Carrier 58MEB Installation, Start-up, And Operating Instructions Manual

Page 1
58MEB D e l u x e 4 --- W a y M u l t i p o i s e Fixed---Capacity Condensing Gas Furnace Sizes 040 --- 120, Series 100
Installation, Start---up and
Operating Instructions
Visit www.carrier.com
NOTE: Read the entire instruction manual before starting the installation.
NOTE: This furnace can be installed as a
or (1-pipe) non-direct vent
Special Venting Requirements for Installations in Canada
Installation in Canada must conform to the requirements of CSA B149 code. Vent systems must be composed of pipe, fittings, cements, and primers listed to ULC S636. The special vent fittings and accessory concentric vent termination kits and accessory external drain trap have been certified to ULC S636 for use with those IPEX PVC vent components which have been certified to this standard. In Canada, the primer and cement must be of the same manufacturer as the vent system -- IPEX System 636, PVC/CPVC Primer, Purple Violet for Flue Gas Venting and IPEX System 636, PVC Cement for Flue Gas Venting, rated Class IIA, 65 deg C. must be used with this venting system -- do not mix primers and cements from one manufacturer with a vent system from a different manufacturer. Follow the manufacturer’s instructions in the use of primer and cement and never use primer or cement beyond its expiration date.
The safe operation, as defined by ULC S636, of the vent system is based on following these installation instructions, the vent system manufacturer’s installation instructions, and proper use of primer and cement. All fire stop and roof flashing used with this system must be UL listed material. Acceptability under Canadian standard CSA B149 is dependent upon full compliance with all installation instructions. Under this standard, it is recommended that the vent system be checked once a year by qualified service personnel.
The authority having jurisdiction (gas inspection authority, municipal building department, fire department, etc) should be consulted before installation to determine the need to obtain a permit.
condensing gas furnace.
(2-pipe) direct vent
Consignes spéciales pour l’installation de ventillation au Canada
L’installation faite au Canada doit se conformer aux exigences du code CSA B149. Ce systême de ventillation doit se composer de tuyaux, raccords, ciments et apprêts conformes au ULC S636. La tuyauterie de ventillation des gaz, ses accessoires, le terminal concentrique mural ainsi que l’ensemble du drain de condensat extérieur ont été certifiés ULCS 636 pour l’application des composantes IPEX PVC qui sont certifiées à ce standard. Au Canada l’apprêt et le ciment doivent être du même manufacturier que le systême de ventillation -- IPEX Système 636, Apprêt PVC/CPVC. Mauve Violette pour conduit en évacuation des gaz et IPEX Système 636, ciment pour PVC pour conduit en évacuation des gaz, évalué CLASSEIIA,65deg.C.doitëtre utilisé avec ce systèeme d’évacuation -- ne pas mélanger l’apprêt et le ciment d’un manufacturier avec le systême de ventillation d’un autre manufacturier. Bien suivre les indications du manufacturier lors de l’utilisation de l’apprêt et du ciment et ne pas utiliser ceux--ci si la date d’expiration est atteinte.
L’opération sécuritaire, tel que définit par ULC S636, du système de ventilation est basé sur les instructions d’installation suivantes, ainsi que l’usage approprié de l’apprêt et ciment. Tout arrët feu et solin de toit utilisés avec ce système doivent être des matériaux listés UL. L’acceptation du standard Canadien CSA B419 est directement relié à l’installation conforme aux instructions ci-­haut mentionnées. Le standard Canadien recommande l’ inspection par un personel qualifié et ce, une fois par année.
Les autoritées ayant juridiction (inspecteurs de gas, inspecteurs en bâtiments, département des incendies, etc) devraient être consultées avant l’installation afin de déterminer si un permis est requis.
Page 2
Required Notice for Massachusetts Installations
IMPORTANT
The Commonwealth of Massachusetts requires compliance with regulation 248 CMR as follows:
5.08: Modifications to NFPA--54, Chapter 10
2) Revise 10.8.3 by adding the following additional requirements: a. For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used
in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing p lumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back--up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the d welling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors
a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard
wired carbon monoxide detector with alarm and battery back--up may be installed on the next adjacent floor level.
b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner
shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.
2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE. A metal o r plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one--half (1/2) inch in size, ”GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.
4. INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.
5. EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:
(1.) The equipment listed in Chapter 10 entitled ”Equipment Not Required To Be Vented” in the most current edition of
NFPA 54 as adopted by the Board; and
(2.) Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from
the dwelling, building o r structure used in whole or in part for residential purposes.
c. MANUFACTURER REQUIREMENTS -- GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the
manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
1. Detailed instructions for the installation of the venting system design or the venting system components; and
2. A complete parts list for the venting system design or venting system.
d. MANUFACTURER REQUIREMENTS -- GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When
the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems”, the following requirements shall be satisfied by the manufacturer:
1. The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and
2. The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.
e. A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled
equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.
For questions regarding these requirements, please contact the Commonwealth of Massachusetts Board of State Examiners of Plumbers
and Gas Fitters, 239 Causeway Street, Boston, MA 02114. 617 --727--9952.
-- 2 --
Page 3
AIRFLOW
SAFETY CONSIDERATIONS
!
CAUTION
UPFLOW
AIRFLOW
HORIZONTAL
LEFT
Fig. 1 -- Multipoise Operations
DOWNFLOW
AIRFLOW
HORIZONTAL
RIGHT
AIRFLOW
A93041
TABLE OF CONTENTS
SAFETY CONSIDERATIONS 3..........................
CODES AND STANDARDS 5...........................
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS 7...
INTRODUCTION 8....................................
APPLICATIONS 8.....................................
General 8...........................................
Upflow Applications 8.................................
Downflow Applications 10.............................
Horizontal Left (Supply-Air Discharge)
Applications 12......................................
Horizontal Right (Supply-Air Discharge)
Applications 13......................................
LOCATION 16........................................
General 16..........................................
Furnace Location Relative to Cooling Equipment 17.........
Hazardous Locations 18...............................
Furnace Location and Application 18.....................
AIR FOR COMBUSTION AND VENTILATION 18..........
INSTALLATION 21....................................
Leveling Legs (If Desired) 21...........................
Installation in Upflow and Downflow Applications 21.......
Installation in Horizontal Applications 22.................
Air Ducts 23.........................................
Filter Arrangement 25.................................
Bottom Closure Panel 25...............................
Gas Piping 25........................................
Electrical Connections 27..............................
Removal of Existing Furnaces from
Common Vent Systems 30..............................
Combustion Air and Vent Pipe Systems 30.................
Condensate Drain 46..................................
START-UP, ADJUSTMENTS, AND SAFETY CHECK 47.....
General 47..........................................
Prime Condensate Trap With Water 47....................
Purge Gas Lines 47...................................
Sequence of Operation 48..............................
Adjustments 54......................................
Check Safety Controls 57..............................
Checklist 59.........................................
UNIT RELIABILITY HAZARD
Failure to follow this caution may result in unit component damage.
Application of this furnace should be indoors with special attention given to vent sizing and material, gas input rate, air temperature rise, unit leveling, and unit sizing.
!
CAUTION
FIRE, EXPLOSION, ELECTRICAL SHOCK AND CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in electrical shock, fire, personal injury, or death.
Improper installation, adjustment, alteration, service, maintenance, or use can cause carbon monoxide poisoning, explosion, fire, electrical shock, or other conditions which may cause personal injury or property damage. Consult a qualified installer, service agency, local gas supplier, or your distributor or branch for information or assistance. The qualified installer or agency must use only factory-authorized and listed kits or accessories when modifying this product.
Installing and servicing heating equipment can be hazardous due to gas and electrical components. Only trained and qualified
personnel should install, repair, or service heating equipment.
Untrained personnel can perform basic maintenance functions such as cleaning and replacing air filters. All other operations must be performed by trained service personnel. When working on heating equipment, observe precautions in literature, on tags, and on labels attached to or shipped with unit and other safety precautions that may apply.
These instructions cover the minimum requirements and conform to existing national standards and safety codes. In some instances, these instructions exceed certain local codes and ordinances, especially those that may not have kept up with changing residential construction practices. We require these instructions as a minimum for a safe installation.
Wear safety glasses and work gloves. Have a fire extinguisher available during start-up and adjustment procedures and service calls.
!
CAUTION
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing and gloves when handling parts.
Recognize safety information. This is the safety-alert symbol
. When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury. Understand these signal words: DANGER, WARNING, and
CAUTION. These words are used with the safety-alert symbol. DANGER identifies the most serious hazards which will result in severe personal injury or death. WARNING signifies hazards which could result in personal injury or death. CAUTION is used to identify unsafe practices which may result in minor personal injury or product and property damage. NOTE is used to
-- 3 --
Page 4
highlight suggestions which will result in enhanced installation, reliability, o r operation.
The 58MEB Multipoise Condensing Gas-Fired Furnaces are CSA (formerly AGA and CGA) design-certified for natural and propane gases (see furnace rating plate) and for installation in alcoves, attics, basements, closets, utility rooms, crawlspaces, and garages. The furnace is factory-shipped for use with natural gas. A CSA listed gas conversion kit is required to convert furnace for use with propane gas.
See Fig. 3 for required clearances to combustibles. Maintain a 1-in. (25.4 mm) clearance from combustible materials
to supply air ductwork for a distance of 36 inches (914 mm) horizontally from the furnace. See NFPA 90B or local code for further requirements.
These furnaces SHALL NOT be installed directly on carpeting, tile, or any other combustible material other than wood flooring. In downflow installations, factory accessory floor base MUST be used when installed on combustible materials and wood flooring. Special base is not required when this furnace is installed on manufacturer’s Coil Assembly Part No. CAP, CAR or CNPV, CNRV, or when Coil Box Part No. KCAKC is used.
The 58MEB 040 through 120 size units are CSA design-certified for use in manufactured (mobile) homes when installed as a 2-pipe (direct vent) furnace and a factory accessory conversion kit is used. These furnaces are suitable for installation in a structure built on site or a manufactured building completed at final site. The design of this furnace line is NOT CSA design-certified for installation in recreation vehicles or outdoors.
This furnace is designed for continuous return-air minimum temperature of 60°F(16°C)db or intermittent operation down to 55°F(13°C) db such as when used with a night setback thermometer. Return-air temperature must not exceed 80°F(27° C) db. Failure to follow these return air limits may affect reliability of heat exchangers, motors and controls. (See Fig. 4.)
These furnaces are shipped with the drain and pressure tubes connected for UPFLOW applications. Minor modifications are required when used in DOWNFLOW, HORIZONTAL RIGHT, or HORIZONTAL LEFT (supply-air discharge direction) applications as shown in Fig. 1. See details in Applications section.
Install this furnace only in a location and position as specified in LOCATION and INSTALLATION sections of these instructions.
Always provide adequate combustion and ventilation air as specified in section Combustion Air and Vent Pipe Systems of these instructions to the furnace.
Combustion products must be discharged outdoors. Connect this furnace to an approved vent system only, as specified in the Combustion Air and Vent piping sections of these instructions.
Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for detection of leaks to check all connections as specified in the GAS PIPING section of these instructions.
Always install the furnace to operate within the furnace’s intended rise range with a duct system which has an external static pressure within the allowable range as specified in the SET
TEMPERATURE RISE section of these instructions. See furnace rating plate.
When a furnace is installed so that supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by ducts sealed to the furnace casing and terminating outside the space containing the furnace.
A gas-fired furnace for installation in a residential garage must be installed as specified in the Hazardous Locations section of these instructions.
The furnace may be used for construction heat provided that the furnace installation and operation complies with the first CAUTION in the LOCATION section of these instructions.
This gas furnace may be used for construction heat provided that:
S The furnace is permanently installed with all electrical wiring,
piping, air filters, venting and ducting installed according to these installation instructions. A return air duct is provided, sealed to the furnace casing, and terminated outside the space containing the furnace. This prevents a negative pressure condition as created by the circulating air blower, causing a flame rollout and/or drawing combustion products into the structure.
S The furnace is controlled by a thermostat. It may not be “hot
wired” to provide heat continuously to the structure with out thermostatic control.
S Clean outside air is provided for combustion. This is to
minimize the corrosive effects of adhesives, sealers and other construction materials. It also prevents the entrainment of drywall dust into combustion air, which can cause fouling and plugging of furnace components.
S The temperature of the return air to the furnace is maintained
between 55°F(13°C) and 80°F(27°C), with no evening setback or shutdown. The use of the furnace while the structure is under construction is d eemed to be intermittent operation per our installation instructions.
S The air temperature rise is within the rated rise range on the
furnace rating plate, and the firing rate has been set to the nameplate value.
S The filters used to clean the circulating air during the
construction process must be either changed or thoroughly cleaned prior to occupancy.
S The furnace, ductwork and filters are cleaned as necessary to
remove drywall dust and construction debris from all HVAC system components after construction is completed.
S After construction is complete, verify furnace operating
conditions including ignition, input rate, temperature rise and venting, according to the manufacturer’s instructions.
The furnace shall be installed so that the electrical components are protected by water.
-- 4 --
Page 5
These furnaces are shipped with the following materials to assist in proper furnace installation. These materials are shipped in the main blower compartment.
Installer Packet includes:
Installation, Startup, and Operating Instructions Service and Maintenance Instructions User’s Information Manual Warranty Certificate
Loose Parts Bag includes: Quantity
Pressure tube extension 1 Collector Box or condensate trap extension tube 1 Inducer housing drain tube 1 1/2-in CPVC street elbow 2 Drain tube coupling 1 Drain tube coupling grommet 1 Gas line grommet 1 Vent pipe grommet 1 Combustion-air pipe grommet 1 Gas line entry hole filler plug 1 Power ent ry hole filler plug 2 Condensate trap hole filler plug 3 Vent and combustion-air intake hole filler plug 2 Combustion-air pipe perforated disk assembly 1
Vent Pipe Extension 2 in. x 12 in. (51mm x 305mm) 1*
* ONLY supplied with some furnaces.
When this furnace is installed with a direct vent (combustion-air and vent) system, a factory accessory termination kit MUST be used. In a direct-vent system, all air for combustion is taken directly from the outdoor atmosphere and flue gases are discharged to the outside atmosphere. See furnace and factory accessory vent-air intake termination kit instructions for proper installation.
CODES AND STANDARDS
For accessory installation details, refer to accessory installation instructions.
Follow all national and local codes and standards in addition to these instructions. The installation must comply with
regulations of the serving gas supplier, local building, heating, plumbing, and other codes. In absence of local codes, the installation must comply with the national codes listed below and all authorities having jurisdiction.
In the United States and Canada, follow all codes and standards for the following:
Step 1—Safety
S US: National Fuel Gas Code (NFGC) NFPA 54-2006/ANSI
Z223.1-2006 and the Installation Standards, Warm Air Heating
and Air Conditioning Systems ANSI/NFPA 90B
S CANADA: National Standard of Canada, Natural Gas and
Propane Installation Code (NSCNGPIC) CSA B149.1-05
Step 2—General Installation
S US: NFGC and the NFPA 90B. For copies, contact the
National Fire Protection Association Inc., Batterymarch Park,
Quincy, MA 02269; or for only the NFGC contact the
American Gas Association, 400 N. Capitol, N.W., Washington
DC 20001
S A manufactured (Mobile) home installation must conform with
the Manufactured Home Construction and Safety Standard,
Title 24 CFR, Part 3280, or when this standard is not
applicable, the Standard for Manufactured Home Installation
(Manufactured Home Sites, Communities, and Set-Ups),
ANSI/NCS A225.1, and/or CAN/CSA-Z240, MH Series
Mobile Homes
S CANADA: NSCNGPIC. For a copy, contact Standard Sales,
CSA International, 178 Rexdale Boulevard, Etobicoke (Toronto), Ontario, M9W 1R3, Canada.
Step 3—Combustion and Ventilation Air
S US: Section 9 .3 of the NFGC, Air for Combustion
and Ventilation
S CANADA: Part 8 of the NSCNGPIC, Venting Systems and Air
Supply for Appliances
Step 4—Duct Systems
S US and CANADA: Air Conditioning Contractors Association
(ACCA) Manual D, Sheet Metal and Air Conditioning Contractors National Association (SMACNA), or American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) 2005 Fundamentals Handbook Chapter 35.
Step 5—Acoustical Lining and Fibrous Glass Duct
S US and CANADA: current edition of SMACNA, NFPA 90B as
tested by UL Standard 181 for Class I Rigid Air Ducts
Step 6—Gas Piping and Gas Pipe Pressure Testing
S US: NFGC; chapters 5, 6, 7, and 8 and national
plumbing codes
S CANADA: CAN/CSA----B149.1-- --05 Parts 4, 5, 6, and 9.
In the state of Massachusetts:
S This product must be installed by a licensed plumber or
gas fitter.
S When flexible connectors are used, the maximum length shall
not exceed 36 inches (914 mm).
S When lever type gas shutoffs are used they shall not exceed
36 inches (914 mm).
S The use of copper tubing for gas piping is not approved b y the
state of Massachusetts.
Step 7—Electrical Connections
S US: National Electrical Code (NEC) ANSI/NFPA 70-2008 S CANADA: Canadian Electrical Code CSA C22.1
-- 5 --
Page 6
(21mm)
UNIT SIZE A D E
0
40-12 / 036040 17-
1
/2 (445) 15-7/8 (403) 16 (406)
060-12 / 036060 17-1/2 (445) 15-7/8 (403) 16 (406)
080-12 / 036080 17-1/2 (
4
45) 15-7/8 (403)16 (406)
080-16 / 048080 17-1/2 (445) 15-7/8 (
403) 1
6 (
4
06)
100-20 / 060100 21 (25.4) 19-3/8
(492) 19-1/2 (495)
120-20 / 060120 24-1/2 (622) 22-7/8 (581) 23 (584)
(16mm)
"
"
16
⁄
8
⁄
5
13
"
8
⁄
"
16
⁄
5
(8mm)
7
39
(1013mm)
1"
(25mm)
1mm) 1
(
"
16
⁄
7
(17mm)
"
16
⁄
1
1
(694mm)
"
(724mm)
16
⁄
"
2
⁄
15
1
26
28
(667mm)
"
4
⁄
1
26
9
LOW
AIRF
(567mm)
(483mm)
"
"
16
⁄
19
5
22
"
16
⁄
TYP
(14mm)
"
16
⁄
13
A
D
"
16
⁄
13
OUTLET
. COMBUSTION-
2-IN
CONDENSATE DRAIN
OUTLET
(21mm) (21mm)
W &
ATION
O
LOC
OWNFL
CONDENSATE DRAIN
TRAP
(D
HORIZONTA L LEFT)
1
AIR CONN
LOCATION P
(DOWNFLOW &
TRA
HORIZONTAL RIGHT)
(22mm)
-IN. DIA
8
⁄
7
POWER CONN
A DI
. DIA
-IN
-IN.
8
2
⁄
⁄
GAS CONN
7
TE A
TERN
OR AL
-IN. DIA GAS CONN
2
⁄
1
TRY EN
POWER CONN
-IN. DIA
2
⁄
1
THERMOSTAT
"
4
⁄
1
TYP
33
(845mm)
"
16
⁄
13
30
(783mm)
. VENT CONN
2-IN
"
2
⁄
1
30
"
16
⁄
1 1
TYP
29
(22mm)
-IN. DIA
CCESSORY
8
⁄
7
A
(775mm)
"
8
⁄
5
TYP
32
(754mm)
"
8
⁄
5
27
(702mm)
Y R T
CONDENSAT E
POWER EN
"
16
⁄
1 1
22
(829mm)
"
16
P
⁄
9
TY
27
(700mm)
TE
TRAP
TION A
DRAIN
LOC
(ALTERNA
"
2
⁄
1
24
W) O
UPFL
SIDE INLET
"
4
⁄
1
18
(464mm)
"
(622mm)
16
⁄
5
17
(440mm)
"
16
⁄
7
9
TYP
(240mm)
1
TE
CONDENSA
T
INLE
TYP
"
4
⁄
(565mm)
22
OW) L
ATION
(UPF
DRAIN LOC
"
16
⁄
1 1
E
"
16
⁄
1 1
TION A
CONDENSATE
DRAIN LOC
"
NLET
16
⁄
3
OM I
24
T
(614mm)
T O B
TA L
HANGING
OCAT OR S
FOR HORIZON
DIMPLE L
(17mm)
(17mm)
W)
O
(UPFL
.
-in. (495mm) rectangle
2
/
. (305mm) rectangle.
1
1
x 19
x 12-in
(368mm)
2
(368mm)
/
2
1
/
1
1
round or 14
round or 14
facturerÕs recommendations for equivalent diameters. u n
um return-air openings at furnace, based on metal duct. If flex duct is used,
um return-air opening at furnace:
m
m
see flex duct ma
a. For 800 CFM 16-in . (406mm)
b. For 1200 CFM 20-in . (508mm)
2. Mini
NOTES: 1. Mini
. e
a
.
. ESP
, a
.C W
.(591mm) rectangl
-in
4
/
(368mm) x 23
2
/
round or 14
c. For 1600 CFM 22-in .(559mm)
“
e 1800 CFM at 0.5 v
e 1800 CFM, see Air Delivery table in Product Dat v o
ature for specific use of single side inlets. The use of both side inlets
r lite
combination of 1 side and the bottom, or the bottom only will ensure adequate
return air openings for airflow requirements abo
d. For airflow requirements ab
(684mm)
"
16
⁄
15
(667mm)
"
4
⁄
1
26
1
26
(666mm)
"
2
⁄
24
(567mm)
"
16
⁄
5
22
(51mm)
BUSTION-
COM
-IN. 2
AIR CONN
(13mm)
-IN. DIA
2
⁄
1
GAS CONN
CONN
. VENT
-IN
(51mm)
2
. DIA THERMOSTAT
-IN
2
⁄
1
ENTRY
"
16
⁄
1 1
22
(13mm)
T
(576mm)
SIDE INLE
"
2
⁄
P
1
TY
14
(368mm)
Fig. 2 -- Dimensional Drawing
-- 6 --
1
(32mm)
"
4
⁄
1
1
(591mm) P
" TY
4
⁄
23
1"
(684mm)
TYP
"
16
SIDE INLET
⁄
15
26
(25mm)
A08321
Page 7
This forced air furnace is equipped for use with natural gas at altitudes 0 - 10,000 ft (0 - 3,050m), except 140 size furnaces are only approved for altitudes 0 - 7,000 ft. (0 - 2,135m). An accessory kit, supplied by the manufacturer, shall be used to convert to propane gas use or may be required for some natural gas applications. This furnace is for indoor installation in a building constructed on site. This furnace may be installed in a manufactured (mobile) home when stated on rating plate and using factory authorized kit.. This furnace may be installed on combustible flooring in alcove or closet at Minimum Inches Clearance To Combustible Construction as described below. This furnace requires a special venting system. Refer to the installation instructions for parts list and method of installation. This furnace is for use with schedule-40 PVC, PVC-DWV, CPVC, or ABS-DWV pipe, and must not be vented in common with other gas-fired appliances. Construction through which vent/air intake pipes may be installed is maximum 24 inches (600 mm), minimum 3/4 inches (19 mm) thickness (including roofing materials).
Cette fournaise à air pulsé est équipée pour utilisation avec gaz naturel et altitudes comprises entre 0 - 3,050m (0 - 10,000 pi),excepté queles fournaises de 140 taille sont pour altitudes comprises entre 0 - 2,135m (0 - 7,000pi). Utiliser une trousse de conversion, fournie par le fabricant, pour passer au gaz propane ou pour certaines installations au gaz naturel. Cette fournaise à air pulsé est pour installation à l´intérieur dans un bâtiment construit sur place. Cette fournaise à air pulse peut être installée dans une maison préfabriquée (maison mobile) si prescrit par la plaque signalétique et si l' on utilise une trousse specifiée par le fabricant. Cette fournaise peut être installée sur un plancher combustible dans un enfoncement ou un placard en observant les Dégagement Minimum En Pouces Avec
Éléments De Construction Combustibles.
Cette fournaise nécessite un système d´évacuation spécial. La méthode d´installation et la liste des pièces nécessaires figurent dans les instructions d´installation. Cette fournaise doit s´utiliser avec la tuyauterie des nomenclatures 40 PVC, PVC-DWV, CPVC, ou ABS-DWV et elle ne peut pas être ventilée conjointment avec d´autres appareils à gaz. Épaisseur de la construction au travers de laquelle il est possible de faire passer les tuyaux d'aération (admission/évacuation): 24 po (600 mm) maximum, 3/4 po (19mm) minimum (y compris la toiture).
For upflow and downflow applications, furnace must be installed level, or pitched within 1/2" of level. For a horizontal application, the furnace must be pitched minimum 1/4" to maximum of 1/2" forward for proper drainage. See Installation Manual for IMPORTANT unit support details on horizontal applications.
Pour des applications de flux ascendant et descendant, la fournaise doit être installée de niveau ou inclinée à pas plus de 1/2" du niveau. Pour une application horizontale, la fournaise doit être inclinée entre minimum 1/4" et maximum 1/2" du niveau pour le drainage approprié. En cas d´installation en position horizontale, consulter les renseignements IMPORTANTS sur le support dans le manuel d´installation.
MINIMUM INCHES CLEARANCE TO COMBUSTIBLE CONSTRUCTION
ALL POSITIONS:
Minimum front clearance for service 24 inches (610mm).
*
†
†
140 size furnaces require 1 inch back clearance to combustible materials.
DOWNFLOW POSITIONS:I
†
For installation on combustible floors only when installed on special base No. KGASB0201ALL, Coil Assembly, Part No. CD5 or CK5, or Coil Casing, Part No. KCAKC.
HORIZONTAL POSITIONS::
Line contact is permissible only between lines formed by intersections of top and two sides of furnace jacket, and building joists, studs, or framing.
§
Clearance shown is for air inlet and air outlet ends.
Ø
120 and 140 size furnaces require 1 inch bottom clearance to combustible materials.
DÉGAGEMENT MINIMUM EN POUCES AVEC ÉLÉMENTS DE CONSTRUCTION COMBUSTIBLES
POUR TOUS LES POSITIONS:U
Dégagement avant minimum de 610mm (24 po) pour l´entretien.
*
Pour les fournaises de 140 taille, 1 po (25mm) dégagement des matériaux combustibles est
†
†
requis au-arriere.
POUR LA POSITION COURANT DESCENDANT:
†
Pour l´installation sur le plancher combustible seulement quand on utilise la base spéciale, pièce nº KGASB0201ALL, l pièce nº KCAKC.
POUR LA POSITION HORIZONTALE:
Le contact n deuxcôtés de la chemise de la fournaise, et des solives, des montants ou de la charpente du bátiment. La distance indiquée concerne l
§
´
air.
d
Ø
Pour les fournaises de 120 et 140 taille, 1 po (25mm) dégagement des matériaux combusitbles est requis au-dessous.
´
ensemble serpentin, pièce nº CD5 ou CK5, ou le carter de serpentin,
´
est permis qúentre les lignes formées par les intersections du dessus et des
´
extrémité du tuyau d´arrivée d´air et l´extrémité du tuyau de sortie
INSTALLATION
LEVEL (0") TO
1/2" MAX
UPFLOW OR DOWNFLOW
This furnace is approved for UPFLOW, DOWNFLOW and HORIZONTAL installations.
Cette fournaise est approuvée pour l´installation HORIZONTALE et la circulation d´air VERS LE HAUT et VERS LE BAS.
Clearance arrows do not change with furnace orientation.
†
†
0"
B
A
R
R
0"
FRONT
A
C
K
I
E
R
E
E
D
S
I
S
E
T
O
C
§
Clearance in inches Dégagement (po).
MIN 1/4" TO 1/2" MAX
FRONT
HORIZONTAL
1"
Les fléches de dégagement
ne change pas avec
l
générateur d´air chaud.
TOP/PLENUM
DESSUS/CHAMBRE D´AIR
E
C
E
A
S
I
N
A
R
U
N
R
F
T
U
N
O
FO
T
R
N
F
A
V
A
L
È
F
R
O
A
N
V
T
A
N
T
3"
BOTTOM
0"
†
DESSOUS
Ø
Vent clearance to combustibles 0".
0 (po) Dégagement
d´évent avec combustibles.
´
orientation de la
S
C
S
N
328066-201 REV. B LIT TOP
§
0"
E
D
S
I
E
T
O
E
R
V
I
T
R
C
E
E
T
I
E
*
N
24
MIN
Fig. 4 -- Return-Air Temperature
Fig. 3 -- Clearances to Combustibles
ELECTROSTATIC DISCHARGE (ESD)
(27º C)
0
UNIT DAMAGE HAZARD
Failure to follow this caution may damage furnace components.
Electrostatic dischar ge can affect electronic components. Take
60
(16º C)
A05004
precautions during furnace installation and servicing to protect the furnace electronic control. Precautions will prevent electrostatic discharges from personnel and hand tools which are held during the procedure. These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace, the control, and the person at the same electrostatic potential.
PRECAUTIONS
!
CAUTION
A04110
-- 7 --
Page 8
3. Disconnect all power to the furnace. Multiple disconnects may be required. DO NOT TOUCH THE CONTROL OR ANY WIRE CONNECTED TO THE CONTROL PRIOR TO DISCHARGING YOUR BODY’S ELECTROSTATIC CHARGE TO GROUND.
4. Firmly touch the clean, unpainted, metal surface of the furnace chassis w hich is close to the control. Tools held in a person’s hand during grounding will be satisfactorily discharged.
5. After touching the chassis, you may proceed to service the control or connecting wires as long as you do nothing to recharge your body with static electricity (for example; DO NOT move or shuffle your feet, do not touch ungrounded objects, etc.).
6. If you touch ungrounded objects (and recharge your body with static electricity), firmly touch a clean, unpainted metal surface of the furnace again before touching control or wires.
7. Use this procedure for installed and uninstalled (ungrounded) furnaces.
8. Before removing a new control from its container, discharge your body’s electrostatic charge to ground to protect the control from damage. If the control is to be installed in a furnace, follow items 1 through 4 before bringing the control or yourself in contact with the furnace. Put all used and new controls into containers before touching ungrounded objects.
9. An ESD service kit (available from commercial sources) mayalsobeusedtopreventESDdamage.
!
CAUTION
MINOR PROPERTY DAMAGE
Failure to follow this caution may result in minor property damage.
Local codes may require a drain pan under entire furnace and condensate trap when a condensing furnace is used in an attic application or over a finished ceiling.
INTRODUCTION
The model 58MEB 4-way multipoise, Gas-Fired, Category IV, condensing furnace is available in model sizes ranging from input capacities of 40,000 to 120,000 Btuh as direct vent (2-pipe) application, and in model sizes ranging from input capacity of 40,000 to 120,000 Btuh as non-direct vent (1-pipe) application.
APPLICATIONS
Step 1—General
Some assembly and modifications are required for furnaces installed in any of the 4 applications shown in Fig. 1. All drain and pressure tubes are connected as shown in Fig. 6. See appropriate application instructions for these procedures.
Step 2—Upflow Applications
An upflow furnace application is where furnace blower is located below combustion and controls section of furnace, and conditioned air is discharged upwards.
CONDENSATE TRAP LOCATION (FACTORY-SHIPPED ORIENTA
The condensate trap is factory installed in the blower shelf and factory connected for UPFLOW applications. A factory-supplied tube is used to extend the condensate trap drain connection to the desired furnace side for field drain attachment. See Condensate Trap Tubing (Factory-Shipped Orientation) section for drain tube extension details. (See Fig. 5.)
CONDENSATE TRAP TUBING (FACTORY-SHIPPED ORIENTA
NOTE: See Fig. 6 or tube routing label on main furnace door to
confirm location of these tubes.
1. Collector Box Drain, Inducer Housing Drain, Relief Port, and Pressure Switch Tubes. These tubes should be factory attached to condensate trap and pressure switch ready for use in UPFLOW applications. These tubes can be identified by their connection location and also by a color label on each tube. These tubes are identified as follows: collector box drain tube (blue label), inducer housing drain tube (violet label or molded), relief port tube (green label), and pressure switch tube (pink label).
2. Condensate Trap Drain Tube The condensate trap drain connection must be extended for field attachment by doing the following:
f. Determine location of field drain connection. (See Fig.
2or6.)
NOTE: If internal filter or side Filter/Media Cabinet is used, drain tube should be located to opposite side of casing from return duct attachment to assist in filter removal.
g. Remove and discard casing drain hole plug button
from desired side.
h. Install drain tube coupling grommet (factory-supplied
in loose parts bag) in selected casing hole.
i. Slide drain tube coupling (factory-supplied in loose
parts bag) through grommet ensuring long end of coupling faces blower.
TION)
TION)
-- 8 --
Page 9
BLOWER SHELF
CONDENSATE TRAP (INSIDE)
ALTERNATE DRAIN TUBE LOCATION
CONDENSATE TRAP
DRAIN TUBE LOCATION
UPFLOW APPLICATIONS
(19mm)
FURNACE DOOR
FIELD
DRAIN
CONN
1
26
4
(667mm)
CONDENSATE TRAP
FURNACE
SIDE VIEW FRONT VIEW END VIEW FRONT VIEW
DOWNFLOW AND ALTERNATE
EXTERNAL UPFLOW APPLICATIONS
SLOT FOR SCREW
HORIZONTAL
APPLICATION
(OPTIONAL)
1
(88mm)
1
2
3
4
1
8
7
7
8
WIRE TIE GUIDES (WHEN USED)
1
3
4
(181mm)
(44mm)
(3mm)
FRONT VIEW SIDE VIEW
Fig. 5 -- Condensate Trap
SIDE
1
(38mm)
1
2
(57mm)
FURNACE DOOR
7
(124mm)
8
4
1
2
1/4” (6mm) COLLECTOR BOX TO TRAP RELIEF PORT
1/2 (13mm) INDUCER HOUSING DRAIN CONNECTION
5/8 (16mm) COLLECTOR BOX DRAIN CONNECTION
SCREW HOLE FOR UPFLOW OR DOWN­FLOW APPLICATIONS (OPTIONAL)
4
1/2 IN. (13mm) PVC OR CPV
(102mm)
FIELD
DRAIN
CONN
4
(667mm)
3
(146mm) (146mm)
5
4
1
26
4
HORIZONTAL
APPLICATIONS
4
(102mm)
(19mm)
FURNACE SIDE
5
3
4
3
4
A07459
j. Cement 2 factory-supplied 1/2-in. (13 mm) street
CPVC elbows to the rigid drain tube connection on the condensate trap. (See Fig. 6.) These elbows must be cemented together and cemented to condensate trap drain connection.
NOTE: Failure to use CPVC elbows may allow drain to kink and prevent draining.
k. Connect larger diameter drain tube and clamp
(factory-supplied in loose parts bag) to condensate trap and clamp securely.
l. Route tube to coupling and cut to appropriate length.
m. Attach tube to coupling and clamp securely.
CONDENSATE TRAP LOCATION (ALTERNATE UPFLOW ORIENTA
An alternate location for the condensate trap is the left-hand side of casing. (See Fig. 2 and 7.)
NOTE: If the alternate left-hand side of casing location is used, the factory-connected drain and relief port tubes must be disconnected and modified for attachment. See Condensate Trap Tubing (Alternate Upflow Orientation) section for tubing attachment.
To relocate condensate trap to the left-hand side, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward and rotating trap.
TION)
3. Install casing hole filler cap (factory-supplied in loose parts bag) into blower shelf hole where trap was removed.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Casing hole filler cap must be installed in blower shelf hole when condensate trap is relocated to prevent combustion products being drawn in from appliances in the equipment room.
4. Install condensate trap into left-hand side casing hole by inserting tube connection stubs through casing hole and rotating until tabs snap into locking position.
5. Fill unused condensate trap casing holes with plastic filler caps (factory-supplied in loose parts bag).
CONDENSATE TRAP TUBING (ALTERNATE UPFLOW ORIENTA
NOTE: See Fig. 7 or tube routing label on main furnace door to
confirm location of these tubes.
1. Collector Box Drain Tube Connect collector box drain tube (blue label) to condensate trap.
NOTE: On 17-1/2 in. (445 mm) wide furnaces ONLY, cut tube between corrugated sections to prevent kinks from occurring.
TION)
-- 9 --
Page 10
PLUG
CAP
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
TUBE (PINK)
PLUG
CAP
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
TUBE (PINK)
COLLECTOR BOX
TUBE (GREEN)
INDUCER HOUSING
(MOLDED) DRAIN
TUBE (BEHIND
COLLECTOR BOX
DRAIN TUBE)
COLLECTOR BOX
DRAIN TUBE (BLUE)
FIELD-INSTALLED
FACTORY-SUPPLIED
DRAIN TUBE
COUPLING (LEFT
DRAIN OPTION)
FIELD-INSTALLED
FACTORY-SUPPLIED
DRAIN TUBE
FIELD-INSTALLED
FACTORY-SUPPLIED
1
/2-IN. CPVC STREET
Fig. 6 -- Factory-Shipped Upflow Tube Configuration
ELBOWS (2) FOR
LEFT DRAIN OPTION
(Shown with Blower Access Panel Removed)
FIELD-INSTALLED
FACTORY-SUPPLIED
COUPLING (RIGHT
CONDENSATE TRAP
DRAIN TUBE
DRAIN OPTION)
A94163
2. Inducer Housing Drain Tube a. Remove and discard LOWER (molded) inducer
housing drain tube which was previously connected to condensate trap.
b. Use inducer housing drain extension tube (violet label
and factory-supplied in loose parts bag) to connect LOWER inducer housing drain connection to the condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube a. Connect relief port tube (green label) to
condensate trap.
b. Extend this tube (if required) by splicing to small
diameter tube (factory-supplied in loose parts bag).
c. Determine appropriate length, cut, and connect tube.
CONDENSATE TRAP FIELD DRAIN ATT
ACHMENT
Refer to Condensate Drain section for recommendations and procedures.
PRESSURE SWITCH TUBING
The LOWER collector box pressure tube (pink label) is factory connected to the pressure switch and should not require any modification.
COLLECTOR BOX
TUBE (GREEN)
COLLECTOR BOX
DRAIN TUBE (BLUE)
CONDENSATE
TRAP
INDUCER
HOUSING
DRAIN TUBE
(VIOLET)
A94164
Fig. 7 -- Alternate Upflow Configuration and Trap Location
NOTE: See Fig. 6 or 7 or tube routing label on main furnace
door to check for proper connections.
UPPER COLLECTOR BOX AND INDUCER HOUSING (UNUSED) DRAIN
Upper Collector Box Drain Connection
Attached to the UPPER collector box drain connection is a factory-installed corrugated, plugged tube (blue and white striped label). This tube is plugged to prevent condensate leakage in this application. Ensure this tube is plugged.
NOTE: See Fig. 6 or 7 or tube routing label on main furnace door to check for proper connections.
Upper Inducer Housing Drain Connection
Attached to the UPPER (unused) inducer housing drain connection is a cap and clamp. This cap is used to prevent condensate leakage in this application. Ensure this connection is capped.
NOTE: See Fig. 6 or 7 or tube routing label on main furnace door to check for proper connections.
CONNECTIONS
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommendations and procedures.
Step 3—Downflow Applications
A downflow furnace application is where furnace blower is located above combustion and controls section of furnace, and conditioned air is discharged downwards.
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed blower shelf location and relocated in selected application location as shown in Fig. 2, 8, or 9.
-- 1 0 --
Page 11
COLLECTOR BOX
DRAIN TUBE (BLUE)
CAP
PLUG
COLLECTOR BOX
TUBE (GREEN)
COLLECTOR BOX
EXTENSION TUBE
COLLECTOR BOX
TUBE (PINK)
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX EXTENSION TUBE
CONDENSATE
TRAP
INDUCER HOUSING
DRAIN TUBE (VIOLET)
PLUG
CAP
COLLECTOR BOX DRAIN TUBE (BLUE)
COLLECTOR BOX TUBE (PINK)
COLLECTOR BOX TUBE (GREEN)
COLLECTOR BOX EXTENSION TUBE
COLLECTOR BOX DRAIN TUBE (BLUE & WHITE STRIPED)
COLLECTOR BOX EXTENSION TUBE
INDUCER HOUSING DRAIN TUBE (VIOLET)
CONDENSATE TRAP
COLLECTOR BOX EXTENSION DRAIN TUBE
DRAIN TUBE COUPLING
A94165
Fig. 8 -- Downflow Tube Configuration
(Left-Hand Trap Installation)
To relocate condensate trap from the blower shelf to desired location, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs
inward and rotating trap.
3. Remove casing hole filler cap from casing hole. (See Fig.
2, 8, or 9.)
4. Install casing hole filler cap into blower shelf hole where
trap was removed.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Casing hole filler cap must be installed in blower shelf hole when condensate trap is relocated to prevent combustion products being drawn in from appliances in the equipment room.
5. Install condensate trap into desired casing hole by
inserting tube connection stubs through casing hole and rotating until tabs snap into locking position.
CONDENSATE TRAP TUBING
NOTE: See Fig. 8 or 9 or tube routing label on main furnace
door to check for proper connections.
Relocate tubes as described below.
1. Collector Box Drain Tube a. Remove factory-installed plug from LOWER collector
box drain tube (blue and white striped label).
A94166
Fig. 9 -- Downflow Tube Configuration
(Right-Hand Trap Installation)
b. Install removed clamp and plug into UPPER collector
box drain tube (blue label) which was connected to condensate trap.
c. Connect LOWER collector box drain connection to
condensate trap.
(3.) Condensate Trap Located on Left Side of Casing
a. Connect LOWER collector box drain tube (blue
and white striped label) to condensate trap. Tube does not need to be cut.
b. Clamp tube to prevent any condensate leakage.
(4.) Condensate Trap Located on Right Side of Casing
a. Install drain tube coupling (factory-supplied in
loose parts bag) into collector box drain tube (blue and white striped label) which was previously plugged.
b. Connect larger diameter drain tube
(factory-supplied in loose parts bag) to drain tube coupling, extending collector box drain tube for connection to condensate trap.
c. Route extended collector box drain tube
directly from collector box drain to condensate
trap as shown in Fig. 9. d. Determine appropriate length and cut. e. Connect to condensate trap.
f. Clamp tube to prevent any condensate leakage.
2. Inducer Housing Drain Tube a. Remove factory-installed cap and clamp from
LOWER inducer housing drain connection.
b. Remove and discard UPPER (molded) inducer
housing drain tube which was previously connected to condensate trap.
-- 1 1 --
Page 12
c. Install cap and clamp on UPPER inducer
housing drain connection where molded drain tube was removed.
d. Use inducer housing drain tube (violet label and
factory-supplied in loose p arts bag) to connect LOWER inducer housing drain connection to the condensate trap.
e. Connect inducer housing drain connection to
condensate trap.
(1.) Condensate Trap Located on Left Side of Casing
a. Determine appropriate length and cut. b. Connect tube to condensate trap. c. Clamp tube to prevent any condensate leakage.
(2.) Condensate Trap Located on Right Side of Casing
a. Route inducer housing drain tube (violet label)
directly from inducer housing to condensate
trap as shown in Fig. 9. b. Determine appropriate length and cut. c. Connect tube to condensate trap. d. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
Refer to Pressure Switch Tubing section for connection procedure.
CONDENSATE TRAP FIELD DRAIN ATT
ACHMENT
Refer to Condensate Drain section for recommendations and procedures.
PRESSURE SWITCH TUBING
One collector box pressure tube (pink label) is factory connected to the pressure switch for use when furnace is installed in UPFLOW applications. This tube MUST be disconnected and used for the condensate trap relief port tube. The other collector box pressure tube (green label) which was factory connected to the condensate trap relief port connection MUST be connected to the pressure switch in DOWNFLOW or HORIZONTAL RIGHT applications.
NOTE: See Fig. 8 or 9 or tube routing label on main furnace door to check for proper connections.
1. Disconnect collector box pressure tube (pink label) attached to pressure switch.
2. Extend collector box pressure tube (green label) which was previously connected to condensate trap relief port connection by splicing to small diameter tube (factory-supplied in loose parts bag).
3. Connect collector box pressure tube (green label) to pressure switch connection labeled COLLECTOR BOX.
4. Extend collector box pressure tube (pink label) which was previously connected to pressure switch by splicing to remaining small diameter tube (factory-supplied in loose parts bag).
5. Route this extended tube (pink label) to condensate trap relief port connection.
6. Determine appropriate length, cut, and connect tube.
7. Clamp tube to relief port connection.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommendations and procedures.
Step 4—Horizontal Left (Supply-Air Discharge) Applications
A horizontal left furnace application is where furnace blower is located to the right of combustion and controls section of furnace, and conditioned air is discharged to the left.
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed blower shelf location and relocated in selected application location as shown in Fig. 2 or 10.
To relocate condensate trap from the blower shelf to desired location, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward and rotating trap.
3. Install casing hole filler cap (factory-supplied in loose parts bag) into blower shelf hole where trap was removed.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Casing hole filler cap must be installed in blower shelf hole when condensate trap is relocated to prevent combustion products being drawn in from appliances in the equipment room.
4. Install condensate trap into left-hand side casing hole by inserting tube connection stubs through casing hole and rotating until tabs snap into locking position.
5. Fill unused condensate trap casing holes with plastic filler caps (factory-supplied in loose parts bag).
CONDENSATE TRAP TUBING
NOTE: See Fig. 10 or tube routing label on main furnace door to
check for proper connections.
1. Collector Box Drain Tube
a. Install drain tube coupling (factory-supplied in loose
parts bag) into collector box drain tube (blue label) which was previously connected to condensate trap.
b. Connect large diameter drain tube and clamp
(factory-supplied in loose parts bag) to drain tube coupling, extending collector box drain tube.
c. Route extended tube (blue label) to condensate trap
and cut to appropriate length.
d. Clamp tube to prevent any condensate leakage.
2. Inducer Housing Drain Tube
a. Remove and discard LOWER (molded) inducer
housing drain tube which was previously connected to condensate trap.
b. Use inducer housing drain extension tube (violet label
and factory-supplied in loose parts bag) to connect LOWER inducer housing drain connection to the condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
a. Extend collector box tube (green label) which was
previously connected to the condensate trap by splicing to small diameter tube (factory-supplied in loose parts bag).
b. Route extended collector box pressure tube to relief
port connection on the condensate trap.
-- 1 2 --
Page 13
AUXILIARY "J" BOX
PLUG
CAP
COLLECTOR BOX DRAIN TUBE (BLUE AND WHITE STRIPED)
CONDENSATE
RELOCATE TUBE BETWEEN BLOWER SHELF AND INDUCER HOUSING FOR
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
TRAP
COLLECTOR
BOX EXTENSION
DRAIN TUBE
COLLECTOR BOX
EXTENSION TUBE
DRAIN TUBE COUPLING
040, 060, AND 080 HEATING INPUT FURNACES
Fig. 10 -- Horizontal Left Tube Configuration
CONDENSATE TRAP FIELD DRAIN ATT
ACHMENTS
Refer to Condensate Drain section for recommendations and procedures.
PRESSURE SWITCH TUBING
The LOWER collector box pressure tube (pink label) is factory connected to the pressure switch for use when furnace is installed in UPFLOW applications. This tube MUST be disconnected, extended, rerouted, and then reconnected to the pressure switch in HORIZONTAL LEFT applications.
NOTE: See Fig. 10 or tube routing label on main furnace door to check for proper connections.
Modify tube as described below.
1. Disconnect collector box pressure tube (pink label) attached to pressure switch.
2. Use smaller diameter tube (factory-supplied in loose parts bag) to extend tube disconnected in item 1.
3. Route extended tube:
a. Behind inducer housing.
b. Between blower shelf and inducer housing.
c. Behind inducer motor bracket.
d. Between inducer motor and pressure switch.
4. Determine appropriate length, cut, and reconnect tube to pressure switch connection labeled COLLECTOR BOX.
COLLECTOR BOX TUBE (PINK)
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommendations and procedures.
CONSTRUCT A WORKING PLATFORM
Construct working platform where all required furnace clearances are met. (See Fig. 3 and 11 or 12.)
!
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent unit operation.
The condensate trap MUST be installed below furnace. See Fig. 5 for dimensions. The drain connection to condensate trap must also be properly sloped to an open drain.
NOTE: Combustion-air and vent pipes are restricted to a minimum length of 5 ft.(1.5 M) (See Table 11.)
NOTE: A 12-in. (305 mm) minimum offset pipe section is recommended with short (5 to 8 ft. (1.5 to 2.4 M)) vent systems. This recommendation is to reduce excessive condensate droplets from exiting the vent pipe. (See Fig. 11, 12 or 41.)
Step 5—Horizontal Right (Supply-Air Discharge) Applications
A horizontal right furnace application is where furnace blower is located to the left of combustion and controls section of furnace, and conditioned air is discharged to the right.
COLLECTOR BOX TUBE (GREEN)
INDUCER HOUSING DRAIN TUBE (VIOLET)
COLLECTOR BOX DRAIN TUBE (BLUE)
CAUTION
A00215
-- 1 3 --
Page 14
MANUAL
SHUTOFF
GAS VALVE
COMBUSTION - AIR
SEDIMENT TRAP
INTAKE
3
5
/4″
(146 mm)
CONDENSATE TRAP
VENT
30″ (762 mm)MIN WORK AREA
ACCESS OPENING FOR TRAP
DRAIN
A 12-IN. (305 mm) MIN HORIZONTAL PIPE SECTION IS RECOMMENDED WITH SHORT (5 TO 8 FT / 1.5 TO 2.4 M) VENT SYSTEMS TO REDUCE EXCESSIVE CONDENSATE DROPLETS FROM EXITING THE VENT PIPE.
NOTE: LOCAL CODES MAY REQUIRE A DRAIN PAN UNDER THE
FURNACE AND CONDENSATE TRAP WHEN A CONDENSING FURNACE IS INSTALLED ABOVE FINISHED CEILINGS.
Fig. 11 -- Attic Location and Working Platform for Direct Vent (2-Pipe) Applications--All Sizes
COMBUSTION AIR
INTAKE
A 3-IN.(76mm) MINIMUM CLEARANCE TO COMBUSTION-AIR INTAKE IS REQUIRED.
3
5
/4 IN. (146mm)
VENT
30-IN. (762mm) MIN WORK AREA
A 12-IN. (305mm) MIN HORIZONTAL PIPE SECTION IS RECOMMENDED WITH SHORT (5 TO 8 FT / 1.5 TO 2.4M) VENT SYSTEMS TO REDUCE EXCESSIVE CONDENSATE DROPLETS FROM EXITING THE VENT PIPE.
A93031
MANUAL
SHUTOFF
GAS VALVE
SEDIMENT TRAP
NOTE: LOCAL CODES MAY REQUIRE A DRAIN PAN UNDER THE
FURNACE AND CONDENSATE TRAP WHEN A CONDENSING FURNACE IS INSTALLED ABOVE FINISHED CEILINGS.
Fig. 12 -- Attic Location and Working Platform for Non-Direct Vent (1-pipe) Applications-Sizes 040 Through 120 Only
CONDENSATE TRAP
-- 1 4 --
DRAIN
ACCESS OPENING FOR TRAP
A96184
Page 15
CAP
PLUG
COLLECTOR BOX DRAIN TUBE
(BLUE AND WHITE STRIPED)
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
EXTENSION TUBE
Fig. 13 -- Horizontal Right Tube Configuration
COLLECTOR BOX DRAIN TUBE (BLUE)
COLLECTOR BOX TUBE (GREEN)
COLLECTOR BOX EXTENSION TUBE
COLLECTOR BOX TUBE (PINK)
AUXILARY “J” BOX RELOCATED HERE
CONDENSATE TRAP
A00214
!
CAUTION
PROPERTY DAMAGE
Failure to follow this caution may result in minor property damage.
Local codes may require a drain pan under entire furnace and condensate trap when a condensing furnace is used in attic application or over a finished ceiling.
NOTE: In Canada, installations shall be in accordance with current NSCNGPIC Installation Codes and/or local codes.
NOTE: The junction box (J-Box) MUST be relocated to opposite side of furnace casing. (See Fig. 13.) See Electrical Connection section for J-Box relocation.
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed blower shelf location and relocated in selected application location as shown in Fig. 2 or 13.
To relocate condensate trap from the blower shelf to desired location, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward and rotating trap.
3. Install casing hole filler cap (factory-supplied in loose parts bag) into blower shelf hole where trap was removed.
4. Install condensate trap into left-hand side casing hole by inserting tube connection stubs through casing hole and rotating until tabs snap into locking position.
5. Fill unused condensate trap casing holes with plastic filler caps (factory-supplied in loose parts bag).
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Casing hole filler cap must be installed in blower shelf hole when condensate trap is relocated to prevent combustion products being drawn in from appliances in the equipment room.
CONDENSATE TRAP TUBING
NOTE: See Fig. 13 or tube routing label on main furnace door to
check for proper connections.
1. Collector Box Drain Tube a. Remove factory-installed plug from LOWER collector
box drain tube (blue and white striped label).
b. Install removed clamp and plug into UPPER collector
box drain tube (blue label) which was previously connected to condensate trap.
c. Connect LOWER collector box drain tube (blue and
white striped label) to condensate trap. Tube does not need to be cut.
d. Clamp tube to prevent any condensate leakage.
2. Inducer Housing Drain Tube a. Remove factory-installed cap and clamp from LOWER
inducer housing drain connection.
b. Remove and discard UPPER (molded) inducer housing
drain tube which was previously connected to condensate trap.
c. Install cap and clamp on UPPER inducer housing drain
connection where molded drain tube was removed.
d. Use inducer housing drain extension tube (violet label
and factory-supplied in loose parts bag) to connect
-- 1 5 --
Page 16
LOWER inducer housing drain connection to condensate trap.
e. Determine appropriate length, cut, and connect tube to
condensate trap.
f. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube Refer to Pressure Switch Tubing section for connection procedure.
CONDENSATE TRAP FIELD DRAIN ATT
ACHMENT
Refer to Condensate Drain section for recommendations and procedures.
PRESSURE SWITCH TUBING
One collector box pressure tube (pink label) is factory connected to the pressure switch for use when furnace is installed in UPFLOW applications. This tube MUST be disconnected and used for the condensate trap relief port tube. The other collector box pressure tube (green label) which was factory connected to the condensate trap relief port connection MUST be connected to the pressure switch in DOWNFLOW or HORIZONTAL RIGHT applications.
NOTE: See Fig. 13 or tube routing label on main furnace door to check for proper connections. Relocate tubes as described below.
1. Disconnect collector box pressure tube (pink label) attached to pressure switch.
2. Extend collector box pressure tube (green label) which was previously connected to condensate trap relief port connection by splicing to small diameter tube (factory-supplied in loose parts bag).
3. Route extended collector box pressure tube behind inducer motor bracket then between inducer motor and pressure switch.
4. Connect collector box pressure tube (green label) to pressure switch connection labeled COLLECTOR BOX.
5. Use remaining smaller diameter tube (factory-supplied in loose parts bag) to extend collector box pressure tube (pink label) which was previously connected to pressure switch.
6. Route this extended tube (pink label) to condensate trap relief port connection.
7. Determine appropriate length, cut, and connect tube.
8. Clamp tube to relief port connection.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommendations and procedures.
CONSTRUCT A WORKING PLATFORM
Construct working platform where all required furnace clearances are met. (See Fig. 3 and 11 or 12.)
LEVEL (0”)
TO 1/2” (13mm)
MAX
UPFLOW OR DOWNFLOW
Fig. 14 -- Furnace Location for Proper Condensate Drainage
UNIT OPERATION HAZARD
Failure to follow this caution may result in intermittent unit operation.
The condensate trap MUST be installed below furnace. See Fig. 5 for dimensions. The drain connection to condensate trap must also be properly sloped to an open drain.
NOTE: Vent pipe(s) and combustion-air pipe (when applicable) are restricted to a minimum length of 5 ft.(1.5 M) (See Table 11.)
NOTE: A 12--in. (305 mm) minimum offset pipe section is recommended with short (5 to 8 ft / 1.5 M -- 2.4 M) vent systems. This recommendation is to reduce excessive condensate droplets from exiting the vent pipe. (See Fig. 11, 12 or 41.)
FRONT FRONT
MIN 1/4” (7mm) TO 1/2” (13mm)
!
CAUTION
MAX
HORIZONTAL
A02146
LOCATION
Step 1—General
This furnace must
S be installed so the electrical components are protected
from water.
S not be installed directly on any combustible material other than
wood flooring (refer to SAFETY CONSIDERATIONS).
S be located so combustion-air and vent pipe maximum lengths
are not exceeded. Refer to Table 11.
S be located where available electric power and gas supplies
meet specifications on the furnace rating plate.
S be attached to an air distribution system and be located as close
to the center of the distribution system as possible. Refer to Air Ducts section.
S be provided with ample space for servicing and cleaning.
Always comply with minimum fire protection clearances shown on the furnace clearance-to-combustibles label.
This furnace may be located in a confined space without special provisions for dilution o r ventilation air.
When a furnace is installed so that supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by ducts sealed to furnace casing. The ducts terminate outside the space containing the furnace to ensure there will not be a negative pressure condition within equipment room or space.
NOTE: For upflow/downflow applications install furnace so that it is level or pitched forward within 1/2-in. (13 mm) for proper furnace operation. For horizontal applications pitch 1/4-in.(6 mm) minimum to 1/2-in. (13 mm) maximum forward to ensure proper condensate drainage from secondary heat exchangers. (See Fig.
14.)
-- 1 6 --
Page 17
!
WARNING
!
CAUTION
FIRE, INJURY OR DEATH HAZARD
Failure to follow this warning could result in fire, property damage, personal injury or death.
Do not install furnace on its back. Safety control operation will be adversely affected. Never connect return-air ducts to back of furnace. (See Fig. 15.)
FRONT
B A
C
K
BACK
FRONT
A93043
Fig. 15 -- Installation on Back is Prohibited
UNIT DAMAGE HAZARD
This gas furnace may be used for construction heat provided that:
-The furnace is permanently installed with all electrical wiring, piping, air filters, venting and ducting installed according to these installation instructions. A return air duct is provided, sealed to the furnace casing, and terminated outside the space containing the furnace. This prevents a negative pressure condition as created by the circulating air blower, causing a flame rollout and/or drawing combustion products into the structure.
-The furnace is controlled by a thermostat. It may not be “hot wired” to provide heat continuously to the structure without thermostatic control.
-Clean outside air is provided for combustion. This is to minimize the corrosive effects of adhesives, sealers and other construction materials. It also prevents the entrainment of drywall dust into combustion air, which can cause fouling and plugging of furnace components.
-The temperature of the return air to the furnace is maintained between 55°F(13°C) and 80°F(27°C), with no evening setback or shutdown. The use of the furnace while the structure is under construction is deemed to be intermittent operation per our installation instructions.
-The air temperature rise is within the rated rise range on the furnace rating plate, and the firing rate has been set to the nameplate value.
-The filters used to clean the circulating air during the construction process must be either changed or thoroughly cleaned prior to occupancy.
-The furnace, ductwork and filters are cleaned as necessary to remove drywall dust and construction debris fr om all HV AC system components after construction is completed.
-After construction is complete, verify furnace operating conditions including ignition, input rate, temperature rise and venting, according to the manufacturer’s instructions.
Fig. 16 -- Freeze Protection
A07911
!
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in minor property or unit damage.
If furnace is installed in an unconditioned space where the ambient temperatures may be 32°F(0°C)or lower, freeze protection measures must be taken. (See Fig. 16.)
Step 2—Furnace Location Relative to Cooling Equipment
The cooling coil must be installed parallel with or on downstream side of furnace to avoid condensation in heat exchanger. When installed parallel with a furnace, dampers or other means used to control flow o f air shall be adequate to prevent chilled air from entering furnace. If dampers are manually operated, they must be equipped with a means to prevent operation of either unit, unless damper is in full-heat or full-cool position.
-- 1 7 --
Page 18
Step 3—Hazardous Locations
!
WARNING
FIRE, EXPLOSION, INJURY OR DEATH HAZARD
Failure to follow this warning could result in personal injury, death or property damage.
When furnace is installed in a residential garage, it must be installed so that burners and ignition sources are located a minimum of 18 in. (457 mm) above floor. The furnace must be located or protected to avoid physical damage by vehicles. When furnace is installed in a public garage, airplane hangar, or other building having a hazardous atmosphere, the furnace must be installed in accordance with NFGC or NSCNGPIC. (See Fig. 17.)
Step 4—Furnace Location and Application
DIRECT VENT (2-PIPE) APPLICATION
Furnace may be located in a confined space without special provisions for dilution o r ventilation air.
18-IN. (457.2 mm)
MINIMUM TO BURNERS
A93044
Fig. 17 -- Installation in a Garage
NON-DIRECT VENT (1-PIPE) APPLICATION
!
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in intermittent unit operation.
Do not install furnace in a corrosive or contaminated atmosphere. Make sure all combustion and circulating air requirements are met.
Refer to the AIR FOR COMBUSTION AND VENTILATION section for details.
AIR FOR COMBUSTION AND
VENTILATION
Provisions for adequate combustion, ventilation, and dilution air must be provided in accordance with:
S U.S. Installations: Section 9.3 NFPA 54/ANSI Z223.1----2006,
Air for Combustion and Ventilation and applicable provisions
of the local building codes.
S Canadian Installations: Part 8 of CAN/CS-- --B149.1----05,
Venting Systems and Air Supply for Appliances and all
authorities having jurisdiction.
!
WARNING
FURNACE CORROSION HAZARD
Failure to follow this warning could result in reduced furnace component life.
Air for combustion must not be contaminated by halogen compounds, which include fluoride, chloride, bromide, and iodide. These elements could corrode heat exchangers and shorten furnace life. Air contaminants are found in aerosol sprays, detergents, bleaches, cleaning solvents, salts, air fresheners, and other household products.
The following types of furnace installations may require OUTDOOR AIR for combustion due to chemical exposures:
S Commercial buildings S Buildings with indoor pools S Laundry rooms S Hobby or craft rooms, and S Chemical storage areas
If air is exposed to the following substances, it should not be used for combustion air, and outdoor air may be required for combustion:
S Permanent wave solutions S Chlorinated waxes and cleaners S Chlorine based swimming pool chemicals S Water softening chemicals S De-icing salts or chemicals S Carbon tetrachloride S Halogen type refrigerants S Cleaning solvents (such as perchloroethylene) S Printing inks, paint removers, varnishes, etc. S Hydrochloric acid S Cements and glues S Antistatic fabric softeners for clothes dryers S Masonry acid washing materials
All fuel-burning equipment must be supplied with air for fuel combustion. Sufficient air must be provided to avoid negative pressure in the equipment room or space. A positive seal must be made between the furnace cabinet and th e return-air duct to prevent pulling air from the burner area and from draft safeguard opening.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
The operation of exhaust fans, kitchen ventilation fans, clothes dryers, attic exhaust fans or fireplaces could create a NEGATIVE PRESSURE CONDITION at the furnace. Make-up air MUST be provided for the ventilation devices, in addition to that required by the furnace. Refer to the Carbon Monoxide Poisoning Hazard warning in the venting section of these instructions to determine if an adequate amount of make-up air is available.
The requirements for combustion and ventilation air depend upon whether or not the furnace is located in a space having a volume of at least 50 cubic feet per 1,000 Btuh input rating for all gas appliances installed in the space.
S Spaces having less than 50 cubic feet per 1,000 Btuh require
the OUTDOOR COMBUSTION AIR METHOD.
-- 1 8 --
Page 19
S Spaces having at least 50 cubic feet per 1,000 Btuh may use
the INDOOR COMBUSTION AIR, STANDARD or
KNOWN AIR INFILTRATION METHOD.
Outdoor Combustion Air Method
1. Provide the space with sufficient air for proper combustion, ventilation, and dilution of flue gases using permanent horizontal or vertical duct(s) or opening(s) directly communicating with the outdoors or spaces that freely communicate with the outdoors.
2. Fig. 18 illustrates how to provide TWO OUTDOOR OPENINGS, one inlet and one outlet combustion and ventilation air openings to the outdoors.
a. One opening MUST commence within 12” (300 mm)
of the ceiling and the second opening MUST commence within 12” (300 mm) of the floor.
b. Size openings and ducts per Fig. 1 8 and Table 1.
c. TWO HORIZONTAL DUCTS require 1 square inch of
free area per 2,000 Btuh (1,100 mm
2
/kW) of combined input for all gas appliances in the space per Fig. 18 and Tab le 1.
d. TWO OPENINGS OR VERTICAL DUCTS require 1
square inch of free area per 4,000 Btuh (550 mm
2
/kW)
Indoor Combustion Air Standard and Known-Air-Infiltration Rate Methods Indoor combustion air is permitted for combustion, ventilation,
and dilution, if the Standard or Known-Air-Infiltration Rate Method is used.
for combined input of all gas appliances in the space per Fig. 18 and Table 1.
3. ONE OUTDOOR OPENING requires: a. 1 square inch of free area per 3,000 Btuh
(734 mm
2
/kW) for combined input of all gas
appliances in the space per Table 1 and
b. Not less than the sum of the areas of all vent
connectors in the space. The opening shall commence within 12” (300 mm) of the ceiling. Appliances in the space shall have clearances of at least 1” (25 mm) from the sides and back and 6” (150 mm) from the front. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces (crawl or attic) that freely communicate with the outdoors.
©
NFPA & AGA
Tab l e 1 – Minimum Free Area Required for Each Combustion Air Opening or Duct to Outdoors
TWO HORIZONTAL DUCTS
(1 SQ. IN./2,000 BTUH)
D u c t ---
(1,100 SQ.
MM/KW)
Round Duct In. (mm) Dia
FURNACE
INPUT
(BTUH)
40,000 20 (12903) 6 (152) 13.4 (8645) 5 (127) 10 (6451) 4 (102) 60,000 30 (19354) 7 (178) 20 (12903) 6 (152) 15 (9677) 5 (127)
80,000 40 (25806) 8 (203) 26.7 (17225) 6 (152) 20 (12903) 6 (152) 100,000 50 (32258) 8 (203) 33.4 (21548) 7 (178) 25 (16129) 6 (152) 120,000 60 (38709) 9 (229) 40 (25806) 8 (203) 30 (19354) 7 (178)
Free Area of
Opening and
Sq. In (Sq. mm)
SINGLE DUCT OR OPENING
(1 SQ. IN./3,000 BTUH)
(734 SQ. MM/KW)
Free Area of
Opening and
D u c t ---
Sq. In (Sq. mm)
Round Duct ---
In. (mm) Dia
TWO OPENINGS OR
VERTICAL DUCTS
(1 SQ. IN./4,000 BTUH)
(550 SQ. MM/KW)
Free Area of
Opening and
D u c t ---
Sq. In (mm)
Round Duct ---
In. (mm) Dia
EXAMPLES: Determining Free Area
FURNACE WATER HEATER TOTAL INPUT
100,000 + 40,000 = (140,000 divided by 4,000) = 35.0 Sq. In. for each two Vertical Ducts or Openings
60,000 + 40,000 = (100,000 divided by 3,000) = 33.4 Sq. In. for a Single Duct or Opening 80,000 + 30,000 = (110,000 divided by 2,000) = 55.0 Sq. In. for each of two Horizontal Ducts
Tab l e 2 – Minimum Space Volumes for 100% Combustion, Ventilation and Dilution Air from Outdoors
OTHER THAN FAN-ASSISTED TOTAL
(1,000’S BTUH GAS INPUT RATE)
ACH
0.60
0.50
0.40
0.30
0.20
0.10
0.00 NP NP NP NP NP NP NP NP NP
30 40 50 44 66 88 110 132 154
SpaceVolumeFt3(M3)
1,050 (29.7)
1,260 (35.6)
1,575 (44.5)
2,100 (59.4)
3,150 (89.1)
6,300
(178.3)
1,400
(39.6)
1,680
(47.5)
2,100
(59.4)
2,800
(79.2)
4,200
(118.9)
8,400
(237.8)
1,750
(49.5)
2,100
(59.4)
2,625
(74.3)
3,500
(99.1)
5,250
(148.6)
10,500 (297.3)
1,100
(31.1)
1,320
(37.3)
1,650
(46.7)
2,200
(62.2)
3,300
(93.4)
6,600
(186.8)
1,650 (46.7)
1,980 (56.0)
2,475 (70.0)
3,300 (93.4)
4,950
(140.1)
9,900
(280.3)
FAN-ASSISTED TOTAL
(1,000’S BTUH GAS INPUT RATE)
2,200 (62.2)
2,640 (74.7)
3,300 (93.4)
4,400
(124.5)
6,600
(186.8)
13,200 (373.7)
2,750 (77.8)
3,300 (93.4)
4,125
(116.8)
5,500
(155.7)
8,250
(233.6)
16,500 (467.2)
3,300 (93.4)
3,960
(112.1)
4,950
(140.1)
6,600
(186.8)
9,900
(280.3)
19,800 (560.6)
3,850
(109.0)
4,620
(130.8)
5,775
(163.5)
7,700
(218.0)
11,550 (327.0)
23,100 (654.1)
-- 1 9 --
Page 20
1 SQ IN.
DUCTS
TO
O UTDOORS
(305mm)
12 ″ MAX
1 SQ IN. PER 2000 BTUH*
DUCT S
TO
OUTDOORS
1 SQ IN. PER 2000 BTUH*
(305mm)
12 ″ MAX
CIRCULA TING AIR DUCT S
*Minimum dimensions of 3 in. (76 mm).
NOTE: Use any of the following combinations of openings:
A&BC&DD&EF&G
B
AIR DUCTS
C IRCULA TING
A
OF COMB USTION AIR
CLEARANCE IN FRONT
D
VENT THR OUGH R OOF
(76mm)
AT LEAST 3 IN .
OPENINGS SHALL BE
C
DUCT
TO
OUTDOORS
PER 4000 BTUH*
E
12 ″ MAX
(305mm)
1 SQ IN. PER 4000 BTUH*
F
G
12 ″ MAX
1 SQ IN .
PER 4000
BTUH*
1 SQ IN .
PER
4000
BTUH*
12 ″ MAX
Fig. 18 -- Air for Combustion, Ventilation, and Dilution
for Outdoors
(305mm)
OUTDOORS
(305mm)
A03174
CIRCULATING AIR
DUCTS
INTERIOR
HEATED
SPACE
CIRCULATING AIR DUCTS
* Minimum opening size is 100 sq in. with minimum dimensions of 3 in. (76 mm) † Minimum of 3 in. (76 mm) when type-B1 vent is used.
VENT THROUGH ROOF
12" MAX
1 SQ IN. PER 1000 BTUH* IN DOOR OR WALL
UNCONFINED SPACE
(152mm)
6" MIN (FRONT)
1 SQ IN. PER 1000 BTUH* IN DOOR
OPENINGS SHALL BE AT LEAST 3 IN.
OR WALL
CLEARANCE IN FRONT OF COMBUSTION AIR
12" MA X
(305mm)
Ü
(305mm)
Fig. 19 -- Air for Combustion, Ventilation, and Dilution
from Indoors
A03175
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in death and/or personal injury .
Many homes require air to be supplied from outdoors for furnace combustion, ventilation, and dilution of flue gases. The furnace combustion air supply must be provided in accordance with this instruction manual.
The Standard Method:
1. The space has no less volume than 50 ft3(1.4M3)per 1,000 Btuh of the maximum input ratings for all gas appliances installed in the space and
2. The air infiltration rate is not known to be less than 0.40 air changes per hour (ACH).
The Known Air Infiltration Rate Method shall be used, if the infiltration rate is known to be:
1. Less than 0.40 ACH and
2. Equal to or greater than 0.10 ACH
Infiltration rates greater than 0.60 ACH shall not be used. The minimum required volume of the space varies with the number of ACH and shall be determined per Table 2 or Equations 1 and 2. Determine the minimum required volume for each appliance in the space and add the volumes together to get the total minimum required volume for the space.
Table 2-Minimum Space Volumes were determined by using the following equations from the National Fuel Gas Code ANSI
Z223.1-2006/NFPA54-2006, 9.3.2.2:
1. For other than fan-assisted appliances, such as a draft hood-equipped water heater:
A04002
2. For fan-assisted appliances such as this furnace:
A04003
If: Iother = combined input of all other than fan-assisted appliances
in Btu/hr I
fan= combined input of all fan-assisted appliances in Btu/hr
ACH = air changes per hour (ACH shall not exceed 0.60.) The following requirements apply to the Standard Method and to
the Known Air Infiltration Rate Method.
1. Adjoining rooms can be considered part of a space if: a. There are no closeable doors between rooms.
b. Combining spaces on same floor level. Each opening
shall have free area of at least 1 in.2/1,000 Btuh (2,000 mm2/kW) of the total input rating of all gas appliances in the space, but not less than 100 in.
2
(0.06 m2). One opening shall commence within 12 in. (300 mm) of the ceiling and the second opening shall commence within 12 in. (300 mm) of the floor. The minimum dimension of air openings shall be at least 3 in. (80 mm). (See Fig. 19.)
c. Combining space on different floor levels. The
volumes of spaces on different floor levels shall be considered as communicating spaces if connected by one or more permanent openings in doors or floors having free area of at least 2 in. (4,400 mm
2
/kW) of total input rating o f all
2
/1,000 Btuh
gas appliances.
-- 2 0 --
Page 21
2. An attic or crawlspace may be considered a space that freely communicates with the outdoors provided there are adequate permanent ventilation openings directly to outdoors having free area of at least 1-in.
2
/4,000 (645.1mm2/1.17KWh Btuh of total input rating for all gas appliances in the s pace.
3. In spaces that use the Indoor Combustion Air Method, infiltration should be adequate to provide air for combustion, permanent ventilation and dilution of flue gases. However, in buildings with unusually tight construction, additional air MUST be provided using the methods described in the Outdoor Combustion Air Method section. Unusually tight construction is defined as Construction with:
a. Walls and ceilings exposed to the outdoors have a
continuous, sealed vapor barrier. Openings are gasketed or sealed and
b. Doors and openable windows are weatherstripped and
c. Other openings are caulked or sealed. These include
joints around window and door frames, between sole plates and floors, between wall-ceiling joints, between wall panels, at penetrations for plumbing, electrical and gas lines, etc.
NOTE: In determining the free area of an opening, the blocking effect of the louvers, grilles, and screens must be considered. If the free area of a louver or grille design is unknown, it may be assumed that wood louvers have a 20 p ercent free area, and metal louvers or grilles have a 60 percent free area. Screens, when used, must not be smaller than 1/4-in. (6 mm) mesh. Louvers and grilles must be constructed so they cannot be closed.
When combustion air ducts are used, they must be of the same cross sectional area as the free area of the openings to which they connect. The minimum dimension of ducts must not be less than 3in.(76mm).
5/
16″
(8mm)
(8mm)
5/
16″
1 3/ 4″
(44mm)
3
/ 4″
1
(44mm)
(8mm)
5
/ 16″
(8mm)
5/
16″
A89014
(44mm)
(44mm)
3/
1
4″
1 3/ 4″
Fig. 20 -- Leveling Legs
b. Outdoor opening size reduction Factor is 1 minus the
Ratio in a. above.
c. Minimum size of Outdoor openings shall be the size
required in Outdoor Combustion Air Method above multiplied by reduction Factor in b. above. The minimum dimension of air openings shall be not less than 3 in. (76 mm).
INSTALLATION
Step 1—Leveling Legs (If Desired)
When furnace is used in upflow position with side inlet(s), leveling legs may be desired. (See Fig. 20.) Install field-supplied, corrosion-resistant 5/16-in. (8 mm) machine bolts and nuts.
NOTE: The maximum length of bolt should not exceed 1-1/2 in. (38 mm).
1. Position furnace on its back. Locate and drill a 5/16–in.(8 mm) diameter hole in each bottom corner of furnace. (See Fig. 20.) Holes in bottom closure panel may be used as guide locations.
2. For each hole, install nut on bolt and then install bolt and nut in hole. (Install flat washer if desired.)
3. Install another nut on other side of furnace base. (Install flat washer if desired.)
4. Adjust outside nut to provide desired height, and tighten inside nut to secure arrangement.
NOTE: Bottom closure must be used when leveling legs are used. See Bottom Closure Panel section.
Step 2—Installation in Upflow and Downflow Applications
NOTE: For downflow applications, this furnace is approved for
use on combustible flooring when special base (available from manufacturer) Part No. KGASB0201ALL is used. Special base is not required when this furnace is installed o n manufacturer’s Coil Assembly Part No. CAP, CAR, CNPV, CNRV, or Coil Box Part No. KCAKC is used.
1. Determine application being installed from Table 3.
2. Construct hole in floor per dimensions specified in Table 3 and Fig. 21.
3. Construct plenum to dimensions specified in Table 3 and Fig. 21.
4. If downflow subbase (KGASB) is used, install as shown in Fig. 22. If Coil Assembly Part No. CAP, CAR, CNPV, CNRV or Coil Box Part No. KCAKC is used, install as shown in Fig. 23.
NOTE: Remove furnace perforated, discharge duct flanges when they interfere with mating flanges on coil on downflow subbase. To remove furnace perforated, discharge duct flange, use wide duct pliers or duct flange tool or hand seamers to bend flange back and forth until it breaks off. Be careful of sharp edges. (See Fig. 24.)
!
CAUTION
Combination of Indoor and Outdoor Air
1. Indoor openings shall comply with the Indoor Combustion Air Method below and,
2. Outdoor openings shall be located as required in the Outdoor Combustion Air Method mentioned previously and,
3. Outdoor openings shall be sized as follows:
a. Calculate the Ratio of all Indoor Space volume divided
by required volume for Indoor Combustion Air Method below.
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent unit operation.
Do not bend duct flanges inward as shown in Fig. 24. This will affect airflow across heat exchangers and may cause limit cycling or premature heat exchanger failure. Remove duct flange completely or bend it inward a minimum of 210° as shown in Fig. 24.
-- 2 1 --
Page 22
Step 3—Installation in Horizontal Applications
!
CAUTION
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent unit operation.
The entire length of furnace MUST be supported when furnace is used in a horizontal position to ensure proper draining. When suspended, bottom brace supports sides and center blower shelf. When unit is supported from the ground, blocks or pad should support sides and center blower shelf area.
These furnaces can be installed horizontally in either horizontal left or right discharge position. In a crawlspace, furnace can either be hung from floor joist or installed on suitable blocks or pad. Furnace can be suspended from each corner by hanger bolts and angle iron supports. (See Fig. 25.) Cut hanger bolts (4 each 3/8-in. all-thread rod) to desired length. Use 1 X 3/8-in. flat washers, 3/8-in. lock washers, and 3/8-in. nuts on hanger rods as shown in Fig. 25. Dimples are provided for hole locations. (See Fig. 2.)
A
PLENUM
OPENING
B
FLOOR
OPENING
C
D
FURNACE
(OR COIL CASING
WHEN USED)
COMBUSTIBLE
FLOORING
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
FLOOR
OPENING
Fig. 22 -- Furnace, Plenum, and Subbase
Installed on a Combustible Floor
FURNACE
CD5 OR CK5
COIL ASSEMBLY
OR KCAKC
COIL BOX
COMBUSTIBLE
FLOORING
A96285
Fig. 21 -- Floor and Plenum Opening Dimensions
A96283
SHEET METAL
PLENUM
FLOOR
OPENING
A96284
Fig. 23 -- Furnace, Plenum, and Coil Assembly or Coil Box
Installed on a Combustible Floor
-- 2 2 --
Page 23
Tab l e 3 – Opening Dimensions --- In. (mm)
FURNAC
E
CASING
WIDTH
17-1/2
(445)
21
(533)
24-1/2
(622)
Downflow Applications on Non-Combustible Flooring 15-7/8 (403) 19 (483) 16-1/2 (419) 19-5/8 (498)
Downflow Applications on Combustible Flooring Using KGASB Subbase
Furnace with or without CAP, CAR, CNPV, CNRV Coil Assembly or KCAKC
Downflow Applications on Combustible Flooring NOT Using KGASB
Subbase Furnace with CAP, CAR, CNPV, CNRV Coil Assembly or KCAKC Coil
Downflow Applications on Non-Combustible Flooring 19-3/8 (492) 19 (483) 20 (508) 19-5/8 (498)
Downflow Applications on Combustible Flooring Using KGASB Subbase
Furnace with or without CAP, CAR, CNPV, CNRV Coil Assembly or KCAKC
Downflow Applications on Combustible Flooring NOT Using KGASB
Subbase Furnace with CAP, CAR, CNPV, CNRV Coil Assembly or KCAKC Coil
Downflow Applications on Non-Combustible Flooring 22-7/8 (581) 19 (483) 23-1/2 (597) 19-5/8 (498)
Downflow Applications on Combustible Flooring Using KGASB Subbase
Furnace with or without CAP, CAR, CNPV, CNRV Coil Assembly or KCAKC
Downflow Applications on Combustible Flooring NOT Using KGASB
Subbase Furnace with CAP, CAR, CNPV, CNRV Coil Assembly or KCAKC Coil
PERFORATED DISCHARGE DUCT FLANGE
APPLICATION
Upflow Applications 16 (406) 24-1/8 (613) 16-5/8 (422) 24-3/4 (629)
Coil Box
Box
Upflow Applications 19-1/2 (495) 24-1/8 (613) 20-1/8 (511) 24-3/4 (629)
Coil Box
Box
Upflow Applications 23 (584) 24-1/8 (613) 23-5/8 (600) 24-3/4 (629)
Coil Box
Box
NO
YES
210 DEG.
MIN
YES
A93029
Fig. 24 -- Duct Flanges
Step 4—Air Ducts
GENERAL REQUIREMENTS
The duct system should be designed and sized according to accepted national standards such as those published by: Air Conditioning Contractors Association (ACCA), Sheet Metal and Air Conditioning Contractors National Association (SMACNA) or American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) or consult The Air Systems Design Guidelines reference tables available from your local distributor. The duct system should be sized to handle the required system design CFM at the design static pressure.
When a furnace is installed so that the supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by a duct(s) sealed to the furnace casing and terminating outside the space containing the furnace.
PLENUM OPENING FLOOR OPENING
A B C D
15-1/8 (384) 19 (483) 16-3/4 (425) 20-3/8 (518)
15-1/2 (394) 19 (483) 16-1/2 (419) 20 (508)
18-5/8 (473) 19 (483) 20-1/4 (514) 20-3/8 (518)
19 (483) 19 (483) 20 (508) 20 (508)
22-1/8 (562) 19 (483) 23-3/4 (603) 20-3/8 (518)
22-1/2 (572) 19 (483) 23-1/2 (597) 20 (508)
Secure ductwork with proper fasteners for type of ductwork used. Seal supply-and return-duct connections to furnace with code approved tape or duct sealer.
Flexible connections should be used between ductwork and furnace to prevent transmission of vibration. Ductwork passing through unconditioned space should be insulated to enhance system performance. When air conditioning is used, a vapor barrier is recommended.
Maintain a 1-in.(25 mm) clearance from combustible materials to supply air ductwork for a distance of 36-in. (914 mm) horizontally from the furnace. See NFPA 90B or local code for further requirements.
For a furnace not equipped with a cooling coil, the outlet duct shall be provided with a removable access panel. This opening shall be accessible when the furnace is installed and shall be of such a size that the heat exchanger can be viewed for possible openings using light assistance or a probe can be inserted for sampling the air stream. The cover attachment shall prevent leaks.
DUCTWORK ACOUSTICAL TREATMENT
Metal duct systems that do not have a 90 degree elbow and 10 ft (3.0 M) of main duct to the first branch take-off may require internal acoustical lining. As an alternative, fibrous ductwork may be used if constructed and installed in accordance with the latest edition of SMACNA construction 18 standard on fibrous glass ducts. Both acoustical lining and fibrous ductwork shall comply with NFPA 90B as tested by UL Standard 181 for Class 1 Rigid air ducts.
SUPPLY AIR CONNECTIONS
Upflow Furnaces
Connect supply-air duct to 3/4-in. (19 mm) flange on furnace supply-air outlet. The supply-air duct attachment must be connected to ONLY furnace supply-/outlet-air duct flanges or air conditioning coil casing (when used). DO NOT cut main furnace casing to attach supply side air duct, humidifier, or other accessories. All accessories MUST be connected external to furnace main casing.
-- 2 3 --
Page 24
3-IN. (76 mm) MINIMUM CLEARANCE TO COMBUSTION-AIR INTAKE IS REQUIRED (NON-DIRECT VENT/1-PIPE APPLICATION,)
COMBUSTION-AIR INTAKE (NON-DIRECT VENT/1-PIPE APPLICATION)
COMBUSTION-AIR PIPE (DIRECT VENT/2-PIPE APPLICATION,ALL SIZES)
VENT
3
/
-IN. (10 mm) ROD
8
ANGLE IRON OR EQUIVALENT
(B)
(A) ROD LOCATION
USING DIMPLE LOCATORS (SEE DIMENSIONAL DWG FOR LOCATIONS)
(A) PREFERRED ROD LOCATION
(B) ALTERNATE ROD LOCATION
(B)
(A)
3
/8-IN. HEX NUT
& WASHER (4)
REQD PER ROD
(A)
NOTES:
1. A 1-in. (25.4 mm) clearance minimum between top of furnace and combustible material.
2. The entire length of furnace must be supported when furnace is used in horizontal position to ensure proper drainage.
3. For non-direct vent/1-pipe application, bottom side combustion-air entry cannot be used when furnace is installed with hangers as shown.
5
(B)
3
/4″
DRAIN
(146 mm)
(A)
(B)
13
/16-IN. (21 mm) MAX ALTERNATE SUPPORT LOCATION FROM BACK
ALTERNATE SUPPORT LOCATION 4-IN. (102 mm) MIN 8-IN. (203 mm) MAX
Fig. 25 -- Crawlspace Horizontal Application for Direct Vent/2-Pipe Installation and for
Non-Direct Vent/1-Pipe Installation
A05054
Downflow Furnaces
Connect supply-air duct to supply-air opening on furnace. The supply-air duct attachment must be connected to ONLY furnace supply/outlet or air conditioning coil casing (when used), when installed on non-combustible material. When installed on combustible material, supply-air duct attachment must be connected to ONLY an accessory subbase or factory approved air conditioning coil casing. DO NOT cut main furnace casing to attach supply side air duct, humidifier, or other accessories. All accessories MUST be connected external to furnace main casing. Supply air opening duct flanges must be modified per Fig. 24.
Horizontal Furnaces
Connect supply-air duct to supply air opening on furnace. The supply-air duct attachment must be connected to ONLY furnace supply/outlet or air conditioning coil casing (when used). DO NOT cut main furnace casing to attach supply side air duct, humidifier, or other accessories. A ll accessories MUST be connected external to furnace main casing.
RETURN AIR CONNECTIONS
The furnace and its return air system shall be designed and installed so that negative pressure created by the air circulating fan cannot affect another appliance’s combustion air supply or act to mix products of combustion with circulating air. The air circulating fan of the furnace, if installed in an enclosure
communicating with another fuel-burning appliance not of the direct-vent type, shall be operable only when any door or panel covering an opening in the furnace fan compartment or in a return air plenum on ducts is in the closed position.
Upflow Furnaces
The return-air duct must be connected to bottom, sides (left or right), or a combination of bottom and side(s) of main furnace casing as shown in Fig. 2. Bypass humidifier may be attached into unused side return air portion of the furnace casing. DO NOT connect any portion of return-air duct to back of furnace casing.
!
WARNING
FIRE HAZARD
A failure to follow this warning could result in personal injury, death, or property damage.
Never connect return-air ducts to the back of the furnace. Return-air duct connections on furnace side(s) permitted in upflow applications only.
Downflow and Horizontal Furnaces
The return-air duct must be connected to end inlet opening provided as shown in Fig. 2. DO NOT cut into casing sides or
-- 2 4 --
Page 25
back to attach any portion of return-air duct. Bypass humidifier
R
connections should be made at ductwork or coil casing sides exterior to furnace.
Step 5—Filter Arrangement
!
WARNING
FIRE, CARBON MONOXIDE AND POISONING HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
Never operate furnace without a filter or with filter access door removed.
The air filter arrangement will vary due to application, furnace orientation, and filter type. The filter may be installed in an external Filter/Media cabinet (if provided) or the furnace blower compartment. Factory supplied washable filters are shipped in the blower compartment.
If a factory-supplied external Filter/Media cabinet is provided, instructions for its application, assembly, and installation are packaged with the cabinet. The Filter/Media cabinet can be used with the factory-supplied washable filter or a factory-specified high-efficiency disposable filter (see cabinet instructions).
Tab l e 4 – Filter Information
AIR FILTER LOCATED IN BLOWER COMPARTMENT
FURNACE
CASING W I D T H ---
IN (mm)
17–1/2
(445)
21 (533)
24–1/2
(622)
* Factory-provided with the furnace. Filters may be field modified by cutting filter material and support rods (3) in filters. Alternate sizes and additional filters can be ordered from your distributor or dealer.
† Upflow only. Alternate sizes and additional filters may be ordered from your dealer.
If installing the filter in the furnace blower compartment, determine location for filter and relocate filter retaining wire, if necessary. See Table 4 to determine correct filter size for desired filter location. Table 4 indicates filter size, location, and quantity shipped with this furnace. See Fig. 2 for location and size of bottom and side return-air openings.
F I L T E R S I Z E --- I N ( m m )
Side Return†* Bottom Return*
(1) 16 X 25 X 1
(406 X 635 X 25)
(1) 16 X 25 X 1
(406 X 635 X 25)
(1 or 2) 16 X 25 X 1
(406 X 635 X 25)
WASHABLE
FILTER
(1) 16 X 25 X 1
(406 X 635 X 25)
1) 20 X 25 X 1
(508 X 635 X 25)
(1) 24 X 25 X 1
(610 X 635 X 25)
FILTER
TYPE
Cleanable
Cleanable
Cleanable
FILTER RETAINE
!
CAUTION
CUT HAZARD
Failure to follow this caution may result in personal injury.
Use care when cutting support rods in filters to protect against flying pieces and sharp rod ends. Wear safety glasses, gloves, and appropriate protective clothing.
!
CAUTION
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent unit operation.
For airflow requirements above 1800 CFM, see Air Delivery table in Product Data literature for specific use of single side inlets. The use of both side inlets, a combination of 1 side and the bottom, or the bottom only will ensure adequate return air openings for airflow requirements above 1800 CFM.
NOTE: Side return-air openings can ONLY be used in UPFLOW configurations. Install filter(s) as shown in Fig. 26.
Bottom return-air opening may be used with all 4 orientations. Filter may need to be cut to fit some furnace widths. Install filter as shown in Fig. 27.
NOTE: Remove and discard bottom closure panel when bottom inlet is used.
Step 6—Bottom Closure Panel
These furnaces are shipped with bottom enclosure panel installed in bottom return-air opening. This panel MUST be in place when side return air is used.
To remove bottom closure panel, perform following:
1. Tilt or raise furnace and remove 2 screws holding front filler panel. (See Fig. 28.)
2. Rotate front filler panel downward to release holding tabs.
3. Remove bottom closure panel.
4. Reinstall front filler panel and screws.
Step 7—Gas Piping
Gas piping must be installed in accordance with national and local codes. Refer to current edition of NFGC in the United States. Canadian installations must be made in accordance with NSCNGPIC and all authorities having jurisdiction.
Gas supply line should be a separate line running directly from meter to furnace, if possible. Refer to Table 5 for recommended gas pipe sizing. Risers must be used to connect to furnace and to meter. Support all gas piping with appropriate straps, hangers, etc. Use a minimum of 1 hanger every 6 ft (1.8 M). Joint compound (pipe dope) should be applied sparingly and only to male threads of joints. Pipe dope must be resistant to propane gas.
Fig. 26 -- Filter Installed for Side Inlet
A93045
-- 2 5 --
Page 26
171⁄2-IN. (444mm) WIDE CASINGS ONLY:
INSTALL FIELD-SUPPLIED FILTER FILLER STRIP UNDER FILTER.
3″
(76mm)
1
24
(533mm)
/2″
1″
(25.4mm)
FILTER SUPPORT
21-IN. (533mm) WIDE CASINGS ONLY:
SUPPORT RODS (3) EXTEND 1/4" (6mm) ON EACH SIDE OF FILTER AND REST ON CASING FLANGE
FILTER RETAINER
Fig. 27 -- Bottom Filter Arrangement
WASHABLE FILTER
A00290
Tab l e 5 – Maximum Capacity of Pipe*
NOMINAL
IRON PIPE
SIZE
IN. (MM)
1/2 (12.7)
3/4 (19.0)
1 (25.4)
1-1/4
(31.8)
1-1/2
(38.1)
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14--- in. wc) or less and a pressure drop of 0.5 --- in wc (based on a 0.60 specific gravity gas). Ref: Ta b l e 9 . 2 N F G C .
INTERNAL
DIA.
IN. (MM)
0.622 (158)
0.824
(20.9)
1.049 (26.6)
1.380 (35.0)
1.610 (40.9)
!
(3.0)20(6.0)30(9.1)40(12.1)50(15.2)
175 120 97 82 73
360 250 200 170 151
680 465 375 320 285
1400 950 770 660 580
2100 1460 1180 990 900
WARNING
LENGTH OF PIPE --- FT (M)
10
FIRE OR EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
-Connect gas pipe to furnace using a backup wrench to avoid damaging gas controls.
-Gas valve shutoff switch MUST be facing forward or tilted upward.
-Never purge a gas line into a combustion chamber. Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections.
-Use proper length of pipe to avoid stress on gas control manifold.
-If a flexible connector is required or allowed by authority having jurisdiction, black iron pipe shall be installed at furnace gas valve and extend a minimum of 2 in. (51 mm) outside furnace casing.
-Protect gas valve from water and debris. Gas valve inlet and/or inlet piping must remain capped until gas supply line is permanently installed to protect the valve from moisture and debris. Also, install a sediment trap in the gas supply piping at the inlet to the gas valve.
FRONT FILLER PANEL
Fig. 28 -- Removing Bottom Closure Panel
BOTTOM CLOSURE PAN EL
Install a sediment trap in riser leading to furnace. Trap can be installed by connecting a tee to riser leading to furnace so straight-through section of tee is vertical. Then connect a capped nipple into lower end of tee. Capped nipple should extend below level of gas controls. Place a ground joint union between gas control manifold and manual gas shutoff valve. (See Fig. 29.)
If local codes allow the use of a flexible gas appliance connector, always use a new listed connector. Do not use a connector which has previously served another gas appliance.
A93047
-- 2 6 --
Page 27
!
WARNING
FIRE OR EXPLOSION HAZARD
Failure to follow the warning could result in personal injury, death or property damage.
Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections. A fire or explosion could result causing property damage, personal injury or loss of life.
GAS SUPPLY
MANUAL SHUTOFF VALVE (REQUIRED)
SEDIMENT TRAP
UNION
Gas line grommet (factory-supplied loose parts bag) should be used when installing gas piping. Gas line entry hole filler plug should be installed in unused gas line entry hole. (See Fig. 30.)
NOTE: The gas valve inlet pressure tap connection is suitable to use as test gauge connection providing test pressure DOES NOT exceed maximum 0.5 psig (14-in. wc) stated on gas control valve. (See Fig. 55.)
Piping should be pressure and leak tested in accordance with NFGC in the United States or NSCNGPIC in Canada, local, and national plumbing and gas codes before the furnace has been connected. After all connections have been made, purge lines and check for leakage at furnace prior to operating furnace.
If pressure exceeds 0.5 psig (14-in. wc), gas supply pipe must be disconnected from furnace and capped before pressure test. If test pressure is equal to or less than 0.5 psig (14-in. wc), turn o ff electric shutoff switch located on furnace gas control valve and accessible manual shutoff valve before test. After all connections have been made, purge lines and check for leakage.
The gas supply pressure shall be within the maximum and minimum inlet supply pressures marked on the rating plate with the furnace burners ON and OFF.
Step 8—Electrical Connections
See Fig. 31 for field wiring diagram showing typical field 115-v and 24-v wiring. Check all factory and field electrical connections for tightness.
A93324
Fig. 29 -- Typical Gas Pipe Arrangement
An accessible manual shutoff valve MUST be installed external to furnace casing and within 6 ft (1.8 M) of furnace. A 1/8--in. (3 mm) NPT plugged tapping, accessible for test gauge connection, MUST be installed immediately upstream of gas supply connection to furnace and downstream of manual shutoff valve.
COMBUSTION-AIR PIPE GROMMET
COMBUSTION
-AIR PIPE
GAS LINE
VENT PIPE
GAS LINE GROMMET
VENT PIPE GROMMET
!
WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
Blower access door switch opens 115-v power to control. No component operation can occur . Do not bypass or close switch with panel removed.
UNUSED 1-3/4 -IN. (44 mm) DIAMETER GAS CONN. HOLE
GAS LINE ENTRY HOLE FILLER PLUG
NOTE: PIPE GROMMETS AND ENTRY HOLE FILLER PLUGS ARE INCLUDED IN FACTORY-SUPPLIED LOOSE PARTS BAG
A05057
A05057
Fig. 30 -- Typical Gas Pipe Arrangement
-- 2 7 --
Page 28
FIVE WIRE
THREE-WIRE
HEATING-ONLY
BLOWER DOOR SWITCH
BLK
WHT
115-V FIELD-
SUPPLIED
DISCONNECT
GND
BLK
WHT
AUXILIARY J-BOX
FIELD 24-V WIRING FIELD 115-, 208/230-, 460-V WIRING FACTORY 24-V WIRING FACTORY 115-V WIRING
GND
FURNACE
NOTE 2
W
C
R
O N T
G
R O
COM
L
Y/Y2
24-V
TERMINAL
BLOCK
WCR GY
NOTE 1
NOTES: Connect Y-terminal in furnace as shown for proper blower operation.
1. Some thermostats require a "C" terminal connection as shown.
2. If any of the original wire, as supplied, must be replaced, use
3. same type or equivalent wire.
THERMOSTAT TERMINALS
CONDENSING UNIT
TWO WIRE
FIELD-SUPPLIED DISCONNECT
Fig. 31 -- Typical Heating and Cooling Application Wiring Diagram
GND
208/230- OR 460-V THREE PHASE
208/230-V SINGLE PHASE
A99440
Tab l e 6 – Electrical Data
FURNACE
SIZE
040---12/036040 1 1 5 --- 6 0 --- 1 127 104 8 10.8 34 (10.3) 15 14 060---12/036060 1 1 5 --- 6 0 --- 1 127 104 9.4 12.5 29 (8.8) 15 14 080---12/036080 1 1 5 --- 6 0 --- 1 127 104 9.4 12.5 29 (8.8) 15 14 080---16/048080 1 1 5 --- 6 0 --- 1 127 104 9.6 12.8 29 (8.8) 15 14 100---20/060100 1 1 5 --- 6 0 --- 1 127 104 12.1 15.9 36 (10.9) 20 12 120---20/060120 1 1 5 --- 6 0 --- 1 127 104 12.1 15.9 36 (10.9) 20 12
* Permissible limits of voltage range at which unit will operate satisfactorily. † Unit ampacity = 125 percent of largest operating component’s full load amps plus 100 percent of all other potential operating components’ (EAC, humidifier,
etc.) full load amps. ‡ Length shown is a measured one way along wire path between unit and service panel for maximum 2 percent voltage drop. ** Time-delay type is recommended.
VOLTS HERTZ
PHASE
OPERATING VOLTAGE
MAX* MIN*
MAX UNIT
AMPS{
UNIT
AMPACITY
MAX
WIRE
LGTH
FT (M)
‡
MAX
FUSE/CKT
BKR AMPS**
MIN
WIRE
GAGE
Electric Code ANSI/NFPA 70 and/or the Canadian Electric Code,
!
CAUTION
CSA C22.1, Part I, if an external electrical source is utilized. Use a separate, branch electrical circuit containing a properly
FURNACE MAY NOT OPERATE
Failure to follow this caution may result in intermittent furnace operation.
Furnace control must be grounded for proper operation or control will lock out. Control is grounded through green/yellow wire connected to gas valve and burner
sized fuse or circuit breaker for this furnace. See Table 6 for wire size and fuse specifications. A disconnecting means must be located within sight from and readily accessible to furnace.
NOTE: Proper polarity and proper grounding must be maintained for 115-v wiring. If polarity is incorrect, control LED status indicator will flash rapidly and furnace will NOT operate.
box screw.
115–V WIRING
Before proceeding with electrical connections, make certain that voltage, frequency, and phase correspond to that specified on furnace rating plate. Also, check to be sure that service provided
ELECTRIC
DISCONNECT
SWITCH
COPPER
WIRE ONLY
by power supply is sufficient to handle load imposed by this equipment. Refer to rating plate or Table 6 for equipment electrical specifications.
ALUMINUM
WIRE
The furnace must be electrically grounded in accordance with local codes; or in the absence of local codes, with the National
Fig. 32 -- Disconnect Switch and Furnace
A93033
-- 2 8 --
Page 29
!
WARNING
FIRE HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
Do not connect aluminum wire between disconnect switch furnace. Use only copper wire. (See Fig. 32.)
POWER ENTRY HOLE FILLER PLUG (FACTORY­SUPPLIED LOOSE PARTS BAG)
UNUSED 7/8-IN. (22 mm) DIAMETER POWER ENTRY HOLES
FACT ORY INSTALLED LOCATION
!
WARNING
ELECTRICAL SHOCK AND FIRE HAZARD
Failure to follow this warning could result in serious injury, death, or property damage.
The cabinet MUST have an uninterrupted or unbroken ground according to NEC ANSI/NFPA 70-2008 and Canadian Electrical Code CSA C22.1 or local codes to minimize personal injury if an electrical fault should occur. This may consist of electrical wire or conduit approved for electrical ground when installed in accordance with existing electrical codes. Do not use gas piping as an electrical ground.
Factory Installed J-Box Location
Install electrical entry hole filler plugs (factory-supplied in loose parts bag) in unused power entry holes. (See Fig. 33.)
J-Box Relocation
1. Remove 2 screws holding auxiliary J-box. (See Fig. 34.)
2. Rotate J-box 180° and attach box to left side, using
holes provided.
3. Install electrical entry hole filler plugs (factory-supplied loose parts Bag) in unused power entry holes. (See Fig. 34.)
A05113
Fig. 33 -- Factory Installed J-Box Location
!
WARNING
ELECTRICAL SHOCK AND FIRE HAZARD
Failure to follow this warning could result in personal injury, and death, or property damage.
If manual disconnect switch is to be mounted on furnace, select a location where a drill or fastener will not contact electrical or gas components.
24–V WIRING
Connect 24-v thermostat leads to 24-v terminal block on furnace control. For proper cooling operation, Y wire from thermostat MUST be connected to Y/Y2 terminal on furnace control, as shown in Fig. 31. The 24-v terminal block is marked for easy connection of field wiring. (See Fig. 36.) The 24-v circuit contains a 3-amp, automotive-type fuse located on furnace control. (See Fig. 36.) Any electrical shorts of 24-v wiring during installation,service, or maintenance may cause fuse to blow. If fuse replacement is required, use only a fuse of identical size (3 amp) and type. The control will flash code 24 when fuse needs replacement.
NOTE: Use AWG No. 18 color-coded copper thermostat wire for lengths up to 100 ft. (30.4 M). For wire lengths over 100 ft (30.4 M), use AWG No. 16 wire.
ALTERNATE
LOCATION
POWER ENTRY HOLE FILLER PLUG (FACTORY­SUPPLIED LOOSE PARTS BAG)
UNUSED 7/8-IN. (22 mm) DIAMETER POWER ENTRY HOLES
FIELD
FAC TORY INSTALLED LOCATION
POWER ENTRY HOLE FILLER PLUG (FACTORY­SUPPLIED LOOSE PARTS BAG)
UNUSED 7/8-IN. (22 mm) DIAMETER POWER ENTRY HOLES
A05058
Fig. 34 -- Relocating J-Box
-- 2 9 --
Page 30
ACCESSORIES
1. Electronic Air Cleaner (EAC). Two quick-connect terminals marked EAC-1 and EAC-2 are provided for EAC connection. (See Fig. 36.) These terminals are energized with 115-v (1.0-amp maximum) during blower motor operation.
!
CAUTION
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent operation or performance satisfaction.
DO NOT connect furnace control HUM terminal to HUM (humidifier) terminal on Thermidistatt, Zone Controller or similar device. See Thermidistatt, Zone Controller, thermostat, or controller manufacturer’s instructions for proper connection.
2. Humidifier (HUM) A quick-connect terminal (HUM) and screw terminal (COM 24V) are provided for 24-v humidifier connection. (See Fig. 36.) HUM terminal is energized with 24-v (0.5-amp maximum) when gas v alve is energized.
NOTE: A field-supplied, 115-v controlled relay connected to EAC terminals may be added if humidifier operation is desired during all blower operation.
Step 9—Removal of Existing Furnaces from Common Vent Systems
When an existing Category I furnace is removed or replaced, the original venting system may no longer be sized to properly vent the remaining attached appliances. An improperly sized Category I venting system could cause the formation of condensate in the furnace and vent, leakage of condensate and combustion products, spillage of combustion products into the living space, etc.
Step 10—Combustion Air and Vent Pipe Systems
GENERAL
Vent system or vent connectors may need to be resized. For any other appliances when resizing vent systems or vent connectors, system or connector must be sized to approach minimum size as determined using appropriate table found in the NFGC or NSCNGPIC.
The 58MEB can be vented as either a direct vent or as a non-direct vent application. A direct vent system shall be installed in accordance with the d irect vent (2-pipe) procedures in the following Combustion Air and Vent Pipe Systems section. For non-direct vent (1-pipe) applications, refer to the non-direct vent (1-pipe) procedures in the same section.
Tab l e 7 – Approved Combustion-Air and Vent Pipe, Fitting and Cement Materials
ASTM
SPECIFICATION
(MARKED ON
MATERIAL)
D1527 ABS Pipe --- --- --- --- S c h e d u l e --- 4 0 D1785 PVC Pipe --- --- --- --- S c h e d u l e --- 4 0 D2235 For ABS --- --- --- --- Solvent Cement For ABS D2241 PVC Pipe --- --- --- --- S D R --- 2 1 & S D R --- 2 6 D2466 PVC --- --- Fittings --- --- S c h e d u l e --- 4 0 D2468 ABS --- --- Fittings --- --- S c h e d u l e --- 4 0 D2564 For PVC --- --- --- --- Solvent Cement For PVC D2661 ABS Pipe Fittings --- --- DWV at Schedule---40 IPS sizes D2665 PVC Pipe Fittings --- --- DWV
F438 CPVC --- --- Fittings --- --- S c h e d u l e --- 4 0 F441 CPVC Pipe --- --- --- --- Sc h e d u l e --- 4 0 F442 CPVC Pipe --- --- --- --- SDR F493 For CPVC --- --- --- --- Solvent Cement For CPVC
F628 ABS Pipe --- --- --- ---
F656 For PVC --- --- --- --- Primer For PVC F891 PVC Pipe --- --- --- --- Cellular Core Schedule---40 & DWV
MATERIAL PIPE FITTINGS
SOLVENT CEMENT
AND PRIMERS
DESCRIPTION
Cellular Core DWV at Schedule---40
IPS sizes
-- 3 0 --
Page 31
Fig. 35 -- Wiring Diagram
A08342
-- 3 1 --
Page 32
Multistory and common venting are prohibited.
DIRECT VENT/2-PIPE SYSTEM
In a direct-vent (2-pipe) system, all air for combustion is taken directly from outdoor atmosphere, and all flue products are discharged to outdoor atmosphere. A factory accessory vent termination kit MUST be used in a direct vent (2-pipe) system.
NON-DIRECT VENT/1-PIPE SYSTEM
In a non-direct vent (1-pipe) system, all air for combustion is taken from the area adjacent to furnace, and all flue products are discharged to outdoor atmosphere. A factory-supplied perforated disk assembly (in loose parts bag) MUST be used in combustion-air pipe elbow.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could result in carbon monoxide poisoning or death.
The following steps shall be followed for each appliance connected to the venting system being placed into operation, while all other appliances connected to the venting system are not in operation:
1. Seal any unused openings in venting system.
2. Inspect the venting system for proper size and horizontal pitch, as required in the National Fuel Code, ANSI Z223.1-2006/NFPA 54-2006 CSA B149.1, Natural Gas and Propane Installation Code and these instructions. Determine that there is no blockage or restriction, leakage, corrosion and other deficiencies, which could cause an unsafe condition.
3. As far as practical, close all building doors and windows and all doors between the space in which the appliance(s) connected to the venting system are located and other spaces of the building.
4. Close fireplace dampers.
5. Turn on clothes dryers and any appliance not connected to the venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they are operating at maximum speed. Do not operate a summer exhaust fan.
6. Follow the lighting instructions. Place the appliance being inspected into operation. Adjust the thermostat so appliance is operating continuously.
7. Test for spillage from draft hood equipped appliances at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle.
8. If improper venting is observed during any of the above tests, the venting system must be corrected in accordance with the National Fuel Gas Code, Z223.1-2006/NFPA 54-2006 and/or CSA B149.1, Natural Gas and Propane Installation
9. After it has been determined that each appliance connected to the venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas-fired burning appliance to their previous conditions of use.
Codes.
Gas
or the
ANSI
MATERIALS
Combustion-air and vent pipe, fittings, primers, and solvents must conform to American National Standards Institute (ANSI) standards and American Society for Testing and Materials (ASTM) standards. See Table 7 for approved materials for use in the U.S.A.
!
WARNING
FIRE AND EXPLOSION HAZARD
Failure to follow this warning could result in property damage, personal injury , or death.
Solvent cements are combustible. Keep away from heat, sparks, and open flame. Use only in well-ventilated areas. Avoid breathing in vapor or allowing contact with skin or eyes.
In Canada, construct all combustion-air and vent pipes for this unit of CSA or ULC listed schedule-40 PVC, PVC-DWV or ABSDWV pipe and pipe cement. SDR pipe is NOT approved in Canada.
In direct vent (2-pipe) systems, combustion air and vent pipes must terminate together in same atmospheric pressure zone, either through roof or sidewall (roof termination preferred), using accessory termination kit. See Table 8 for required clearances.
In non-direct vent (1-pipe) system, vent pipe termination must be installed with adequate clearances to building openings and equipment to comply with national and local codes. See Table 9 for required clearances.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in property damage, personal injury , or death.
All combustion-air and vent pipes must be airtight and watertight. Pipes must also terminate exactly as shown in Fig. 42 for direct vent (2-pipe) system and Fig. 43 for non-dir ect vent (1-pipe) system.
An abandoned masonry chimney may be used as a raceway for properly insulated and supported combustion-air (when applicable) and vent pipes. Each furnace must have its own set of combustion-air and vent pipes and be terminated individually, as showninFig.42forDirectVent(2-Pipe)systemandFig.43for Non-Direct Vent (1-Pipe) system.
A furnace shall not be connected to a chimney flue serving a separate appliance designed to burn solid fuel.
Other gas appliances with their own venting system may also use the abandoned chimney as a raceway providing it is permitted by local code, the current edition of the National Fuel Gas Code and the vent or liner manufacturer’s installation instructions. Care must be taken to prevent the exhaust gases from one appliance from contaminating the combustion air of other gas appliances.
!
CAUTION
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent unit operation.
When vent pipe is exposed to temperatures below freezing, such as when it passes through an unheated space or when a chimney is used as a raceway, pipe must be insulated as shown in Table 10 with Armaflex-type insulation.
Furnace combustion air and vent pipe connections are sized for 2-in. (51 mm) pipe. Any pipe size change should b e made outside furnace casing in vertical pipe. The transition has to be made as close to the furnace as reasonably possible.
COMBUSTION AIR PIPE
General
Furnace combustion-air connection must be attached as shown in Fig. 37. Combustion-air intake housing plug may need to be relocated in some applications.
-- 3 2 --
Page 33
BLOWER OFF-DELAY
24-V THERMOSTAT TERMINALS
3-AMP FUSE
LED OPERATION & DIAGNOSTIC LIGHT
BLOWER SPEED SELECTION TERMINALS
115-VAC (L2) NEUTRAL CONNECTIONS
TEST / TWIN
HUH
PL1
BLOWER OFF-DELAY
PLT
115-VAC (LI) NUETRAL CONNECTIONS
T1 DHUM G COM W TIT2 R
24V
SEC-2 SEC-1
COM 24VAC
24V HTR TAPS
COM
HEAT
COOL
FAN
SPARE 2 SPARE 1
EAC-2
Fig. 36 -- Furnace Control
EAC-1
L1 BL-1 PR-1
EAC-1 TERMINAL (115-VAC 1.0 AMP. MAX0
PL2
PL1-HOT SURFACE IGNITER & INDUCER MOTOR CONNECTION
TWINNING AND/OR COMPONENT TEST TERMINAL
HUMIDIFIER TERMINAL (24-VAC 0.5 AMP. MAX)
TRANSFORMER 24-VAC CONNECTIONS
PL1-LOW VOLTAGE DRAIN HARNESS CONNECTOR
A08345
For Non-Direct Vent (1-Pipe) system, combustion-air must terminate outside of furnace casing with 1 elbow. Orient elbow so that its opening faces down for upflow or downflow applications. Orient elbow so that its opening faces sideways (left or right) for horizontal left or horizontal right applications (See Fig. 37.) Maintain a 3-in minimum clearance between the opening of the combustion-air inlet pipe and any object.
!
CAUTION
UNIT CORROSION HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
Combustion air must not be taken from inside structure because inside air is frequently contaminated by halogens, which include fluorides, chlorides, bromides, and iodides. These elements are found in aerosols, detergents, bleaches, cleaning solvents, salts, air fresheners, adhesives, paint, and other household products. Locate combustion-air inlet as far as possible from swimming pool and swimming pool pump house.
NOTE: All pipe joints must be cemented, with the exception of combustion--air pipe to inlet housing connection, as it may be necessary to remove pipe for servicing.
Assembly of Combustion Air Pipe (Non-Direct Vent/1-Pipe System ONLY)
1. Permanently install perforated disk assembly (factory-supplied in loose parts bag) in combustion-air elbow using RTV or by cementing, as shown in Fig. 38. For proper combustion disk usage, please refer to Table
11.
2. Determine the length of straight portion of combustion-air inlet pipe from Fig. 38.
3. Cut field-supplied 2-in. (51 mm) diameter PVC pipe to length as determined per Fig. 38.
4. Permanently attach elbow/perforated disk assembly to straight portion of pipe using RTV or by cementing as shown in Fig. 38.
Assembly of Combustion Air Pipe (Direct Vent-2-Pipe System ONLY)
1. Using Table 11, individually determine the diameter of the combustion--air and vent pipe allowed. If different sizes, pick the larger of the two diameters and use this diameter for both combustion--air and vent pipes.
2. When installing vent systems of short pipe length, use the smallest allowable pipe diameter. use of pipe size greater than required may result in incomplete combustion, flame disturbance, and flame sense lockout.
-- 3 3 --
Page 34
Tab l e 8 – Direct Vent Termination Clearance
A05009
-- 3 4 --
Page 35
Tab l e 9 – Other than Direct Vent Termination Clearance
A05013
-- 3 5 --
Page 36
Tab l e 10 – Maximum Allowable Exposed Vent Pipe Length (FT / M) With and Without Insulation in Winter Design
Temperature Ambient*
WINTER DESIGN
FURNACE SIZE
040
060
080
100
120
* Pipe length ft (M) specified for maximum pipe lengths located in unconditioned spaces. Pipes located in unconditioned space cannot exceed total allowable pipe length as specified in Table 11.
† Insulation thickness based on R value of 3.5 per in.
TEMPERATURE
°F 〈°C)
20 (--- 7) 1.5 (38) 51 (16) 70 (21) 0 ( --- 1 8 ) 1.5 (38) 28 (9) 70 (21)
--- 2 0 ( --- 29 ) 1.5 (38) 16 (5) 70 (21) 20 (--- 7) 2 (51) 45 (14) 70 (21) 0 ( --- 1 8 ) 2 (51) 22 (7) 70 (21)
--- 2 0 ( --- 29 ) 2 (51) 10 (3) 58 (18) 20 (--- 7) 2 (51) 65 (20) 70 (21) 0 ( --- 1 8 ) 2 (51) 35 (11) 70 (21)
--- 2 0 ( --- 29 ) 2 (51) 20 (6) 70 (21) 20 (--- 7) 2 (51) 55 (17) 55 (17) 0 ( --- 1 8 ) 2 (51) 48 (15) 55 (17)
--- 2 0 ( --- 29 ) 2 (51) 30 (9) 55 (17) 20 (--- 7) 2.5 (64) 70 (21) 70 (21) 0 ( --- 1 8 ) 2.5 (64) 47 (14) 70 (21)
--- 2 0 ( --- 29 ) 2.5 (64) 28 (9) 70 (21) 20 (--- 7) 2.5 (64) 40 (12) 40 (12) 0 ( --- 1 8 ) 2.5 (64) 40 (12) 40 (12)
--- 2 0 ( --- 29 ) 2.5 (64) 38 (12) 40 (12) 20 (--- 7) 3 (76) 70 (21) 70 (21) 0 ( --- 1 8 ) 3 (76) 50 (15) 70 (21)
--- 2 0 ( --- 29 ) 3 (76) 28 (9) 70 (21) 20 (--- 7) 3 (76) 70 (21) 70 (21) 0 ( --- 1 8 ) 3 (76) 61 (19) 70 (21)
--- 2 0 ( --- 29 ) 3 (76) 37 (11) 70 (21) 20 (--- 7) 4 (102) 70 (21) 70 (21) 0 ( --- 1 8 ) 4 (102) 48 (15) 70 (21)
--- 2 0 ( --- 29 ) 4 (102) 23 (7) 70 (21)
NOTE: Do not count elbows or pipe sections in terminations or within furnace (All elbows shown in Fig. 42 and Fig. 43 are not to be counted).
MAX PIPE
DIAMETER
IN (mm)
WITHOUT
INSULATION
FT (M)
WITH 3/8–IN. OR THICKER
INSULATION†
FT (M)
4. Insert assembled combustion air inlet pipe into intake housing as shown in Fig. 37.
5. Drill a 1/8-in.(3 mm) hole in 2-in (51 mm), combustion air pipe using the hole in intake housing as a guide.
!
CAUTION
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent furnace operation.
When installing combustion air and vent system of short pipe length, the smallest allowable pipe diameter must be used.
6. Install a field-supplied No. 6 or No. 8 sheet metal screw into combustion air pipe.
7. Install casing hole filler cap (factory-supplied in loose parts bag) in unused combustion air pipe casing hole.
NOTE: Do not attach combustion air intake pipe permanently to combustion air intake housing since it may be necessary to remove pipe for service of igniter or flame sensor.
Attachment of Combustion Air Intake Housing Plug Fitting
The combustion-air intake plug fitting must be installed in unused NOTE: A 2-in. (51 mm) diameter pipe must be used within furnace casing. Make all pipe diameter transitions outside furnace casing per Fig. 39.
3. If required per Table 11, insert perforated disk assembly (factory-supplied in loose parts bag) in intake housing where combustion air pipe will be connected. If half d isk set is required, install only shouldered disk half.
Attachment of Combustion Air Pipe
1. Determine location of combustion air intake pipe connection to combustion air intake housing as shown in Fig. 37 for application.
2. Reposition combustion air intake housing plug fitting in appropriate unused intake housing connection.
3. Install pipe grommet (factory-supplied in loose parts bag) into selected furnace casing combustion-air pipe hole.
combustion air intake housing. This fitting must be attached by using RTV sealant, or by drilling a 1/8--in. (3 mm) hole in fitting, using hole in intake housing as a guide. Install a field-supplied No. 6 or No. 8 sheet metal screw.
NOTE: DO NOT OVERTIGHTEN SCREW. Breakage of intake housing or fitting may cause air leakage to occur.
A plugged drain connection has been provided on this fitting for use when moisture is found in combustion air intake pipe and combustion box. If use of this drain connection is desired, drill out fitting’s tap plug with 3/16--in. (5 mm). drill and connect a field-supplied 3/8-in. (10 mm) tube. This tube should be routed to open condensate drain for furnace and A/C (if used), and should be trapped, as shown in Fig. 40.
NOTE: (Direct Vent/2-Pipe System ONLY) Moisture in combustion air intake may be a result of improper termination.
-- 3 6 --
Page 37
Ensure combustion air pipe termination is similar to those as shown in Fig. 42 so that it will not be susceptible to area where light snow or others sources of moisture could be pulled in.
NOTE: Select 1 vent pipe connection and
Select 1 vent pipe connection and 1 combustion-air pipe connection.
AIR
COMBUSTION-
VENT
COMBUSTION-
AIR
FLOW
HORIZONTAL-LEFT DISCHARGE HORIZONTAL-RIGHT DISCHARGE
FLOW
AIR
AIR
* For Non-Direct Vent (1-Pipe) system, orient elbow so that its
opening faces down.
** For Non-Direct Vent (1-Pipe) system, orient elbow so that its
opening faces sideways.
† An external trap kit (see furnace product data sheet) must be used. † †
Bottom combustion-air not allowed for non-direct vent
COMBUSTION-
*
UPFLOW DOWNFLOW
VENT
**
†
AIR
VENT
†
NOTE:
1 combustion-air pipe connection.
VENT
COMBUSTION-
AIR
AIR
FLOW
COMBUSTION-
VENT
†
VENT
*
COMBUSTION-
AIR
AIR
**
AIR
FLOW
††††
A05092
†
Fig. 37 -- Combustion-Air and Vent Pipe Connections
FIELD-SUPPLIED 2-IN. (51 mm) DIA. PVC 90° ELBOW
FIELD-SUPPLIED 2-IN. (51 mm) DIA. PVC PIPE
NOTE: Ensure combustion air pipe termination is similar to those as shown in Fig. 44 so that it will not be susceptible to area where light snow or other sources of moisture could be pulled in.
VENT PIPE
General
Furnace vent connection must be attached as shown in Fig. 37.
!
WARNING
CARBON MONOXIDE POISONING AND PROPERTY DAMAGE HAZARD
Failure to follow this warning could result in property damage, personal injury , or death.
Vent pipes must be airtight.
NOTE: A 2-- in. (51 mm) diameter pipe must be used within the furnace casing. Make all pipe diameter transitions outside furnace casing per Fig. 39.
The minimum vent pipe length for these furnaces is 5 ft. (1.5 M). Short pipe lengths (5-8 ft (1.5--2.4 M)) may discharge condensate droplets. These condensate droplets may be undesirable. A 12--in. (305 mm) minimum offset p ipe section is recommended to reduce excessive condensate droplets from exiting vent pipe outlet. (See Fig. 41)
Attachment of Vent Pipe
1. Determine vent pipe diameter and maximum pipe lengths using Table 11.
NOTE: (Direct Vent/2-Pipe ONLY) vent pipe system has the same diameter and same length as combustion air pipe as mentioned in section “Assembly of Combustion Air Pipe (Direct Vent/2-Pipe system ONLY).”
NOTE: Do not count elbows or pipe sections in terminations or within furnace (all elbows shown in Fig. 42 and Fig. 43 are not be counted).
2. Determine location of vent pipe connection to inducer housing as shown in Fig. 37 for application.
3. Reposition elastomeric (rubber) inducer housing outlet cap and clamp to appropriate unused inducer housing connection. Tighten clamp.
!
WARNING
COMBUSTION-AIR DISC (FACTORY-SUPPLIED IN LOOSE PARTS BAG)
Length of Straight Pipe Portion of
Combustion-Air Inlet Pipe Assembly --- In. (mm)
CASING WIDTH A
17---1/2 (445) 8 --- 1 / 2 ±1/2 (216 ± 13)
21(533) 10---1/2 ±1/2 (267 ± 13)
24---1/2 (622) 12 ±1/2 (318 ± 13)
Fig. 38 -- Combustion-Air Inlet Pipe A ssembly
CARBON MONOXIDE POISONING AND PROPERTY DAMAGE HAZARD
Failure to follow this warning could result in personal injury or death.
A
Inducer housing outlet cap must be installed and fully seated against inducer housing. Clamp must be tightened to prevent any condensate leakage.
4. Install pipe grommet (factory-supplied in loose parts bag) into selected furnace casing vent pipe hole.
5. Be certain that mating surfaces of inducer housing connection elastomeric (rubber) coupling, and 2--in. (51
A96211
mm) diameter vent pipe are clean and dry. Assemble the elastomeric (rubber) vent coupling (with 2 loose clamps) onto inducer housing connection. Insert the 2--in. (51 mm) diameter vent pipe through the elastomeric (rubber) coupling and fully into inducer housing connection until it touches a stop inside the inducer housing outlet. Tighten the screws on both clamps to 15-in-lb. of torque. pipe to inducer housing. Tighten the clamp screws to 15 in.-lb. of torque.
NOTE: Starting at furnace, slope vent pipe a minimum of 1/4-in.(6 mm) per linear ft with no sags between hangers.
-- 3 7 --
Page 38
ALTITUDE (FT)
0 to 2000
(0 to 610)
ALTITUDE (FT)
2001 to 3000
(610 to 914)
See notes at end of table.
UNIT SIZE
UNIT SIZE
(BTUH)
40,000
60,000
80,000
100,000
120,000
(BTUH)
40,000
60,000
80,000
100,000
120,000
Tab l e 11 – MaximumAllowablePipeLength ---Ft(M)
NON-DIRECT
DIRECT VENT (2-PIPE) ONLY
TERMINATION
TYPE
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor3-in
Concentric
2Pipeor3-in.
Concentric
DIRECT VENT (2-PIPE) ONLY
TERMINATION
TYPE
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor3-in
Concentric
2Pipeor3-in.
Concentric
PIPE DIA
IN. (mm)*
1 (25) 1 (25)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
3 (76) 3 (76)
2-1/2 (64)
one disk
3 (76)† NA
3 (76) † no disk 3 (76)†
PIPE DIA
IN. (mm)*
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
2-1/2 (64) 2-1/2 (64)
3 (76) 3 (76)
3 (76) NA
3 (76)† no disk NA
4 (102)† no
NA 3 (76)†
disk
VENT (1-PIPE)
ONLY
PIPE DIA
IN. (mm)*
2-1/2 (64)
NON-DIRECT
VENT (1-PIPE)
ONLY
PIPE DIA
IN. (mm)*
4 (102)† no disk
(21.3)70(21.3)65(19.8)60(18.3)60(18.3)55(16.8)
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
(16.8)50(15.2)35(10.7)30(9.1)30(9.1)20(6.1)
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
(12.2)30(9.1)20(6.1)20(6.1)10(3.0)
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
(13.7)40(12.2)35(10.7)30(9.1)25(7.6)20(6.1)
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
(20.4)62(18.9)57(17.4)52(15.8)52(15.8)47(14.3)
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
(21.3)67(20.4)66(20.1)61(18.6)61(18.6)61(18.6)
(14.9)44(13.4)30(9.1)25(7.6)25(7.6)15(4.6)
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
(10.7)26(7.9)16(4.9)16(4.9)6(1.8)
(21.3)70(21.3)70(21.3)70(21.3)66(20.1)61(18.6)
(19.2)62(18.9)62(18.9)61(18.6)61(18.6)61(18.6)
(21.3)70(21.3)63(19.2)56(17.1)50(15.2)43(13.1)
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
NUMBER OF 90° ELBOWS
1 2 3 4 5 6
5
(1.5)
70
70
20
(6.1)15(4.6)10(3.0)5(1.5)
70
10
(3.0)
55
70
(1.5)
40
70
10
(3.0)
45
70
67
70
17
(5.2)12(3.7)7(2.1)
70
49
70
35
70
14
(4.3)9(2.7)
63
70
70
NA NA NA NA NA
NA NA
NA NA NA NA NA
5
NA NA NA NA NA
NA NA NA NA NA
NUMBER OF 90° ELBOWS
1 2 3 4 5 6
NA NA NA
NA NA NA NA
NA
NA
-- 3 8 --
Page 39
ALTITUDE (FT)
3001 to 4000
(914 to 1219)
ALTITUDE (FT)
4001 to 5000‡
(1219 to 1524)
See notes at end of table.
UNIT SIZE
UNIT SIZE
(BTUH)
40,000
60,000
80,000
100,000
120,000
(BTUH)
40,000
60,000
80,000
100,000
120,000
Table11—MaximumAllowablePipeLength ---Ft(M)(Continued)
NON-DIRECT
DIRECT VENT (2-PIPE) ONLY
TERMINATION
TYPE
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor3-in
Concentric
2Pipeor3-in.
Concentric
4† no disk
DIRECT VENT (2-PIPE) ONLY
TERMINATION
TYPE
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor3-in
Concentric
2Pipeor3-in.
Concentric
PIPE DIA ---
IN (mm)*
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
2-1/2 (64) 2-1/2 (64)
3 (76) 3 (76)
3 (76)† no disk NA
4 (102)† no
PIPE DIA
IN. (mm)*
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
2-1/2 (64) 2-1/2 (64)
3 (76) 3 (76)
3 (76)†
no disk
4 (102)† no
NA 3 (76)†
disk
NA 3 (76)†
disk
VENT (1-PIPE)
ONLY
PIPE DIA ---
IN (mm)*
4 (102) † no disk
NON-DIRECT
VENT (1-PIPE)
ONLY
PIPE DIA
IN. (mm)*
NA
4 (102)† no disk
NUMBER OF 90° ELBOWS
1 2 3 4 5 6
64
(19.5)59(18.0)54(16.5)49(14.9)48(14.6)43(13.1)
70
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
16
(4.9)11(3.4)6(1.8)
68
(20.7)63(19.2)62(18.9)57(17.4)57(17.4)56(17.1)
46
(14.0)41(12.5)28(8.5)23(7.0)22(6.7)13(4.0)
70
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
33
(10.1)24(7.3)15(4.6)14(4.3)5(1.5)
70
(21.3)70(21.3)70(21.3)66(20.1)61(18.6)56(17.1)
65
(19.8)58(17.7)51(15.5)44(13.4)38(11.6)31(9.4)
59
(18.0)59(18.0)58(17.7)57(17.4)57(17.4)56(17.1)
70
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
NUMBER OF 90° ELBOWS
1 2 3 4 5 6
60
(18.3)55(16.8)50(15.2)45(13.7)44(13.4)39(11.9)
70
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
15
(4.6)10(3.0)5(1.5)
64
(19.5)59(18.0)58(17.7)53(16.2)52(15.8)52(15.8)
44
(13.4)39(11.9)26(7.9)21(6.4)20(6.1)11(3.4)
70
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
31
(9.4)22(6.7)13(4.0)12(3.7)
70
(21.3)70(21.3)67(20.4)62(18.9)57(17.4)52(15.8)
53
(16.2)46(14.0)40(12.2)33(10.1)26(7.9)20(6.1)
56
(17.1)55(16.8)54(16.5)53(16.2)52(15.8)52(15.8)
70
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
NA NA NA
NA
NA NA NA
NA NA
-- 3 9 --
Page 40
ALTITUDE (FT)
5001 to 6000‡
(1524 to 1829)
ALTITUDE (FT)
6001 to 7000‡
(1829 to 2134)
See notes at end of table.
UNIT SIZE
UNIT SIZE
(BTUH)
40,000
60,000
80,000
100,000
120,000
(BTUH)
40,000
60,000
80,000
100,000
120,000
Table11—MaximumAllowablePipeLength ---Ft(M)(Continued)
NON-DIRECT
DIRECT VENT (2-PIPE) ONLY
TERMINATION
TYPE
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor3-in
Concentric
2Pipeor3-in.
Concentric
DIRECT VENT (2-PIPE) ONLY
TERMINATION
TYPE
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor3-in
Concentric
2Pipeor3-in.
Concentric
PIPE DIA
IN. (mm)*
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
2-1/2 (64) 2-1/2 (64)
3 (76) 3 (76)
3 (76)†
no disk
4 (102)† no
PIPE DIA
IN. (mm)*
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
2-1/2 (64) 2-1/2 (64)
3 (76) 3 (76)
3 (76)†
no disk
NA 3 (76)†
disk
NA 3 (76)†
VENT (1-PIPE)
ONLY
PIPE DIA
IN. (mm)*
NA
4 (102)† no disk
NON-DIRECT
VENT (1-PIPE)
ONLY
PIPE DIA
IN. (mm)*
NA
NUMBER OF 90° ELBOWS
1 2 3 4 5 6
57
(17.4)52(15.8)47(14.3)42(12.8)40(12.2)35(10.7)
70
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
14
(4.3)9(2.7)
60
(18.3)55(16.8)54(16.5)49(14.9)48(14.6)47(14.3)
41
(12.5)36(11.0)23(7.0)18(5.5)17(5.2)8(2.4)
70
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
29
(8.8)21(6.4)12(3.7)11(3.4)
70
(21.3)67(20.4)62(18.9)57(17.4)52(15.8)47(14.3)
42
(12.8)35(10.7)29(8.8)22(6.7)15(4.6)9(2.7)
53
(16.2)52(15.8)50(15.2)49(14.9)48(14.6)47(14.3)
70
(21.3)70(21.3)70(21.3)70(21.3)70(21.3)70(21.3)
NUMBER OF 90° ELBOWS
1 2 3 4 5 6
53
(16.2)48(14.6)43(13.138(11.6)37(11.3)32(9.8)
70
(21.3)70(21.3)68(20.7)67(20.4)66(20.1)64(19.5)
13
(4.0)8(2.4)
57
(17.4)52(15.8)50(15.2)45(13.7)44(13.4)43(13.1)
38
(11.6)33(10.1)21(6.4)16(4.9)15(4.6)6(1.8)
70
(21.3)70(21.3)68(20.7)67(20.4)66(20.1)64(19.5)
27
(8.2)19(5.8)10(3.0)9(2.7)
68
(20.7)63(19.2)58(17.7)53(16.2)48(14.6)43(13.1)
31
(9.4)24(7.3)18(5.5)11(3.4)
49
(14.9)48(14.6)47(14.3)45(13.7)44(13.4)43(13.1)
NA NA NA NA
NA NA
NA NA NA NA
NA NA
NA NA
-- 4 0 --
Page 41
ALTITUDE (FT)
7001 to 8000‡
(2134 to 2438)
ALTITUDE (FT)
8001 to 9000‡
(2438 to 2743)
See notes at end of table.
UNIT SIZE
UNIT SIZE
(BTUH)
40,000
60,000
80,000
100,000
120,000
(BTUH)
40,000
60,000
80,000
100,000
120,000
Table11—MaximumAllowablePipeLength ---Ft(M)(Continued)
NON-DIRECT
DIRECT VENT (2-PIPE) ONLY
TERMINATION
TYPE
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor3-in
Concentric
2Pipeor3-in.
Concentric
DIRECT VENT (2-PIPE) ONLY
TERMINATION
TYPE
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor3-in
Concentric
2Pipeor3-in.
Concentric
PIPE DIA
IN. (mm)*
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
2-1/2 (64) 2-1/2 (64)
3 (76) 3 (76)
3 (76)† no disk NA
4 (102)† no
PIPE DIA
IN. (mm)*
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
1-1/2 (38) 1-1/2 (38)
2 (51) 2 (51)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
2-1/2 (64) 2-1/2 (64)
3 (76) 3 (76)
3 (76)† no disk NA
4 (102)† no
NA 3 (76)†
disk
NA 3 (76)†
disk
VENT (1-PIPE)
ONLY
PIPE DIA
IN. (mm)*
4 (102)† no disk
NON-DIRECT
VENT (1-PIPE)
ONLY
PIPE DIA
IN. (mm)*
4† no disk
NUMBER OF 90° ELBOWS
1 2 3 4 5 6
49
(14.9)44(13.4)39(11.9)34(10.4)33(10.1)28(6.5)
66
(20.1)65(19.8)63(19.2)62(18.9)60(18.3)59(18.0)
12
(3.7)7(2.1)
53
(16.2)48(14.6)46(14.0)41(12.5)40(12.2)38(11.6)
36
(11.0)31(9.4)19(5.8)14(4.3)12(3.7)
66
(20.1)65(19.8)63(19.2)62(18.9)60(18.3)59(18.0)
25
(7.6)17(5.2)8(2.4)7(2.1)
63
(19.2)58(17.7)53(16.2)48(14.6)43(13.1)38(11.6)
20
(6.1)13(4.0)7(2.1)
46
(14.0)44(13.4)43(13.1)41(12.5)40(12.2)38(11.6)
61
(18.6)56(17.1)51(15.5)46(14.0)41(12.5)36(11.0)
NUMBER OF 90° ELBOWS
1 2 3 4 5 6
46
(14.0)41(12.5)36(11.0)31(9.4)29(8.8)24(7.3)
62
(18.9)60(18.3)58(17.7)56(17.1)55(16.8)53(16.2)
11
(3.4)6(1.8)
49
(14.9)44(13.4)42(12.8)37(11.3)35(10.7)34(10.4)
33
(10.1)28(8.5)17(5.2)12(3.7)10(3.0)
62
(18.9)60(18.3)58(17.7)56(17.1)55(16.8)53(16.2)
23
(7.0)15(4.6)7(2.1)5(1.5)
59
(18.0)54(16.5)49(14.9)44(13.4)39(11.9)34(10.4)
10
(3.0)
43
(13.1)41(12.5)39(11.9)37(11.3)35(10.7)34(10.4)
35
(10.7)30(9.1)25(7.6)20(6.1)15(4.6)10(3.0)
NA NA NA NA NA
NA NA NA NA
NA
NA NA
NA NA NA
NA NA NA NA
NA
NA NA
-- 4 1 --
Page 42
Table11—MaximumAllowablePipeLength ---Ft(M)(Continued)
ALTITUDE (FT)
9001 to 10,000‡
(2743 to 3048)
* Disk usage-Unless otherwise specified, use perforated disk assembly (factory-supplied in loose parts bag). # If one disk is stated, separate 2 halves of perforated disk assembly and use shouldered disk half. When using shouldered disk half, install screen sidetowardinletbox. † Wide radius elbow. ‡ Vent sizing for Canadian installations over 4500 ft (1370 M) above sea level are subject to acceptance by the local authorities having jurisdiction. NA-Not Allowed;
pressure switch will not make.
NOTES:
1. Do not use pipe size greater than those specified in table or incomplete combustion, flame disturbance, or flame sense lockout may occur.
2. Size both the combustion-air and vent pipe independently, then use the larger diameter for both pipes.
3. Assume two 45° elbows equal one 90° elbow. Wide radius elbows are desirableandmayberequiredinsomecases.
4. Elbows and pipe sections within the furnace casing and at the vent termination should not be included in vent length or elbow count.
5. The minimum pipe length is 5 ft (1.5 M) for all applications.
6. Use 3-in. (76 mm) diameter vent termination kit for installations requiring 4-in (102 mm) diameter pipe.
UNIT SIZE
(BTUH)
40,000
60,000
80,000
100,000
120,000
DIRECT VENT (2-PIPE) ONLY
TERMINATION
TYPE
2Pipeor2-in 1-1/2 (38) 1-1/2 (38)
Concentric 2 (51) 2 (51)
2Pipeor2-in
Concentric
2Pipeor2-in
Concentric
2Pipeor3-in
Concentric
2Pipeor3-in.
Concentric
PIPE DIA
IN. (mm)*
2 (51) 2 (51)
2 (51) 2 (51)
2-1/2 (64) 2-1/2 (64)
2-1/2 (64) 2-1/2 (64)
3 (76) 3 (76)
NA 3 (76)†
4 (102)† no
disk
NON-DIRECT
VENT (1-PIPE)
ONLY
PIPE DIA
IN. (mm)*
4 (102)† no disk
NUMBER OF 90° ELBOWS
1 2 3 4 5 6
42
(12.8)37(11.3)32(9.8)27(8.2)25(7.6)20(6.1)
57
(17.4)55(16.8)53(16.2)51(15.5)49(14.9)47(14.3)
45
(13.7)40(12.2)38(11.6)33(10.1)31(9.4)29(8.8)
30
(9.1)25(7.6)14(4.3)9(2.7)7(2.1)
57
(17.4)55(16.8)53(16.2)51(15.5)49(14.9)47(14.3)
21
(6.4)13(4.0)5(1.5)
54
(16.5)49(14.9)44(13.4)39(11.9)34(10.4)29(8.8)
39
(11.9)37(11.3)35(10.7)33(10.1)31(9.4)29(8.8)
10
(3.0)5(1.5)
NA NA NA NA
NA NA NA
NA
FURNACE
NOT IN HORIZONTAL SECTION
PIPE DIAMETER
TRANSITION IN
VERTICAL SECTION
Fig. 39 -- Combustion--Air and Vent Pipe Diameter
Transition Location and Elbow Configuration
A93034
COMBUSTION – AIR
3/8 ID TUBE
3/16
DRILL
INTAKE HOUSING
4″MIN
TO OPEN
DRAIN
(102 mm)
TRAP
Fig. 40 -- Air Intake Housing Plug Fitting Drain
BURNER BOX
COMBUSTION-AIR PIPE (DIRECT VENT/2 PIPE)
COMBUSTION-AIR PIPE (NON-DIRECT VENT/1-PIPE)
A05093
-- 4 2 --
Page 43
COMBUSTION AIR
PIPE (NON-DIRECT
VENT/1-PIPE)
12″ MIN
(305 mm)
COMBUSTION AIR PIPE (DIRECT VENT /2-PIPE)
COMBUSTION AIR
PIPE (NON-DIRECT
VENT/1-PIPE)
12″ MIN
(305 mm)
VENT PIPE
COMBUSTION AIR
PIPE (NON-DIRECT
VENT/1-PIPE)
VENT PIPE
HORIZONTAL TO ROOF HORIZONTAL TO SIDEWALL
COMBUSTION AIR PIPE (DIRECT VENT /2-PIPE)
VENT PIPE
COMBUSTION AIR
PIPE (NON-DIRECT
VENT/1-PIPE)
12″ MIN
(305 mm)
VERTICAL TO SIDEWALLVERTICAL TO ROOF
NOTE: A 12-in. (305 mm) minimum offset pipe section is recommended with
short (5-ft. to 8-ft (1.5 to 2.4 M)) vent systems. This recommendation is to reduce excessive condensate droplets from exiting the vent pipe.
Fig. 41 -- Short Vent (5 to 8 ft (1.5 to 2.4 M)) System
COMBUSTION AIR PIPE (DIRECT VENT/2-PIPE)
COMBUSTION AIR PIPE (DIRECT VENT /2-PIPE)
12″ MIN
(305 mm)
VENT PIPE
A05094
Roof Te rmination (Preferred)
At least 36 in.
Vertical separation between combustion
air and vent 8 3/4 in. (222mm)for 3 in. (76mm)kit 6 3/4 in. (172mm)for 2 in. (51mm) kit
Maintain 12 in. (305mm)min. clearance above highest anticipated snow level Maximum of 24 in.(614mm) above roof
Note: "A" denotes 0 to < 2 in. Between the first 2 vents Third vent must be > 36 in. away
18 in. maximum
90°
(457mm)
At least 36 in
(914mm)
(51mm)
91
(
A
Abandoned masonry used as raceway (per code)
(914mm)
12
in. min from
overhang or roof
(typ)
in.
(305mm)
At least 36 in.
(914mm)
12
in. (305mm)
separation between
A
.
m)
4m
bottom ofcombustion air and bottom of vent (typ)
Maintain 12 min. clearance above highest anticipated snow level or grade whichever is greater (typ)
Concentric Vent and Combustion Air Roof Termination (preferred)
A
Side wall termination
in. (305mm) above highest snow level
of less than 12
At least
36 in.
(914mm)
A
Fig. 42 -- Combustion Air and Vent Pipe Termination for Direct Vent (2-pipe) System
Maintain 12 in.
(305mm)
min. clearance above highest anticipated snow level, maximum of 24 in. above roof
1
in. (25mm) maximum (typ) from wall to inlet
12
in. (305mm) minimum from
overhang or roof
A
t le
a
3
st
6
A
in
.
Concentric Vent and Combustion - Air Side Te rmination
Maintain 12 in. min. clearance above highest anticipated snow level or grade whichever is greater
(305mm)
A05090
-- 4 3 --
Page 44
Roof Termination (Preferred)
Ven t
(305mm)
Maintain 12 in .
minimum clearance
above highest anticipated
snow level maximum of
24 in. (610mm) above roof.
Abandoned masonry used as raceway (per code)
12 in. min. (305 mm)from
overhang or roof
Sidewall Ter mi n a ti o n
with Straight Pipe (preferred)
90°
Side wall termination with 2 elbows (preferred)
12 in. (305 mm) min. from
overhang or roof
Maintain 12 in. (305mm) minimum clearance above highest anticipated snow level or grade whichever is greater.
6 in. (152mm) minimum clearance
between wall and end of vent pipe.
10 in. (254mm) maximum pipe length
Fig. 43 -- Vent Pipe Termination for Non-Direct Vent (1-pipe) System
Maintain 12 in. (305mm) minimum clearance above highest anticipated snow level or grade whichever is greater
A05091
!
WARNING
CARBON MONOXIDE POISONING AND PROPERTY DAMAGE HAZARD
Failure to follow this warning could result in property damage, personal injury or death.
Vent pipe must be installed and fully seated against inducer housing internal stop. Clamp must be tightened to prevent any condensate leakage.
6. Install casing hole filler cap (factory-supplied in loose parts bag) in unused vent pipe casing hole.
Attachment of Vent Extension Pipe
Furnaces with 100,000 Btuh and larger input are supplied with a PVC vent extension pipe (2--in. (51 mm) diameter by 12--in. (305 mm) long). This pipe has a built-in channel to assist vent condensate disposal. When this vent extension pipe is supplied, it MUST be used to connect the field vent pipe to furnace inducer housing on ALL upflow and downflow applications.
NOTE: See label on vent extension pipe for proper installation. This pipe may be shortened if an elbow is used to connect vent extension tube to field-installed v ent pipe.
Installation Guidelines for Combustion Air Pipe and Vent Pipe
It is recommended that all pipes be cut, prepared, and pre-assembled before permanently cementing any joint.
1. Attach combustion air pipe and vent pipe per instructions in sections “Combustion Air Pipe” and “Vent Pipe.”
2. Working from furnace to outside, cut pipe to required length(s).
3. Deburr inside and outside of pipe.
4. Chamfer outside edge of pipe for b etter distribution of primer and cement.
5. Clean and dry all surfaces to be joined.
6. Check dry fit of pipe and mark insertion depth on pipe.
7. After pipes have been cut and preassembled, apply generous layer of cement primer to pipe fitting socket and end of pipe to insertion mark. Quickly apply approved cement to end of pipe and fitting socket (over primer). Apply cement in a light, uniform coat on inside of socket to prevent buildup of excess cement. Apply second coat.
8. While cement is still wet, twist pipe into socket with 1/4 turn. Be sure pipe is fully inserted into fitting socket.
9. Wipe excess cement from joint. A continuous bead of cement will be visible around perimeter of a properly made joint.
10. Handle pipe joints carefully until cement sets.
11. Horizontal portions of the venting system shall be supported to prevent sagging support. Support combustion air piping (if applicable) and vent piping a minimum of every 5 ft (1.5 M)(3 ft (.9 M) for SDR-21 or -26 PVC) using perforated metal hanging strap.
12. Slope combustion air piping (if applicable) and vent piping downward towards furnace a minimum of 1/4 in. (6 mm) per linear ft with no sags between hangers.
13. Horizontal portions of the venting system shall be installed so as to prevent the accumulation of condensate.
14. Use appropriate methods to seal openings where combustion air pipe (if applicable) and vent pipe pass through roof or sidewall.
VENT TERMINATION
General
Combustion-air (direct vent/2-pipe system only) and vent pipe must terminate outside structure, either through sidewall or roof. For vent termination clearance, refer to Table 8 for Direct Vent/2-Pipe system and Table 9 for Non-direct Vent/1-Pipe system. For exterior piping arrangements, refer to Fig. 42 for Direct Vent/2-Pipe system and Fig. 43 for Non-Direct/1-Pipe system.
Roof termination is preferred since it is less susceptible to damage or contamination, and it has less visible vent vapors. Sidewall termination require sealing or shielding of building
-- 4 4 --
Page 45
surfaces with a corrosive resistance material due to corrosive combustion products of vent system.
NOTE: (Direct Vent/2-Pipe system ONLY) A factory accessory termination kit MUST be used. See section “Vent Termination Kit (Direct Vent/2-Pipe System Only)” in this instruction.
When determining appropriate location for termination, consider the following guidelines:
1. Comply with all clearance requirements stated in Table 8 or Table 9 per application.
2. Termination or termination kit should be positioned where vent vapors will not damage plants/shrubs or air conditioning equipment.
3. Termination or termination kit should be positioned so that it will not be affected by wind eddy, such as inside building corners, nor by recirculation of flue gases, airborne leaves, or light snow.
4. Termination or termination kit should be positioned where it will not be damaged by or subjected to foreign objects such as stones, balls, etc.
5. Termination or termination kit should be positioned where vent vapors are not objectionable.
Extended Exposed Sidewall Pipes
Sidewall combustion air pipe termination (direct vent/2-pipe system only) and vent pipe termination may be extended beyond
EXAMPLE: An 080-12 size furnace located in Indianapolis, elevation
650 ft (198 M) above sea level, could be installed as either a direct vent/2-pipe system that requires 3 elbows and 32 ft (9.7 M) of vent pipe, along with 5 elbows and 34 ft (10.3 M) o f combustion-air pipe OR a non-direct vent/1-pipe system that requires 3 elbows and 32 ft (9.7 M) vent pipe.
For a direct vent/2-pipe system, Table 11 indicates this application would allow a 2--in. (51 mm) diameter vent pipe, but require a 2-1/2 in. (64 mm) diameter combustion air pipe. According to Table 11, 2--in. (51 mm) diameter pipe is good for 35 ft ( with 3 elbows, but only 30 ft (9.1 M) with 5 elbows. Therefore, 2-1/2 in. (64 mm) diameter pipe must be used for both vent and combustion-air pipes since larger required diameter must always be used for both pipes.
For a non-direct vent/1-pipe system, Table 11 indicates that this application would allow a 2--in. (51 mm) diameter vent pipe. If same installations were in Albuquerque, elevation 5250 ft (1600 M)above sea level:
For a direct vent/2-pipe system, Table 11 indicates that 2-1/2 in. (64 mm) diameter vent pipe and combustion-air pipe are required.
For a non-direct vent/1-pipe system, Table 1 indicates that 2-1/2-in. (64 mm) diameter vent pipe is required.
If same applications are to be installed at 5001-to 6000 ft (1524.3 to 1828.8 M) elevation:
For a direct vent/2-pipe system, 2--in. (51 mm) pipe is only good for 23 ft (7.0 M) (with 3 elbows) and 17 ft (5.2 M) (with 5 elbo w s). Therefore, 2-1 /2 in. (64 mm) diameter combustion air and vent pipe must be used.
For a non-direct vent/1-pipe system, a 2--in. (51 mm) diameter pipe is only good for 23 ft (7.0 M)with 3 elbows. A 2-1/2-in. (64 mm) diameter vent pipe must be used.
areashowninFig.42orinFig.43perapplicationinoutside ambient by insulating pipe as indicated in Table 10.
1. Determine combustion air pipe diameter (direct vent/2-pipe system only) and vent pipe diameter, as stated above, using total p ipe length and number of elbows.
2. Using winter design temperature (used in load calculations), find appropriate temperature for your application and furnace model.
3. Determine required insulation thickness for exposed pipe length(s).
NOTE: Pipe length (ft / M) specified for maximum pipe lengths located in unconditioned spaces cannot exceed total allowable pipe length as specified in Table 11.
Vent Termination Kit (Direct Vent/2-Pipe System Only)
NOTE: Always refer to the instructions in termination kit for the
latest version.
Combustion air and vent pipes MUST terminate outside structure. A factory accessory termination kit must be installed as shown in Table 12. There are four options of vent/combustion air termination kits available as shown in Table 12.
NOTE: Combustion air pipe must have the same diameter as vent pipe.
Concentric Vent/Combustion Air Termination Kit (Direct Vent/2-Pipe System Only)
Determine an appropriate location for termination kit using the guidelines provided in section “Vent Termination:General” in this instruction.
1. Cut one 4-in. (102 mm) diameter hole for 2-- in. (51 mm) kit, or one 5-in. (127 mm) diameter hole for 3-in. (76 mm) kit.
2. Loosely assemble concentric vent/combustion air termination components together using instructions in kit.
3. Slide assembled kit with rain shield REMOVED through hole.
NOTE: Do not allow insulation or other materials to accumulate inside of pipe assembly when installing it through hole.
Roof terminations — Locate assembly through roof to appropriate height as shown in Fig. 42.
Sidewall terminations — Locate assembly through sidewall with rain shield positioned no more than 1-in. (25 mm) from wall as shown in Fig. 42.
4. Disassemble loose pipe fittings. Clean and cement using same procedures as used for system piping.
5. Check required dimensions as shown in Fig. 42.
Two-Pipe Termination Kit (Direct Vent/2-Pipe System Only Determine an appropriate location for termination kit using the guidelines provided in section “Vent Termination: General” in this instruction.
1. Cut 2 holes, 1 for each pipe, of appropriate size for pipe size being used.
2. Loosely install elbow in bracket and place assembly on combustion-air pipe.
Roof terminations —Loosely install pipe coupling on properly cut vent pipe. Coupling must be positioned so bracket will mount as shown in Fig. 42.
For applications using combustion-air pipe option, indicated by dashed lines in Fig. 42, install 90° street elbow into 90° elbow, making a U-fitting. A 180° U-fitting may be used.
-- 4 5 --
Page 46
Tab l e 12 – Vent Termination Kit for Direct Vent/2-Pipe System
DIRECT VENT (2-PIPE) TERMINATION KIT TERMINATION SYSTEM DIAM. OF COMBUSTION AIR AND VENT
2-in. (51 mm) Concentric Vent Kit Single Penetration of Wall or Roof 1, 1 --- 1/2, 2, or 2---1/2 (25, 38, 51, 64 mm)
3-in. (76 mm)Concentric Vent Kit Single Penetration of Wall or Roof 2--- 1/2, 3 or 4 (64, 76, 102 mm)
2-in. (51 mm)Termination Bracket Kit 2- -- Pipe Termination System 1, 1 --- 1/2 or 2 (25, 38, 51mm)
3-in. (76 mm) Termination Bracket Kit 2 ---Pipe Termination System 2--- 1/2, 3 or 4 (64, 76, 102 mm)
Sidewall terminations —Install bracket as shown in Fig. 42.
For applications using vent pipe option indicated by dashed lines in Fig. 42, rotate vent elbow 90° from position shown in Fig. 42.
3. Disassemble loose pipe fittings. Clean and cement using
See Fig. 44 for example of possible field drain attachment using 1/2-in. (13 mm) CPVC or PVC tee for vent and A/C or humidifier drain connection.
Outdoor draining of the furnace is permissible if allowed by local codes. Caution should be taken when freezing ambient may freeze drain pipe and prohibit draining.
PIPES --- IN (mm)
same procedures as used for system piping.
4. Check required dimensions as shown in Fig. 42.
Multiventing and Vent T
erminations
When 2 or more 58MEB Furnaces are vented near each other, each furnace must be individually vented. NEVER common vent or breach vent 58MEB furnaces.
(Direct Vent/2-Pipe System ONLY)-When 2 or more 58MEB furnaces are vented near each other, 2 vent terminations may be installed as shown in Fig. 42, but next vent termination must be at
PERSONAL INJURY AND PROPERTY DAMAGE HAZARD
Failure to follow this warning could result in property damage, personal injury , or death.
Excessive condensate draining may cause saturated soil conditions which could result in damage to plants.
!
WARNING
least 36 in. (914 mm) away from first 2 terminations. It is important that vent terminations be made as shown in Fig. 42 to avoid recirculation of flue gases.
Step 11—Condensate Drain
GENERAL
Condensate trap is shipped installed in the blower shelf and factory connected for UPFLOW applications. Condensate trap must be RELOCATED for use in DOWNFLOW and HORIZONTAL applications.
Condensate trap MUST be used for all applications. An external trap is not required when connecting the field drain
to this condensate trap.
CONDENSATE DRAIN PROTECTION
Freezing condensate left in condensate trap and drain line may cause cracks, and possible water damage may o ccur. If freeze protection is required, use condensate freeze protection accessory or equivalent 3 to 6 watt per ft at 120–v and 40°F(4°C) self-regulating, shielded, and waterproof heat tape. See Installation Instructions supplied with accessory or heat tape manufacturer’s recommendations.
1. Fold heat tape in half and wrap on itself 3 times.
2. Locate heat tape between sides of condensate trap back. (See Fig. 45.)
The field drain connection (condensate trap or drain tube coupling) is sized for l/2-in. (13 mm) CPVC, 1/2-in. (13 mm) PVC, or 5/8-in. (16 mm) ID tube connection.
Drain pipe and fittings must conform to ANSI standards and ASTM D1785, D2466 or D2846. CPVC or PVC cement must conform to ASTM D2564 or F493. Primer must conform to ASTM F656. In Canada, use CSA o r ULC listed schedule 40 CPVC or PVC drain pipe, fittings, and cement.
When a condensate pump is required, select a pump which is approved for condensing furnace applications. To avoid condensate spillage, select a pump with an overflow switch.
OPEN STAND
PIPE FOR
A/C OR
HUMIDIFIER
DRAIN
Furnace condensate is mildly acidic, typically in the pH range of
3.2 to 4.5. Due to corrosive nature of this condensate, a
TEE
condensate pH n eutralizing filter may be desired. Check with local authorities to d etermine if a pH neutralizer is required.
APPLICATION
The furnace, A/C, and humidifier drains may be combined and
TO OPEN DRAIN
drained together. The A/C drain must have an external, field­supplied trap prior to the furnace drain connection. All drain connections (furnace, A/C, or humidifier) must be terminated into an open or vented drain as close to the respective equipment as possible to prevent siphoning of the equipment’s drain.
Fig. 44 -- Example of Field Drain Attachment
A94054
-- 4 6 --
Page 47
CONDENSATE TRAP
WIRE TIE(S)
HEAT TAPE
(3 WRAPS MINIMUM)
A93036
Fig. 45 -- Condensate Trap Heat Tape
3. Use wire ties to secure heat tape in place. Wire ties can be positioned in notches of condensate trap sides. (See Fig. 45.)
4. Wrap field drain pipe with remaining heat tape, approximately 1 wrap per ft.
5. When using field-supplied heat tape, follow h eat tape manufacturer’s instructions for all other installation guidelines.
START-UP, ADJUSTMENTS, AND
SAFETY CHECK
Step 1—General
1. Furnace must have a 115-v power supply properly connected and grounded.
NOTE: Proper polarity and proper grounding must be maintained for 115-v wiring. If polarity is incorrect, controlled LED status indicator will flash rapidly and furnace will not operate.
2. Thermostat wire connections at terminals R, W, G, and Y/Y2 must be made at 24-v terminal block on furnace control.
3. Natural gas service pressure must not exceed 0.5 psig (14-in. wc), and be no less than 0.16 psig (4.5-in. wc).
4. Blower access panel must be in place to complete 115-v electrical circuit to furnace.
Step 2—Prime Condensate Trap With Water
!
CAUTION
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent unit operation.
Condensate trap must be PRIMED or proper draining may not occur. The condensate trap has 2 internal chambers which can ONLY be primed by pouring water into the inducer drain side of condensate trap.
1. Remove upper inducer housing drain connection cap. (See Fig. 46.)
2. Connect field-supplied 1/2-in. (13 mm) ID tube to upper inducer housing drain connection.
3. Insert field-supplied funnel into tube.
4. Pour 1 quart of water into funnel/tube. Water should run through inducer housing, overfill condensate trap, and flow into open field drain. (See Fig. 47.)
5. Remove funnel and tube from inducer housing and replace drain connection cap and clamp.
Step 3—Purge Gas Lines
If not previously done, purge lines after all connections have been made and check for leaks.
!
CAUTION
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent unit operation.
These furnaces are equipped with a manual reset limit switch in burner box. This switch will open and shut off power to gas valve if an overheat condition (flame rollout) occurs in burner enclosure. Correct inadequate combustion-air supply or improper venting condition and reset switch. DO NOT jumper this switch.
Before operating furnace, check flame roll-out manual reset switch for continuity. If necessary, press button to reset switch.
-- 4 7 --
A99118
Fig. 46 -- Inducer Housing Drain Tube Cap
!
WARNING
FIRE AND EXPLOSION HAZARD
Failure to follow this warning could result in property damage, personal injury , or death.
Never purge a gas line into a combustion chamber. Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections.
Page 48
A99119
Fig. 47 -- Filling Condensate Trap
Step 4—Sequence of Operation
!
CAUTION
FURNACE MAY NOT OPERATE
Failure to follow this caution may result in intermittent furnace operation.
Furnace control must be grounded for proper operation, or control will lock out. Control is grounded through green/yellow wire connected to gas valve and burner box screw.
Using schematic diagram, follow sequence of operation through different modes. (See Fig. 35.) Read and follow wiring diagram carefully.
NOTE: If a power interruption occurs during a call for heat (W), the control will start a 90-second blower-only ON period two seconds after power is restored, if the thermostat is still calling for gas h eating. The Amber status code LED light will flash code 12 during the 90-second period, after which the LED will be ON continuous, as long as no faults are detected. After the 90-second period, the furnace will respond to the thermostat normally.
The blower door must be installed for power to be conducted through the blower door interlock switch ILK to the furnace control CPU, transformer TRAN, inducer motor IDM, blo wer motor BLWM, hot-surface igniter HSI, and gas valve GV.
HEATING MODE
(See Fig. 31 for thermostat connections.)
The wall thermostat “calls for heat,” closing the R to W circuit. The furnace control performs a self-check, verifies the pressure switch contacts PRS are open, and starts the inducer motor IDM.
a. Inducer Prepurge Period- As the inducer motor IDM
comes up to speed, the pressure switch contacts PRS close to begin a 15-second prepurge period.
b. Igniter Warm-Up-At the end of the prepurge period,
the Hot-Surface igniter HSI is energized for a 17-second igniter warm-up period.
c. Trial-for-Ignition Sequence-When the igniter
warm-up period is completed the main gas valve relay contacts GVR-1 and-2 close to energize the gas valve GV, the gas valve opens, and 24 vac power is supplied for a field-installed humidifier at the HUM terminal. The gas valve GV permits gas flow to the burners where it is ignited by the Hot Surface Igniter HSI. Five seconds after the GVR-1 closes, a 2-second flame period begins. The HSI igniter will remain energized until the flame is sensed or until the 2-second flame proving period begins.
d. Flame-Proving- When the burner flame is proved at
the flame-proving sensor electrode FSE, the furnace control CPU begins the blower-ON delay period and continues to hold the gas valve GV open. If the burner flame is not proved within two seconds, the control CPU will close the gas valve GV, and the control CPU will repeat the ignition sequence for up to three more Trials-For-Ignition before going to Ignition-Lockout. Lockout will be reset automatically after three hours, or by momentarily interrupting 115 vac power to the furnace, or by interrupting 24 vac power at SEC1 or SEC2 to the furnace control CPU (not at W,G,R, etc.). If flame is proved when flame should not be present, the furnace control CPU will lock out of Gas-Heating mode and operate the inducer motor IDM until flame is no longer proved.
e. Blower-On Delay- If the burner flame is proven, the
blower motor is energized on HEAT speed 66 seconds after the gas valve GV is energized. Simultaneously, the electronic air cleaner terminal EAC-1 is energized and remains energized as long as the blower motor BLWM is energized.
f. Blower-Off Delay-When the thermostat is satisfied,
the R-to-W circuit is opened, de-energizing the gas valve GV, stopping gas flow to the burners, and de-energizing the humidifier terminal HUM. The inducer motor IDM will remain energized for a 15-second post-purge period. The blower motor BLWM and air cleaner terminal EAC-1 will remain energized for 90, 120, 150, or 180 seconds (depending on the blower-OFF delay selection). The furnace control CPU is factory-set for a 120-second blower-OFF delay.
COOLING MODE
The thermostat “calls for cooling.”
a. Single-Speed Cooling
(See Fig. 48, 50, and 52 for thermostat connections) The thermostat closes the R to G-and-Y circuits. The R
to Y circuit starts the outdoor unit, and the R to G-and-Y/Y2 circuits start the furnace blower motor BLWM on COOL speed.
The electronic air cleaner terminal EAC-1 is energized with 115 vac when the blower motor BLWM is operating. When the thermostat is satisfied, the R to G-and-Y circuits are opened. The outdoor unit will stop, and the furnace blower motor BLWM will continue operating on the COOL speed for an
-- 4 8 --
Page 49
additional 90 seconds. Jumper Y/Y2 to DHUM to reduce the cooling off-delay to 5 seconds. (See Fig. 31.)
b. Two-Speed Cooling
(See Fig. 49, 51, 53, and 54 for thermostat connections.) The thermostat closes the R to G-and-Y1 circuits for low-cooling or closes the R to G-and-Y1-and-Y2 circuits for high-cooling. The R to Y1 circuit starts the outdoor unit on low-cooling speed, and the R to G-and-Y1 circuit starts the furnace blower motor BLWM on low-cool speed (same speed as FAN). The R to Y1-and-Y2 circuits start the outdoor unit on high-cooling speed, and the R to G-and-Y/Y2 circuits start the furnace blower motor BLWM on COOL speed. The electronic air cleaner terminal EAC-1 is energized with 115 vac whenever the blower motor BLWM is operating. When the thermostat is satisfied, the R to G and-Y1 or R to G and-Y1 and-Y2 circuits are opened. The outdoor unit stops, and the furnace blower BLWM and electronic air cleaner terminal EAC-1 will remain energized for an additional 90 seconds. Jumper Y1 to DHUM to reduce the cooling off-delay to 5 seconds. (See Fig. 31.)
THERMIDISTAT MODE
(See Fig. 48 -- 51 for Thermidistat connections.) The dehumidification output, DHUM on the Thermidistat should
be connected to the furnace control thermostat terminal DHUM. When there is a dehumidify demand, the DHUM input is activated, which means 24 vac signal is removed from the DHUM input terminal. In other words, the DHUM input logic is reversed. The DHUM input is turned ON when no dehumidify demand exists. When 24 vac is initially detected by the furnace control on the DHUM input, the furnace control operates in Thermidistat mode. If the DHUM input is low or OFF for more than 48 hours, the furnace control reverts back to non-Thermidistat mode.
The cooling operation described in item 2. above also applies to operation with a Thermidistat. The exceptions are listed below:
a. When the R to G-and-Y1 circuit is closed and there is
a demand for dehumidification, the furnace blower motor BLWM will continue running at low-cool speed (same speed as FAN).
b. When the R to G-and Y/Y2 circuit is closed and there
is a demand for dehumidification, the furnace blower motor BLWM will drop the blower speed from COOL to HEAT for a maximum of 10 minutes before reverting back to COOL speed. If there is still a demand for dehumidification after 20 minutes, the furnace control CPU will drop the blower speed back to HEAT speed. This alternating 10-minute cycle will continue as long as there is a call for cooling.
c. When the “call for cooling” is satisfied while there is a
demand for dehumidification, the cooling blower-off delay is decreased from 90 seconds to 5 seconds.
A00268
Fig. 48 -- Single-Stage Furnace with Single-Speed
Air Conditioner
A00269
Fig. 49 -- Single Stage Furnace with Two-Speed
Air Conditioner
-- 4 9 --
Page 50
HUMIDFIER
(24VAC)
Fig. 50 -- Single-Stage Furnace with Single-Speed
Heat Pump (Dual Fuel)
A00270
A02102
Fig. 52 -- Dual Fuel Thermostat with Single--Stage Furnace
and Single--Speed Heat Pump
HUMIDFIER
(24VAC)
Fig. 51 -- Single-Stage Furnace with Two-Speed
Heat Pump (Dual Fuel)
A00271
A02103
Fig. 53 -- Dual Fuel Thermostat with Single--Stage Furnace
and Two--Speed Heat Pump
-- 5 0 --
Page 51
HUMIDFIER
(24VAC)
A02161
Fig. 54 -- Two-Stage Thermostat with Single-Stage
Furnace and Two-Speed Air Conditioner
NOTES FOR FIGURE 48-54
1. Heat pump MUST have a high pressure switch for dual fuel applications.
2. Refer to outdoor equipment Installation Instructions for additional information and setup procedure.
3. Select the “ZONE” position on the two-speed heat pump control.
4. Outdoor Air Temperature Sensor must be attached in all dual fuel applications.
5. Dip switch No. 1 on Thermidistat should be set in OFF position for air conditioner installations. This is factory default.
6. Dip switch No. 1 on Thermidistat should be set in ON position for heat pump installations.
7. Dip switch No. 2 on Thermidistat should be set in OFF position for single-speed compressor operation. This is factory default.
8. Dip switch No. 2 on Thermidistat should be set in ON position for two-speed compressor operation.
9. Configuration Option No. 10 “Dual Fuel Selection” must be turned ON in all dual fuel applications.
10. NO connection should be made to the furnace HUM terminal when using a Thermidistat.
11. The RVS Sensing terminal “L” should not be connected. This is internally used to sense defrost operation.
12. DO NOT SELECT the “FURNACE INTERFACE” or “BALANCE POINT” option on the two-speed heat pump control board. This is controlled internally by the Thermidistat/Dual Fuel Thermostat.
13. Dip switch D on Dual Fuel Thermostat should be set in OFF position for single-speed compressor operation. This is factory default.
14. Dip switch D on Dual Fuel Thermostat should be set in ON position for two-speed compressor operation.
-- 5 1 --
Page 52
CONTINUOUS BLOWER
When the R to G circuit is closed by the thermostat, the blower motor BLWM will operate on continuous-blower speed (can be adjusted to FAN, HEAT, or COOL speed) at the thermostat. Factory default is FAN speed. Terminal EAC-1 is energized as long as the blower motor BLWM is energized. During a call for heat, the blower BLWM will stop during igniter warm-up (17 seconds), ignition (7 seconds), and blower-ON delay (66 seconds ), allowing the furnace heat exchangers to heat up more quickly, then restarts at the end of the blower-ON delay period at HEAT speed.
In heating, the furnace control CPU will hold the blower motor BLWM at HEAT speed during the selected blower-OFF delay period before reverting to continuous-blower speed. When the thermostat “calls for low-cooling”, the blower motor BLWM will switch to operate at low-cool speed (same speed as FAN). When the thermostat is satisfied, the blower motor BLWM will operate an additional 90 seconds on low-cool speed (same speed as FAN) before reverting back to continuous-blower speed.
When the thermostat “calls for high-cooling”, the blower motor BLWM will operate at COOL speed. When the thermostat is satisfied, the blower motor BLWM will operate an additional 90 seconds on COOL speed before reverting back to continuous-blower speed.
When the R to G circuit is opened, the blower motor BLWM will continue operating for an additional 5 seconds, if no other function requires blower motor BLWM operation. Continuous Blower Speed Selection from Thermostat- To select different continuous-blower speeds from the room thermostat, momentarily turn off the FAN switch or push-button on the room thermostat for 1-3 seconds after the blower motor BLWM is operating. The furnace control CPU will shift the continuous-blower speed from the factory setting of FAN to HEAT speed. Momentarily turning off the FAN switch again at the thermostat will shift the continuous-blower speed from HEAT to COOL. Repeating the procedure will shift the continuous-blower speed from COOL back to FAN speed.
The selection can be changed as many times as desired and is stored in the memory to be automatically used following a power interruption.
MODE
HEAT PUMP MODE
(See Fig. 50 -- 53 for thermostat connections.)
When installed with a heat pump, the furnace control automatically changes the blower timing sequence to avoid long blower off times during demand d efrost cycles. When the R toW-and-Y1 or R to W-and-Y1-and-G circuits are energized the furnace control CPU will switch to or turn on the blower motor BLWM at HEAT speed, and begin a heating cycle. The blower motor BLWM will remain on until the end of the prepurge period, then shut off for 24 seconds then come back on at HEAT speed. When the W input signal disappears, the furnace control begins a normal inducer post-purge period and the blower remains running at HEAT speed for the selected blower-OFF delay period then switches to low-cool speed (same speed as FAN). If the R to W-and-Y1-and-G signals disappear at the same time, the blower motor BLWM will remain on for the selected blower-OFF delay period. If the R to W-and-Y1 signals disappear, leaving the G signal, the blower motor BLWMwill remain on for the selected blower-OFF delay period then switch to continuous-blower speed.
When the R to W-and-Y/Y2, R to W-and-Y/Y2-and-G, R to W-and-Y1-and-Y/Y2, or R to W-and-Y1-and-Y/Y2-and-G circuits are energized the furnace control CPU will switch to o r turn on the blower motor BLWM at HEAT speed, and begin a heating cycle. The blower motor BLWM will remain on until the end of the prepurge period, then shut off for 24 seconds then come back on at HEAT speed. When the W input signal disappears, the furnace control begins a normal inducer post-purge period and the blower switches to COOL speed after a 3-second delay. If the R to W-and-Y/Y2-and-G or R to W-and-Y1-and-Y/Y2-and-G signals disappear at the same time, the blower motor BLWMwill remain on for the selected blower-OFF delay period.If the R to W-and-Y/Y2 or R to W-and-Y1-and-Y/Y2 signals disappear, leaving the G signal, the blower motor BLWM will remain on for the selected blower-OFF delay period then switch to continuous-blower speed.
-- 5 2 --
Page 53
Tab l e 13 – Model 58MEB Orifice Size and Manifold Pressure for Correct Input
For Use with 040 through 120 Size Furnaces Only
(Tabulated Data is Based on 20,000 Btuh per Burner, Derated 2% for Each 1000 Ft Above Sea Level) *
-- 5 3 --
Page 54
Table 13—Model 58MEB Orifice Size and Manifold Pressure for Correct Input (Continued)
For Use with 040 through 120 Size Furnaces Only
(Tabulated Data is Based on 20,000 Btuh per Burner, Derated 2% for Each 1000 Ft Above Sea Level) *
*Orifice numbers 45 shown in BOLD are factory installed. Percents of derate are based on midpoints of U.S. altitude ranges.
*Orifice numbers 45 shown in BOLD are factory installed. Percents of derate are based on midpoints of U.S. altitude ranges.
COMPONENT TEST
NOTE: The furnace control component test allows all
components to run for a short time; except the gas valve and humidifier terminal HUM are not energized for safety reasons. The EAC-1 terminal is energized when the blower is energized. This feature helps diagnose a system problem in case of a component failure. The component test feature will not operate if any thermostat signal is present ant the control and not until all time delays are completed.
To Begin Component Self-Test:
!
WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
Blower access panel door switch opens 115-v power to control. No component operation can occur. Caution must be taken when manually closing this switch for service purposes.
1. Remove blower access door.
2. Disconnect the thermostat R lead from furnace control.
3. Manually close blower door switch.
4. For approximately 2 sec, short (jumper) the COM-24v terminal on control to the TEST/TWIN 3/16--in. (5 mm) quick-connect terminal on control until the LED goes off. Remove jumper from terminals. (See Fig. 36.)
A08375B
NOTE: If TEST/TWIN and COM-24v terminals are jumpered longer than 2 sec, LED will flash rapidly and ignore component test request.
Component test sequence is as follows:
a. LED will display previous status code 4 times.
b. Inducer motor starts and continues to run until Step g
of component test sequence.
c. After 7 seconds the hot surface igniter is energized
for15sec.,thenoff.
d. Blower motor operates on Continuous-FAN speed for
10 sec.
e. Blower motor operates on HEAT speed for 10 sec.
f. Blower motor operates on COOL speed for 10 sec.
g. Inducer motor stops.
5. Reconnect R lead to furnace control, remove tape from blower door switch, and re-install blower door.
6. Operate furnace per instruction on outer door.
7. Verify furnace shut down by lowering thermostat setting below room temperature.
8. Verify that furnace restarts by raising thermostat setting above room temperature.
Step 5—Adjustments
SETGASINPUTRATE
Furnace gas input rate on rating plate is for installations at altitudes up to 2000 ft (609.6 M).
In the U.S.A., the input ratings for altitudes above 2000 ft (609.6 M) must be reduced by 2 percent for each 1000 ft (304.8 M) above sea level.
-- 5 4 --
Page 55
In Canada, the input ratings must be derated by 5 percent for altitudes between 2001 ft to 4500 ft (1524.3 to 1371.6 M) above sea level.
Furnace input rate must be within ± 2 percent of input on furnace rating plate adjusted for altitude.
1. Determine natural gas orifice size and manifold pressure for correct input.
a. Obtain average gas heat value (at installed altitude)
from local gas supplier.
b. Obtain average gas specific gravity from local
gas supplier.
c. Verify furnace model and size. Table 13 can only b e
used for model 58MEB furnaces with rating plate heating inputs (1000’s Btuh) of 040 through 120.
d. Find installation altitude in Table 13.
NOTE: For Canadian altitudes of 2001 to 4500 ft (609.9 to
1371.6 M), use U.S.A. altitudes of 2001 to 3000 ft (609.9 to
914.4 M) in Table 13.
e. Find closest natural gas heat value and specific gravity
in Table 13 or 14.
f. Follow heat value and specific gravity lines to point of
intersection to find orifice size and manifold pressure settings for proper operation.
EXAMPLE: (0-2000 ft (0 -- 609.9 M) altitude using Table 13) Heating value = 1050 Btu/cu ft Specific gravity = 0.62 Therefore: Orifice No. 45 and Manifold pressure 3.6-in. wc *FurnaceisshippedwithNo.45orifices.Inthis
example all main burner orifices are the correct size and do not need to be changed to obtain the proper input rate.
!
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in reduced furnace life.
DO NOT bottom-out gas valve regulator adjusting screw. This can result in unregulated manifold pressure and result in excess overfire and heat exchanger failures.
NOTE: If orifice hole appears damaged or it is suspected to have been redrilled, check orifice hole with a numbered drill bit of correct size. Never redrill an o rifice. A burr-free and squarely aligned orifice hole is essential for proper flame characteristics.
Regulator Seal Cap
Regulator Adjustment Under Cap
½” NPT Outlet
1/8” NPT Manifold Pressure Tap
A07536
“
1/8 NPT Inlet Pressure Tap
ON/OFF Switch
Fig. 55 -- Redundant Automatic Gas Control Valve
Check and verify burner orifice size in furnace. NEVER ASSUME ORIFICE SIZE; ALWAYS CHECK AND VERIFY.
2. Adjust manifold pressure to obtain input rate.
NOTE: Manifold pressure must always be measured with burner enclosure front REMOVED. Gas meter must always be clocked with burner enclosure front INSTALLED.
a. Remove burner enclosure front.
b. Remove seal cap that conceals adjustment screw for
gas valve regulator. (See Fig. 55.)
c. Jumper R and W thermostat connections on control to
start furnace.
d. Turn adjusting screw, counterclockwise (out) to
decrease manifold pressure or clockwise (in) to increase manifold pressure.
NOTE: This furnace has been approved for a manifold pressure of 3.2 in. wc to 3.8 in. wc when installed at altitudes up to 2000 ft (609.6 M). For altitudes above 2000 ft (609.6 M), the manifold pressure can be adjusted from 2.0 in. wc to 3.8 in. wc. If manifold pressure is outside this range, change burner orifices to obtain pressure in this range.
BURNER
ORIFICE
A93059
Fig. 56 -- Orifice Holes
!
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in component damage.
DO NOT redrill orifices. Improper drilling (burrs, out-of round holes, etc.) can cause excessive burner noise and misdirection of burner flames. (See Fig. 56.)
-- 5 5 --
Page 56
e. Replace gas valve regulator adjustment screw seal cap. f. Replace burner enclosure front and verify adjusted gas
input rate using method outlined in Item 3.
g. Look through sight glass in burner enclosure and
check burner flame. Burner flame should be clear blue, almost transparent. (See Fig. 57.)
h. Remove jumper from R and W.
3. Verify natural gas input rate by clocking gas meter.
NOTE: Be sure all pressure tubing, combustion-air and vent pipes, and burner box cover front are in place when checking input by clocking gas meter.
BURNER FLAME
BURNER
MANIFOLD
A89020
Fig. 57 -- Burner Flame
Tab l e 14 – Altitude Derate Multiplier for U.S.A.
ALTITUDE
FT (M)
0–2000
(305--- 610) 2001–3000
(610--- 914)
3001–4000
(914--- 1219)
4001–5000
(1219--- 1524)
5001–6000
1524--- 1829)
6001–7000
(1829--- 2134)
7001–8000
2134--- 2438)
8001–9000
2438--- 2743
9001–10,000
2743--- 3048
* Derate multiplier factors are based on midpoint altitude for altitude range.
PERCENT OF
DERATE
0 1.00
4 --- 6 0.95
6 --- 8 0.93
8 --- 1 0 0.91
10---12 0.89
12---14 0.87
14---16 0.85
16---18 0.83
18---20 0.81
DERATE MULTIPLIER
FACTOR*
EXAMPLE: (0-2000 ft (0--610 M) altitude) Furnace input from rating p late is 100,000 Btuh.
Btu heating input = Btu/cu ft X cu ft/hr Heating value of gas = 975 Btu/cu ft Time for 1 revolution of 2-cu ft dial = 70 sec Gas rate = 103 cu ft/hr (from Table 16) Btu heating input = 103 X 975 = 100,425 Btuh. In this example, the o rifice size and manifold pressure adjustment is within ±2 percent of the furnace input rate.
SET TEMPERATURE RISE
a. Calculate high-altitude adjustment (if required)
UNITED STATES At altitudes above 2000 ft (609.6 M), this furnace has
been approved for a 2 percent derate for each 1000 ft (304.8 M) above sea level. See Table 14 for derate multiplier factor.
EXAMPLE:
100,000 Btuh input furnace installed at 4300 ft.
Furnace Input
Rate
at Sea Level Factor Altitude
100,000 X 0.91 = 91,000
X
Derate
Multiplier
Furnace Input
=
Rate at Installation
CANADA At installation altitudes between 2001 to 4500 ft (609.9
to 1371.6 M), this furnace must be derated 5 percent by an authorized Gas Conversion Station or Dealer. To determine correct input rate for altitude, see example above and use 0.95 as derate multiplier factor.
b. Reinstall burner box cover.
c. Gas valve regulator seal cap MUST be on.
d. Turn off all other gas applications and pilots.
e. Start furnace and let operate for 3 minutes. f. Measure time (in sec) for gas meter to dial to complete
1 revolution. g. RefertoTable15forcuftofgasperhr. h. Multiply gas rate (cu ft/hr) X heating value (Btu/cu ft)
using natural gas heating value from local gas
utility/supplier.
!
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in unit component damage.
T emperature rise must be within limits specified on furnace rating plate. Recommended operation is at midpoint of rise range or slightly above.
Determine and adjust air temperature rise as follows:
1. Place thermometers in return and supply ducts as close to furnace as possible. Be sure thermometers do not see heat exchangers so that radiant heat does not affect readings. This practice is particularly important with straight-run ducts.
2. When thermometer readings stabilize, subtract return-air temperature from supply-air temperature to determine air temperature rise.
3. Adjust temperature rise by adjusting blower speed. Increase blower speed to reduce temperature rise. Decrease blower speed to increase temperature rise.
!
WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
Disconnect 115-v electrical power before changing speed tap.
-- 5 6 --
Page 57
(READ following CAUTION before changing taps)
!
CAUTION
UNIT DAMAGE HAZARD
To avoid operating outside the range and avoid component damage:
1. Never connect Speed Tap 1 (RED) to ’HEAT’.
2. Never connect Speed Tap 2 (ORANGE) to ’HEAT’ on all models except the 036040/040-- 12 unit.
Tab l e 15 – Gas Rate (cu ft/hr)
SECONDS
FOR 1
REVOLUTION
10 360 720 1800 50 72 144 360
11 327 655 1636 51 71 141 355
12 300 600 1500 52 69 138 346
13 277 555 1385 53 68 136 340
14 257 514 1286 54 67 133 333
15 240 480 1200 55 65 131 327
16 225 450 1125 56 64 129 321
17 212 424 1059 57 63 126 316
18 200 400 1000 58 62 124 310
19 189 379 947 59 61 122 305
20 180 360 900 60 60 120 300
21 171 343 857 62 58 116 290
22 164 327 818 64 56 112 281
23 157 313 783 66 54 109 273
24 150 300 750 68 53 106 265
25 144 288 720 70 51 103 257
26 138 277 692 72 50 100 250
27 133 267 667 74 48 97 243
28 129 257 643 76 47 95 237
29 124 248 621 78 46 92 231
30 120 240 600 80 45 90 225
31 116 232 581 82 44 88 220
32 113 225 563 84 43 86 214
33 109 218 545 86 42 84 209
34 106 212 529 88 41 82 205
35 103 206 514 90 40 80 200
36 100 200 500 92 39 78 196
37 97 195 486 94 38 76 192
38 95 189 474 96 38 75 188
39 92 185 462 98 37 74 184
40 90 180 450 100 36 72 180
41 88 176 439 102 35 71 178
42 86 172 429 104 35 69 173
43 84 167 419 106 34 68 170
44 82 164 409 108 33 67 167
45 80 160 400 110 33 65 164
46 78 157 391 112 32 64 161
47 76 153 383 116 31 62 155
48 75 150 375 120 30 60 150
49 73 147 367 124 29 58 145
SIZE OF TEST DIAL
1
Cu Ft2Cu Ft5Cu Ft
SECONDS
FOR 1
REVOLUTION
SIZE OF TEST DIAL
1
Cu Ft2Cu Ft5Cu Ft
ADJUST BLOWER OFF DELAY (HEAT MODE)
The blower off delay has 4 adjustable settings from 90 sec to 180 sec. (See Table 17.) The blower off delay jumpers are located on the furnace control (See Fig. 36). To change the blower off delay setting, move the jumper from one set of pins on the control to the pins used for the desired blower off delay. Factory blower off delay setting is 120 sec.
SETTHERMOSTATHEATANTICIPATOR
When using a nonelectronic thermostat, the thermostat heat anticipator must be set to match the amp draw of the electrical components in R-W circuit. Accurate amp draw readings can be obtained at thermostat subbase terminals R and W. Fig. 58 illustrates the easy method of obtaining actual amp draw. The amp reading should be taken after blower motor has started and furnace is heating. Connect ammeter wires as shown in Fig. 58. The thermostat anticipator should NOT be in the circuit while measuring current. If thermostat has no subbase, the thermostat must be disconnected from R and W wires during current measurement. See thermostat manufacturer’s instructions for adjusting heat anticipator and for varying heating cycle length.
For an electronic thermostat, set cycle rate for 3 cycles per hour.
Tab l e 16 – Speed Selector
FACTORY
COLOR SPEED
Gray 5 Cool
Yellow 4 Spare
Blue 3 Heat
Orange 2 Spare
Red 1 Cont Fan
SHIPPED
CONNECTION
Table 17 – Blower Off Delay Jumper Positions
PINS 1AND2 2AND3 3AND4 4AND5
Time (in sec) 90 120 150 180
Step 6—Check Safety Controls
This section covers the safety controls that must be checked before the installation is complete. The flame sensor, gas valve, and pressure switch were all checked in the Start-up procedure section as part of normal operation.
CHECK PRIMARY LIMIT CONTROL
This control shuts off gas control system and energizes air-circulating blower motor if furnace overheats. Recommended method of checking this limit control is to gradually block off return air after furnace has been operating for a period of at least 5 minutes. As soon as limit control has shut off burners, return-air opening should be unblocked to permit normal air circulation. By using this method to check limit control, it can be established that limit is functioning properly and operates if there is a restricted
return-air duct or motor failure. If limit control does not function during this test, cause must be determined and corrected.
CHECK PRESSURE SWITCH
This control proves operation of draft inducer. Check switch operation as follows:
1. Turn off 115-v power to furnace.
-- 5 7 --
Page 58
2. Remove outer furnace door and disconnect inducer motor from wire harness.
3. Turn on 115-v power to furnace.
THERMOSTAT SUBBASE TERMINALS WITH THERMOSTAT REMOVED
HOOK-AROUND
VOLT/AMMETER
R Y W G
10 TURNS
FROM UNIT 24-VOLT TERMINAL BLOCK
EXAMPLE:
5.0 AMPS ON AMMETER 10 TURNS AROUND JAWS
= 0.5 AMPS FOR THERMOSTAT SETTING
Fig. 58 -- Amp D ra w Check with Ammeter
4. Set thermostat to “call for heat” and wait 1 minute. When pressure switch is functioning properly, hot surface igniter should NOT glow, and control status code LED flashes a Status Code 31. If hot surface igniter glows when inducer motor is disconnected, shut furnace down immediately. Determine reason pressure switch did not function properly and correct condition.
5. Turn off 115-v power to furnace.
6. Reconnect inducer motor leads, reinstall main furnace door, and turn on 115-v power supply.
Step 7—Checklist
1. Put away tools and instruments. Clean up debris.
2. Verify flame-rollout manual reset switch has continuity.
3. Verify that blower and main outer access doors are properly installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer’s instructions.
6. Review User’s Guide with owner.
7. Leave literature packet near furnace.
A80201
-- 5 8 --
Page 59
CHECKLIST—DIRECT VENT (2-PIPE) INSTALLATION
LOAD CALCULATION
Condensate Drain
__________ Heating Load (Btuh)
__________ Cooling Load (Btuh)
__________ Furnace Model Selection
COMBUSTION AIR AND VENT PIPING
Termination Location
__________ Roof or Sidewall
__________ Termination Kit — 2 Pipe or Concentric
__________ Combustion-Air Pipe Length
__________ Combustion-Air Pipe Elbow Quantity
__________ Vent Pipe Length
__________ Vent Pipe Elbow Quantity
__________ Pipe Diameter Determined from Sizing Table
__________ Pipe Sloped To Furnace
Pipe Insulation
__________ Over Ceilings
__________ Unit Level o r Pitched Forward
__________ Internal Tubing Connections Free
of Kinks and Traps
__________ External Drain Connection Leak Tight and sloped
__________ Condensate Trap Primed before Start-Up
__________ Heat Tape Installed if Required
CHECKLIST—START-UP
__________ Gas Input Rate
(Set Within 2 percent of Rating Plate)
__________ Temperature Rise Adjusted
Thermostat Anticipator
__________ Anticipator Setting Adjusted or
__________ Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
__________ Primary Limit
__________ Pressure Switch
__________ Low-Ambient Exposed Pipes
-- 5 9 --
Page 60
CHECKLIST—NON DIRECT VENT (1-PIPE) INSTALLATION
LOAD CALCULATION
Condensate Drain
__________ Heating Load (Btuh)
__________ Cooling Load (Btuh)
__________ Furnace Model Selection
VENT PIPING
Termination Location
__________ Roof or Sidewall
__________ Vent Pipe Length
__________ Vent Pipe Elbow Quantity
__________ Pipe Diameter Determined from Sizing Table
__________ Pipe Sloped To Furnace
Pipe Insulation
__________ Over Ceilings
__________ Low-Ambient Exposed Pipes
__________ Unit Level or Pitched Forward
__________ Internal Tubing Connections
Free of Kinks and Traps
__________ External Drain Connection Leak Tight and Sloped
__________ Condensate Trap Primed before Start-Up
__________ Heat Tape Installed if Required
CHECKLIST—START-UP
__________ Gas Input Rate
(Set Within 2 percent of Rating Plate)
__________ Temperature Rise Adjusted
Thermostat Anticipator
__________ Anticipator Setting Adjusted or
__________ Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
__________ Primary Limit
__________ Pressure Switch
Copyright 2008 Carrier Corp. S 7310 W. Morris St. S Indianapolis, IN 46231 Pri nted in U.S.A. Edition Date: 07/08
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
-- 6 0 --
Catalog No:58MEB--- 01SI
Replaces: NEW
Loading...