidification (DEHUM)
A dehumidification input is provided via a 1/4-in. male
quick-connect labeled DEHUM located next to the transformer secondary connections. When there is a dehumidify
demand, the DEHUM input is activated, which means 24 vac
signal is removed from the DEHUM input terminal. In other
words, the DEHUM input logic is reversed. the DEHUM input
is turned ON when no dehumidify demand exists and is turned
OFF when demand exists. This logic reversal has come about
from historical use of a standard humidistat to do dehumidification since the contacts open on high humidity, thus
removing the 24-v signal to initiate dehumidification.
The DEHUM output on the thermidistat control or the
humidistat output is connected directly to the DEHUM terminal on the furnace control. In addition, the DE jumper located
next to the DEHUM terminal must be removed to enable the
DEHUM input. (See Fig. 27 and 28.) When a dehumidify
demand exists, the furnace control reduces the blower airflow
by 21 percent to 315 CFM per ton during continuous fan or
cooling operation.
DIRECT VENTING
The 58MVP Furnaces require a dedicated (one 58MVP furnace
only) direct-vent system. In a direct-vent system, all air for
combustion is taken directly from outside atmosphere, and all flue
products are discharged to outside atmosphere.
W/W1 Y/Y2HUMRG
24V
W2 Com
DE
SEC-2
SEC-1
DE CONNECTION
LOCATION
DEHUM
DE CONNECTION
Fig. 27—58MVP Variable Speed Furnace Control
22
A99098
Page 23
VARIABLE-SPEED
THERMIDISTAT
24 VA C HOT
DEHUMIDIFY
24 VA C COMM
RR
DHUM
C
NOTE 1 - Remove DE Connection
To Enable DEHUM Input
CONDENSING
FURNACE
DEHUM
DE
NOTE 1
Com
A98295
Fig. 28—Thermidistat Connection
Step 1—Removal of Existing Furnaces from
Common Vent Systems
If furnace being replaced was connected to a common vent system
with other appliances, the following steps shall be followed with
each appliance connected to the venting system placed in operation, while any other appliances connected to the venting system
are not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and horizontal pitch
as required in the National Fuel Gas Code, NFPA 541999/ANSI Z223.1-1999 or the CAN/CGA B149 Installation
Codes and these instructions. Determine that there is no
blockage or restriction, leakage, corrosion, and other deficiencies which could cause an unsafe condition.
3. If practical, close all building doors and windows and all doors
between the space in which the appliance(s) connected to the
venting system are located and other spaces of the building.
Turn on clothes dryers and any appliance not connected to the
venting system. Turn on any exhaust fans, such as range hoods
and bathroom exhausts, so they shall operate at maximum
speed. Do not operate a summer exhaust fan. Close fireplace
dampers.
4. Follow the lighting instructions. Place the appliance being
inspected in operation. Adjust thermostat so appliance shall
operate continuously.
5. Test for draft hood equipped appliance spillage at the draft
hood relief opening after 5 minutes of main burner operation.
Use the flame of a match or candle.
6. After it has been determined that each appliance connected to
the venting system properly vents when tested as outlined
above, return doors, windows, exhaust fans, fireplace dampers, and any other gas-burning appliance to their previous
conditions of use.
7. If improper venting is observed during any of above tests, the
venting system must be corrected.
Vent system or vent connectors may need to be resized. For any
other appliances when resizing vent systems or vent connectors,
system or connector must be sized to approach minimum size as
determined using appropriate table found in the NFGC or NSCNGPIC.
Step 2—Combustion-Air and Vent Piping
GENERAL
Combustion-air and vent pipe fittings must conform to American
National Standards Institute (ANSI) standards and American
Society for Testing and Materials (ASTM) standards D1785
(schedule-40 PVC), D2665 (PVC-DWV), D2241 (SDR-21 and
SDR-26 PVC), D2661 (ABS-DWV), F628 (schedule-40 ABS),
F891 (PVC-DWV cellular core) or F441 (schedule-40 CPVC pipe)
and F438 (schedule -40 CPVC fittings). Pipe cement and primer
must conform to ASTM standards D2564 or F493 (PVC or CPVC)
D2235 (ABS). See Table 6 for maximum pipe lengths and Fig. 34,
35, 36, 37, and 38 for exterior piping arrangements.
In Canada, construct all combustion-air and vent pipes for this unit
of CSA or ULC certified schedule-40 PVC, PVC-DWV or
ABS-DWV pipe and pipe cement. SDR pipe is NOT approved in
Canada.
NOTE: Furnace combustion-air and vent pipe connections are
sized for 2-in. pipe. Any pipe size change should be made outside
furnace casing in vertical pipe. (See Fig. 29.) This allows proper
drainage of vent condensate.
Combustion-air and vent pipes must terminate together in same
atmosphere pressure zone, either through roof or sidewall (roof
termination preferred), using accessory termination kit. See Table
5 for required clearances.
Table 5—Combustion-Air and Vent Pipe
Termination Clearances
LOCATION
Above grade level or above anticipated snow depth
Dryer vent33
From plumbing vent stack33
From any mechanical fresh air intake16
For furnaces with an input capacity
less than 100,000 Btuh—from any nonmechanical air supply (windows or
doors which can be opened) or
combustion-air opening
From service regulator vent, electric
and gas meters, and relief equipment
Above grade when adjacent to public
walkway
* Horizontal distance.
† 18 in. above roof surface in Canada.
‡ 36 in. to electric meter in Canada only.
NOTES:
1. If installing 2 adjacent 58MVP Furnaces, refer to Multiventing
and Vent Terminations section for proper vent configurations.
2. When locating combustion-air and vent terminations, consideration must be given to prevailing winds, location, and other
conditions which may cause recirculation of the appliance’s
own flue products or the flue products of adjacent vents.
Recirculation can cause poor combustion, inlet condensate
problems, and accelerated corrosion of heat exchangers.
3. Vent termination can not terminate less than 2 ft horizontal
and 7 ft above public walkway or where condensate vapor or
droplets may be a hazard.
Furnace combustion-air and vent pipe connections must be attached as shown in Fig. 31. Combustion-air intake plug fitting and
inducer housing alternate vent cap may need to be relocated in
some applications.
NOTE: →Slope combustion-air and vent pipes a minimum of 1/4
in. per linear ft with no sags between hangers.
CLEARANCE (FT)
U.S.A.Canada
11†
11
4*6‡
Note 3Note 3
23
Page 24
NOT IN
HORIZONTAL
SECTION
FURNACE
PIPE DIAMETER
TRANSITION IN
VERTICAL SECTION
Combustion air must not be taken from inside structure
because that air is frequently contaminated by halogens,
which include fluorides, chlorides, bromides, and iodides.
These elements are found in aerosols, detergents, bleaches,
cleaning solvents, salts, air fresheners, adhesives, paint, and
other household products. Locate combustion-air inlet as far
as possible from swimming pool and swimming pool pump
house.
Excessive exposure to contaminated combustion air will
result in safety and performance related problems.
A93034
Fig. 29—Combustion-Air and Vent Pipe Diameter
Transition Location and Elbow Configuration
NOTE:Select 1 vent pipe connection and
Select 1 vent pipe connection and
1 combustion-air pipe connection.
Solvent cements are combustible. Keep away from heat,
sparks, and open flame. Use only in well ventilated areas.
Avoid breathing in vapor or allowing contact with skin or
eyes. Failure to follow this warning could result in fire,
property damage, personal injury, or death.
All combustion-air and vent pipes must be airtight and
watertight. Pipes must also terminate exactly as shown in Fig.
33, 34, 35, 36, or 37. Failure to follow this warning could
result in property damage, personal injury, or death.
NOTE: The minimum combustion-air and vent pipe length (each)
for these furnaces is 5 ft. Short pipe lengths (5-8 ft) may discharge
water droplets. These droplets may be undesirable, and a 12-in.
minimum offset pipe section is recommended, as shown in Fig. 31,
to reduce excessive droplets from exiting vent pipe outlet.
COMBUSTION-AIR AND VENT PIPE DIAMETER
Determine combustion-air and vent pipe diameter.
1. Using Table 6, individually determine the combustion-air and
vent pipe diameters. Pick the larger of these 2 pipe diameters
and use this diameter for both combustion-air and vent pipes.
2. When installing vent systems of short pipe length, use the
smallest allowable pipe diameter. Do not use pipe size greater
than required or incomplete combustion, flame disturbance, or
flame sense lockout may occur.
NOTE: Do not count elbows or pipe sections in terminations or
within furnace. See shaded areas in Fig. 34, 35, 36, 37, and 38.
Fig. 30—Combustion-Air and Vent Pipe Connec-
tions
When combustion-air pipe is installed above a suspended
ceiling, pipe must be insulated with 3/8-in. thick Armaflextype insulation. Combustion-air pipe should also be insulated
when it passes through a warm, humid space.
When vent pipe is exposed to temperatures below freezing,
such as when it passes through an unheated space or when a
chimney is used as a raceway, pipe must be insulated as
shown in Table 7 with Armaflex-type insulation.
A96187
24
Page 25
12″ MIN
12″ MIN
VENT PIPE
HORIZONTAL TO ROOFHORIZONTAL TO SIDEWALL
COMBUSTION-AIR PIPE
12″ MIN
VENT PIPE
COMBUSTION-AIR PIPECOMBUSTION-AIR PIPE
COMBUSTION-AIR PIPE
VENT PIPE
12″ MIN
VENT PIPE
VERTICAL TO SIDEWALLVERTICAL TO ROOF
NOTE: A 12 In. minimum offset pipe section is recommended with
short (5 to 8 ft) vent systems. This recommendation is to reduce
excessive condensate droplets from exiting the vent pipe.
Fig. 31—Short Vent (5 to 8 Ft) System
EXAMPLE:
An 080-14 size furnace located in Indianapolis, elevation
650 ft above sea level, could be installed in an application
requiring 3 elbows and 17 ft of vent pipe, along with 5
elbows and 16 ft of combustion-air pipe. Table 6 indicates
this application would allow a 1-1/2-in. diameter vent pipe,
but require a 2-in. diameter combustion air pipe (1-1/2-in.
pipe is good for 20 ft with 3 elbows, but only 10 ft with 5
elbows). Therefore, 2-in. diameter pipe must be used for
both vent and combustion-air pipes since larger required
diameter must always be used for both pipes. If same
installation were in Albuquerque, elevation 5250 ft above
sea level, installation would require 2-in. vent pipe and
combustion-air pipe. At 5001- to 6000-ft elevation, 1-1/2in. pipe is not allowed with 5 elbows, but 2-in. pipe is good
for 68 ft with 5 elbows.
COMBUSTION-AIR AND VENT PIPE ATTACHMENT
NOTE: All pipe joints must be watertight except attachment of
combustion-air pipe to inlet housing connection since it may be
necessary to remove pipe for servicing.
1. Attach combustion-air pipe as follows:
A96230
a. Determine location of combustion-air intake pipe connec-
tion to combustion-air intake housing as shown in Fig. 30
for application.
b. Reposition combustion-air intake housing plug fitting in
appropriate unused intake housing connection.
c. Insert perforated disk assembly (factory supplied) in intake
housing where combustion-air intake pipe will be connected.
d. Install pipe support (factory-supplied in loose parts bag)
into selected furnace casing combustion-air pipe hole. Pipe
support should be positioned to bottom of casing hole.
e. Insert 2-in. diameter pipe into intake housing.
f. Install casing hole filler cap (factory-supplied in loose parts
bag) in unused combustion-air pipe casing hole.
NOTE: A 2-in. diameter pipe must be used within the furnace
casing. Make all pipe diameter transitions outside furnace casing.
g. Drill a 1/8-in. hole in 2-in. combustion-air pipe using hole
in intake housing as a guide.
h. Install a field-supplied No. 6 or No. 8 sheet metal screw
into combustion-air pipe.
NOTE: DO NOT OVERTIGHTEN SCREW. Breakage to intake
housing or fitting may cause air leakage to occur.
* Disk usage—Unless otherwise stated, use perforated disk assembly (factory-supplied in loose parts bag).
† Wide radius elbow.
‡ Vent sizing for Canadian installations over 4500 ft (1370m) above sea level are subject to acceptance by the local authorities having jurisdiction.NA—Not Allowed; pressure switch will not make.
NOTES:
1. Do not use pipe size greater than those specified in table or incomplete combustion, flame disturbance, or flame sense lockout may occur.
2. Size both the combustion-air and vent pipe independently, then use the larger diameter for both pipes.
3. Assume two 45° elbows equal one 90° elbow. Long radius elbows are desirable and may be required in some cases.
4. Elbows and pipe sections within the furnace casing and at the vent termination should not be included in vent length or elbow count.
5. The minimum pipe length is 5 ft for all applications.
TERMINATION
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
TERMINATION
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
TERMINATION
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
TERMINATION
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
PIPE DIAMETER
(IN.)*
12345 6
1-1/2353025201510
27070686766 64
1-1/2353025201510
27070686766 64
1-1/22015105NANA
27070686762 57
23126211611 6
2-1/2707068676664
3†494847454443
PIPE DIAMETER
(IN.)*
1234 5 6
1-1/232272217127
266656362 60 59
1-1/232272217127
266656362 60 59
1-1/218138NANANA
266656362 57 52
229241914 9 NA
2-1/2666563626059
3†464443414038
PIPE DIAMETER
(IN.)*
1234 5 6
1-1/230252015105
262605856 55 53
1-1/230252015105
262605856 55 53
1-1/217127NANANA
262605856 51 46
227221712 7 NA
2-1/2626058565553
3†434139373534
PIPE DIAMETER
(IN.)*
1234 5 6
1-1/2272217127NA
257555351 49 47
1-1/2272217127NA
257555351 49 47
1-1/215105NANANA
257555351 46 41
2241914 9 NANA
2-1/2575553514947
3†393735333129
NUMBER OF 90° ELBOWS
NUMBER OF 90° ELBOWS
NUMBER OF 90° ELBOWS
NUMBER OF 90° ELBOWS
27
Page 28
NOTE: Do not attach combustion-air intake pipe permanently to
combustion-air intake housing since it may be necessary to remove
pipe for service of ignitor or flame sensor.
COMBUSTION-AIR INTAKE HOUSING PLUG FITTING
The combustion-air intake plug fitting must be installed in
unused combustion-air intake housing. This fitting must be
attached by using RTV sealant, or by drilling a 1/8-in. hole in
fitting, using hole in intake housing as a guide. Install a
field-supplied No. 6 or No. 8 sheet metal screw.
NOTE: DO NOT OVERTIGHTEN SCREW. Breakage to intake
housing or fitting may cause air leakage to occur.
A plugged drain connection has been provided on this fitting
for use when moisture is found in combustion-air intake pipe
and combustion box.
NOTE: Moisture in combustion-air intake may be result of
improper termination. Ensure combustion-air intake pipe is similar
to that shown in Fig. 33, 34, 35, 36, or 37 so it will not be
susceptible to areas where light snow or other sources of moisture
could be pulled in.
If use of this drain connection is desired, drill out fitting’s tap
plug with a 3/16-in. drill and connect a field-supplied 3/8-in.
tube. This tube should be routed to open condensate drain for
furnace and A/C (if used), and should be trapped. (See Fig.
32.)
COMBUSTION – AIR
3/8" ID TUBE
3/16"
DRILL
4″
TRAP
TO OPEN
MIN
DRAIN
Fig. 32—Intake Housing Plug Fitting Drain
INTAKE HOUSING
BURNER
BOX
COMBUSTION –
AIR PIPE
A93035
2. Attach vent pipe as follows:
a. Determine location of vent pipe connection to inducer
housing as shown in Fig. 30 for application.
b. Reposition elastomeric (rubber) inducer housing outlet cap
and clamp to appropriate unused inducer housing connection. Tighten clamp.
Inducer housing outlet cap must be installed and fully seated
against inducer housing. Clamp must be tightened to prevent
any condensate leakage. Failure to follow this warning could
result in electrical shock, fire, personal injury, or death.
c. Install pipe support (factory-supplied in loose parts bag)
into selected furnace casing vent pipe hole. Pipe support
should be positioned to bottom of casing hole.
d. Be certain that mating surfaces of inducer housing connec-
tion, elastomeric coupling, and 2-in. diameter vent pipe are
clean and dry. Assemble the elastomeric (rubber) vent
coupling (with 2 loose clamps) onto inducer housing
connection. Insert the 2-in. diameter vent pipe through the
elastomeric (rubber) coupling and fully into inducer housing connection until it bottoms on the internal stop. Tighten
both clamps to secure the pipe to inducer housing. Tighten
the clamp screws to 15 in.-lb. of torque.
e. Install casing hole filler cap (factory-supplied in loose parts
bag) in unused combustion-air pipe casing hole.
Vent pipe must be installed and fully seated against inducer
housing internal stop. Clamp must be tightened to prevent any
condensate leakage. Failure to follow this warning could
result in electrical shock, fire, personal injury, or death.
NOTE: A 2-in. diameter pipe must be used within the furnace
casing. Make all pipe diameter transitions outside furnace casing.
3. Working from furnace to outside, cut pipe to required
length(s).
4. Deburr inside and outside of pipe.
5. Chamfer outside edge of pipe for better distribution of primer
and cement.
6. Clean and dry all surfaces to be joined.
7. Check dry fit of pipe and mark insertion depth on pipe.
NOTE: It is recommended that all pipes be cut, prepared, and
preassembled before permanently cementing any joint.
8. After pipes have been cut and preassembled, apply generous
layer of cement primer to pipe fitting socket and end of pipe
to insertion mark. Quickly apply approved cement to end of
pipe and fitting socket (over primer). Apply cement in a light,
uniform coat on inside of socket to prevent buildup of excess
cement. Apply second coat.
9. While cement is still wet, twist pipe into socket with 1/4 turn.
Be sure pipe is fully inserted into fitting socket.
10. Wipe excess cement from joint. A continuous bead of cement
will be visible around perimeter of a properly made joint.
11. Handle pipe joints carefully until cement sets.
12. Support combustion-air and vent piping a minimum of every
5 ft (3 ft for SDR-21 or -26 PVC) using perforated metal
hanging strap.
13. Slope combustion-air and vent pipes toward furnace a minimum of 1/4 in. per linear ft with no sags between hangers.
14. Use appropriate methods to seal openings where vent and
combustion-air pipes pass through roof or sidewall.
Step 3—Concentric Vent and Combustion-Air
Termination Kit Installation
NOTE: If these instructions differ from those packaged with
termination kit, follow kit instructions.
Combustion-air and vent pipes must terminate outside structure. A
factory accessory termination kit must be installed in 1 of the
installations shown in Fig. 33, 34, 35, 36, or 37. Four termination
kits are available.
1. The 2-in. termination bracket kit is for 1-in., 1-1/2 in., and
2-in. diameter 2-pipe termination systems.
2. The 3-in. termination bracket kit is for 2-1/2 in. and 3-in.
diameter 2-pipe termination systems.
3. The 2-in. concentric vent/air termination kit is for 1-in., 1-1/2
in., 2-in., and 2-1/2 in. diameter pipe systems when single
penetration of wall or roof is desired.
4. The 3-in. concentric vent/air termination kit is for 2-1/2 in. and
3-in. diameter pipe systems when single penetration of wall or
roof is desired.
28
Page 29
VERTICAL SEPARATION
BETWEEN COMBUSTION
MAXIMUM OF 24 IN. ABOVE ROOF.
AIR AND VENT
8 3/4″ FOR 3″ KIT
6 3/4″ FOR 2″ KIT
MAINTAIN 12 IN. MINIMUM
CLEARANCE ABOVE HIGHEST
ANTICIPATED SNOW LEVEL.
COUPLING
VENT
ROOF
18″ MAXIMUM
BRACKET
COMBUSTION
AIR
Fig. 33—Roof Termination (Preferred)
VENT
COMBUSTION
AIR
MAINTAIN 12 IN.
(18 IN. FOR CANADA)
MINIMUM CLEARANCE
ABOVE HIGHEST
ANTICIPATED SNOW
LEVEL. MAXIMUM OF
24 IN. ABOVE ROOF.
A93054
Fig. 34—Concentric Vent and Combustion-Air Roof
Termination (Preferred)
OVERHANG OR ROOF
A87224
OVERHANG OR ROOF
12″ MINIMUM
1″ MAXIMUM
COMBUSTION-AIR
VENT
MAINTAIN 12 IN.
CLEARANCE
ABOVE HIGHEST
ANTICIPATED SNOW
LEVEL OR GRADE,
WHICHEVER IS
GREATER.
A93055
Fig. 35—Concentric Vent and Combustion-Air Side
Termination
OVERHANG OR ROOF
12″ MINIMUM
VENT
BRACKET
90°
COMBUSTION-AIR
12 IN. SEPARATION
BETWEEN BOTTOM OF
COMBUSTION AIR AND
BOTTOM OF VENT
MAINTAIN 12 IN.
CLEARANCE
ABOVE HIGHEST
ANTICIPATED SNOW
LEVEL OR GRADE,
WHICHEVER IS
GREATER.
Fig. 36—Sidewall Termination of 12 in. or More
A87225
12″ MINIMUM
VENT
BRACKET
COUPLING
90°
COMBUSTION-AIR
(ELBOW PARALLEL
TO WALL)
12 IN. SEPARATION
BETWEEN BOTTOM OF
COMBUSTION AIR AND
BOTTOM OF VENT
MAINTAIN 12 IN.
CLEARANCE
ABOVE HIGHEST
ANTICIPATED SNOW
LEVEL OR GRADE,
WHICHEVER IS
GREATER.
Fig. 37—Sidewall Termination of Less than 12 in.
29
A87226
Page 30
Table 7—Maximum Allowable Exposed Vent Pipe Length (Ft) With Insulation in Winter Design
Temperature Ambient*
UNIT
SIZE
040-14
060-14
080-14
080-20
100-20
120-20
* Pipe length (ft) specified for maximum pipe lengths located in unconditioned spaces. Pipes located in unconditioned space cannot exceed total allowable pipe length
as specified in Table 6.
† Insulation thickness based on R value of 3.5 per in.
WINTER DESIGN
TEMPERATURE
(°F)
20 22137425057
021022253035
-202514172125
20 23055617070
021633384653
-202923263338
20 23765707070
022039455563
-2021127313945
202-1/24170707070
02-1/22142485968
-202-1/21128334149
20 34970707070
032651587070
-2031535405059
MAXIMUM PIPE
DIAMETER
(IN.)
INSULATION THICKNESS (IN.)†
03/81/23/41
NOTE: Shaded parts in Fig. 33, 34, 35, 36, and 37 are considered
to be terminations. These components should NOT be counted
when determining pipe diameter. Roof termination is preferred
since it is less susceptible to damage, has reduced chances to intake
contaminants, and has less visible vent vapors. (See Fig. 33 or 34.)
Sidewall termination may require sealing or shielding of building
surfaces with a corrosive resistance material due to corrosive
combustion products of vent system.
EXTENDED EXPOSED SIDEWALL PIPES
Sidewall combustion-air and vent pipe terminations may be
extended beyond area shown in Fig. 36 or 37 in outside ambient by
insulating pipes as indicated in Table 7.
1. Determine combustion-air and vent pipe diameters, as stated
above, using total pipe length and number of elbows.
2. Using winter design temperature (used in load calculations),
find appropriate temperature for your application and furnace
model.
3. Determine required insulation thickness for exposed pipe
lengths.
NOTE: Pipe length (ft) specified for maximum pipe lengths
located in unconditioned spaces cannot exceed total allowable pipe
length as specified in Table 6.
TWO-PIPE TERMINATION KIT
1. Determine location for termination.
Consideration of the following should be made when deter-
mining an appropriate location for termination kit.
a. Comply with all clearance requirements as stated in Table
5.
b. Termination kit should be positioned where vent vapors
will not damage plants/shrubs or air conditioning equipment.
c. Termination kit should be positioned so it will not be
affected by wind eddy (such as inside building corners) or
accumulation of airborne leaves or light snow, or allow
recirculation of flue gases.
d. Termination kit should be positioned where it will not be
damaged by or subjected to foreign objects, such as stones,
balls, etc.
e. Termination kit should be positioned where vent vapors are
not objectionable.
2. Cut 2 holes, 1 for each pipe, of appropriate size for pipe size
being used.
3. Loosely install elbow in bracket and place assembly on
combustion-air pipe.
Roof terminations—Loosely install pipe coupling on prop-
erly cut vent pipe. Coupling must be positioned so bracket will
mount as shown in Fig. 33.
For applications using combustion-air pipe option indicated
by dashed lines in Fig. 33, install 90° street elbow into 90°
elbow, making U-fitting. A 180° U-fitting may be used.
Sidewall terminations—Install bracket as shown in Fig. 36 or
37.
For applications using vent pipe option indicated by dashed
lines in Fig. 36, rotate vent elbow 90° from position shown in
Fig. 36.
4. Disassemble loose pipe fittings. Clean and cement using same
procedures as used for system piping.
5. Check required dimensions as shown in Fig. 33, 36, or 37.
CONCENTRIC VENT/AIR TERMINATION KIT
1. Determine location for termination.
Consideration of the following should be made when deter-
mining an appropriate location for termination kit.
a. Comply with all clearance requirements as stated in Table
5.
b. Termination kit should be positioned where vent vapors
will not damage plants/shrubs or air conditioning equipment.
c. Termination kit should be positioned so it will not be
affected by wind eddy (such as inside building corners) or
accumulation of airborne leaves or light snow, or allow
recirculation of flue gases.
d. Termination kit should be positioned where it will not be
damaged by or subjected to foreign objects, such as stones,
balls, etc.
e. Termination kit should be positioned where vent vapors are
not objectionable.
30
Page 31
2. Cut one 4-in. diameter hole for 2-in. kit, or one 5-in. diameter
hole for 3-in. kit.
3. Loosely assemble concentric vent/air termination components
together using instructions in kit.
4. Slide assembled kit with rain shield REMOVED through hole.
NOTE: Do not allow insulation or other materials to accumulate
inside of pipe assembly when installing it through hole.
Roof terminations—Locate assembly through roof to appro-
priate height as shown in Fig. 34.
Sidewall terminations—Locate assembly through sidewall
with rain shield positioned no more than 1-in. from wall as
shown in Fig. 34 .
5. Disassemble loose pipe fittings. Clean and cement using same
procedures as used for system piping.
6. Check required dimensions as shown in Fig. 34 or 35.
Step 4—Multiventing and Vent Terminations
When 2 or more 58MVP Furnaces are vented near each other, each
furnace must be individually vented. NEVER common vent or
breach vent 58MVP furnaces. When 2 or more 58MVP furnaces
are vented near each other, 2 vent terminations may be installed as
shown in Fig. 38, 39, 40, 41, or 42, but next vent termination must
be at least 36 in. away from first 2 terminations. It is important that
vent terminations be made as shown to avoid recirculation of flue
gases. Dimension "A" in Fig. 38, 39, 40, 41, and 42 represents
distance between pipes or rain shields, as touching or 2-in.
maximum separation.
32°F MINIMUM INSTALLED
AMBIENT OR FREEZE
PROTECTION REQUIRED
A93058
Unit must not be installed, operated, and then turned and left
off in an unoccupied structure during cold weather when
temperature drops to 32°F or below unless drain trap and
drain line have adequate freeze protection. See Service and
Maintenance Instructions for winterizing procedure.
CONDENSATE DRAIN
Step 1—General
Condensate trap is shipped installed in the blower shelf and factory
connected for UPFLOW applications. Condensate trap must be
RELOCATED for use in DOWNFLOW and HORIZONTAL
applications.
Condensate trap MUST be used for all applications.
An external trap is not required when connecting the field drain to
this condensate trap.
The field drain connection (condensate trap or drain tube coupling)
is sized for 1/2-in. CPVC, 1/2-in. PVC, or 5/8-in. ID tube
connection.
Drain pipe and fittings must conform to ANSI standards and
ASTM D1785 or D2846. CPVC or PVC cement and primer must
conform to ASTM D2564 or F493. In Canada, use CSA or ULC
certified schedule 40 CPVC or PVC drain pipe, fittings, and
cement.
When a condensate pump is required, select a pump which is
approved for condensing furnace applications. To avoid condensate spillage, select a pump with an overflow switch.
Furnace condensate is mildly acidic, typically in the pH range of
3.2 to 4.5. Due to corrosive nature of this condensate, a condensate
pH neutralizing filter may be desired. Check with local authorities
to determine if a pH neutralizer is required.
Step 2—Application
The furnace, A/C, and humidifier drains may be combined and
drained together. The A/C drain must have an external, fieldsupplied trap prior to the furnace drain connection. All drain
connections (furnace, A/C, or humidifier) must be terminated into
an open or vented drain as close to the respective equipment as
possible to prevent siphoning of the equipment’s drain.
See Fig. 43 for example of possible field drain attachment using
1/2-in. CPVC or PVC tee for vent and A/C or humidifier drain
connection.
Outdoor draining of the furnace is permissible if allowed by local
codes. Caution should be taken when freezing ambient may freeze
drain pipe and prohibit draining.
Caution should be taken to prevent draining where slippery
conditions may cause personal injuries. Excessive condensate
draining may cause saturated soil conditions which may result
in damage to plants.
Step 3—Condensate Drain Protection
Freezing condensate left in condensate trap and drain line may
cause cracks, and possible water damage may occur. If freeze
protection is required, use condensate freeze protection accessory
or equivalent 3 to 6 watt per ft at 120v and 40°F self-regulating,
shielded, and waterproof heat tape. See Installation Instructions
supplied with accessory or heat tape manufacturer’s recommendations.
1. Fold heat tape in half and wrap on itself 3 times.
2. Locate heat tape between sides of condensate trap back. (See
Fig. 44.)
3. Use wire ties to secure heat tape in place. Wire ties can be
positioned in notches of condensate trap sides. (See Fig. 44.)
4. Wrap field drain pipe with remaining heat tape, approximately
1 wrap per ft.
5. When using field-supplied heat tape, follow heat tape manufacturer’s instructions for all other installation guidelines.
31
Page 32
A
A96128
Fig. 38—Rooftop Termination (Dimension "A" is Touching or 2-In. Maximum Separation)
VENT
VENT
A
COMBUSTION
AIR
A93056
Fig. 39—Concentric Vent and Combustion-Air Roof
Termination (Dimension "A" is Touching or
2-In. Maximum Separation)
VENT
1″ MAXIMUM
(TYP)
COMBUSTION AIR
VENT
A
VENT
A93057
Fig. 40—Concentric Vent and Combustion-Air Side
Termination (Dimension "A" is Touching or
2-In. Maximum Separation)
VENT
COMBUSTION AIR
COMBUSTION AIR
A
Fig. 41—Sidewall Termination of 12 in. or Less
(Dimension "A" is Touching or 2-In.
Maximum Separation)
A96129
COMBUSTION AIR
A
COMBUSTION AIR
Fig. 42—Sidewall Termination of More Than 12 in.
(Dimension "A" is Touching or 2-In.
Maximum Separation)
32
A96130
Page 33
OPEN STAND
PIPE FOR
A/C OR
HUMIDIFIER
DRAIN
TEE
TO OPEN
DRAIN
A94054
Fig. 43—Example of Field Drain Attachment
CONDENSATE TRAP
WIRE TIE(S)
(3 WRAPS MINIMUM)
Furnace control must be grounded for proper operation, or
control will lock out. Control is grounded through green wire
routed to gas valve and burner box screw.
Using schematic diagram (see Fig. 24), follow sequence of
operation through different modes. This furnace has a new control
system. Read and follow wiring diagram carefully.
NOTE: If 115-v power supply to furnace or blower access panel
switch is interrupted during a call for heat, blower operates at
low-heat speed for 60 sec when power is restored before heating
cycle is resumed.
Step 1—Self-Test Mode
The control center goes through a brief self-test whenever 115-v or
24-v power is interrupted. The self-test takes approximately 2 sec
to complete. After power is restored, red (microprocessor) LED
HEAT TAPE
Fig. 44—Condensate Trap Heat Tape
SEQUENCE OF OPERATION
A93036
briefly comes on. Then green LED comes on for 1 sec, followed by
1 sec where both yellow and green LEDs are on. During this time,
the microprocessor is checking itself.
Step 2—Heating Mode
When thermostat calls for heat, R-W/W1 circuit closes.
1. Prepurge period—The inducer motor is turned on and slowly
comes up to speed. When low-pressure switch closes, inducer
motor RPM is noted by microprocessor, and a 25 sec prepurge
period begins. The RPM is used to evaluate vent system
resistance. This evaluation is then used to determine required
RPM necessary to operate inducer in low-heat mode.
NOTE: The heat cycle can start in either high or low heat. If a
high-heat cycle is initiated, the inducer continues increasing its
speed after low-pressure switch closes. When high-pressure switch
closes, inducer motor RPM is noted by microprocessor before the
25 sec prepurge period begins. The RPM is used to evaluate vent
system resistance. This evaluation is then used to determine
required RPM necessary to operate inducer in high-heat mode.
2. Humidifier (HUM)—The HUM terminal is energized after
the inducer prepurge period is completed.
3. Ignitor warm up—At end of prepurge period, the hot surface
ignitor (HSI) is energized for a 17-sec HSI warm-up period.
4. Ignition sequence—After HSI ignitor warm-up period is
completed, the gas valve opens, permitting gas flow to burners
where it is ignited. After 5 sec, the HSI is de-energized, and a
2-sec flame-sensing period begins.
NOTE: The initial heat mode after 115-v or 24-v power interruption will be LOW HEAT. Low heat remains energized for 16
minutes before high heat is initiated, providing thermostat is still
calling for heat.
After initial cycle, the microprocessor evaluates the length of lowand high-heat operating times and calculates optimum length of
low and high heat for next heat cycle. This accommodates the heat
load requirement seen as a result of thermostat operating time.
5. Flame sensing—When burner flame is sensed, the control
center holds gas valve open and begins blower on delay
period.
NOTE: Ignition sequence repeats 3 additional times before a
lockout occurs. Lockout automatically resets after 3 hr, or can be
manually reset by turning 115-v or 24-v power off (not at
thermostat) for 3 sec minimum, then turning on again.
6. Inducer speed operation—If cycle starts in low heat, inducer
speed reduces slightly after flame sense. If cycle starts in high
heat, inducer speed increases 15 sec after flame sense. The
reduction in speed in low heat is to optimize combustion for
maximum efficiency.
7. Blower on delay—The blower starts 60 sec after flame sense
if cycle started in low heat or 35 sec after flame sense if cycle
started in high heat.
NOTE: The blower starts at approximately 400-500 RPM. After
20 sec, the motor is turned off for 1/10 of a sec where a coast down
calibration is done to evaluate resistance of the conditioned air
duct system. The microprocessor then determines blower RPM
required to provide proper airflow for heating mode.
8. Electronic Air Cleaner—The EAC-1 terminal is energized
whenever the blower operates.
9. Blower off delay—When thermostat is satisfied, the R-W/W1
signal is terminated, de-energizing gas valve (stopping gas
flow to burners), and HUM terminal is de-energized.
33
Page 34
The blower reduces its speed to low-heat RPM. The blower
and EAC remain operating 90, 135, 180, or 225 sec (depending on blower off time selection). The furnace is factory set for
a 90-sec blower off delay.
10. Post purge—The inducer continues operating for 15 sec after
gas valve is de-energized.
Step 3—Heating Mode—Two Stage
The control center provides 2-stage heating using a single-stage
thermostat. The control center maximizes comfort while optimizing efficiency to meet the demands of conditioned area when a
thermostat R-W/W1 signal is received.
If thermostat control over furnace staging is desired, a 2-stage
thermostat can be used. When control center receives a thermostat
R-W/W1 and R-W2 signal, high heat is energized and when a
R-W/W1 signal alone is received, low heat is energized. This
method overrides microprocessor control of high or low heat.
NOTE: When using 2-stage thermostat operation with R-W/W1
and R-W2 signals, setup switch SW-2 MUST be in ON position.
The heat cycle operates as stated in Heating Mode section.
To allow for greater comfort, 2-stage thermostat control is recom-
mended when zone systems are used.
Step 4—Emergency Heat Mode
NOTE: The furnace should not be operated in emergency heat
mode for extended periods of time. Operation is only recommended to provide heat until replacement components can be
obtained or fault resolved.
In this mode, the microprocessor is bypassed and motors operate at
full speed with high-heat operation. The heat exchangers, motors,
and electronics can be overstressed and may reduce the life of
components if operated for an extended period.
NOTE: No safeties are bypassed when using emergency heat
mode.
Emergency heat mode can be selected using setup switch SW-4.
SW-4 should be used when a fault condition exists or difficult to
resolve problems occur. This allows heating until fault can be
corrected.
In emergency heat mode, the normal heat mode outlined in
Heating Mode section is not followed. The following sequence
will occur:
When thermostat calls for heat, the R-W/W-1 circuits close.
1. Prepurge period—The inducer motor is turned on IMMEDI-
ATELY operating at maximum speed, closing low- and
high-pressure switches. Prepurge begins 25 sec after highpressure switch closes.
2. Blower on—The blower motor is turned on IMMEDIATELY
and slowly increases to maximum speed as soon as a call for
heat is received. No blower calibration occurs.
3. Electronic Air Cleaner—The EAC-1 terminal does not
operate in emergency heat mode.
4. Humidifier—The HUM terminal is energized IMMEDI-
ATELY.
5. Ignitor warm up—The HSI is energized for a 17 sec
warm-up period after prepurge period is completed.
6. Ignition sequence—After HSI warm-up period has com-
pleted, the gas valve is energized, permitting gas flow to
burners where it is ignited. After 5 sec, the HSI is deenergized, and a 2-sec flame-sensing period begins.
NOTE: Emergency heat mode only operates in high heat.
7. Flame sensing—When burner flame is sensed, control center
holds gas valve open. If burner flame is not sensed, control
center de-energizes gas valve and ignition sequence is repeated.
NOTE: Ignition sequence repeats 3 additional times before lockout occurs. Lockout automatically resets after 3 hr, or can be
manually reset by turning 115-v or 24-v power off (not at
thermostat) for 3 sec minimum, then turning on again. Fault codes
will not flash in emergency heat mode.
8. Blower off delay—When thermostat is satisfied, the R-W/W1
signal is terminated, de-energizing gas valve (stopping gas
flow to burners), and HUM terminal is de-energized. The
blower stops immediately.
9. Post purge—Post purge does NOT occur. The inducer stops
immediately.
Step 5—Cooling Mode
SINGLE-SPEED APPLICATIONS
When thermostat calls for cooling, the R-G and R-Y/Y2 circuits
close.
1. Cooling unit—The cooling unit starts when thermostat R-Y
signal is received.
2. Blower on—The control center starts blower immediately
when it receives an R-Y/Y2 and R-G signal. The blower starts
at approximately 400-500 RPM. After 20 sec, the blower is
turned off for 1/10 of a sec where a coast down calibration is
done to evaluate resistance of the conditioned air duct system.
The microprocessor then determines blower RPM required to
provide selected cooling airflow.
NOTE: In cooling mode, the microprocessor adjusts blower RPM
to operate at 400 CFM per ton as selected on A/C setup switches.
Airflow will be reduced to 315 CFM per ton when a dehumidification demand exists. See Air Conditioning Setup Switches
section. There is also a chart on wiring diagram. (See Fig. 24.)
NOTE: If Y/Y2 thermostat lead is not connected to furnace
control center, blower motor operates in continuous fan speed and
indoor coil freeze-up may occur.
3. Electronic Air Cleaner—The EAC-1 terminal is energized
whenever blower operates.
4. Cooling unit—The cooling unit stops when thermostat R-Y
signal is terminated.
5. Blower off delay—When thermostat is satisfied, the R-Y/Y2
and R-G signals are terminated, and blower remains operating
for 90 sec. The blower airflow will drop by 21 percent during
the off-delay period when the DE jumper is connected. The
DE jumper is only removed to enable the DEHUM input for
use with a thermidistat or humidistat for dehumidification
purposes.
TWO-SPEED APPLICATIONS
For details on 2-speed cooling applications, refer to Fig. 45.
Step 6—Heat Pump Mode
SINGLE-SPEED APPLICATIONS
When furnace is operating in heat pump heating mode, R-Y/Y2
and R-G circuits are closed energizing heat pump, and blower
operates at cooling speed. When heat pump defrost is required,
R-W/W1 circuits close starting gas heat cycle, and blower adjusts
to low-heat speed.
1. Prepurge period—The inducer motor is turned on and slowly
comes up to speed. When low-pressure switch closes, inducer
motor RPM is noted by microprocessor, and a 25 sec prepurge
period begins. The RPM is used to evaluate vent system
resistance. This evaluation is then used to determine required
RPM necessary to operate inducer in low-heat mode.
34
Page 35
2-SPEED
THERMOSTAT
RR
CC
G
W2
Y2Y2
E
LL
Y1Y1
VARIABLE
SPEED
THERMOSTAT
R
C
G
W/W1
Y/Y2
2-SPEED AIR
CONDITIONER
W2
W3
10. Call for heat terminated—When the call for heat is satisfied,
the R-W/W1 signal is terminated, de-energizing gas valve
(stopping gas flow to burners), and HUM terminal is deenergized.
a. R-W/W1 signal terminated with R-Y/Y2 and R-G still
present—The blower changes its speed to cooling RPM.
b. R-W/W1 with R-Y/Y2 and R-G signals terminated—
The blower continues to operate completing a normal
heating blower off delay.
11. Post purge—The inducer continues operating for 15 sec after
gas valve is de-energized.
TWO-SPEED APPLICATIONS
For details on 2-speed heat pump applications, refer to Fig. 46.
2-SPEED
THERMOSTAT
RR
CC
VARIABLE
SPEED
THERMOSTAT
R
C
2-SPEED
HEAT PUMP
A94302
Fig. 45—Wiring Schematic for 2-Speed
Cooling Applications
NOTE: The heat cycle can start in either high or low heat. If a
high-heat cycle is initiated, inducer continues increasing its speed
after low-pressure switch closes. When high-pressure switch
closes, inducer motor RPM is noted by microprocessor before the
25 sec prepurge period begins. The RPM is used to evaluate vent
system resistance. This evaluation is used to determine required
RPM necessary to operate inducer in high-heat mode.
2. Humidifier—The HUM terminal is energized after inducer
prepurge period is completed.
3. Ignitor warm up—After prepurge period, HSI is energized
for 17 sec.
4. Ignition sequence—After HSI warm-up period is completed,
the gas valve is energized, permitting gas flow to the burners
where it is ignited. After 5 sec, the HSI is de-energized, and a
2-sec flame-sensing period begins.
5. Flame sensing—When burner flame is sensed, control center
holds gas valve open.
If burner flame is not sensed, control center de-energizes gas
valve, and ignition sequence is repeated.
6. Blower off period—Ten sec after gas valve is energized, the
blower stops for 25 sec to allow heat exchangers to warm up.
7. Blower on delay—After blower off period, blower starts.
NOTE: The blower starts at approximately 400-500 RPM. After
20 sec, the motor is turned off for 1/10 of a sec where a coast down
calibration is done to evaluate resistance of the conditioned air
duct system. The microprocessor then determines blower RPM
required to provide proper airflow for heating mode.
8. Electronic Air Cleaner—The EAC-1 terminal is energized
whenever blower operates.
9. Inducer speed operation—If cycle starts in low heat, inducer
speed reduces slightly after the flame sense. If cycle starts in
high heat, inducer speed increases 15 sec after flame sense.
The reduction in speed in low heat is to optimize combustion
for maximum efficiency.
G
W2
Y2Y2
E
LL
OO
Y1Y1
G
W/W1
Y/Y2
W2
W3
A94303
Fig. 46—Wiring Schematic for 2-Speed
Heat Pump Applications
Step 7—Continuous Fan Mode
1. Operating with continuous fan only—
a. Call for continuous fan—The thermostat closes R-G
circuit.
b. Blower on—The blower starts immediately.
NOTE: The blower starts at approximately 400-500 RPM. After
20 sec, the motor is turned off for 1/10 of a sec where a coast down
calibration is done to evaluate resistance of the conditioned air
duct system. The microprocessor then determines blower RPM
required to provide proper airflow for heating mode.
NOTE: The continuous fan speed is the same as low-heat speed
unless it is field adjusted to another desired airflow. See Continuous Fan Setup Switches section. There is also a chart on wiring
diagram. (See Fig. 24.)
c. Electronic Air Cleaner—The EAC-1 terminal is ener-
gized whenever blower operates, regardless of operating
mode.
2. Operating with continuous fan (R-G) and call for heat(R-W/W1) is received—Same as heat pump mode except
blower on delay is 10 sec less than heat mode. After call for
35
Page 36
heat (R-W/W1) is terminated, the blower remains operating at
low-heat speed for selected blower off delay before resuming
continuous fan speed.
3. Operating with continuous fan (R-G) and call for cooling(R-Y/Y2) is received—See Cooling Mode section. After call
for cooling (R-Y/Y2) is terminated, the blower remains
operating at cooling speed for 90 sec before resuming continuous fan speed.
Step 8—Component Test
All components are functionally operated except gas valve with
component test feature.
This feature helps diagnose a system problem in case of a
component failure.
NOTE: Setup switch SW-1 MUST be in OFF position or Fault
Code 22 (setup error) will occur.
NOTE: NO thermostat signal may be present at control center,
and all blower time delay off periods must be completed.
To initiate component test feature, proceed with the following:
1. Leave 115-v power to furnace turned on.
2. Remove main furnace door.
3. Remove blower access panel.
4. Move setup switch SW-6 to ON position.
5. Manually close blower access panel door switch. Use a piece
of tape to hold switch closed.
Blower access panel door switch opens 115-v power to
control center. No component operation can occur. Caution
must be taken when manually closing this switch for service
purposes. Failure to follow this warning could result in
personal injury or death.
When items 1-5 have been completed, the following will occur:
1. The control center goes through a brief self-test. This self-test
takes approximately 2 sec to complete. After door switch is
closed, red (microprocessor) LED briefly comes on. Then
green LED comes on for 1 sec, followed by 1 sec where both
green and yellow LEDs are on. During this time, the microprocessor is checking itself.
2. Inducer motor operates for 20 sec at low speed, operates for 20
sec at high speed, then turns off.
3. Hot surface ignitor is energized for 15 sec, then de-energized.
4. Main blower motor operates for 20 sec at low speed, operates
for 20 sec at high speed, then turns off.
5. After component operation test is completed, 1 or more fault
codes (11, 22, 41, or 42) will flash. See service label on back
of main furnace door for explanation of fault codes.
NOTE: To repeat component test, turn setup switch SW-6 to OFF
and then back to ON.
After component test, perform the following:
1. Release blower panel access door switch and turn setup switch
SW-6 to OFF position.
2. If applicable, replace blower access panel and check LED
status by removing plug in blower access panel.
3. Reinstall main furnace door if all LEDs are off, indicating
furnace is ready to operate when a signal from thermostat is
received.
Step 9—Bypass Humidifier Mode
When setup switch SW-3 BPH is in ON position, RPM calculated
for low heat is multiplied by 1.15 for all furnace model sizes. This
compensates for increased return-air temperature caused by bypassed air supply.
Step 10—Dehumidification Mode
A dehumidification input is provided via a 1/4 in. male quickconnect terminal labeled DEHUM located next to the transformer
secondary connections. When there is a dehumidify demand, the
DEHUM input is activated, which means 24 vac signal is removed
from the DEHUM input terminal. In other words, the DEHUM
input logic is reversed. the DEHUM input is turned ON when no
dehumidify demand exists and is turned OFF when demand exists.
This logic reversal has come about from historical use of a
standard humidistat to do dehumidification since the contacts open
on high humidity, thus removing the 24-v signal to initiate
dehumidification.
The DEHUM output on the thermidistat control or the humidistat
output, is connected directly to the DEHUM terminal on the
furnace control. In addition, the DE jumper located next to the
DEHUM terminal must be removed to enable the DEHUM input
(See Fig. 27 and 28). When a dehumidify demand exists, the
furnace control reduces the blower airflow by 21 percent to 315
CFM per ton during continuous fan or cooling operation.
This blower speed reduction compensates for high humidity
conditions during cooling operation on all furnace model sizes.
Reference Thermidistat™ Control Installation, Start-Up, and Operating Instructions for further details.
Step 11—Zone Mode
When setup switch SW-5 MZ is in ON position, blower motor
control is the same as above except with the following exceptions:
1. While blower is operating in either low heat or continuous fan,
the coast down calibration is performed once a minute to
update blower RPM for zone damper position changes during
a given cycle unless the blower pulse width to blower motor
is greater than 60 percent. This prevents nuisance faults from
occurring when a high continuous fan CFM has been selected.
2. While blower is operating in either high heat or cooling,
blower pulse width to blower motor is frozen when blower
RPM is within 10 percent of calculated blower RPM for 5 sec.
START-UP PROCEDURES
Step 1—General
1. Furnace must have a 115-v power supply properly connected
and grounded.
NOTE: Proper polarity must be maintained for 115-v wiring. If
polarity is incorrect, control center fault indicator light flashes
rapidly and furnace does not operate.
2. Thermostat wire connections at terminals R, W/W1, G, and
Y/Y2 must be made at 24-v terminal block on control center.
3. Natural gas service pressure must not exceed 0.5 psig (14-in.
wc), but must be no less than 0.16 psig (4.5-in. wc).
4. Blower access panel must be in place to complete 24-v
electrical circuit to furnace.
36
Page 37
Table 8—Air Conditioning (A/C) Airflow Setup Switch Position
AIR
CONDITIONER
(TONS)
Default
1-1/2600ONOFFOFFXXX———
2800OFFONOFFXXXXXX
2-1/21000ONONOFFXXXXXX
31200OFFOFFONXXXXXX
3-1/21400ONOFFONXXXXXX
41600OFFONON———XXX
52000ONONON———XXX
X—Indicates allowable selection.
CFM AIRFLOW
1200 or
2000
These furnaces are equipped with a manual reset limit switch
in burner box. This switch opens if an overheat condition
(rollout) occurs in burner enclosure. Correct inadequate
combustion-air supply or improper venting condition and
reset switch. DO NOT jumper this switch.
Before operating furnace, check each manual reset switch for
continuity. If necessary, press button to reset switch.
Step 2—Select Setup Switch Positions
AIR CONDITIONING (A/C) SETUP SWITCHES
The air conditioning setup switches are used to match furnace
airflow to cooling unit used. This furnace will provide 400 CFM
per selected air conditioning tonnage.
To set the desired cooling airflow:
1. Remove main furnace door and blower access panel.
2. Locate A/C setup switches on control center. (See Fig. 25.)
3. Determine air conditioning tonnage used.
4. Use Table 8 or wiring schematic to determine proper setup
position of A/C switches. (See Fig. 24 and 47.)
1. Remove main furnace door and blower access panel.
2. Locate CF setup switches on control center. (See Fig. 25.)
3. Determine desired continuous fan airflow.
4. Use Table 9 or wiring schematic to determine proper setup
position of CF switches. (See Fig. 24 and 48.)
NOTE: The CF switches are factory set to provide continuous fan
airflow equal to low-heat mode.
5. Replace main furnace door and blower access panel.
SETUP SWITCHES (SW)
The control center has 8 setup switches that may be set to meet the
application requirements. Position these setup switches for the
appropriate requirement.
1. Remove main furnace door and blower access panel.
2. Locate setup switches on control center. (See Fig. 25.)
3. See Table 10 for setup switch description. (See Fig. 24 and
48.)
4. Replace main furnace door and blower access panel.
NOTE: If a bypass humidifier is used, setup switch SW-3 (BPH)
should be in ON position. This prevents nuisance limit trips caused
by the increased temperature in return air resulting from bypass.
NOTE: If modulating dampers are used, setup switch SW-5 (MZ)
should be in ON position. This allows furnace control center to
compensate for modulating dampers. The control re-calibrates for
new system static conditions once every minute while operating in
low-heat or continuous fan modes.
OFF
Fig. 47—Example of Setup Switch in OFF Position
NOTE: Excessive airflow caused by improper A/C switch setup
may cause condensate blow off in cooling mode.
5. Replace main furnace door and blower access panel.
NOTE: EAC-1 terminal is energized whenever blower operates.
HUM terminal is only energized when gas valve is energized.
CONTINUOUS FAN (CF) SETUP SWITCHES
The CF setup switches are used to select desired airflow when
thermostat is in continuous fan mode. This setup feature allows
continuous fan airflow to be adjusted. To set desired continuous
fan airflow:
A95198
Step 3—Prime Condensate Trap With Water
Condensate trap must be PRIMED or proper draining may not
occur. The condensate trap has 2 internal chambers which can
ONLY be primed by pouring water into the inducer drain side
of condensate trap.
2. Connect field-supplied 1/2-in. ID tube to upper inducer
housing drain connection.
3. Insert field-supplied funnel into tube.
4. Pour 1 quart of water into funnel/tube. Water should run
through inducer housing, overfill condensate trap, and flow
into open field drain. (See Fig. 49.)
5. Remove funnel and tube from inducer housing and replace
drain connection cap and clamp.
37
Page 38
Table 9—Continuous Fan (CF) Airflow Setup Switch Position
* Add 15% additional CFM when Bypass Humidifier switch SW-3 on control board is used.
X—Indicates allowable selection.
CF-1CF-2CF-3040-14060-14080-14080-20100-20120-20
CF SETUP
SWITCH POSITION
ALLOWABLE FURNACE MODEL SETUP
Table 10—Setup Switch Description
SETUP
SWITCH NO.
SW-1
(FLT)
SW-2
(LOW)
SW-3
(BPH)
SW-4
(EMER HEAT)
SW-5
(MZ)
SW-6
(COMP TEST)
SW-7 and -8
(Blower Off Delay)
NORMAL
POSITION
OFF
OFF
OFF
OFF
OFF
OFF
See Table 11
DESCRIPTION OF USE
Turn switch to ON for fault history display. No thermostat signal can be
present for fault history display.
Turn switch to ON to lock furnace in low-heat mode only or when using a
2-stage thermostat with R-W/W1 and R-W2 signals.
Turn switch to ON when a bypass humidifier is used. This compensates
for higher return-air temperature and provides 15 percent more airflow in
low-heat mode only.
Turn switch to ON to bypass microprocessor control. Furnace will operate at high heat only with main blower and inducer motor operating at
maximum RPM. NO safeties are bypassed.
Turn switch to ON when modulating dampers are used. In this mode,
main blower speed is recalculated once every minute while furnace is in
low-heat or continuous fan mode.
Turn switch to ON to initiate component test. Furnace will operate inducer motor for 20 sec at low speed, operate inducer motor for 20 sec at
high speed, energize HSI for 15 sec, operate blower for 20 sec at low
speed, and operate blower for 20 sec at high speed. SW-1 must be in
OFF position. No thermostat signal can be present for component test to
be initiated.
Adjust switches to provide desired heating mode blower off delay time,
90, 135, 180, or 225 sec.
Table 11—Blower Off Delay Setup Switch
Position
DESIRED HEATING
MODE BLOWER
OFF DELAY (SEC)
90OFFOFF
135ONOFF
180OFFON
225ONON
Step 4—Purge Gas Lines
If not previously done, purge the lines after all connections have
been made and check for leaks.
Never purge a gas line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition for the
purpose of checking leakage. Use a soap-and-water solution
to check for leakage. Failure to follow this warning could
result in fire, explosion, personal injury, or death.
Step 5—Adjustments
SET GAS INPUT RATE
Furnace gas input rate on rating plate is for installations at altitudes
up to 2000 ft.
SETUP SWITCH (SW-7 AND -8) POSITION
SW-7SW-8
In the U.S.A., the input rating for altitudes above 2000 ft must be
reduced by 2 percent for each 1000 ft above sea level.
In Canada, the input rating must be derated by 5 percent for
altitudes of 2000 ft to 4500 ft above sea level.
Furnace input rate must be within ±2 percent of input on furnace
rating plate.
1. Determine natural gas orifice size and manifold pressure for
correct input.
a. Obtain yearly heat value average (at installed altitude) from
local gas supplier.
b. Obtain yearly specific gravity average from local gas
supplier.
c. Verify furnace model. Table 12 can only be used for model
58MVP Furnaces.
d. Find installation altitude in Table 12.
NOTE: For Canada altitudes of 2000 to 4500 ft, use U.S.A.
altitudes of 2001 to 3000 ft in Table 12.
e. Find closest natural gas heat value and specific gravity in
Table 12.
f. Follow heat value and specific gravity lines to point of
intersection to find orifice size and low- and high-heat
manifold pressure settings for proper operation.
38
Page 39
Fig. 48—Inducer Housing Drain Tube
A99118
EXAMPLE: (0—2000 ft altitude)
Heating value = 1050 Btu/cu ft
Specific gravity = 0.62
Therefore: Orifice No. 45
Manifold pressure: 3.6-in. wc for high heat
1.5-in. wc for low heat
* Furnace is shipped with No. 45 orifices. In this example,
all main burner orifices are the correct size and do not need
to be changed to obtain proper input rate.
g. Check and verify burner orifice size in furnace. NEVER
ASSUME ORIFICE SIZE; ALWAYS CHECK AND
VERIFY.
2. Adjust manifold pressure to obtain input rate.
a. Remove burner enclosure front.
NOTE: Manifold pressure MUST always be measured with the
burner box cover REMOVED.
b. Remove caps that conceal adjustment screws for low- and
high-heat gas valve regulators. (See Fig. 50.)
c. Move setup switch SW-2 on control center to ON position.
(See Fig. 25.) This keeps furnace locked in low-heat
operation.
d. Jumper R and W/W1 thermostat connections on control
center to start furnace.
e. Turn low-heat adjusting screw (5/64 hex Allen wrench)
counterclockwise (out) to decrease input rate or clockwise
(in) to increase input rate.
NOTE: DO NOT set low-heat manifold pressure less than 1.3-in.
wc or more than 1.7-in. wc for natural gas. If manifold pressure is
outside this range, change main burner orifices.
Fig. 49—Filling Condensate Trap
A99119
DO NOT bottom out gas valve regulator adjusting screw.
This can result in unregulated manifold pressure and result in
excess overfire and heat exchanger failures.
NOTE: If orifice hole appears damaged or it is suspected to have
been redrilled, check orifice hole with a numbered drill bit of
correct size. Never redrill an orifice. A burr-free and squarely
aligned orifice hole is essential for proper flame characteristics.
f. Move setup switch SW-2 to OFF position after completing
low-heat adjustment.
g. Jumper R and W2 thermostat connections on control
center. (See Fig. 25.) This keeps furnace locked in highheat operation.
h. Turn high-heat adjusting screw (5/64 hex Allen wrench)
counterclockwise (out) to decrease input rate or clockwise
(in) to increase rate.
NOTE: DO NOT set high-heat manifold pressure less than 3.2-in.
wc or more than 3.8-in. wc for natural gas. If manifold pressure is
outside this range, change main burner orifices.
i. When correct input is obtained, replace caps that conceal
gas valve regulator adjustment screws. Main burner flame
should be clear blue, almost transparent. (See Fig. 51.)
j. Remove jumpers R to W/W1 and R to W2
3. Verify natural gas input rate by clocking gas meter.
NOTE: Be sure all pressure tubing, combustion-air and vent
pipes, and burner enclosure front are in place when checking input
by clocking gas meter.
a. Calculate high-altitude adjustment (if required).
39
Page 40
Table 12—Model 58MVP Orifice Size and Manifold Pressure for Correct Input
(Tabulated Data Based on 20,000 Btuh High Heat/13,000 Btuh Low Heat per Burner
* Derate multiplier factor is based on midpoint altitude for altitude range.
%OF
DERATE
DERATE MULTIPLIER
FACTOR FOR U.S.A.*
BURNER
ORIFICE
A93059
DO NOT redrill orifices. Improper drilling (burrs, out-ofround holes, etc.) can cause excessive burner noise and
misdirection of burner flames. This can result in flame
impingement of burners and heat exchangers, causing
failures.
UNITED STATES
At altitudes above 2000 ft, this furnace has been approved
for a 2 percent derate for each 1000 ft above sea level. See
Table 13 for derate multiplier factor and example.
EXAMPLE: 100,000 BTUH INPUT FURNACE INSTALLED AT
4300 FT.
Furnace Input Rate
at Sea Level
100,000X0.91=91,000
X
Derate
Multiplier
Factor
Furnace Input Rate
=
at Installation
Altitude
CANADA
At installation altitudes from 2000 to 4500 ft, this furnace
must be derated 5 percent by an authorized Gas Conversion
Station or Dealer. To determine correct input rate for
altitude, see example above and use 0.95 as derate multiplier factor.
b. Reinstall burner box cover.
NOTE: Clocking gas input rate MUST always be performed with
the burner box cover INSTALLED.
c. Check that gas valve adjustment caps are in place for
proper input to be clocked.
d. Obtain yearly heat value average for local gas supply.
NOTE: Be sure heating value of gas used for calculations is
correct for your altitude. Consult local gas utility for altitude
adjustment of gas heating value.
e. Check and verify orifice size in furnace. NEVER ASSUME
THE ORIFICE SIZE. ALWAYS CHECK AND VERIFY.
f. Turn off all other gas appliances and pilots.
g. Move setup switch SW-2 to ON position. (See Fig. 25.)
This keeps furnace locked in low-heat operation.
43
Page 44
h. Jumper R to W/W1.
i. Let furnace run for 3 minutes in low-heat operation.
j. Measure time (in sec) for gas meter to complete 1 revolu-
tion. Note reading.
k. Refer to Table 14 for cubic ft of gas per hr.
l. Multiply gas rate cu ft/hr by heating value (Btu/cu ft).
m. Move setup switch SW-2 to OFF position and jumper R
and W2 thermostat connections. (See Fig. 25.) This keeps
furnace locked in high-heat operation. Repeat items h
through k for high-heat operation.
EXAMPLE: (High-heat operation at 0—2000 ft altitude)
Furnace input from rating plate is 100,000 Btuh
Btu heating input = Btu/cu ft X cu ft/hr
Heating value of gas = 975 Btu/cu ft
Time for 1 revolution of 2-cu ft dial = 70 sec
Gas rate = 103 cu ft/hr (from Table 14)
Btu heating input = 103 X 975 = 100,425 Btuh In this
example, the orifice size and manifold pressure adjustment
is within ±2 percent of the furnace input rate.
NOTE: Measured gas inputs (high heat and low heat) must be
within ±2 percent of that stated on furnace rating plate when
installed at sea level or derated per that stated above when installed
at higher altitudes.
n. Remove jumper across R, W/W1, and W2 thermostat
connections to terminate call for heat.
Table 14—Gas Rate Cu Ft/Hr
SECONDS
FOR 1
REVOLUTION
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
360
720
655
600
555
514
480
450
424
400
379
360
343
327
313
300
288
277
267
257
248
240
232
225
218
212
206
200
195
189
185
180
176
172
167
164
160
157
153
150
147
1800
1636
1500
1385
1286
1200
1125
1059
1000
947
900
857
818
783
750
720
692
667
643
621
600
581
563
545
529
514
500
486
474
462
450
439
429
419
409
400
391
383
375
367
327
300
277
257
240
225
212
200
189
180
171
164
157
150
144
138
133
129
124
120
116
113
109
106
103
100
97
95
92
90
88
86
84
82
80
78
76
75
73
SECONDS
FOR 1
REVOLUTION
50
51
52
53
54
55
56
57
58
59
60
62
64
66
68
70
72
74
76
78
80
82
84
86
88
90
92
94
96
98
100
102
104
106
108
110
112
116
120
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
72
144
141
138
136
133
131
129
126
124
122
120
116
112
109
106
103
100
97
95
92
90
88
86
84
82
80
78
76
75
74
72
71
69
68
67
65
64
62
60
360
355
346
340
333
327
321
316
310
305
300
290
281
273
265
257
250
243
237
231
225
220
214
209
205
200
196
192
188
184
180
178
173
170
167
164
161
155
150
71
69
68
67
65
64
63
62
61
60
58
56
54
53
51
50
48
47
46
45
44
43
42
41
40
39
38
38
37
36
35
35
34
33
33
32
31
30
SET TEMPERATURE RISE
Temperature rise must be within limits specified on unit
rating plate. Recommended operation is at midpoint of rise or
above. Failure to follow this caution may result in condensing
or overheating the heat exchangers.
Furnace must operate within range of temperature rise specified on
the unit rating plate. Determine air temperature rise as follows:
1. Place thermometers in return and supply ducts as near furnace
as possible. Be sure thermometers do not see heat exchanger
so that radiant heat does not affect readings. This practice is
particularly important with straight-run ducts.
2. When thermometer readings stabilize, subtract return-air temperature from supply-air temperature to determine air temperature rise.
NOTE: Temperature rise can be determined for low-fire operation by placing setup switch SW-2 on control center in ON
position. For high-heat operation, place setup switch SW-2 in OFF
position and jumper R-W2 on control center. DO NOT forget to
return setup switch to OFF position and remove R-W2 jumper
upon completion of testing. (See Fig. 25 for switch and terminal
location.)
3. This furnace is capable of automatically providing proper
airflow to maintain the temperature rise within the range
specified on unit rating plate. If temperature rise is outside this
range, proceed as follows:
a. Check gas input for low- and high-heat operation.
b. Check derate for altitude if applicable.
c. Check all return and supply ducts for excessive restrictions
causing static pressure greater than 0.5-in. wc.
d. Ensure bypass humidifier switch (BPH) setup switch SW-3
on control center is in ON position when a bypass
humidifier is used. (See Fig. 25 for switch location.)
e. Check Troubleshooting Guide for Variable-Speed 2-Stage
Electronic Condensing Furnaces.
44
Page 45
SET THERMOSTAT HEAT ANTICIPATOR
The thermostat heat anticipator must be set to match the amp draw
of components in the R-W/W1 circuit. Accurate amp draw
measurements can be obtained at the thermostat subbase terminals
R and W.
Fig. 52 illustrates an easy method of obtaining thermostat amp
draw measurements. The amp reading should be taken after blower
motor has started and furnace is operating in low heat.
1. To operate furnace in low heat, turn setup switch SW-2 to ON
position (See Fig. 25) and connect ammeter leads across
thermostat subbase R-W.
2. See thermostat manufacturer’s instructions for adjusting the
heat anticipator and for varying heating cycle length.
NOTE: When using an electronic thermostat, set cycle rate for 3
cycles per hr.
3. Return setup switch SW-2 to OFF position and replace
thermostat on subbase.
THERMOSTAT SUBBASE
TERMINALS WITH
THERMOSTAT REMOVED
(ANITICIPATOR, CLOCK, ETC.,
MUST BE OUT OF CIRCUIT.)
HOOK-AROUND
AMMETER
R Y W G
10 TURNS
FROM UNIT 24-V
CONTROL TERMINALS
EXAMPLE:
5.0 AMPS ON AMMETER
10 TURNS AROUND JAWS
0.5 AMPS FOR THERMOSTAT
=
ANTICIPATOR SETTING
A96316
Fig. 52—Amp Draw Check with Ammeter
CHECK SAFETY CONTROLS
Step 1—Check Primary Limit Control
This control shuts off the combustion control system and energizes
the air-circulating blower motor if furnace overheats.
1. The recommended method of checking this limit control is to
gradually block off return air after furnace has been operating
for a period of at least 5 minutes.
2. As soon as limit control has shut off burners, a 33 fault code
will appear on control center.
3. The return-air opening should be unblocked to permit normal
air circulation.
By using this method to check the limit control, it can be
established that the limit is functioning properly and the furnace
will operate safely if there is a restricted return-air supply or motor
failure. If the limit control does not function during this test, the
cause must be determined and corrected.
Step 2—Check Pressure Switches
This control proves operation of the draft inducer. Check switch
operation as follows:
1. Turn off 115-v power to furnace.
2. Remove control access door and disconnect inducer motor
12-pin wire harness at inducer motor.
3. Turn on 115-v power to furnace.
4. Set thermostat to call for heat. When pressure switches are
functioning properly, fault code 42 will flash on control center
approximately 10 sec after thermostat switch is closed. If
either a fault code 31 or 32 is flashed when ICM inducer motor
is disconnected, the furnace will shut itself down immediately.
Determine the reason pressure switches did not function
properly and correct the condition.
5. Turn off 115-v power to furnace.
6. Reconnect inducer motor wire harness. Reinstall furnace
access door.
7. Turn on 115-v power to furnace.
8. Reset thermostat to desired temperature.
CHECKLIST
1. Put away tools and instruments. Clean up debris.
2. Verify manual reset switch has continuity.
3. Verify that blower and control access doors are properly
installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer’s instructions.
6. Review User’s Manual with owner.
7. Leave literature packet near furnace.
45
Page 46
LOAD CALCULATION
____________Heating Load (Btuh)
____________Cooling Load (Btuh)
____________Furnace Model Selection
CHECKLIST—INSTALLATION
________Unit Level or Pitched Forward
________
Condensate Drain
Internal Tubing Connections Free of Kinks
and Traps
COMBUSTION AND VENT PIPING
Termination Location
________Roof or Sidewall
________Termination Kit — 2 Pipe or Concentric
________Combustion-Air Pipe Length
________Combustion-Air Pipe Elbow Quantity
________Vent Pipe Length
________Vent Pipe Elbow Quantity
________Pipe Diameter Determined from Sizing Table
________Pipe Sloped To Furnace
Pipe Insulation
________Over Ceilings
________Low-Ambient Exposed Pipes
________
________Condensate Trap Primed before Start-Up
________Heat Tape Installed if Required
________
________Temperature Rise Adjusted
________Anticipator Setting Adjusted or
________Cycle Rate (3 Cycles per Hr) Selected
________Primary Limit
________Pressure Switches
External Drain Connection Leak Tight and
Sloped
CHECKLIST—START-UP
Gas Input Rate
(Set Within 2 percent of Rating Plate)
Thermostat Anticipator
Safety Controls Check Operation
46
Page 47
SERVICE TRAINING
Packaged Service Training programs are an excellent way to increase your
knowledge of the equipment discussed in this manual, including:
• Unit Familiarization• Maintenance
• Installation Overview• Operating Sequence
A large selection of product, theory, and skills programs is available, using popular
video-based formats and materials. All include video and/or slides, plus companion
book.
Classroom Service Training plus "hands-on" the products in our labs can mean
increased confidence that really pays dividends in faster troubleshooting, fewer
callbacks. Course descriptions and schedules are in our catalog.
CALL FOR FREE CATALOG 1-800-962-9212
[ ] Packaged Service Training[ ] Classroom Service Training
A94328
47
Page 48
Copyright 2001 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 4623158mvp11si
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 6a 8a
PC 101Catalog No. 535-80021Printed in U.S.A.Form 58MVP-11SIPg 482-01Replaces: 58MVP-10SI
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.