Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 6a 8a
PC 101Catalog No. 535-758Printed in U.S.A.Form 58MCA-7SIPg 11-00Replaces: New
Page 2
A99112
"
8
⁄
"
16
"
16
⁄
13
⁄
5
"
8
⁄
5
7
39
1"
"
"
16
⁄
16
⁄
7
11
"
16
⁄
5
19"
"
22
4
⁄
OUTLET
1
"
16
⁄
26
15
"
2
⁄
26
1
28
A
AIRFLOW
"
16
⁄
9
"
16
/
13
D
"
16
/
13
TYP
OUTLET
CONDENSATE DRAIN
TRAP LOCATION
2-IN. COMBUSTION-
TRAP LOCATION
CONDENSATE DRAIN
(DOWNFLOW &
HORIZONTAL LEFT)
⁄2-IN. DIA
1
GAS CONN
AIR CONN
(DOWNFLOW &
OR ALTERNATE
-IN. DIA GAS CONN
2
⁄
1
HORIZONTAL RIGHT)
⁄8-IN. DIA
POWER CONN
7
⁄8-IN. DIA
POWER CONN
7
"
4
⁄
1
TYP
33
⁄2-IN. DIA
1
"
8
⁄
5
TYP
32
"
16
⁄
11
22
2-IN. VENT CONN
THERMOSTAT ENTRY
"
2
⁄
1
30
"
16
⁄
13
"
30
16
⁄
11
TYP
29
"
8
⁄
5
27
⁄8-IN. DIA
ACCESSORY
POWER ENTRY
7
"
16
⁄
9
TYP
27
1
CONDENSATE
DRAIN TRAP
LOCATION
(ALTERNATE
SIDE INLET
"
4
⁄
1
18
"
2
⁄
24
"
16
⁄
5
17
UPFLOW)
"
16
⁄
7
TYP
9
" TYP
4
⁄
1
22
CONDENSATE
INLET
DRAIN LOCATION
11
11
CONDENSATE
"
16
/
E
"
16
/
DRAIN LOCATION
(UPFLOW)
"
16
⁄
3
24
BOTTOM INLET
DIMPLE LOCATORS
(UPFLOW)
HANGING
FOR HORIZONTAL
/2-in. rectangle.
/4-in. rectangle.
1
1
/2 x 19
/2 x 23
1
1
/2 x 12-in. rectangle.
1
c. For 1600 CFM–22-in. round or 14
b. For 1200 CFM–20-in. round or 14
see flex duct manufacturer’s recommendations for equivalent diameters.
a. For 800 CFM–16-in. round or 14
2. Minimum return-air opening at furnace:
NOTES: 1. Minimum return-air openings at furnace, based on metal duct. If flex duct is used,
Dimensions (In.)
literature for specific use of single side inlets. The use of both side inlets, a
combination of 1 side and the bottom, or the bottom only will ensure adequate
return air openings for airflow requirements above 1800 CFM.
d. For airflow requirements above 1800 CFM, see Air Delivery table in Product Data
Fig. 2—Dimensional Drawing
"
16
⁄
"
15
4
⁄
1
"
26
2
⁄
1
26
"
16
⁄
24
5
22
2-IN. COMBUSTION-
AIR CONN
⁄2-IN. DIA
1
GAS CONN
2-IN. VENT CONN
ENTRY
"
16
⁄
11
22
⁄2-IN. DIA THERMOSTAT
1
SIDE INLET
"
2
⁄
1
TYP
14
"
4
⁄
1
1
" TYP
4
⁄
1
23
SIDE INLET
1"
15
" TYP
16
⁄
26
040-0817-1/215-7/816
040-1217-1/215-7/816
060-0817-1/215-7/816
060-1217-1/215-7/816
060-1617-1/215-7/816
080-1217-1/215-7/816
080-1617-1/215-7/816
080-202119-3/819-1/2
100-162119-3/819-1/2
100-202119-3/819-1/2
120-2024-1/222-7/823
UNIT SIZEADE
140-2024-1/222-7/823
2
Page 3
SAFETY CONSIDERATIONS
In Canada, refer to the current edition of the CAN/CGA-B149.1and .2-M95 National Standard of Canada, Natural Gas and
Installing and servicing heating equipment can be hazardous due to
gas and electrical components. Only trained and qualified personnel should install, repair, or service heating equipment. Untrained
personnel can perform basic maintenance functions such as cleaning and replacing air filters. All other operations must be performed by trained service personnel. When working on heating
equipment, observe precautions in literature, on tags, and on labels
attached to or shipped with unit and other safety precautions that
may apply.
Follow all safety codes. In the United States, follow all safety
codes including the National Fuel Gas Code (NFGC) NFPA No.
54-1999/ANSI Z223.1-1999 and the Installation Standards, Warm
Air Heating and Air Conditioning Systems (NFPA 90B)
ANSI/NFPA 90B.
Propane Installation Codes (NSCNGPIC).
Wear safety glasses and work gloves. Have a fire extinguisher
available during start-up and adjustment procedures and service
calls.
Recognize safety information. This is the safety-alert symbol
When you see this symbol on unit or in instructions and manuals,
be alert to potential for personal injury.
Understand the signal words DANGER, WARNING, and CAUTION. These words are used with the safety-alert symbol. DANGER identifies most serious hazards which will result in severe
personal injury or death. WARNING signifies hazards which
could result in personal injury or death. CAUTION is used to
identify unsafe practices which would result in minor personal
injury or product and property damage. NOTE is used to highlight
suggestions which will result in enhanced installation, reliability,
or operation.
INSTALLATION
This forced air furnace is equipped for use with natural gas at altitudes 0 - 10,000 ft (0 - 3,050m), except 140 size Furnaces are only approved for altitudes
0 - 7,000 ft. (0 - 2,135m).
An accessory kit, supplied by the manufacturer, shall be used to convert to propane gas use or may be required for some natural gas applications.
This furnace is for indoor installation in a building constructed on site. This furnace may be installed in a manufactured (mobile) home when stated on rating
plate and using factory authorized kit.
This furnace may be installed on combustible flooring in alcove or closet at minimum clearance from combustible material.
This appliance requires a special venting system. Refer to the installation instructions for parts list and method of installation. This furnace is for use with
schedule-40 PVC, PVC-DWV, CPVC or ABS-DWV pipe, and must not be vented in common with other gas-fired appliances. Construction through which
vent/air intake pipes may be installed is maximum 24 inches (600 mm), minimum 3/4 inches (19 mm) thickness (including roofing materials).
.
Furnace must be installed level, or pitched forward within 1/2 inch
of level for proper drainage. Failure will result in equipment or
property damage. See Installation Manual for IMPORTANT unit
support details on horizontal applications
MINIMUM INCHES CLEARANCE TO
COMBUSTIBLE CONSTRUCTION
ALL POSITIONS:
Mimimum front clearance for service 30 inches (762mm).
*
140 size furnaces require 1 inch back clearance to combustible
††
materials.
DOWNFLOW POSITIONS:
For installation on combustible floors only when installed on
†
special base No. KGASB0201ALL, Coil Assembly, Part No. CD5
or CK5, or Coil Casing, Part No. KCAKC.
HORIZONTAL POSITIONS:
Line contact is permissible only between lines formed by
intersections of top and two sides of furnace jacket, and building
joists, studs, or framing.
Clearance shown is for air inlet and air outlet end.
§
120 and 140 size Furnaces require 1 inch bottom clearance to
Ø
combustible materials.
324999-201 REV. B (LIT)
LEVEL (0")
TO
1/2" MAX
UPFLOW OR
DOWNFLOW
LEVEL (0")
TO
1/2" MAX
FRONT
This furnace is approved for UPFLOW, DOWNFLOW and
HORIZONTAL installations.
FRONT
HORIZONTAL
1"
††
0"
B
A
C
K
SIDE
0"
§
Clearance in inches
TOP/PLENUM
FURNACE
BOTTOM
0"
Ø
†
FRONT
F
R
O
S
E
N
T
3"
Vent clearance to
combustibles 0”.
SIDE
R
V
I
C
§
0"
E
*
30
MIN
A99230
Fig. 3—Clearances to Combustibles
3
Page 4
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS
Electrostatic discharge can affect electronic components.
Take precautions during furnace installation and servicing to
protect the furnace electronic control. Precautions will prevent electrostatic discharges from personnel and hand tools
which are held during the procedure. These precautions will
help to avoid exposing the control to electrostatic discharge
by putting the furnace, the control, and the person at the same
electrostatic potential.
1. Disconnect all power to the furnace. DO NOT TOUCH THE
CONTROL OR ANY WIRE CONNECTED TO THE CONTROL PRIOR TO DISCHARGING YOUR BODY’S ELECTROSTATIC CHARGE TO GROUND.
2. Firmly touch a clean, unpainted, metal surface of the furnace
chassis which is close to the control. Tools held in a person’s
hand during grounding will be satisfactorily discharged.
3. After touching the chassis you may proceed to service the
control or connecting wires as long as you do nothing that
recharges your body with static electricity (for example; DO
NOT move or shuffle your feet, DO NOT touch ungrounded
objects, etc.).
4. If you touch ungrounded objects (recharge your body with
static electricity), firmly touch furnace again before touching
control or wires.
5. Use this procedure for installed and uninstalled (ungrounded)
furnaces.
6. Before removing a new control from its container, discharge
your body’s electrostatic charge to ground to protect the
control from damage. If the control is to be installed in a
furnace, follow items 1 through 5 before bringing the control
or yourself into contact with the furnace. Put all used AND
new controls into containers before touching ungrounded
objects.
7. An ESD service kit (available from commercial sources) may
also be used to prevent ESD damage.
INTRODUCTION
The 58MCA Multipoise Condensing Gas-Fired Series 140 Limited
Furnaces are A.G.A./C.G.A. design certified for natural and
propane gases and for installation in alcoves, attics, basements,
closets, utility rooms, crawlspaces, and garages. The furnace is
factory-shipped for use with natural gas. An A.G.A./C.G.A. listed
gas conversion kit is required to convert furnace for use with
propane gas. The 58MCA 040 through 120 size units are
A.G.A./C.G.A. approved for use in manufactured (mobile) homes
when factory accessory conversion kit is used. The 140 size unit is
NOT approved for use in manufactured (mobile) homes. These
furnaces are suitable for installation in a residence built on site or
a manufactured residence completed at final site. The design of
this furnace line is NOT A.G.A./C.G.A. certified for installation in
recreation vehicles or outdoors.
These furnaces SHALL NOT be installed directly on carpeting,
tile, or any other combustible material other than wood flooring. In
downflow installations, factory accessory floor base MUST be
used when installed on combustible materials and wood flooring.
Special base is not required when this furnace is installed on
manufacturer’s Coil Assembly Part No. CD5 or CK5, or when Coil
Box Part No. KCAKC is used.
These furnaces are shipped with the drain and pressure tubes
connected for UPFLOW applications. Minor modifications are
required when used in DOWNFLOW, HORIZONTAL RIGHT, or
HORIZONTAL LEFT (supply-air discharge direction) applications as shown in Fig. 1. See details in Applications section.
These furnaces are shipped with the following materials to assist in
proper furnace installation. These materials are shipped in the main
blower compartment.
Installer Packet includes:
Installation, Start-Up, and Operating Instructions
Service and Maintenance Instructions
User’s Information Manual
Warranty Certificate
Loose Parts Bag includes:Quantity
Pressure tube extension1
Collector box or condensate trap extension tube1
Inducer housing drain tube1
1/2-in. CPVC street elbow2
Drain tube coupling1
Drain tube coupling grommet1
Vent and combustion-air pipe support2
Combustion-air pipe perforated disk assembly1
Vent Pipe Extension1*
* ONLY supplied with some furnaces.
This furnace must be installed with a direct-vent (combustion air
and flue) system and a factory accessory termination kit. In a
direct-vent system, all air for combustion is taken directly from the
outside atmosphere and all flue products are discharged to the
outside atmosphere. See furnace and factory accessory termination
kit instructions for proper installation.
Before installing the furnace in the United States, refer to the
current edition of the NFGC and the NFPA 90B.
For copies of the NFGC and NFPA 90B, contact the National Fire
Protection Association Inc., Batterymarch Park, Quincy, MA
02269; or for only the NFGC contact the American Gas Association, 400 N. Capitol St., NW, Washington DC 20001.
Before installing the furnace in Canada, refer to the NSCNGPIC.
For a copy of the NSCNGPIC, contact Standard Sales, CSA
International, 178 Rexdale Boulevard, Etobicoke, (Toronto) Ontario, Canada M9W 1R3.
Installation must comply with regulations of serving gas supplier
and local building, heating, plumbing or other codes in effect in the
area in which installation is made. In the absence of local building
codes, installation must conform with the NFGC in the United
States and the NSCNGPIC and all authorities having jurisdiction
in Canada.
These instructions cover minimum requirements for a safe installation and conform to existing national standards and safety codes.
In some instances, these instructions exceed certain local codes
and ordinances, especially those that may not have kept pace with
changing residential construction practices. We require these
instructions as a minimum for a safe installation.
Application of this furnace should be indoors with special
attention given to vent sizing and material, gas input rate, air
temperature rise, unit leveling, and unit sizing. Improper
installation or misapplication of furnace can require excessive
servicing or cause premature component failure.
4
Page 5
BLOWER SHELF
CONDENSATE
TRAP (INSIDE)
ALTERNATE DRAIN
TUBE LOCATION
CONDENSATE TRAP
DRAIN TUBE LOCATION
UPFLOW APPLICATIONS
FURNACE
DOOR
FIELD
DRAIN
CONN
EXTERNAL UPFLOW APPLICATIONS
SLOT FOR SCREW
HORIZONTAL
APPLICATION
(OPTIONAL)
1
2
1
3
4
WIRE TIE
GUIDES
(WHEN USED)
CONDENSATE
TRAP
FURNACE
SIDE
7
8
4
1
4
26
1
2
1
FURNACE
DOOR
FIELD
DRAIN
CONN
FURNACE
SIDE
4
3
4
5
1
4
26
4
3
5
3
4
SIDE VIEWFRONT VIEWEND VIEWFRONT VIEW
DOWNFLOW AND ALTERNATE
1
8
7
3
4
1
7
8
1
4
2
1
⁄4 OD
COLLECTOR BOX TO
TRAP RELIEF PORT
1
⁄2 OD
INDUCER HOUSING
DRAIN CONNECTION
5
⁄8 OD
COLLECTOR BOX
DRAIN CONNECTION
SCREW HOLE FOR
UPFLOW OR DOWN-
FLOW APPLICATIONS
(OPTIONAL)
1
⁄2-IN. PVC OR CPVC
HORIZONTAL
APPLICATIONS
4
FRONT VIEWSIDE VIEW
Fig. 4—Condensate Trap
Improper installation, adjustment, alteration, service, maintenance, or use can cause carbon monoxide poisoning, explosion, fire, electrical shock, or other conditions which may
cause personal injury or property damage. Consult a qualified
installer, service agency, local gas supplier, or your distributor or branch for information or assistance. The qualified
installer or agency must use only factory-authorized and
listed kits or accessories when modifying this product. Failure
to follow this warning could result in electrical shock, fire,
personal injury, or death.
For accessory installation details, refer to applicable installation
literature.
APPLICATIONS
Step 1—General
Some assembly and modifications are required for furnaces
installed in any of the 4 applications shown in Fig. 1. All drain and
pressure tubes are connected as shown in Fig. 5. See appropriate
application instructions for these procedures.
Step 2—Upflow Applications
An upflow furnace application is where furnace blower is located
below combustion and controls section of furnace, and conditioned
air is discharged upwards.
The condensate trap is factory installed in the blower shelf and
factory connected for UPFLOW applications. A factory-supplied
tube is used to extend the condensate trap drain connection to the
desired furnace side for field drain attachment. See Condensate
Trap Tubing (Factory-Shipped Orientation) section for drain tube
extension details.
CONDENSATE TRAP TUBING (FACTORY-SHIPPED
ORIENTATION)
NOTE: See Fig. 5 or tube routing label on main furnace door to
confirm location of these tubes.
These tubes should be factory attached to condensate trap and
pressure switch ready for use in UPFLOW applications. These
tubes can be identified by their connection location and also
by a color label on each tube. These tubes are identified as
follows: collector box drain tube (blue label), inducer housing
drain tube (violet label or molded), relief port tube (green
label), and pressure switch tube (pink label).
2. Condensate Trap Drain Tube
The condensate trap drain connection must be extended for
field attachment by doing the following:
a. Determine location of field drain connection. (See Fig. 2 or
5.)
5
Page 6
PLUG
CAP
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
TUBE (PINK)
COLLECTOR BOX
TUBE (GREEN)
INDUCER HOUSING
(MOLDED) DRAIN
TUBE (BEHIND
COLLECTOR BOX
DRAIN TUBE)
COLLECTOR BOX
DRAIN TUBE (BLUE)
FIELD-INSTALLED
FACTORY-SUPPLIED
DRAIN TUBE
COUPLING (LEFT
DRAIN OPTION)
FIELD-INSTALLED
FACTORY-SUPPLIED
DRAIN TUBE
FIELD-INSTALLED
FACTORY-SUPPLIED
1
⁄2-IN. CPVC STREET
ELBOWS (2) FOR
LEFT DRAIN OPTION
FIELD-INSTALLED
FACTORY-SUPPLIED
COUPLING (RIGHT
CONDENSATE
TRAP
DRAIN TUBE
DRAIN OPTION)
Fig. 5—Factory-Shipped Upflow Tube
Configuration
(Shown With Blower Access Panel Removed)
PLUG
CAP
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
TUBE (PINK)
COLLECTOR BOX
TUBE (GREEN)
COLLECTOR BOX
DRAIN TUBE (BLUE)
CONDENSATE
TRAP
INDUCER
HOUSING
DRAIN TUBE
(VIOLET)
A94163
A94164
Fig. 6—Alternate Upflow Tube Configuration and
Trap Location
NOTE: If internal filter is used, drain tube should be located to
opposite side of casing of return duct attachment to assist in filter
removal.
b. Remove and discard casing drain hole plug button from
desired side.
c. Install drain tube coupling grommet (factory-supplied in
loose parts bag) in selected casing hole.
d. Slide drain tube coupling (factory-supplied in loose parts
bag) through grommet ensuring long end of coupling faces
blower.
e. Cement 2 factory-supplied 1/2-in. street CPVC elbows to
the rigid drain tube connection on the condensate trap. (See
Fig. 5.) These elbows must be cemented together and
cemented to condensate trap drain connection.
NOTE: Failure to use CPVC elbows may allow drain to kink and
prevent draining.
f. Connect larger diameter drain tube and clamp (factory-
supplied in loose parts bag) to condensate trap and clamp
securely.
g. Route tube to coupling and cut to appropriate length.
h. Attach tube to coupling and clamp securely.
An alternate location for the condensate trap is the left-hand side
of casing. (See Fig. 2 and 6.)
NOTE: If the alternate left-hand side of casing location is used,
the factory-connected drain and relief port tubes must be disconnected and modified for attachment. See Condensate Trap Tubing
(Alternate Upflow Orientation) section for tubing attachment.
To relocate condensate trap to the left-hand side, perform the
following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
3. Remove casing hole filler cap from casing hole. (See Fig. 2 or
6.)
4. Install casing hole filler cap into blower shelf hole where trap
was removed.
5. Install condensate trap into left-hand side casing hole by
inserting tube connection stubs through casing hole and
rotating until tabs snap into locking position.
NOTE: On 17-1/2-in. wide furnaces ONLY, cut tube between
corrugated sections to prevent kinks from occurring.
2. Inducer Housing Drain Tube
a. Remove and discard LOWER (molded) inducer housing
drain tube which was previously connected to condensate
trap.
b. Use inducer housing drain extension tube (violet label and
factory-supplied in loose parts bag) to connect LOWER
inducer housing drain connection to the condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
a. Connect relief port tube (green label) to condensate trap.
b. Extend this tube (if required) by splicing to small diameter
tube (factory-supplied in loose parts bag).
c. Determine appropriate length, cut, and connect tube.
CONDENSATE TRAP FIELD DRAIN ATTACHMENT
Refer to Condensate Drain section for recommendations and
procedures.
PRESSURE SWITCH TUBING
The LOWER collector box pressure tube (pink label) is factory
connected to the pressure switch and should not require any
modification.
NOTE: See Fig. 5 or 6 or tube routing label on main furnace door
to check for proper connections.
UPPER COLLECTOR BOX AND INDUCER HOUSING (UNUSED) DRAIN CONNECTIONS
Upper Collector Box Drain Connection
Attached to the UPPER collector box drain connection is a
factory-installed corrugated, plugged tube (blue and white striped
label). This tube is plugged to prevent condensate leakage in this
application. Ensure this tube is plugged.
NOTE: See Fig. 5 or 6 or tube routing label on main furnace door
to check for proper connections.
Upper Inducer Housing Drain Connection
Attached to the UPPER (unused) inducer housing drain connection
is a cap and clamp. This cap is used to prevent condensate leakage
in this application. Ensure this connection is capped.
NOTE: See Fig. 5 or 6 or tube routing label on main furnace door
to check for proper connections.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
Step 3—Downflow Applications
A downflow furnace application is where furnace blower is located
above combustion and controls section of furnace, and conditioned
air is discharged downwards.
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed
blower shelf location and relocated in selected application location
as shown in Fig. 2, 7, or 8.
To relocate condensate trap from the blower shelf to desired
location, perform the following:
COLLECTOR BOX
DRAIN TUBE (BLUE)
CAP
PLUG
COLLECTOR BOX
TUBE (GREEN)
COLLECTOR BOX
EXTENSION TUBE
COLLECTOR BOX
TUBE (PINK)
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
EXTENSION TUBE
CONDENSATE
TRAP
INDUCER HOUSING
DRAIN TUBE (VIOLET)
PLUG
CAP
COLLECTOR BOX
DRAIN TUBE (BLUE)
COLLECTOR BOX
TUBE (PINK)
COLLECTOR BOX
TUBE (GREEN)
COLLECTOR BOX
EXTENSION TUBE
COLLECTOR BOX
DRAIN TUBE (BLUE
& WHITE STRIPED)
COLLECTOR BOX
EXTENSION TUBE
INDUCER HOUSING
DRAIN TUBE
(VIOLET)
CONDENSATE
TRAP
COLLECTOR BOX
EXTENSION
DRAIN TUBE
DRAIN TUBE
COUPLING
Fig. 7—Downflow Tube Configuration
(Left-Hand Trap Installation)
A94165
A94166
Fig. 8—Downflow Tube Configuration
(Right-Hand Trap Installation)
7
Page 8
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
3. Remove casing hole filler cap from casing hole. (See Fig. 2, 7,
or 8.)
4. Install casing hole filler cap into blower shelf hole where trap
was removed.
5. Install condensate trap into desired casing hole by inserting
tube connection stubs through casing hole and rotating until
tabs snap into locking position.
CONDENSATE TRAP TUBING
NOTE: See Fig. 7 or 8 or tube routing label on main furnace door
to check for proper connections.
1. Collector Box Drain Tube
a. Remove factory-installed plug from LOWER collector box
drain tube (blue and white striped label).
b. Install removed clamp and plug into UPPER collector box
drain tube (blue label) which was connected to condensate
trap.
c. Connect LOWER collector box drain connection to con-
densate trap.
(1.) Condensate Trap Located on Left Side of Casing
(a.) Connect LOWER collector box drain tube (blue
and white striped label) to condensate trap. Tube
does not need to be cut.
(b.) Clamp tube to prevent any condensate leakage.
(2.) Condensate Trap Located on Right Side of Casing
(a.) Install drain tube coupling (factory-supplied in
loose parts bag) into collector box drain tube
(blue and white striped label) which was previously plugged.
(b.) Connect larger diameter drain tube (factory-
supplied in loose parts bag) to drain tube coupling, extending collector box drain tube for
connection to condensate trap.
as shown in Fig. 8.
(b.) Determine appropriate length and cut.
(c.) Connect tube to condensate trap.
(d.) Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
Refer to Pressure Switch Tubing section for connection
procedure.
CONDENSATE TRAP FIELD DRAIN ATTACHMENT
Refer to Condensate Drain section for recommendations and
procedures.
PRESSURE SWITCH TUBING
One collector box pressure tube (pink label) is factory connected to
the pressure switch for use when furnace is installed in UPFLOW
applications. This tube MUST be disconnected and used for the
condensate trap relief port tube. The other collector box pressure
tube (green label) which was factory connected to the condensate
trap relief port connection MUST be connected to the pressure
switch in DOWNFLOW or HORIZONTAL RIGHT applications.
NOTE: See Fig. 7 or 8 or tube routing label on main furnace door
to check for proper connections.
2. Extend collector box pressure tube (green label) which was
previously connected to condensate trap relief port connection
by splicing to small diameter tube (factory-supplied in loose
parts bag).
4. Extend collector box pressure tube (pink label) which was
previously connected to pressure switch by splicing to remaining small diameter tube (factory-supplied in loose parts bag).
5. Route this extended tube (pink label) to condensate trap relief
port connection.
6. Determine appropriate length, cut, and connect tube.
7. Clamp tube to relief port connection.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
Step 4—Horizontal Left (Supply-Air Discharge)
Applications
A horizontal left furnace application is where furnace blower is
located to the right of combustion and controls section of furnace,
and conditioned air is discharged to the left.
Local codes may require a drain pan under entire furnace and
condensate trap when a condensing furnace is used in an attic
application or over a finished ceiling.
NOTE: In Canada, installations shall be in accordance with
current NSCNGPIC and/or local codes.
NOTE: The auxiliary junction box (J-Box) MUST be relocated to
opposite side of furnace casing. (See Fig. 9.) See Electrical
Connection section for J-Box relocation.
8
Page 9
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed
blower shelf location and relocated in selected application location
as shown in Fig. 2 or 9.
To relocate condensate trap from the blower shelf to desired
location, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
3. Remove casing hole filler cap from casing hole. (See Fig. 2 or
9.)
4. Install casing hole filler cap into blower shelf hole where trap
was removed.
5. Install condensate trap into casing hole by inserting tube
connection stubs through casing hole and rotating until tabs
snap into locking position.
CONDENSATE TRAP TUBING
NOTE: See Fig. 9 or tube routing label on main furnace door to
check for proper connections.
1. Collector Box Drain Tube
a. Install drain tube coupling (factory-supplied in loose parts
bag) into collector box drain tube (blue label) which was
previously connected to condensate trap.
b. Connect large diameter drain tube and clamp (factory-
supplied in loose parts bag) to drain tube coupling, extending collector box drain tube.
c. Route extended tube (blue label) to condensate trap and cut
to appropriate length.
d. Clamp tube to prevent any condensate leakage.
2. Inducer Housing Drain Tube
a. Remove and discard LOWER (molded) inducer housing
drain tube which was previously connected to condensate
trap.
b. Use inducer housing drain extension tube (violet label and
factory-supplied in loose parts bag) to connect LOWER
inducer housing drain connection to the condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
a. Extend collector box tube (green label) which was previ-
ously connected to the condensate trap by splicing to small
diameter tube (factory-supplied in loose parts bag).
b. Route extended collector box pressure tube to relief port
connection on the condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
CONDENSATE TRAP FIELD DRAIN ATTACHMENT
Refer to Condensate Drain section for recommendations and
procedures.
PRESSURE SWITCH TUBING
The LOWER collector box pressure tube (pink label) is factory
connected to the pressure switch for use when furnace is installed
in UPFLOW applications. This tube MUST be disconnected,
extended, rerouted, and then reconnected to the pressure switch in
HORIZONTAL LEFT applications.
PLUG
CAP
AUXILIARY "J" BOX
RELOCATED HERE
CONDENSATE
TRAP
COLLECTOR
BOX EXTENSION
DRAIN TUBE
COLLECTOR BOX
EXTENSION TUBE
DRAIN TUBE COUPLING
COLLECTOR BOX TUBE (PINK)
RELOCATE TUBE BETWEEN BLOWER SHELF AND INDUCER HOUSING FOR
040, 060, AND 080 HEATING INPUT FURNACES
COLLECTOR BOX
DRAIN TUBE
(BLUE AND WHITE STRIPED)
Fig. 9—Horizontal Left Tube Configuration
COLLECTOR BOX
TUBE (GREEN)
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
DRAIN TUBE (BLUE)
A93302
9
Page 10
MANUAL
SHUTOFF
GAS VALVE
COMBUSTION – AIR
SEDIMENT
TRAP
INTAKE
5 3⁄4″
CONDENSATE
TRAP
VENT
30″ MIN
WORK AREA
DRAIN
A 12-IN. MIN HORIZONTAL PIPE
SECTION IS RECOMMENDED WITH
SHORT (5 TO 8 FT) VENT SYSTEMS
TO REDUCE EXCESSIVE
CONDENSATE DROPLETS FROM
EXITING THE VENT PIPE.
ACCESS OPENING
FOR TRAP
NOTE: LOCAL CODES MAY REQUIRE A DRAIN PAN UNDER THE
FURNACE AND CONDENSATE TRAP WHEN A CONDENSING
FURNACE IS INSTALLED ABOVE FINISHED CEILINGS.
Fig. 10—Attic Location and Working Platform
NOTE: See Fig. 9 or tube routing label on main furnace door to
check for proper connections.
Modify tube as described below.
2. Use smaller diameter tube (factory-supplied in loose parts
bag) to extend tube disconnected in item 1.
3. Route extended tube:
a. Behind inducer housing.
b. Between blower shelf and inducer housing.
c. Behind inducer motor bracket.
d. Between inducer motor and pressure switch.
4. Determine appropriate length, cut, and reconnect tube to
pressure switch connection labeled COLLECTOR BOX.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
CONSTRUCT A WORKING PLATFORM
Construct working platform where all required furnace clearances
are met. (See Fig. 3 and 10.)
The condensate trap MUST be installed below furnace. See
Fig. 4 for dimensions. The drain connection to condensate
trap must also be properly sloped to an open drain.
NOTE: Combustion-air and vent pipes are restricted to a minimum length of 5 ft. (See Table 6.)
A93031
NOTE: A 12-in. minimum offset pipe section is recommended
with short (5 to 8 ft) vent systems. This recommendation is to
reduce excessive condensate droplets from exiting the vent pipe.
(See Fig. 10 or 28.)
Step 5—Horizontal Right (Supply-Air Discharge)
Applications
A horizontal right furnace application is where furnace blower is
located to the left of combustion and controls section of furnace,
and conditioned air is discharged to the right.
Local codes may require a drain pan under entire furnace and
condensate trap when a condensing furnace is used in attic
application or over a finished ceiling.
NOTE: In Canada, installations shall be in accordance with
current NSCNGPIC Installation Codes and/or local codes.
CONDENSATE TRAP LOCATION
The condensate trap must be removed from the factory-installed
blower shelf location and relocated in selected application location
as shown in Fig. 2 or 11.
To relocate condensate trap from the blower shelf to desired
location, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
3. Remove casing hole filler cap from casing hole. (See Fig. 2 or
11.)
10
Page 11
CAP
PLUG
COLLECTOR BOX DRAIN TUBE
(BLUE AND WHITE STRIPED)
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
EXTENSION TUBE
Fig. 11—Horizontal Right Tube Configuration
COLLECTOR BOX DRAIN TUBE (BLUE)
COLLECTOR BOX TUBE (GREEN)
COLLECTOR BOX EXTENSION TUBE
COLLECTOR BOX TUBE (PINK)
CONDENSATE
TRAP
A93303
4. Install casing hole filler cap into blower shelf hole where trap
was removed.
5. Install condensate trap into casing hole by inserting tube
connection stubs through casing hole and rotating until tabs
snap into locking position.
CONDENSATE TRAP TUBING
NOTE: See Fig. 11 or tube routing label on main furnace door to
check for proper connections.
1. Collector Box Drain Tube
a. Remove factory-installed plug from LOWER collector box
drain tube (blue and white striped label).
b. Install removed clamp and plug into UPPER collector box
drain tube (blue label) which was previously connected to
condensate trap.
c. Connect LOWER collector box drain tube (blue and white
striped label) to condensate trap. Tube does not need to be
cut.
d. Clamp tube to prevent any condensate leakage.
2. Inducer Housing Drain Tube
a. Remove factory-installed cap and clamp from LOWER
inducer housing drain connection.
b. Remove and discard UPPER (molded) inducer housing
drain tube which was previously connected to condensate
trap.
c. Install cap and clamp on UPPER inducer housing drain
connection where molded drain tube was removed.
d. Use inducer housing drain extension tube (violet label and
factory-supplied in loose parts bag) to connect LOWER
inducer housing drain connection to condensate trap.
e. Determine appropriate length, cut, and connect tube to
condensate trap.
f. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
Refer to Pressure Switch Tubing section for connection
procedure.
CONDENSATE TRAP FIELD DRAIN ATTACHMENT
Refer to Condensate Drain section for recommendations and
procedures.
PRESSURE SWITCH TUBING
One collector box pressure tube (pink label) is factory connected to
the pressure switch for use when furnace is installed in UPFLOW
applications. This tube MUST be disconnected and used for the
condensate trap relief port tube. The other collector box pressure
tube (green label) which was factory connected to the condensate
trap relief port connection MUST be connected to the pressure
switch in DOWNFLOW or HORIZONTAL RIGHT applications.
NOTE: See Fig. 11 or tube routing label on main furnace door to
check for proper connections.
2. Extend collector box pressure tube (green label) which was
previously connected to condensate trap relief port connection
by splicing to small diameter tube (factory-supplied in loose
parts bag).
3. Route extended collector box pressure tube behind inducer
motor bracket then between inducer motor and pressure
switch.
5. Use remaining smaller diameter tube (factory-supplied in
loose parts bag) to extend collector box pressure tube (pink
label) which was previously connected to pressure switch.
11
Page 12
6. Route this extended tube (pink label) to condensate trap relief
port connection.
7. Determine appropriate length, cut, and connect tube.
8. Clamp tube to relief port connection.
CONDENSATE TRAP FREEZE PROTECTION
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
CONSTRUCT A WORKING PLATFORM
Construct working platform where all required furnace clearances
are met. (See Fig. 3 and 10.)
The condensate trap MUST be installed below furnace. See
Fig. 4 for dimensions. The drain connection to condensate
trap must also be properly sloped to an open drain.
FRONT
°F°F
RETURN
AIR
MAX 85°F MIN 55°F
NOTE: Combustion-air and vent pipes are restricted to a minimum length of 5 ft. (See Table 6.)
NOTE: A 12-in. minimum offset pipe section is recommended
with short (5 to 8 ft) vent systems. This recommendation is to
reduce excessive condensate droplets from exiting the vent pipe.
(See Fig. 10 or 28.)
LOCATION
Step 1—General
When a furnace is installed so that supply ducts carry air to areas
outside the space containing the furnace, return air must also be
handled by ducts sealed to furnace casing. The ducts terminate
outside the space containing the furnace to ensure there will not be
a negative pressure condition within equipment room or space.
Furnace may be located in a confined space without special
provisions for dilution or ventilation air. This furnace must be
installed so electrical components are protected from water.
LEVEL (0″)
TO
1
⁄2″ MAX
UPFLOW OR DOWNFLOWHORIZONTAL
FRONT
LEVEL (0″)
TO
1
⁄2″ MAX
FRONT
A93025
NOTE: For proper furnace operation, install furnace so that it is
level or pitched forward within 1/2 in. to ensure proper condensate
drainage from secondary heat exchangers.
Locate furnace as close to center of air distribution system as
possible.
Locate furnace so combustion-air pipe maximum lengths are not
exceeded. Refer to Table 6.
A93042
NOTE: These furnaces are designed for a minimum continuous
return-air temperature of 60°F or intermittent operation down to 55°F
such as when used with a night setback thermostat. Return-air
temperature must not exceed a maximum of 85°F. Failure to follow
these return-air temperature limits may affect reliability of heat
exchangers, motors, and controls.
FRONT
B
A
C
K
BACK
FRONT
A93043
Do not install furnace on its back. Safety control operation
will be adversely affected. Never connect return-air ducts to
back of furnace. Failure to follow this warning could result in
fire, personal injury, or death.
If these furnaces are used during construction when adhesives, sealers, and/or new carpets are being installed, make
sure all combustion and circulating air requirements are
followed. If operation of furnace is required during construction, use clean outside air for combustion and ventilation.
Compounds of chlorine and fluorine, when burned with
combustion air, form acids which will cause corrosion of heat
exchangers. Some of these compounds are found in paneling,
dry wall adhesives, paints, thinners, masonry cleaning materials, and many other solvents commonly used in construction
process.
Excessive exposure to contaminated combustion air will
result in safety and performance related problems.
12
Page 13
32°F MINIMUM INSTALLED
AMBIENT OR FREEZE
PROTECTION REQUIRED
A93058
INSTALLATION
Step 1—Leveling Legs (If Desired)
When furnace is used in upflow position with side inlet(s), leveling
legs may be desired. (See Fig. 12.) Install field-supplied,
corrosion-resistant 5/16-in. machine bolts and nuts.
5
⁄16″
5
⁄16″
1 3⁄4″
3
⁄4″
1
If these furnaces are installed in an unconditioned space
where ambient temperatures may be 32°F or lower, freeze
protection measures must be taken.
Provide ample space for servicing and cleaning. Always comply
with minimum fire protection clearances shown on unit’s clearance to combustibles label. (See Fig. 3.) Locate furnace where
available electric power and gas supplies meet specifications on
furnace rating plate.
Step 2—Furnace Location Relative to Cooling
Equipment
The cooling coil must be installed parallel with or on downstream
side of furnace to avoid condensation in heat exchanger. When
installed parallel with a furnace, dampers or other means used to
control flow of air must prevent chilled air from entering furnace.
If dampers are manually operated, they must be equipped with a
means to prevent operation of either unit unless damper is in
full-heat or full-cool position.
Step 3—Hazardous Locations
18-IN. MINIMUM
TO BURNERS
A93044
When furnace is installed in a residential garage, it must be
installed so that burners and ignition sources are located a
minimum of 18 in. above floor. The furnace must be located
or protected to avoid physical damage by vehicles. When
furnace is installed in a public garage, airplane hangar, or
other building having a hazardous atmosphere, unit must be
installed in accordance with requirements of National Fire
Protection Association, Inc.
5
⁄16″
5
⁄16″
1 3⁄4″
1 3⁄4″
A89014
Fig. 12—Leveling Legs
NOTE: The maximum length of bolt should not exceed 1-1/2 in.
1. Position furnace on its back. Locate and drill a 5/16-in.
diameter hole in each bottom corner of furnace. (See Fig. 12.)
Holes in bottom closure panel may be used as guide locations.
2. For each hole, install nut on bolt and then install bolt and nut
in hole. (Install flat washer if desired.)
3. Install another nut on other side of furnace base. (Install flat
washer if desired.)
4. Adjust outside nut to provide desired height, and tighten inside
nut to secure arrangement.
NOTE: Bottom closure must be used when leveling legs are used.
See Bottom Closure Panel section.
Step 2—Installation in Upflow or Downflow
Applications
NOTE: For downflow applications, this furnace is approved for
use on combustible flooring when special base (available from
manufacturer) Part No. KGASB0201ALL is used. Special base in
not required when this furnace is installed on manufacturer’s Coil
Assembly Part No. CD5 or CK5, or Coil Box Part No. KCAKC is
used.
1. Determine application being installed from Table 1.
2. Construct hole in floor per dimensions specified in Table 1
and Fig. 13.
3. Construct plenum to dimensions specified in Table 1 and Fig.
13.
4. If downflow subbase (KGASB) is used, install as shown in
Fig. 14.
If Coil Assembly Part No. CD5 or CK5 or Coil Box Part No.
KCAKC is used, install as shown in Fig. 15.
NOTE: Remove furnace perforated, discharge duct flanges when
they interfere with mating flanges on coil on downflow subbase.
To remove furnace perforated, discharge duct flange, use wide
13
Page 14
A
PLENUM
OPENING
B
FLOOR
OPENING
C
D
A96283
Fig. 13—Floor and Plenum Opening Dimensions
FURNACE
(OR COIL CASING
WHEN USED)
COMBUSTIBLE
FLOORING
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
FLOOR
OPENING
A96285
Fig. 14—Furnace, Plenum, and Subbase
Installed on a Combustible Floor
Table 1—Opening Dimensions (In.)
FURNACE
CASING
WIDTH
17-1/2
21
24-1/2
Downflow Applications on Non-Combustible Flooring15-7/81916-1/219-5/8
Downflow Applications on Combustible Flooring Using KGASB Subbase
Furnace with or without CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Combustible Flooring NOT Using KGASB Subbase
Furnace with CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Non-Combustible Flooring19-3/8192019-5/8
Downflow Applications on Combustible Flooring Using KGASB Subbase
Furnace with or without CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Combustible Flooring NOT Using KGASB Subbase
Furnace with CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Non-Combustible Flooring22-7/81923-1/219-5/8
Downflow Applications on Combustible Flooring Using KGASB Subbase
Furnace with or without CD5 or CK5 Coil Assembly or KCAKC Coil Box
Downflow Applications on Combustible Flooring NOT Using KGASB Subbase
Furnace with CD5 or CK5 Coil Assembly or KCAKC Coil Box
APPLICATION
Upflow Applications1624-1/816-5/824-3/4
Upflow Applications19-1/224-1/820-1/824-3/4
Upflow Applications2324-1/823-5/824-3/4
FURNACE
CD5 OR CK5
COIL ASSEMBLY
OR KCAKC
COIL BOX
COMBUSTIBLE
FLOORING
SHEET METAL
PLENUM
FLOOR
OPENING
A96284
Fig. 15—Furnace, Plenum, and Coil
Assembly or Coil Box Installed
on a Combustible Floor
PLENUM OPENINGFLOOR OPENING
ABCD
15-1/81916-3/420-3/8
15-1/21916-1/220
18-5/81920-1/420-3/8
19192020
22-1/81923-3/420-3/8
22-1/21923-1/220
14
Page 15
PERFORATED
DISCHARGE DUCT
FLANGE
210°
MIN
NO
YES
YES
duct pliers or duct flange tool to bend flange back and forth until
it breaks off. Be careful of sharp edges. (See Fig. 16.)
Do not bend duct flanges inward as shown in Fig. 16. This
will affect airflow across heat exchangers and may cause limit
cycling or premature heat exchanger failure. Remove duct
flange completely or bend it inward a minimum of 210° as
shown in Fig. 16.
NOTE: For 140 size unit when installed in downflow orientation,
cut the white jumper wire off between terminals PL1-6 and PL1-9.
Refer to Fig. 24 for location of jumper. Cut jumper close to
connector and remove wire to avoid a short circuit.
Step 3—Installation in Horizontal Applications
These furnaces can be installed horizontally in either horizontal
left or right discharge position. In a crawlspace, furnace can either
be hung from floor joist or installed on suitable blocks or pad.
Furnace can be suspended from each corner by hanger bolts and
angle iron supports. (See Fig. 17.) Cut hanger bolts (4 each 3/8-in.
all-thread rod) to desired length. Use 1 X 3/8-in. flat washers,
3/8-in. lockwashers, and 3/8-in. nuts on hanger rods as shown in
Fig. 17. Dimples are provided for hole locations. (See Fig. 2.)
Fig. 16—Duct Flanges
ANGLE
IRON OR
EQUIVALENT
(B)
(B)
A93029
(A)
5 3⁄4″
DRAIN
3
⁄8-IN. ROD
ALTERNATE SUPPORT
LOCATION 4-IN. MIN
8-IN. MAX
(A) ROD LOCATION
USING DIMPLE
LOCATORS
(SEE DIMENSIONAL
DWG FOR
LOCATIONS)
(A) PREFERRED ROD LOCATION
(B) ALTERNATE ROD LOCATION
(A)
(B)
13
3
/8-IN. HEX NUT
& WASHER (4)
REQD PER ROD
NOTES:
(A)
1. A 1 In. clearance minimum between top of
furnace and combustible material.
2. The entire length of furnace must be
supported when furnace is used in horizontal
position to ensure proper drainage.
(B)
/16-IN. MAX
ALTERNATE SUPPORT
LOCATION FROM BACK
Fig. 17—Crawlspace Horizontal Application
15
A93304
Page 16
The entire length of furnace MUST be supported when
furnace is used in a horizontal position to ensure proper
draining. When suspended, bottom brace supports sides and
center blower shelf. When unit is supported from the ground,
blocks or pad should support sides and center blower shelf
area.
Step 4—Filter Arrangement
Never operate unit without a filter or with blower access
panel removed.
Factory-supplied washable framed filters are shipped in blower
compartment. Determine location for filter and relocate filter
retaining wire if necessary. See Table 2 to determine correct filter
size for desired filter location. Table 2 indicates filter size,
location, and quantity shipped with this furnace. See Fig. 2 for
location and size of bottom and side return-air openings.
Table 2—Filter Information
FURNACE
CASING
WIDTH (IN.)
17-1/2(1) 16 X 25 X 1† (1) 16 X 25 X 1Cleanable
21(1) 16 X 25 X 1 (1) 20 X 25 X 1†Cleanable
24-1/2(2) 16 X 25 X 1† (1) 24 X 25 X 1Cleanable
* Filters can be field modified by cutting frame as marked and folding to
desired size. Alternate sizes can be ordered from your distributor or dealer.
† Factory-provided with furnace.
FILTER SIZE (IN.)*
Side ReturnBottom Return
FILTER TYPE
FRAMED
171⁄2-IN. WIDE
CASINGS ONLY:
INSTALL FIELD-SUPPLIED
FILTER FILLER STRIP
UNDER FILTER.
3″
1
24
/2″
1″
241⁄2-IN. WIDE
CASINGS ONLY:
CUT AND FOLD
FACTORY-PROVIDED
FILTERS AS SHOWN
TO DESIRED SIZE.
WASHABLE
FILTER
Air delivery above 1800 CFM requires that both sides, a
combination of 1 side and bottom, or bottom only of furnace
be used for return air.
NOTE: Side return-air openings can ONLY be used in UPFLOW
configurations. Install filter(s) as shown in Fig. 18.
WASHABLE
FILTER
FILTER
RETAINER
A93045
Fig. 18—Filter Installed for Side Inlet
Bottom return-air opening may be used with all 4 orientations.
Filter may need to be cut to fit some furnace widths. Install filter
as shown in Fig. 19.
NOTE: Remove and discard bottom closure panel when bottom
inlet is used.
Step 5—Bottom Closure Panel
These furnaces are shipped with bottom enclosure panel installed
in bottom return-air opening. This panel MUST be in place when
side return air is used.
FILTER
SUPPORT
FILTER
RETAINER
Fig. 19—Bottom Filter Arrangement
To remove bottom closure panel, perform following:
1. Tilt or raise furnace and remove 2 screws holding front filler
panel. (See Fig. 20.)
2. Rotate front filler panel downward to release holding tabs.
3. Remove bottom closure panel.
4. Reinstall front filler panel and screws.
Step 6—Gas Piping
Gas piping must be installed in accordance with national and local
codes. Refer to current edition of NFGC. Canadian installations
must be made in accordance with NSCNGPIC and all authorities
having jurisdiction. Gas supply line should be a separate line
running directly from meter to furnace, if possible. Refer to Table
3 for recommended gas pipe sizing. Risers must be used to connect
to furnace and to meter. Support all gas piping with appropriate
straps, hangers, etc. Use a minimum of 1 hanger every 6 ft. Joint
compound (pipe dope) should be applied sparingly and only to
male threads of joints. Pipe dope must be resistant to propane gas.
Connect gas pipe to furnace using a backup wrench to avoid
damaging gas controls.
16
A96030
Page 17
BOTTOM
CLOSURE
PANEL
FRONT FILLER
PANEL
Fig. 20—Removing Bottom Closure Panel
A93047
GAS
SUPPLY
MANUAL
SHUTOFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
Fig. 21—Typical Gas Pipe Arrangement
A93324
Gas valve shutoff switch MUST be facing forward or tilted
upward. Failure to follow this warning could result in
property damage or death.
Never purge a gas line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition for
purpose of checking leakage. Use a soap-and-water solution
to check for leakage. Failure to follow this warning could
result in fire, explosion, personal injury, or death.
Use proper length of pipe to avoid stress on gas control
manifold. Failure to follow this warning could result in a gas
leak resulting in fire, explosion, personal injury, or death.
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and
a pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas).
Ref: Table 10-2 NFPA 54-1999.
INTERNAL
DIAMETER
(IN.)
Install a sediment trap in riser leading to furnace. Trap can be
installed by connecting a tee to riser leading to furnace so
straight-through section of tee is vertical. Then connect a capped
nipple into lower end of tee. Capped nipple should extend below
level of gas controls. Place a ground joint union between gas
control manifold and manual gas shutoff valve. (See Fig. 21.)
LENGTH OF PIPE (FT)
1020304050
If a flexible connector is required or allowed by authority
having jurisdiction, black iron pipe shall be installed at gas
valve and extend a minimum of 2 in. outside furnace casing.
An accessible manual shutoff valve MUST be installed upstream
of furnace gas controls and within 6 ft of furnace. A 1/8-in. NPT
plugged tapping, accessible for test gage connection, MUST be
installed immediately upstream of gas supply connection to
furnace and downstream of manual shutoff valve.
NOTE: The gas valve inlet press tap connection is suitable to use
as test gage connection providing test pressure DOES NOT exceed
maximum 0.5 psig (14-in. wc) stated on gas valve. (See Fig. 44.)
Piping should be pressure tested in accordance with local and
national plumbing and gas codes before furnace is attached. In
Canada, refer to current edition of NSCNGPIC. If pressure
exceeds 0.5 psig (14-in. wc), gas supply pipe must be disconnected
from furnace and capped before pressure test. If test pressure is
equal to or less than 0.5 psig (14-in. wc), turn off electric shutoff
switch located on gas valve before test. It is recommended that
ground joint union be loosened before pressure testing. After all
connections have been made, purge lines and check for leakage.
AIR DUCTS
Step 1—General Requirements
The duct system should be designed and sized according to
accepted national standards such as those published by: Air
Conditioning Contractors Association (ACCA), Sheet Metal and
Air Conditioning Contractors National Association (SMACNA) or
American Society of Heating, Refrigerating and Air Conditioning
Engineers (ASHRAE). Or consult factory The Air Systems DesignGuidelines reference tables available from your local distributor.
The duct system should be sized to handle the required system
design CFM at the design static pressure.
When a furnace is installed so that the supply ducts carry air to
areas outside the space containing the furnace, the return air must
also be handled by a duct(s) sealed to the furnace casing and
terminating outside the space containing the furnace.
Secure ductwork with proper fasteners for type of ductwork used.
Seal supply- and return-duct connections to furnace with code
approved tape or duct sealer.
Flexible connections should be used between ductwork and
furnace to prevent transmission of vibration. Ductwork passing
17
Page 18
through unconditioned space should be insulated to enhance
system performance. When air conditioning is used, a vapor
barrier is recommended.
Maintain a 1-in. clearance from combustible materials to supply air
ductwork for a distance of 36 in. horizontally from the furnace. See
NFPA 90B or local code for further requirements.
Step 2—Ductwork Acoustical Treatment
Metal duct systems that do not have a 90 degree elbow and 10 ft
of main duct to the first branch take-off may require internal
acoustical lining. As an alternative, fibrous ductwork may be used
if constructed and installed in accordance with the latest edition of
SMACNA construction standard on fibrous glass ducts. Both
acoustical lining and fibrous ductwork shall comply with NFPA
90B as tested by UL Standard 181 for Class 1 Rigid air ducts.
Step 3—Supply Air Connections
UPFLOW FURNACES
Connect supply-air duct to 3/4-in. flange on furnace supply-air
outlet. The supply-air duct attachment must ONLY be connected
to furnace supply-/outlet-air duct flanges or air conditioning coil
casing (when used). DO NOT cut main furnace casing to attach
supply side air duct, humidifier, or other accessories. All accessories MUST be connected external to furnace main casing.
DOWNFLOW FURNACES
Connect supply-air duct to supply-air opening on furnace. The
supply-air duct attachment must ONLY be connected to furnace
supply/outlet or air conditioning coil casing (when used), when
installed on non-combustible material. When installed on combustible material, supply-air duct attachment must ONLY be connected to an accessory subbase or factory approved air conditioning coil casing. DO NOT cut main furnace casing to attach supply
side air duct, humidifier, or other accessories. All accessories
MUST be connected external to furnace main casing.
HORIZONTAL FURNACES
Connect supply-air duct to supply air opening on furnace. The
supply-air duct attachment must ONLY be connected to furnace
supply/outlet or air conditioning coil casing (when used). DO NOT
cut main furnace casing to attach supply side air duct, humidifier,
or other accessories. All accessories MUST be connected external
to furnace main casing.
Step 4—Return Air Connections
UPFLOW FURNACES
The return-air duct must be connected to bottom , sides (left or
right), or a combination of bottom and side(s) of main furnace
casing as shown in Fig. 1. Bypass humidifier may be attached into
unused side return air portion of the furnace casing. DO NOT
connect any portion of return-air duct to back of furnace casing.
DOWNFLOW AND HORIZONTAL FURNACES
The return-air duct must be connected to return-air opening
provided as shown in Fig. 1. DO NOT cut into casing sides or back
to attach any portion of return-air duct. Bypass humidifier connections should be made at ductwork or coil casing sides exterior to
furnace.
ELECTRICAL CONNECTIONS
See Fig. 22 for field wiring diagram showing typical field 115-v
and 24-v wiring. Check all factory and field electrical connections
for tightness.
Blower access panel door switch opens 115-v power to
control center. No component operation can occur. Do not
bypass or close switch with panel removed. Failure to follow
this warning could result in personal injury or death.
Furnace control must be grounded for proper operation or
control will lock out. Control is grounded through green wire
routed to gas valve and burner box screw.
Step 1—115-v Wiring
Before proceeding with electrical connections, make certain that
voltage, frequency, and phase correspond to that specified on unit
rating plate. Also, check to be sure that service provided by utility
is sufficient to handle load imposed by this equipment. Refer to
rating plate or Table 4 for equipment electrical specifications.
Make all electrical connections in accordance with National
Electrical Code (NEC) ANSI/NFPA 70-1999 and any local codes
or ordinances that might apply. For Canadian installations, all
electrical connections must be made in accordance with Canadian
Electrical Code CSA C22.1 or subauthorities having jurisdiction.
TERMINAL
FURNACE
NOTE 2
BLOCK
THREE-WIRE
HEATING-ONLY
BLOWER DOOR SWITCH
BLK
WHT
115-V FIELD-
SUPPLIED
DISCONNECT
GND
BLK
WHT
AUXILIARY
J-BOX
FIVE WIRE
GND
Fig. 22—Heating and Cooling Application Wiring Diagram
WCRGY
W
C
R
O
N
T
G
R
O
COM
L
Y
24-V
NOTES:Connect Y-terminal in furnace as shown for proper blower operation.
FIELD 24-V WIRING
FIELD 115-, 208/230-, 460-V WIRING
FACTORY 24-V WIRING
FACTORY 115-V WIRING
THERMOSTAT
TERMINALS
NOTE 1
1.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use
same type or equivalent wire.
CONDENSING
UNIT
TWO
WIRE
FIELD-SUPPLIED
DISCONNECT
GND
18
208/230- OR
460-V
THREE
PHASE
208/230-V
SINGLE
PHASE
A99408
Page 19
ELECTRIC
DISCONNECT
SWITCH
COPPER
WIRE ONLY
ALUMINUM
WIRE
A93033
Do not connect aluminum wire between disconnect switch
and furnace. Use only copper wire.
Use a separate, fused branch electrical circuit containing a properly
sized fuse or circuit breaker for this furnace. See Table 4 for wire
size and fuse specifications. A disconnecting means must be
located within sight from and readily accessible to furnace.
NOTE: Proper polarity must be maintained for 115-v wiring. If
polarity is incorrect, control center LED status indicator light will
flash rapidly and furnace will NOT operate.
The cabinet MUST have an uninterrupted or unbroken ground
according to NEC ANSI/NFPA 70-1999 and Canadian Electrical Code CSA C22.1 or local codes to miniize personal
injury if an electrical fault should occur. This may consist of
electrical wire or conduit approved for electrical ground when
installed in accordance with existing electrical codes. Do not
use gas piping as an electrical ground. Failure to follow this
warning could result in electrical shock, fire, or death.
J-Box Relocation
1. Remove 2 screws holding auxiliary J-box. (See Fig. 23.)
2. Rotate J-box 180° and attach box to right side, using holes
provided.
FACTORY
INSTALLED
LOCATION
Fig. 23—Relocating J-Box
ALTERNATE
FIELD
LOCATION
A93051
If manual disconnect switch is to be mounted on furnace,
select a location where a drill or fastener will not contact
electrical or gas components.
Step 2—24-v Wiring
Make field 24-v thermostat connections at 24-v terminal block on
control center. For proper cooling operation, Y wire from thermostat MUST be connected to Y terminal on control center, as shown
in Fig. 22. The 24-v terminal board is marked for easy connection
of field wiring. (See Fig. 24.) The 24-v circuit contains a 3-amp,
automotive-type fuse located on control center. (See Fig. 25.) Any
electrical shorts of 24-v wiring during installation, service, or
maintenance may cause fuse to blow. If fuse replacement is
required, use only a fuse of identical size (3 amp).
NOTE: Use AWG No. 18 color-coded copper thermostat wire for
lengths up to 100 ft. For wire lengths over 100 ft, use AWG No.
16 wire.
Step 3—Accessories
1. Electronic Air Cleaner (EAC)
Two quick-connect terminals marked EAC-1 and EAC-2 are
provided for EAC connection. (See Fig. 25.) These terminals
are energized with 115v (1.5-amp maximum) during blower
motor operation.
2. Humidifier (HUM)
A quick-connect terminal (HUM) and screw terminal (C
OM)
are provided for 24-v humidifier connection. (See Fig. 24.)
HUM terminal is energized with 24-v (0.5-amp maximum)
after pressure switch closes.
NOTE: A field-supplied, 115-v controlled relay connected to
EAC terminals may be added if humidifier operation is desired
during blower operation.
DIRECT VENTING
The 58MCA Furnaces require a dedicated (one 58MCA furnace
only) direct-vent system. In a direct-vent system, all air for
combustion is taken directly from outside atmosphere, and all flue
products are discharged to outside atmosphere.
Step 1—Removal of Existing Furnaces from
Common Vent Systems
If furnace being replaced was connected to a common vent system
with other appliances, the following steps shall be followed with
each appliance connected to the venting system placed in operation, while any other appliances connected to the venting system
are not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and horizontal pitch
as required in the NFGC or NSCNGPIC and these instructions. Determine that there is no blockage or restriction,
leakage, corrosion, and other deficiencies which could cause
an unsafe condition.
3. In so far as is practical, close all building doors and windows
and all doors between the space in which the appliance(s)
connected to the venting system are located and other spaces
of the building. Turn on clothes dryers and any appliance not
connected to the venting system. Turn on any exhaust fans,
such as range hoods and bathroom exhausts, so they shall
operate at maximum speed. Do not operate a summer exhaust
fan. Close fireplace dampers.
4. Follow the lighting instructions. Place the appliance being
inspected in operation. Adjust thermostat so appliance shall
operate continuously.
19
Page 20
325768-101 REV. B
TRIALS-FOR-IGNITION. CONTR OL WILL A UT O-RESET A FT ER THREE HO URS .
10. IGNITION-LOCKOUT WILL OCCUR AFTER FOUR CONSECUTIVE UNSUCCESSFUL
FIELD SPLICE
PLUG RECEPTACLE
A99405
Fig. 24—Wiring Diagram
L2
EAC-2
CAP-1
BLWM
SCHEM AT IC DIAGR AM
START
(NA TU R AL GAS & PROPANE)
OL
LO
MED LO
MED HI
EQUIPMENT GROUND
HEAT
SPARE-2
GND
L2
ILK
NOTE #4
L1
TO 115VAC FIELD DISCONNECT
YEL
LGPS
(WHEN USED)
PRS
NOTE #6
COM
HI
COOL
SPARE-1
HI/LO
BLWR
L1
BLU
FRS
LS
IDM
1HSI
2
1
PL5
1
EAC-1
HSIR
IDR
GV
NOTE #5
GRN
RED
FSE
OL
M
2
PL6
2
PL2
115VAC
PR1
BLK
BLU
BRN
AUX
BRN
PL4
3
1
PL3
1
3
24VAC
TRAN
BRN
WHT
CAP -2
TRAN
BRN
WHT
RED
CAP - 2
2
2
WHT
PL4
PL3
NOTE #7
F U 1
TEST/TWIN
IDM
AUX
M
GRN
321
321
LS
NOTE #5
(WHEN USED)
FRS
1
7
6
8
SEC-2
SEC-1
WHT
OL
PL6
BLK
NOTE #6
LGPS
R
2
WHT
2
PL5
PRS
4
PL7
2
PL1
GVR
HI/LO
BLWR
IDR
HSIR
W
HUM
HSI
1
FUSED OR CIRCUIT BREAKER
BLK
1
DISCONNECT SWITCH (WHEN REQ'D)
WHT
BLK
GV
3
2
4
10
GVR-1
CPU
L1
NEUTRAL
NOTE #4
FU2
BLK
WHT
JB
FSE
5
8
5
Y
GRN
GND
GRN
9
6
7
9
1
G
3
11
OM
C
PL110-CIRCUIT PCB CONNECTOR
PL22-CIRC UIT PCB CONNECTOR
PL33-CIRCUIT ADAPTER CONNECTOR
PL43-CIRCUIT IDM CONNECTOR
PL52-CIRCUIT ADAPTER CONNECTOR
PL62-CIRCUIT HSI, PCB CONNECTOR
PL79-CIRCUIT ADAPTER CONNECTOR
AUTO-RESET THERMAL OVERLOAD SWITCHES (OL).
INSTRUCTIONS FOR DETAILS ON OPTIMUM SPEED SELECTION.
FURNACE JUNCTION BOX (JB).
NOTES:
1. IF ANY OF THE ORIGINAL EQUIPMENT WIRE IS REPLACED USE WIRE RATED FOR 105°C.
2. INDUCER (IDM) AND BLOWER (BLWM) MOTORS CONTAIN INTERNAL
3. BLOWER MOTOR SPEED SELECTIONS ARE FOR AVERAGE CONDITIONS, SEE INSTALLATION
JUNCTION
UNMARKED TERMINAL
PRSPRESSURE SWITCH, SPST-(N.O.)
TEST/TWIN COMPONENT TEST & TWIN TERMINAL
TRANTRANSFORMER-115VAC/24VAC
FLAME.
4. USE ONLY COPPER WIRE BETWEEN THE DISCONNECT SWITCH AND THE
5. THIS WIRE MUST BE CONNECTED TO FURNACE SHEET METAL FOR CONTROL TO PROVE
PCB TERMINAL
FACTORY WIRING (115VAC)
FACTORY WIRING (24VAC)
FIELD WIRING (115VAC)
FIELD WIRING (24VAC)
HEAT PUMP 90 SECONDS.
6. FACTORY CONNECTED WHEN LGPS NOT USED.
7. REPLACE ONLY WITH A 3 AMP FUSE.
8. BLOWER-ON DELAY, GAS HEATING 60 SECONDS, COOLING OR HEAT PUMP 2 SECONDS.
9. BLOWER-OFF DELAY, GAS HEATING 90, 135, 180 OR 225 SECONDS, COOLING OR
CONDUCTOR ON PCB
FIELD WIRING TERMINAL
FIELD EARTH GROUND
EQUIPMENT GROUND
WHT
G
REDRED
WHT
PL7
4
5
6
987
321
RED
BLU
1
2
225
180
24V
OM
C
ORN
W
WHT
WHT
WHT
11
HUM
TEST/TWIN
FU1
SEC-1
R
Y
SEC-2
YEL
RED
GRN
WHT
EAC-2
LED 1
L2
BLOWER OFF DELA Y
JUMPER SELECT
ORN
PCB
J1
4
5
90
135
J2
3
BLK
WHT (COM)
BLK
1
PL2
GRN
2
L1
PL1
12345678910
PR1
EAC-1
SPARE 1 SPARE 2
COOL
HEAT
GRN
BRN
BLWM
BLK (HI)
YEL
(MED HI)
WHT
(COM)
ILK
BLK
WHT
CAP -1
BRN
START
OL
RED (LO)
BLU
(ME D LO)
BLWR BLOWER MOTOR RELAY, SPST-(N.O.)
BLWM BLO W ER MOT OR
CAP CAPACITOR
CPU MICROPROCESSOR AND CIRCUITRY
LEGEND
EAC-1 ELECTRONIC AIR CLEANER CONNECTION (115 VAC 1.5 AMP MAX.)
(FIELD INSTALLED & SUPPLIED)
EAC-2 ELECTRO NIC AIR CLEANER CONNECTION (COMMON)
FRS FLAME ROLLOUT SW. -MANUAL RESET, SPST-(N.C.)
FSE FLAME PROVING ELECTRODE
FU1FUSE, 3 AMP, A UTO MO TIVE BLADE TYPE, FACTORY INSTALLED
FU2 FUSE OR C IRCUIT BREAKER CURRENT INTERRUPT DEVICE
GND EQUIPMENT GROUND
GVGAS VALVE-REDUNDANT OPERATORS
GVR GAS VALVE RELAY, DPST-(N.O.)
HI/LO BLOWER MOTOR SPEED CHANGE RELAY, SPDT
HSIHOT SURFACE IGNITOR (115 VAC)
HSIR HOT SURFACE IGNITOR RELAY, SPST-(N.O.)
HUM 24VAC HUMIDIFIER CONNECTION (.5 AMP. MAX.)
IDMINDUCED DRAFT MOTOR
IDRINDUCED DRAFT RELAY, SPST-(N.O.)
ILKBLOW ER A CCESS PANEL INTERLOCK SWITCH, SPST -(N.O.)
* Permissible limits of voltage range at which unit will operate satisfactorily.
† Unit ampacity = 125 percent of largest operating component’s full load amps plus 100 percent of all other potential operating components’ (EAC, humidifier, etc.) full
load amps.
‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.
** Time-delay type is recommended.
MIN
WIRE
SIZE
MAX WIRE
LENGTH
(FT)‡
MAX FUSE
OR CKT BKR
AMPS**
5. Test for draft hood equipped appliance spillage at the draft
hood relief opening after 5 minutes of main burner operation.
Use the flame of a match or candle.
6. After it has been determined that each appliance connected to
the venting system properly vents when tested as outlined
above, return doors, windows, exhaust fans, fireplace dampers, and any other gas-burning appliance to their previous
conditions of use.
7. If improper venting is observed during any of above tests, the
venting system must be corrected.
COOLING OFF
DELAY DEFEAT
JUMPER-J2
90
J2
135
EAC-2
180
225
SEC-1
24-V THERMOST AT
TERMINALS
HUMIDIFIER TERMINAL
(24-VAC 0.5 AMP MAX)
24-V TRANSFORMER SEC-2
LED OPERATION &
DIAGNOSTIC LIGHT
GYW
24V
Com
R
Vent system or vent connectors may need to be resized. For any
other appliances when resizing vent systems or vent connectors,
system or connector must be sized to approach minimum size as
determined using appropriate table found in the NFGC or NSCNGPIC.
Step 2—Combustion-Air and Vent Piping
GENERAL
Combustion-air and vent pipe fittings must conform to American
National Standards Institute (ANSI) standards and American
BLOWER OFF DELAY
JUMPER SELECT
J1
1
2
3
4
5
TEST/TWIN
HUM
3-AMP FUSE
HARNESS CONNECTOR
115-VAC (L2) NEUTRAL
CONNECTION
COOL
BLOWER SPEED
SELECTION TERMINALS
HEAT
1234567891011
SP ARE-1
SP ARE-2
EAC-1 ELECTRONIC AIR CLEANER
TERMINALS (115-VAC 1.0 AMP MAX)
Fig. 25—Control Center
21
PRI
115-VAC (L1)
POWER SUPPLY
HOT SURFACE
IGNITOR CONNECTOR
INDUCER MOTOR
CONNECTOR
A99416
Page 22
Society for Testing and Materials (ASTM) standards D1785
(schedule-40 PVC), D2665 (PVC-DWV), D2241 (SDR-21 and
SDR-26 PVC), D2661 (ABS-DWV), F628 (schedule-40 ABS),
F891 (PVC-DWV cellular core) or F441 (schedule-40 CPVC pipe)
and F438 (schedule-40 CPVC fittings). Pipe cement and primer
must conform to ASTM standards D2564 or F493 (PVC or CPVC)
or D2235 (ABS). See Table 6 for maximum pipe lengths and Fig.
30, 31, 32, 33, and 34 for exterior piping arrangements.
In Canada construct all combustion-air and vent pipes for this unit
of CSA or ULC certified schedule-40 PVC, PVC-DWV or
ABS-DWV pipe and pipe cement. SDR pipe is NOT approved in
Canada.
NOTE: Furnace combustion-air and vent pipe connections are
sized for 2-in. pipe. Any pipe size change should be made outside
furnace casing in vertical pipe. (See Fig. 26.) This allows proper
drainage of vent condensate.
FURNACE
NOT IN
HORIZONTAL
SECTION
PIPE DIAMETER
TRANSITION IN
VERTICAL SECTION
A93034
Fig. 26—Combustion-Air and Vent Pipe Diameter
Transition Location and Elbow Configuration
Combustion-air and vent pipes must terminate together in same
atmosphere pressure zone, either through roof or sidewall (roof
termination preferred), using accessory termination kit. See Table
5 for required clearances.
Furnace combustion-air and vent pipe connections must be attached as shown in Fig. 27. Combustion-air intake plug fitting and
inducer housing alternate vent cap may need to be relocated in
some applications.
NOTE: Slope combustion-air and vent pipes a minimum of 1/4
in. per linear ft with no sags between hangers.
Table 5—Combustion-Air and Vent Pipe
Termination Clearances
LOCATION
Above grade level or above anticipated snow depth
Dryer vent33
From plumbing vent stack33
From any mechanical fresh air intake16
For furnaces with an input capacity
less than 100,000 Btuh—from any nonmechanical air supply (windows or
doors which can be opened) or
combustion-air opening
From service regulator vent, electric
and gas meters, and relief equipment
Above grade when adjacent to public
walkway
* Horizontal distance.
† 18 in. above roof surface in Canada.
‡ 36 in. to electric meter in Canada only.
NOTES:
1. If installing 2 adjacent 58MCA Furnaces, refer to Multiventing and Vent Terminations section for proper vent configurations.
2. When locating combustion-air and vent terminations, consideration must be given to prevailing winds, location, and other
conditions which may cause recirculation of the appliance’s
own flue products or the flue products of adjacent vents.
Recirculation can cause poor combustion, inlet condensate
problems, and accelerated corrosion of heat exchangers.
3. Vent termination cannot terminate less than 2 ft horizontal and
7 ft above public walkway or where condensate vapor or
droplets may be a hazard.
Combustion air must not be taken from inside structure
because inside air is frequently contaminated by halogens,
which include fluorides, chlorides, bromides, and iodides.
These elements are found in aerosols, detergents, bleaches,
cleaning solvents, salts, air fresheners, adhesives, paint, and
other household products. Locate combustion-air inlet as far
as possible from swimming pool and swimming pool pump
house.
Excessive exposure to contaminated combustion air will
result in safety and performance related problems.
CLEARANCE (FT)
U.S.A.Canada
11†
11
4*6‡
Note 3Note 3
When combustion-air pipe is installed above a suspended
ceiling, pipe must be insulated with 3/8-in. thick Armaflextype insulation. Combustion-air pipe should also be insulated
when it passes through warm, humid space.
When vent pipe is exposed to temperatures below freezing,
such as when it passes through an unheated space or when a
chimney is used as a raceway, pipe must be insulated as
shown in Table 7 with Armaflex-type insulation.
Solvent cements are combustible. Keep away from heat,
sparks, and open flame. Use only in well-ventilated areas.
Avoid breathing in vapor or allowing contact with skin or
eyes. Failure to follow this warning could result in fire,
property damage, personal injury, or death.
All combustion-air and vent pipes must be airtight and
watertight. Pipes must also terminate exactly as shown in Fig.
30, 31, 32, 33, or 34. Failure to follow this warning could
result in property damage, personal injury, or death.
NOTE: The minimum combustion-air and vent pipe length (each)
for these furnaces is 5 ft. Short pipe lengths (5-8 ft) may discharge
water droplets. These droplets may be undesirable, and a 12-in.
minimum offset pipe section is recommended, as shown in Fig. 28,
to reduce excessive droplets from exiting vent pipe outlet.
COMBUSTION-AIR AND VENT PIPE DIAMETER
Determine combustion-air and vent pipe diameter.
1. Using Table 6, individually determine the combustion-air and
vent pipe diameters. Pick the larger of these 2 pipe diameters
and use this diameter for both combustion-air and vent pipes.
2. When installing vent systems of short pipe length, use the
smallest allowable pipe diameter. Do not use pipe size greater
than required or incomplete combustion, flame disturbance, or
flame sense lockout may occur.
NOTE: Do not count elbows or pipe sections in terminations or
within furnace. See shaded areas in Fig. 30, 31, 32, 33, and 34.
EXAMPLE:
An 080-12 size furnace located in Indianapolis, elevation
650 ft above sea level, could be installed in an application
requiring 3 elbows and 32 ft of vent pipe, along with 5
elbows and 34 ft of combustion-air pipe. Table 6 indicates
this application would allow a 2-in. diameter vent pipe, but
require a 2-1/2 in. diameter combustion air pipe (2-in. pipe
is good for 35 ft with 3 elbows, but only 30 ft with 5
elbows). Therefore, 2-1/2 in. diameter pipe must be used
for both vent and combustion-air pipes since larger required
diameter must always be used for both pipes. If same
installation were in Albuquerque, elevation 5250 ft above
sea level, installation would require 2-1/2 in. vent pipe and
combustion-air pipe. At 5001- to 6000-ft elevation, 2-in.
pipe is only good for 17 ft with 5 elbows, and 2-1/2 in. pipe
is good for 70 ft with 5 elbows.
COMBUSTION-AIR AND VENT PIPE ATTACHMENT
NOTE: All pipe joints must be watertight except attachment of
combustion-air pipe to inlet housing connection, since it may be
necessary to remove pipe for servicing.
1. Attach combustion-air pipe as follows:
a. Determine location of combustion-air intake pipe connec-
tion to combustion-air intake housing as shown in Fig. 27
for application.
b. Reposition combustion-air intake housing plug fitting in
appropriate unused intake housing connection.
c. If required, insert perforated disk assembly (factory-
supplied in loose parts bag) in intake housing where
combustion-air intake pipe will be connected. If half disk
set is required, install with shoulder of disk against stop in
combustion-air inlet.
d. Install pipe support (factory-supplied in loose parts bag)
into selected furnace casing combustion-air pipe hole. Pipe
support should be positioned at bottom of casing hole.
e. Insert 2-in. diameter pipe into intake housing.
NOTE: A 2-in. diameter pipe must be used within the furnace
casing. Make all pipe diameter transitions outside furnace casing.
f. Drill a 1/8-in. hole in 2-in. combustion-air pipe using hole
in intake housing as a guide.
g. Install a field-supplied No. 6 or No. 8 sheet metal screw
into combustion-air pipe.
NOTE: DO NOT OVER TIGHTEN SCREW. Breakage to intake
housing or fitting may cause air leakage to occur.
NOTE: Do not attach combustion-air intake pipe permanently to
combustion-air intake housing since it may be necessary to remove
pipe for service of ignitor or flame sensor.
COMBUSTION-AIR INTAKE HOUSING PLUG
FITTING
The combustion-air intake plug fitting must be installed in
unused combustion-air intake housing. This fitting must be
attached by using RTV sealant, or by drilling a 1/8-in. hole in
fitting, using hole in intake housing as a guide. Install a
field-supplied No. 6 or No. 8 sheet metal screw.
NOTE: DO NOT OVER TIGHTEN SCREW. Breakage to intake
housing or fitting may cause air leakage to occur.
A plugged drain connection has been provided on this fitting
for use when moisture is found in combustion-air intake pipe
and combustion box.
23
Page 24
12″ MIN
12″ MIN
VENT PIPE
HORIZONTAL TO ROOFHORIZONTAL TO SIDEWALL
COMBUSTION-AIR PIPE
12″ MIN
VENT PIPE
COMBUSTION-AIR PIPECOMBUSTION-AIR PIPE
COMBUSTION-AIR PIPE
VENT PIPE
12″ MIN
VENT PIPE
VERTICAL TO SIDEWALLVERTICAL TO ROOF
NOTE: A 12 In. minimum offset pipe section is recommended with
short (5 to 8 ft) vent systems. This recommendation is to reduce
excessive condensate droplets from exiting the vent pipe.
Fig. 28—Short Vent (5 to 8 Ft) System
NOTE: Moisture in combustion-air intake may be result of
improper termination. Ensure combustion-air intake pipe is similar
to that shown in Fig. 30, 31, 32, 33, or 34 so it will not be
susceptible to areas where light snow or other sources of moisture
could be pulled in.
If use of this drain connection is desired, drill out fitting’s tap
plug with a 3/16-in. drill and connect a field-supplied 3/8-in.
tube. This tube should be routed to open condensate drain for
furnace and A/C (if used), and should be trapped. (See Fig.
29.)
2. Attach vent pipe as follows:
a. Determine location of vent pipe connection to inducer
housing as shown in Fig. 27 for application.
b. Reposition elastomeric (rubber) inducer housing outlet cap
and clamp to appropriate unused inducer housing connection. Tighten clamp.
Inducer housing outlet cap must be installed and fully seated
against inducer housing. Clamp must be tightened to prevent
any condensate leakage. Failure to follow this warning could
result in electrical shock, fire, personal injury, or death.
c. Install pipe support (factory-supplied in loose parts bag)
into selected furnace casing vent pipe hole. Pipe support
should be positioned at bottom of casing hole.
A96230
d. Be certain that mating surfaces of inducer housing connec-
tion, elastomeric (rubber) coupling, and 2-in. diameter vent
pipe are clean and dry. Assemble the elastomeric (rubber)
vent coupling (with 2 loose clamps) onto inducer housing
connection. Insert the 2-in. diameter vent pipe through the
elastomeric (rubber) coupling and fully into inducer housing connection until it bottoms on the internal stop. Tighten
both clamps to secure the pipe to inducer housing. Tighten
the clamp screws to 15 in.-lb of torque.
Vent pipe must be installed and fully seated against inducer
housing internal stop. Clamp must be tightened to prevent any
condensate leakage. Failure to follow this warning could
result in electrical shock, fire, personal injury, or death.
NOTE: A 2-in. diameter pipe must be used within the furnace
casing. Make all pipe diameter transitions outside furnace casing.
VENT EXTENSION PIPE
Furnaces with 100,000 Btuh and larger inputs are supplied
with a PVC vent extension pipe (2-in. diameter by 12-in.
long). This pipe has a built-in channel to assist vent condensate disposal. When this vent extension pipe is supplied, it
must be used to connect the field vent pipe to furnace inducer
housing on ALL upflow and downflow applications.
24
Page 25
ALTITUDEUNIT SIZE
0 to 2000
ALTITUDEUNIT SIZE
2001 to 3000
ALTITUDEUNIT SIZE
3001 to 4000
See notes on page 27.
040-08
040-12
060-08
060-12
060-16
080-12
080-16
080-20
100-16
100-20
120-20
140-20
040-08
040-12
060-08
060-12
060-16
080-12
080-16
080-20
100-16
100-20
120-20
140-20
040-08
040-12
060-08
060-12
060-16
080-12
080-16
080-20
100-16
100-20
120-20
140-20
Table 6—Maximum Allowable Pipe Length (Ft)
TERMINATION
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
2 Pipe or 3-In.
Concentric
2 Pipe or 3-In.
Concentric
TERMINATION
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
2 Pipe or 3-In.
Concentric
2 Pipe or 3-In.
Concentric
TERMINATION
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
2 Pipe or 3-In.
Concentric
2 Pipe or 3-In.
Concentric
PIPE DIA
(IN.)*
15NANANANANA
1-1/2707065606055
2707070707070
1-1/22015105NANA
2707070707070
1-1/210NANANANANA
2555035303020
2-1/2707070707070
25NANANANANA
2-1/24030202010NA
3707070707070
2-1/2 one
disk
3†454035302520
3† no disk707070707070
4† no disk707070707070
2-1/2 one
disk
3† one disk403530252015
3† no disk605652484440
4† no disk707070707070
PIPE DIA
(IN.)*
1-1/2676257525247
2707070707070
1-1/217127NANANA
2706766616161
2494430252515
2-1/2707070707070
2-1/2352616166NA
3707070706661
314 9 NANANANA
3† no disk707063565043
4† no disk707070707070
3† one disk2015105NANA
3† no disk393531272319
4† no disk707070707070
PIPE DIA
(IN.)*
1-1/2645954494843
2707070707070
1-1/216116NANANA
2686362575756
2464128232213
2-1/2707070707070
2-1/2332415145NA
3707070666156
3† no disk655851443831
4† no disk707070707070
* Disk usage—Unless otherwise specified, use perforated disk assembly (factory-supplied in loose parts bag). If one disk is stated, separate 2 halves of perforated disk
assembly and use shouldered disk half. When using shouldered disk half, install screen side toward inlet box.
† Wide radius elbow.
‡ Vent sizing for Canadian installations over 4500 ft (1370 m) above sea level are subject to acceptance by the local authorities having jurisdiction.
NA—Not Allowed; pressure switch will not make.
NOTES:
1. Do not use pipe size greater than those specified in table or incomplete combustion, flame disturbance, or flame sense lockout may occur.
2. Size both the combustion-air and vent pipe independently, then use the larger diameter for both pipes.
3. Assume two 45° elbows equal one 90° elbow. Long radius elbows are desirable and may be required in some cases.
4. Elbows and pipe sections within the furnace casing and at the vent termination should not be included in vent length or elbow count.
5. The minimum pipe length is 5 ft for all applications.
6. Use 3-in. diameter vent termination kit for installations requiring 4-in diameter pipe.
080-12
080-16
080-20
100-16
100-20
120-20
140-20NA
040-08
040-12
060-08
060-12
060-16
080-12
080-16
080-20
100-16
100-20
120-20
140-20NA
TERMINATION
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
2 Pipe or 3-In.
Concentric
TERMINATION
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
2 Pipe or 3-In.
Concentric
PIPE DIA
(IN.)*
1-1/2464136312924
2626058565553
1-1/2116NANANANA
2494442373534
23328171210NA
2-1/2626058565553
2-1/2231575NANA
3595449443934
3† no disk10NANANANANA
4† no disk353025201510
PIPE DIA
(IN.)*
1-1/2423732272520
2575553514947
2454038333129
230251497NA
2-1/2575553514947
2-1/221135NANANA
3544944393429
4† no disk105NANANANA
123456
123456
NUMBER OF 90° ELBOWS
NUMBER OF 90° ELBOWS
COMBUSTION – AIR
3/8" ID TUBE
3/16"
DRILL
TRAP
TO OPEN
DRAIN
4″
MIN
INTAKE HOUSING
Fig. 29—Intake Housing Plug Fitting Drain
NOTE: See label on vent extension pipe for proper installation.
This pipe may be shortened if an elbow is used to connect vent
extension tube to field-installed vent pipe.
3. Working from furnace to outside, cut pipe to required
length(s).
4. Deburr inside and outside of pipe.
5. Chamfer outside edge of pipe for better distribution of primer
and cement.
BURNER
BOX
COMBUSTION –
AIR PIPE
A93035
6. Clean and dry all surfaces to be joined.
7. Check dry fit of pipe and mark insertion depth on pipe.
NOTE: It is recommended that all pipes be cut, prepared, and
preassembled before permanently cementing any joint.
8. After pipes have been cut and preassembled, apply generous
layer of cement primer to pipe fitting socket and end of pipe
to insertion mark. Quickly apply approved cement to end of
pipe and fitting socket (over primer). Apply cement in a light,
uniform coat on inside of socket to prevent buildup of excess
cement. Apply second coat.
9. While cement is still wet, twist pipe into socket with 1/4 turn.
Be sure pipe is fully inserted into fitting socket.
10. Wipe excess cement from joint. A continuous bead of cement
will be visible around perimeter of a properly made joint.
11. Handle pipe joints carefully until cement sets.
12. Support combustion-air and vent piping a minimum of every
5 ft (3 ft for SDR-21 or -26 PVC) using perforated metal
hanging strap.
13. Slope combustion-air and vent pipes toward furnace a minimum of 1/4 in. per linear ft with no sags between hangers.
14. Use appropriate methods to seal openings where vent and
combustion-air pipes pass through roof or side wall.
27
Page 28
Step 3—Concentric Vent and Combustion-Air
Termination Kit Installation
NOTE: If these instructions differ from those packaged with
termination kit, follow kit instructions.
Combustion-air and vent pipes must terminate outside structure. A
factory accessory termination kit must be installed in 1 of the
installations shown in Fig. 30, 31, 32, 33, or 34. Four termination
kits are available.
1. The 2-in. termination bracket kit is for 1-in., 1-1/2 in., and
2-in. diameter 2-pipe termination systems.
2. The 3-in. termination bracket kit is for 2-1/2 in., 3-in., and
4-in. diameter 2-pipe termination systems.
3. The 2-in. concentric vent/air termination kit is for 1-in., 1-1/2
in., 2-in., and 2-1/2 in. diameter pipe systems when single
penetration of wall or roof is desired.
4. The 3-in. concentric vent/air termination kit is for 2-1/2 in.,
3-in., and 4-in. diameter pipe systems when single penetration
of wall or roof is desired.
NOTE: Shaded parts in Fig. 30, 31, 32, 33, and 34 are considered
to be termination. These components should NOT be counted
when determining pipe diameter. Roof termination is preferred
since it is less susceptible to damage, has reduced chances to take
in contaminants, and has less visible vent vapors. (See Fig. 30 or
31.) Sidewall termination may require sealing or shielding of
building surfaces with a corrosive resistance material due to
corrosive combustion products of vent system.
EXTENDED EXPOSED SIDEWALL PIPES
Sidewall combustion-air and vent pipe terminations may be
extended beyond area shown in Fig. 33 or 34 in outside ambient by
insulating pipes as indicated in Table 7.
1. Determine combustion-air and vent pipe diameters, as stated
above, using total pipe length and number of elbows.
2. Using winter design temperature (used in load calculations),
find appropriate temperature for your application and furnace
model.
3. Determine required insulation thickness for exposed pipe
lengths.
NOTE: Pipe length (ft) specified for maximum pipe lengths
located in unconditioned spaces cannot exceed total allowable pipe
length as specified in Table 6.
TWO-PIPE TERMINATION KIT
1. Determine location for termination.
Consideration of the following should be made when deter-
mining an appropriate location for termination kit.
a. Comply with all clearance requirements as stated in Table
5.
b. Termination kit should be positioned where vent vapors
will not damage plants/shrubs or air conditioning equipment.
c. Termination kit should be positioned so that it will not be
affected by wind eddy (such as inside building corners) or
allow recirculation of flue gases, airborne leaves, or light
snow.
d. Termination kit should be positioned where it will not be
damaged by or subjected to foreign objects, such as stones,
balls, etc.
e. Termination kit should be positioned where vent vapors are
not objectionable.
2. Cut 2 holes, 1 for each pipe, of appropriate size for pipe size
being used.
3. Loosely install elbow in bracket and place assembly on
combustion-air pipe.
Roof terminations—Loosely install pipe coupling on properly cut vent pipe. Coupling must be positioned so bracket will
mount as shown in Fig. 30.
For applications using combustion-air pipe option, indicated
by dashed lines in Fig. 30, install 90° street elbow into 90°
elbow, making U-fitting. A 180° U-fitting may be used.
Sidewall terminations—Install bracket as shown in Fig. 33 or
34.
For applications using vent pipe option indicated by dashed
lines in Fig. 33, rotate vent elbow 90° from position shown in
Fig. 33.
4. Disassemble loose pipe fittings. Clean and cement using same
procedures as used for system piping.
5. Check required dimensions as shown in Fig. 30, 33, or 34.
CONCENTRIC VENT/AIR TERMINATION KIT
1. Determine location for termination.
Consideration of the following should be made when deter-
mining an appropriate location for termination kit.
a. Comply with all clearance requirements as stated in Table
5.
b. Termination kit should be positioned where vent vapors
will not damage plants/shrubs or air conditioning equipment.
c. Termination kit should be positioned so it will not be
affected by wind eddy (such as inside building corners) or
that may allow recirculation of flue gases, airborne leaves,
or light snow.
d. Termination kit should be positioned where it will not be
damaged by or subjected to foreign objects, such as stones,
balls, etc.
e. Termination kit should be positioned where vent vapors are
not objectionable.
2. Cut one 4-in. diameter hole for 2-in. kit, or one 5-in. diameter
hole for 3-in. kit.
3. Loosely assemble concentric vent/air termination components
together using instructions in kit.
4. Slide assembled kit with rain shield REMOVED through hole.
NOTE: Do not allow insulation or other materials to accumulate
inside of pipe assembly when installing it through hole.
Roof terminations—Locate assembly through roof to appropriate height as shown in Fig. 31.
Sidewall terminations—Locate assembly through sidewall
with rain shield positioned no more than 1-in. from wall as
shown in Fig. 32.
5. Disassemble loose pipe fittings. Clean and cement using same
procedures as used for system piping.
6. Check required dimensions as shown in Fig. 31 or 32.
Step 4—Multiventing and Vent Terminations
When 2 or more 58MCA Furnaces are vented near each other, each
furnace must be individually vented. NEVER common vent or
breach vent 58MCA furnaces. When 2 or more 58MCA furnaces
are vented near each other, 2 vent terminations may be installed as
shown in Fig. 35, 36, 37, 38, or 39, but next vent termination must
be at least 36 in. away from first 2 terminations. It is important that
vent terminations be made as shown to avoid recirculation of flue
gases. Dimension "A" in Fig. 35, 36, 37, 38, and 39 represents
distance between pipes or rain shields, as touching or 2-in.
maximum separation.
28
Page 29
VERTICAL SEPARATION
BETWEEN COMBUSTION
MAXIMUM OF 24 IN. ABOVE ROOF.
AIR AND VENT
8 3/4″ FOR 3″ KIT
6 3/4″ FOR 2″ KIT
MAINTAIN 12 IN. MINIMUM
CLEARANCE ABOVE HIGHEST
ANTICIPATED SNOW LEVEL.
COUPLING
VENT
ROOF
18″ MAXIMUM
BRACKET
COMBUSTION
AIR
Fig. 30—Roof Termination (Preferred)
VENT
COMBUSTION
AIR
MAINTAIN 12 IN.
(18 IN. FOR CANADA)
MINIMUM CLEARANCE
ABOVE HIGHEST
ANTICIPATED SNOW
LEVEL. MAXIMUM OF
24 IN. ABOVE ROOF.
Table 7—Maximum Allowable Exposed Vent Pipe Length (Ft) With and Without Insulation
in Winter Design Temperature Ambient*
UNIT
SIZE
040
060
080
100
120
140
* Pipe length (ft) specified for maximum pipe lengths located in unconditioned spaces. Pipes located in unconditioned space cannot exceed total allowable pipe length
as specified in Table 6.
† Insulation thickness based on R value of 3.5 per in.
WINTER DESIGN
TEMPERATURE
(°F)
2024570
022870
-2021058
2026570
023570
-2022070
202-1/27070
02-1/24770
-202-1/22870
2037070
035070
-2032870
2047070
044870
-2042370
2047070
045770
-2043070
MAX PIPE
DIAMETER
(IN.)
WITHOUT
INSULATION
WITH 3/8-IN. OR
THICKER INSULATION†
CONDENSATE DRAIN
Step 1—General
Condensate trap is shipped installed in the blower shelf and factory
connected for UPFLOW applications. Condensate trap must be
RELOCATED for use in DOWNFLOW and HORIZONTAL
applications.
Condensate trap MUST be used for all applications.
An external trap is not required when connecting the field drain to
this condensate trap.
The field drain connection (condensate trap or drain tube coupling)
is sized for 1/2-in. CPVC, 1/2-in. PVC, or 5/8-in. ID tube
connection.
Drain pipe and fittings must conform to ANSI standards and
ASTM D1785 or D2846. CPVC or PVC cement and primer must
conform to ASTM D2564 or F493. In Canada, use CSA or ULC
certified schedule 40 CPVC or PVC drain pipe, fittings, and
cement.
When a condensate pump is required, select a pump which is
approved for condensing furnace applications. To avoid condensate spillage, select a pump with an overflow switch.
Furnace condensate is mildly acidic, typically in the pH range of
3.2 to 4.5. Due to corrosive nature of this condensate, a condensate
pH neutralizing filter may be desired. Check with local authorities
to determine if a pH neutralizer is required.
Step 2—Application
The furnace, A/C, and humidifier drains may be combined and
drained together. The A/C drain must have an external, fieldsupplied trap prior to the furnace drain connection. All drain
connections (furnace, A/C, or humidifier) must be terminated into
an open or vented drain as close to the respective equipment as
possible to prevent siphoning of the equipment’s drain.
See Fig. 40 for example of possible field drain attachment using
1/2-in. CPVC or PVC tee for vent and A/C or humidifier drain
connection.
32°F MINIMUM INSTALLED
AMBIENT OR FREEZE
PROTECTION REQUIRED
Unit must not be installed, operated, and then turned off and
left in an unoccupied structure during cold weather when
temperature drops to 32°F and below unless drain trap and
drain line have adequate freeze protection. See Service and
Maintenance Instructions for winterizing procedure.
Outdoor draining of the furnace is permissible if allowed by local
codes. Caution should be taken when freezing ambient may freeze
drain pipe and prohibit draining.
30
A93058
Page 31
A
A96128
Fig. 35—Rooftop Termination
(Dimension "A" is Touching or 2-In. Maximum Separation)
VENT
VENT
A
COMBUSTION
AIR
A93056
Fig. 36—Concentric Vent and Combustion-Air
Roof Termination
(Dimension "A" is Touching or 2-In. Maximum Sepa-
ration)
VENT
1″ MAXIMUM
(TYP)
COMBUSTION AIR
VENT
A
VENT
A93057
Fig. 37—Concentric Vent and Combustion-Air
Side Termination
(Dimension "A" is Touching or 2-In.
Maximum Separation)
VENT
COMBUSTION AIR
A
Fig. 38—Sidewall Termination of 12 in. or Less
(Dimension "A" is Touching or 2-In.
Maximum Separation)
COMBUSTION AIR
A96129
COMBUSTION AIR
A
COMBUSTION AIR
Fig. 39—Sidewall Termination of More Than 12 in.
(Dimension "A" is Touching or 2-In.
Maximum Separation)
31
A96130
Page 32
OPEN STAND
PIPE FOR
A/C OR
HUMIDIFIER
DRAIN
CONDENSATE TRAP
WIRE TIE(S)
TEE
TO OPEN
DRAIN
A94054
Fig. 40—Example of Field Drain Attachment
Caution should be taken to prevent draining where slippery
conditions may cause personal injuries. Excessive condensate
draining may cause saturated soil conditions which may result
in damage to plants.
Step 3—Condensate Drain Protection
Freezing condensate left in condensate trap and drain line may
cause cracks, and possible water damage may occur. If freeze
protection is required, use condensate freeze protection accessory
or equivalent 3 to 6 watt per ft at 120v and 40°F self-regulating,
shielded, and waterproof heat tape. See Installation Instructions
supplied with accessory or heat tape manufacturer’s recommendations.
1. Fold heat tape in half and wrap on itself 3 times.
2. Locate heat tape between sides of condensate trap back. (See
Fig. 41.)
3. Use wire ties to secure heat tape in place. Wire ties can be
positioned in notches of condensate trap sides. (See Fig. 41.)
4. Wrap field drain pipe with remaining heat tape, approximately
1 wrap per ft.
5. When using field-supplied heat tape, follow heat tape manufacturer’s instructions for all other installation guidelines.
SEQUENCE OF OPERATION
Furnace control must be grounded for proper operation, or
control will lock out. Control is grounded through green wire
routed to gas valve and burner box screw.
Using schematic diagram, follow sequence of operation through
different modes. (See Fig. 24.) Read and follow wiring diagram
carefully.
NOTE: If 115-v power supply to furnace or blower access panel
switch is interrupted during a call for heat, blower operates for 90
sec when power is restored before heating cycle is resumed.
(3 WRAPS MINIMUM)
HEAT TAPE
Fig. 41—Condensate Trap Heat Tape
Step 1—Heating Mode
When wall thermostat calls for heat, R-W circuit closes. Furnace
control performs a self-check, verifies pressure switch contacts are
open, and starts inducer motor.
1. Prepurge period—As inducer motor comes up to speed,
pressure switch contacts close to begin a 15-sec prepurge
period.
HUM terminal on control center is energized through pressure
switch curcuit. See Accessories — Humidifier section.
2. Ignitor warm up—At end of prepurge period, ignitor is
energized for a 17-sec ignitor warm-up period.
3. Ignition sequence—When ignitor warm-up period is com-
pleted, gas valve opens, permitting gas flow to burners where
it is ignited. After 5 sec, ignitor is de-energized and a 2-sec
flame-sensing period begins.
4. Flame sensing—When burner flame is sensed, control begins
blower on delay period and continues holding gas valve open.
If burner flame is not sensed, control center de-energizes gas
valve and ignition sequence is repeated.
NOTE: Ignition sequence repeats 3 additional times before a
lockout occurs. Lockout automatically resets after 3 hr or can be
manually reset by turning off 115v (not at thermostat) for 3 sec
minimum, then turning it on again.
5. Blower on delay—Sixty sec after burner flame is proven (40
sec if jumper has been cut for 140 size unit in downflow
orientation), blower motor is energized on heating speed.
Simultaneously, electronic air cleaner terminal EAC-1 is
energized.
6. Blower off delay—When thermostat is satisfied, circuit be-
tween R-W is opened, de-energizing gas valve (stopping gas
flow to burners) and humidifier. Blower motor and electronic
air cleaner remain energized for selected OFF delay. See
figure 25.
7. Post purge—Inducer motor remains energized 15 sec after
burners are extinguished (5 sec if jumper has been cut for 140
size unit in downflow orientation).
Step 2—Cooling Mode
When thermostat calls for cooling, R-G and R-Y circuits close.
R-Y circuit starts outdoor condensing unit, and combined R-Y and
R-G circuit starts furnace blower motor on cooling speed. Electronic air cleaner EAC-1 terminal is energized with 115v whenever
blower is operating.
32
A93036
Page 33
When thermostat is satisfied, R-G and R-Y circuits are opened,
furnace blower continues operating on cooling speed for an
additional 90 sec. Cooling OFF delay can be set to 3 sec by cutting
jumper J2 on control board. See figure 25.
Step 3—Continuous Blower Mode
When R-G circuit is made, blower motor operates on heating
speed.
NOTE: Electronic air cleaner EAC-1 terminal is energized with
115v whenever blower is operating.
If a call for heat (R-W) occurs while thermostat is in continuous
blower mode, blower stops to allow furnace heat exchangers to
heat up more quickly, then restarts at end of blower on delay
period of 60 sec (40 sec if jumper has been cut for 140 size unit in
downflow orientation).
Blower reverts to continuous operation after heating cycle is
completed.
If a call for cooling (R-Y) occurs while thermostat is in continuous
blower mode, blower changes from continuous blower speed
(heating speed) to cooling speed.
When thermostat cooling call is satisfied, R-Y opens and blower
operates for cooling blower OFF delay at cooling speed before
reverting back to continuous operation (heating speed).
Step 4—Heat Pump Mode
When installed with a heat pump, furnace control automatically
changes blower on delay timing sequence to avoid no blower
operation time during demand defrost cycles. When R-W and R-Y
or R-W, R-Y, and R-G thermostat inputs are received at the same
time at furnace control center, control starts blower in heating
speed. Then a gas heat mode begins. Blower remains operating at
heating speed for 15 sec or until end of prepurge period, then
blower shuts off until end of ignitor warm up and trial for ignition
periods (a total of 24 sec). Blower restarts at heating speed.
When R-W thermostat call disappears, control completes inducer
post-purge period of 15 sec (5 sec if jumper has been cut for 140
size unit in downflow orientation) and changes to cooling speed
after a 2-sec delay.
If R-W, R-Y, and R-G thermostat signals should disappear
simultaneously, blower remains on for heating blower off delay
period of 135, and the inducer goes through 15 sec post-purge
period (5 sec if jumper has been cut for 140 size unit in downflow
orientation). If R-W and R-Y thermostat signals should disappear,
leaving R-G thermostat signal, blower remains on in heating speed
and inducer remains on for 15 sec to complete post-purge period (5
sec if jumper has been cut for 140 size unit in downflow
orientation).
Control initiates a 90-sec blower only on period before starting
another heat pump cycle if there is a power interruption. Anytime
control senses false flame, control locks out of heating mode. This
reaction occurs because control ignores W input due to false flame
signal and, as a result, sees only Y input and goes into cooling
mode blower off delay. All other control functions remain in
standard format.
Step 5—Component Test
COMPONENT TEST SEQUENCE
NOTE: All components are functionally operated except the gas
valve.
When component test is initiated, the following sequence of events
occurs:
1. LED flashes a status code 4 times.
2. Inducer motor starts and continues to run for remainder of
component test.
3. Hot surface ignitor is energized for 15 sec, then de-energized.
4. Main blower operates at HEAT speed for 10 sec, then turns
off.
5. Main blower operates at COOL speed for 10 sec, then turns
off.
6. Inducer motor stops.
Component test can be initiated by one of the following procedures.
INITIATING COMPONENT TEST BY REMOVING MAIN
LIMIT SWITCH WIRE
NOTE: NO thermostat signal may be present at control center
and all blower time delay off periods must be completed.
1. Leave 115-v power to furnace turned on.
2. Remove main furnace door.
3. Look into blower access panel sight glass for current LED
status.
NOTE: Leave blower access panel installed to maintain power to
control center to view current LED status.
4. BRIEFLY remove either wire from the main limit switch until
the LED goes out, then reconnect it.
Make sure limit switch wire does not contact any metallic
component such as the gas valve. If wire is shorted, 3-amp
fuse on control center will blow.
NOTE: If wire to main limit is disconnected longer than 4 sec, the
control senses limit circuit is open. Main blower will start and
status retrieval request will be ignored.
5. When above items have been completed, the component test
sequence will occur as described in the Component Test
Sequence section above.
NOTE: Be sure to record the status code which is flashed 4 times
at start of component test for further troubleshooting.
6. After component test is completed and LED is ON continuously indicating the furnace is ready to operate when a signal
from the thermostat is received, replace main furnace door.
INITIATING COMPONENT TEST BY JUMPERING CONTROL TEST TERMINAL
1. Remove main furnace door.
2. Remove blower access panel.
3. Manually close blower access panel door switch. Use a piece
of tape to hold switch closed.
Blower access panel door switch opens 115-v power to
control center. No component operation can occur. Caution
must be taken when manually closing this switch for service
purposes. Failure to follow this warning could result in
electrical shock, personal injury, or death.
4. BRIEFLY short (jumper) TEST, 3/16-in. quick-connect terminal on control center (behind the Y terminal) and the C
OM
terminal on thermostat connection block. (See Fig. 25.)
NOTE: If TEST to C
OM terminals are jumpered longer than 2 sec,
LED will flash rapidly, and retrieval request will be ignored.
5. When above items have been completed, the component test
sequence will occur as described in the Component Test
Sequence section above.
NOTE: Be sure to record the status code which is flashed 4 times
at start of component test for further troubleshooting.
33
Page 34
Fig. 42—Inducer Housing Drain Tube
A99118
A99119
Fig. 43—Filling Condensate Trap
6. After component test is completed and furnace is operating
properly, release blower access panel door switch, replace
blower access panel, and replace main furnace door.
START-UP PROCEDURES
Step 1—General
1. Furnace must have a 115-v power supply properly connected
and grounded. Proper polarity must be maintained for correct
operation.
NOTE: Proper polarity must be maintained for 115-v wiring. If
polarity is incorrect, control center LED status indicator light will
flash rapidly and furnace will not operate.
2. Thermostat wire connections at terminals R, W, G, and Y
must be made at 24-v terminal block on control center.
3. Natural gas service pressure must not exceed 0.5 psig (14-in.
wc), but must be no less than 0.16 psig (4.5-in. wc).
4. Blower access panel must be in place to complete 24-v
electrical circuit to furnace.
These furnaces are equipped with a manual reset limit switch
in burner box. This switch will open if an overheat condition
(rollout) occurs in burner enclosure. Correct inadequate
combustion-air supply or improper venting condition and
reset switch. DO NOT jumper this switch.
Step 2—Prime Condensate Trap with Water
Condensate trap must be PRIMED or proper draining may not
occur. The condensate trap has 2 internal chambers which can
ONLY be primed by pouring water into the inducer drain side
of condensate trap.
2. Connect field-supplied 1/2-in. ID tube to upper inducer
housing drain connection.
3. Insert field-supplied funnel into tube.
4. Pour 1 quart of water into funnel/tube. Water should run
through inducer housing, overfill condensate trap, and flow
into open field drain. (See Fig. 43.)
5. Remove funnel and tube from inducer housing and replace
drain connection cap and clamp.
Step 3—Purge Gas Lines
If not previously done, purge lines after all connections have been
made and check for leaks.
Before operating furnace, check each manual reset switch for
continuity. If necessary, press button to reset switch.
34
Page 35
Never purge a gas line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition for
purpose of checking leakage. Use a soap-and-water solution
to check for leakage. Failure to follow this warning could
result in fire, explosion, personal injury, or death.
Step 4—Adjustments
SET GAS INPUT RATE
Furnace gas input rate on rating plate is for installations at altitudes
up to 2000 ft.
In the U.S.A., the input ratings for altitudes above 2000 ft must be
reduced by 2 percent for each 1000 ft above sea level.
In Canada, the input ratings must be derated by 5 percent for
altitudes of 2000 ft to 4500 ft above sea level.
Furnace input rate must be within ±2 percent of input on furnace
rating plate adjusted for altitude.
1. Determine natural gas orifice size and manifold pressure for
correct input.
a. Obtain average yearly heat value (at installed altitude) from
local gas supplier.
b. Obtain average yearly specific gravity from local gas
supplier.
c. Verify furnace model. Table 8 can only be used for model
58MCA furnaces with heating sizes of 040 through 120.
Table 9 can only be used for model 58MCA furnaces with
a 140 heating size.
d. Find installation altitude in Table 8 or 9.
NOTE: For Canada altitudes of 2000 to 4500 ft, use U.S.A.
altitudes of 2001 to 3000 ft in Table 8 or 9.
e. Find closest natural gas heat value and specific gravity on
Table 8 or 9.
f. Follow heat value and specific gravity lines to point of
intersection to find orifice size and manifold pressure
settings for proper operation.
EXAMPLE: (0—2000 ft altitude using Table 8)
Heating value = 1050 Btu/cu ft
Specific gravity = 0.62
Therefore: Orifice No. 45
Manifold pressure 3.6-in. wc
* Furnace is shipped with No. 45 orifices. In this example
all main burner orifices are the correct size and do not need
to be changed to obtain the proper input rate.
Check and verify burner orifice size in furnace. NEVER ASSUME
ORIFICE SIZE; ALWAYS CHECK AND VERIFY.
2. Adjust manifold pressure to obtain input rate.
NOTE: Manifold pressure must always be measured with burner
enclosure front REMOVED. Gas meter must always be clocked
with burner enclosure front INSTALLED.
a. Remove burner enclosure front.
b. Remove cap that conceals adjustment screw for gas valve
regulator. (See Fig. 44.)
c. Turn adjusting screw, counterclockwise (out) to decrease
manifold pressure or clockwise (in) to increase manifold
pressure.
NOTE: This furnace has been approved for a manifold pressure
of 3.2 in. wc to 3.8 in. wc when installed at altitudes up to 2000 ft.
For altitudes above 2000 ft, the manifold pressure can be adjusted
from 2.0 in. wc to 3.8 in. wc.
DO NOT bottom out gas valve regulator adjusting screw.
This can result in unregulated manifold pressure and result in
excess overfire and heat exchanger failures.
NOTE: If orifice hole appears damaged or it is suspected to have
been redrilled, check orifice hole with a numbered drill bit of
correct size. Never redrill an orifice. A burr-free and squarely
aligned orifice hole is essential for proper flame characteristics.
d. Replace gas valve regulator adjustment screw cap.
e. Replace burner enclosure front and verify adjusted gas
input rate using method outlined in item 3.
f. Look through sight glass in burner enclosure and check
burner flame. Burner flame should be clear blue, almost
transparent. (See Fig. 45.)
3. Verify natural gas input rate by clocking gas meter.
NOTE: Be sure all pressure tubing, combustion-air and vent
pipes, and burner enclosure front are in place when checking input
by clocking gas meter.
a. Calculate high-altitude adjustment (if required).
UNITED STATES
At altitudes above 2000 ft, this furnace has been approved
for a 2% derate for each 1000 ft above sea level. See Table
10 for derate multiplier factor.
EXAMPLE:
100,000 Btuh input furnace installed at 4300 ft.
Furnace Input Rate
at Sea Level
100,000X0.91=91,000
X
Derate
Multiplier
Factor
Furnace Input Rate
=
at Installation
Altitude
35
Page 36
Table 8—Model 58MCA Orifice Size and Manifold Pressure for Correct Input
For Use with 040 through 120 Size Furnaces Only
(Tabulated Data Based on 20,000 Btuh per Burner, Derated 2% for Each 1000 Ft Above Sea Level) *
ALTITUDE
RANGE
(FT)
0925443.5443.7443.8433.4433.5
to975443.2443.3443.4443.5443.6
20001025453.5453.6453.7443.2443.3
U.S.A. and Canada
ALTITUDE
RANGE
(FT)
U.S.A.775433.8423.2423.3423.4423.5
Altitudes800433.5433.7433.8423.2423.3
2001825443.8433.4433.6433.7433.8
to850443.6443.7443.8433.5433.6
3000875443.4443.5443.6443.7433.4
or900443.2443.3443.4443.5443.6
Canada925453.7453.8443.2443.3443.4
Altitudes950453.5453.6453.7453.8443.3
U.S.A. and Canada
2000975453.3453.4453.5453.6453.8
to1000453.1453.2453.4453.5453.6
45001025453.0453.1453.2453.3453.4
ALTITUDE
RANGE
(FT)
3001825443.5443.6443.8433.4433.5
to875453.8443.2443.3443.5443.6
U.S.A. Only
4000925453.4453.5453.6453.7443.2
* Orifice numbers shown in BOLD are factory installed.
* Derate multiplier factor is based on midpoint altitude for altitude range.
CANADA
At installation altitudes from 2000 to 4500 ft, this furnace
must be derated 5% by an authorized Gas Conversion
Station or Dealer. To determine correct input rate for
altitude, see example above and use 0.95 as derate multi-
plier factor.
b. Turn off all other gas appliances and pilots.
c. Start furnace and let operate for 3 minutes.
d. Measure time (in sec) for gas meter test dial to complete 1
revolution.
e. Refer to Table 11 for cu ft of gas per hr.
%OF
DERATE
DERATE MULTIPLIER
FACTOR FOR U.S.A.*
BURNER
ORIFICE
A93059
DO NOT redrill orifices. Improper drilling (burrs, out-ofround holes, etc.) can cause excessive burner noise and
misdirection of burner flames. This can result in flame
impingement of burners and heat exchangers causing failures.
BURNER FLAME
BURNER
MANIFOLD
A89020
Fig. 45—Burner Flame
f. Multiply gas rate (cu ft/hr) X heating value (Btu/cu ft) using
natural gas heating value from local gas utility/supplier.
EXAMPLE: (0—2000 ft altitude)
Furnace input from rating plate is 100,000 Btuh.
Btu heating input = Btu/cu ft X cu ft/hr
Heating value of gas = 975 Btu/cu ft
Time for 1 revolution of 2-cu ft dial = 70 sec
Gas rate = 103 cu ft/hr (from Table 11)
Btu heating input = 103 X 975 = 100,425 Btuh
In this example, the orifice size and manifold pressure
adjustment is within ±2 percent of the furnace input rate.
SET TEMPERATURE RISE
Temperature rise must be within limits specified on unit
rating plate. Recommended operation is at midpoint of rise or
above. Failure to follow this caution may result in condensing
or overheating the heat exchangers.
Determine and adjust air temperature rise as follows:
1. Place thermometers in return and supply ducts as close to
furnace as possible. Be sure thermometers do not see heat
exchanger so that radiant heat does not affect readings. This
practice is particularly important with straight-run ducts.
2. When thermometer readings stabilize, subtract return-air temperature from supply-air temperature to determine air temperature rise.
3. Adjust temperature rise by adjusting blower speed. Increase
blower speed to reduce temperature rise. Decrease blower
speed to increase temperature rise.
41
Page 42
Disconnect 115-v electrical power before changing speed tap.
Failure to follow this warning could result in personal injury.
4. To change blower motor speed selections for heating mode,
remove blower motor lead from control center HEAT terminal. (See Fig. 25.) Select desired blower motor speed lead
from 1 of the other terminals and relocate it to HEAT terminal.
See Table 12 for lead color identification. Reconnect original
lead on SPARE terminal.
Follow this same procedure for proper selection of COOL
speed selection.
Table 11—Gas Rate (Cu Ft/Hr)
SECONDS
FOR 1
REVOLUTION
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
360
720
655
600
555
514
480
450
424
400
379
360
343
327
313
300
288
277
267
257
248
240
232
225
218
212
206
200
195
189
185
180
176
172
167
164
160
157
153
150
147
1800
1636
1500
1385
1286
1200
1125
1059
1000
947
900
857
818
783
750
720
692
667
643
621
600
581
563
545
529
514
500
486
474
462
450
439
429
419
409
400
391
383
375
367
327
300
277
257
240
225
212
200
189
180
171
164
157
150
144
138
133
129
124
120
116
113
109
106
103
100
97
95
92
90
88
86
84
82
80
78
76
75
73
SECONDS
FOR 1
REVOLUTION
50
51
52
53
54
55
56
57
58
59
60
62
64
66
68
70
72
74
76
78
80
82
84
86
88
90
92
94
96
98
100
102
104
106
108
110
112
116
120
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
72
144
141
138
136
133
131
129
126
124
122
120
116
112
109
106
103
100
97
95
92
90
88
86
84
82
80
78
76
75
74
72
71
69
68
67
65
64
62
60
360
355
346
340
333
327
321
316
310
305
300
290
281
273
265
257
250
243
237
231
225
220
214
209
205
200
196
192
188
184
180
178
173
170
167
164
161
155
150
71
69
68
67
65
64
63
62
61
60
58
56
54
53
51
50
48
47
46
45
44
43
42
41
40
39
38
38
37
36
35
35
34
33
33
32
31
30
Table 12—Speed Selector
COLORSPEED
BlackHighCool
Yellow (When
Present)
Medium HighSpare
BlueMedium LowHeat
RedLowSpare
WhiteCommonL2
BLOWER OFF DELAY (HEAT MODE)
The main blower off time delay period is factory-set at 135 sec and
can be adjusted. See figure 25.
FACTORYSHIPPED
CONNECTION
SET THERMOSTAT HEAT ANTICIPATOR
Thermostat heat anticipator must be set to match amp draw of
components in R-W circuit. Accurate amp draw measurements can
be obtained at thermostat subbase terminals R and W.
Fig. 46 illustrates an easy method of obtaining these measurements. Amp reading should be taken after blower motor has
started. See thermostat manufacturer’s instructions for adjusting
heat anticipator and for varying heating cycle length.
This control shuts off combustion control system and energizes
air-circulating blower motor if furnace overheats. Recommended
method of checking this limit control is to gradually block off
return air after furnace has been operating for a period of at least
5 minutes. As soon as limit control has shut off burners, return-air
opening should be unblocked to permit normal air circulation. By
using this method to check limit control, it can be established that
limit is functioning properly and operates if there is a restricted
return-air supply or motor failure. If limit control does not function
during this test, cause must be determined and corrected.
Step 2—Check Pressure Switch
This control proves operation of draft inducer. Check switch
operation as follows:
1. Turn off 115-v power to furnace.
2. Remove main furnace door and disconnect inducer motor lead
wires from wire harness.
3. Turn on 115-v power to furnace.
4. Set thermostat to call for heat and wait 1 minute. When
pressure switch is functioning properly, hot surface ignitor
should NOT glow, and control center diagnostic light flashes
a Status Code 31. If hot surface ignitor glows when inducer
motor is disconnected, shut furnace down immediately. Determine reason pressure switch did not function properly and
correct condition.
5. Turn off 115-v power to furnace.
6. Reconnect inducer motor leads, reinstall main furnace door,
and turn on 115-v power supply.
42
A80201
Page 43
CHECKLIST
1. Put away tools and instruments. Clean up debris.
2. Verify manual reset switch has continuity.
3. Verify that blower and control access doors are properly
installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer’s instructions.
6. Review User’s Guide with owner.
7. Leave literature packet near furnace.
43
Page 44
LOAD CALCULATION
____________Heating Load (Btuh)
____________Cooling Load (Btuh)
____________Furnace Model Selection
CHECKLIST—INSTALLATION
Condensate Drain
________Unit Level or Pitched Forward
________
Internal Tubing Connections Free of Kinks
and Traps
COMBUSTION AND VENT PIPING
Termination Location
________Roof or Sidewall
________Termination Kit — 2 Pipe or Concentric
________Combustion-Air Pipe Length
________Combustion-Air Pipe Elbow Quantity
________Vent Pipe Length
________Vent Pipe Elbow Quantity
________Pipe Diameter Determined from Sizing Table
________Pipe Sloped To Furnace
Pipe Insulation
________Over Ceilings
________Low-Ambient Exposed Pipes
________
External Drain Connection Leak Tight and
Sloped
________Condensate Trap Primed before Start-Up
________Heat Tape Installed if Required
CHECKLIST—START-UP
________
Gas Input Rate
(Set Within 2 percent of Rating Plate)
________Temperature Rise Adjusted
Thermostat Anticipator
________Anticipator Setting Adjusted or
________Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
________Primary Limit
________Pressure Switch
Copyright 2000 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 4623158mca7si
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 6a 8a
PC 101Catalog No. 535-758Printed in U.S.A.Form 58MCA-7SIPg 441-00Replaces: New