Only skilled, qualified staff must install this product.
⚠
Preliminary checks
Before beginning the installation, do the following:
⚠
• Set up a dual pole cut off switch with minimum contact openings of 3 mm, and section-off the power supply;
• Set up suitable tubes and conduits for the electric cables to pass through, making sure they are protected from any mechanical damage;
• Set up a drainage tube to prevent water from building up and rusting any parts;
Make sure that any connections inside the container (ones that ensure continuity to the protection circuit) are fitted with additional insulation with
•
respect to those of other electrical parts inside;
• Make sure that, the gate structure is sturdy enough, the hinges work efficiently and that there is no friction between the fixed and moving parts;
• Make sure you have fitted opening and closing mechanical gate stops;
Tools and materials
Make sure you have all the tools and materials you will need for installing in total safety and in compliance with applicable regulations. The figure shows some
of the equipment installers will need.
Cable types and minimum thicknesses
ConnectionCable type
Control panel power-supply 230 VH05RN-F4G x 1.5 mm
If cable lengths differ from those specified in the table, establish the cable sections depending on the actual power draw of the connected devices and
according to the provisions of regulation CEI EN 60204-1.
For multiple, sequential loads along the same line, the dimensions on the table need to be recalculated according to the actual power draw and distances. For
connecting products that are not contemplated in this manual, see the literature accompanying said products
The following illustrations show a standard installation for a inner-opening gate.
It is up to the fitter, therefore, to choose the most suitable solution.
Laying the corrugated tubes and fitting the junction pits
Dig the box pit.
Set up the junction boxes and corrugated tubes you will need to connect up to the junction pit and drainage tube.
The number of tubes depends on the type of system and the accessories you are going to fit.
500
500
650
Fitting the foundation box
Fit the box up against the post. Make sure the corrugated tubes and the drainage tube run thought the corresponding holes.
Fill the pit with concrete.
Level the box with the ground and fit the pin along the same axis as that of the gate's upper hinge. Let set for at least 24 hours.
Clean any concrete residue from inside the box.
Lubricate to the foundation box pin, to the latching lever and to the gate brace.
Fit the gate leaf by fitting the upper hinge.
Make sure the leaf opens and closes smoothly.
Carefully fasten or weld the leaf to the gate-fastening brace.
Fitting the release
You must apply grease to the release latching lever; for fitting and operation, please check the wording in the corresponding manual.
Establishing the slow-down points (only for the FROG-A24)
☞ The opening and closing slow-down starting points are established via a magnetic field.
☞ Repeat this slow-down-point establishing procedure several times, until the leaves begin to slow-down 500 mm from the closing strike.
Use the gearmotor to open the leaves to about 500 mm from the opening end-strike. On both motors, set the micro-switchⓐ close to the magnet ⓑ fitted
under the motor shaft.
Establishing the slow-down points (only for the FROG-A24)
☞ The opening and closing slow-down starting points are established via a magnetic field.
☞ Repeat this slow-down-point establishing procedure several times, until the leaves begin to slow-down 500 mm from the closing strike.
Push the leaves to about 500 mm from the opening end-strike, by using the gearmotor. On both gearmotors, set micro-switchⓐ close to the magnet ⓑ
that is fitted below the motor arm.
The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
⚠
Any extraordinary maintenance jobs must be done only by specialized technicians.
⚠
Extraordinary maintenance log
Installation technician stampOperator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________
__________________________________________________________________________________________________
_________________________________________________________________________________________________
____
Installation technician stampOperator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________
__________________________________________________________________________________________________
_________________________________________________________________________________________________
____
Installation technician stampOperator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________
__________________________________________________________________________________________________
_________________________________________________________________________________________________
____
Installation technician stampOperator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________
__________________________________________________________________________________________________
_________________________________________________________________________________________________
____
Installation technician stampOperator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________
__________________________________________________________________________________________________
It neither opens nor closes• Power supply is missing
• The gearmotor is stuck
• The transmitter's battery is run down
• The transmitter is broken
• The stop button is either stuck or broken
• The opening/closing button or the key-switch selector is stuck
The gate opens but does not
The photocells are engaged• Make sure the photocells are clean
close
• Check main power supply
• Lock the gearmotor
• Replacethe batteries
• Call assistance
• Call assistance
• Call assistance
and working properly
• Call assistance
DISMANTLING AND DISPOSAL
CAME S.p.A. applies a certified Environmental Management System at its premises, which is compliant with the UNI EN ISO 14001 standard to ensure the
☞
environment is safeguarded.
Please continue safeguarding the environment. At CAME we consider it one of the fundamentals of our operating and market strategies. Simply follow these
brief disposal guidelines:
DISPOSING OF THE PACKAGING
The packaging materials (cardboard, plastic, and so on) should be disposed of as solid urban waste, and simply separated from other waste for recycling.
Always make sure you comply with local laws before dismantling and disposing of the product.
DO NOT DISPOSE OF IN NATURE!
DISMANTLING AND DISPOSAL
Our products are made of various materials. Most of these (aluminum, plastic, iron, electrical cables) is classified as solid household waste. They can be recycled
by separating them before dumping at authorized city plants.
Whereas other components (control boards, batteries, transmitters, and so on) may contain hazardous pollutants.
These must therefore be disposed of by authorized, certified professional services.
Before disposing, it is always advisable to check with the specific laws that apply in your area.
DO NOT DISPOSE OF IN NATURE!
DECLARATION OF CONFORMITY
Declaration - CAME S.p.A. declares that this device conforms to the essential, pertinent requirements provided by directives 2006/42/CE and 2004/108/