Briggs & Stratton Home Generator Systems User Manual

Home Generator Systems
Installation & Operator’s Manual
Manual No. 203420GS Rev. - (10/17/2007)
Power Management System
2 BRIGGSandSTRATTON.COM
Briggs & Stratton Power Products Group, LLC 900 North Parkway Jefferson, WI 53549
Copyright © 2007 Briggs & Stratton Power Products Group, LLC. All rights reserved. No part of this material may be reproduced or transmitted in any form by any means without the express written permission of Briggs & Stratton Power Products Group, LLC.
Thank you for your purchase of this Briggs & Stratton Power Products Power Management System. This product is intended for use with Briggs & Stratton Home Standby Generator sets and therefore may not function with generators produced by other manufacturers. Seek a qualified electrical professional to determine applicability of this equipment to generators aside from those manufactured by Briggs & Stratton. This is an optional home standby system which provides an alternate source of electric power and to serve loads such as a gas furnace, refrigeration and communication systems that, when stopped during any power outage, could cause discomfort, or the like. This product DOES NOT qualify for emergency standby as defined by NFPA 70 (NEC).
This manual contains safety information to make you aware of the hazards and risks associated with power management systems and how to avoid them. Briggs & Stratton has made every effort to provide for a safe, streamlined and cost-effective installation. Each installation is unique, it is impossible to know of and advise of all conceivable procedures and methods by which installation might be achieved. We do not know all possible hazards and/or the results of each method or procedure.
Save these instructions for future reference.
This power management system requires installation before use. Refer to the Installation section of this manual for instructions on installation procedures. Only licensed electrical contractors should install power management systems. Installations must strictly comply with all applicable federal, state and local codes, standards and regulations.
Where to Find Us
You never have to look far to find Briggs & Stratton support and service for your power management system. Consult your Yellow Pages. There are over 30,000 Briggs & Stratton authorized service dealers worldwide who provide quality service. You can also contact Briggs & Stratton Customer Service by phone at (800) 743-4115, or on the Internet at BRIGGSandSTRATTON.COM.
Power Management System
Model Number
Revision
Serial Number
Date Purchased
3
FrançaisEspañol
Table Of Contents
Important Safety Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Owner Orientation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Installer Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Equipment Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Unpacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Mounting Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Power Wiring Interconnections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Testing the Power Management System . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Wiring Decal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Electrical Load Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Specifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Illustrated Parts List. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4 BRIGGSandSTRATTON.COM

Important Safety Instructions

This is the safety alert symbol. It is used to alert you to potential personal injury hazards. Obey all safety messages that follow this symbol to avoid possible injury or death.
The safety alert symbol ( ) is used with a signal word (DANGER, CAUTION, WARNING), a pictorial and/or a safety message to alert you to hazards. DANGER indicates a hazard which, if not avoided, will result in death or serious injury. WARNING indicates a hazard which, if not avoided, could result in death or serious injury. CAUTION indicates a hazard which, if not avoided, might result in minor or moderate injury. NOTICE indicates a situation that could result in equipment damage. Follow safety messages to avoid or reduce the risk of injury or death.
The manufacturer cannot possibly anticipate every possible circumstance that might involve a hazard. The warnings in this manual, and the tags and decals affixed to the unit are, therefore, not all-inclusive. If you use a procedure, work method or operating technique that the manufacturer does not specifically recommend, you must satisfy yourself that it is safe for you and others. You must also make sure that the procedure, work method or operating technique that you choose does not render the power management system unsafe.
Save These Instructions
• Use power management system only for intended uses.
• If you have questions about intended use, ask dealer or contact Briggs and Stratton Power Products.
• Do not expose power management system to excessive moisture, dust, dirt, or corrosive vapors.
• Remain alert at all times while working on this equipment. Never work on the equipment when you are physically or mentally fatigued.
• If connected devices overheat, turn them off and turn off their circuit breaker/fuse.
NOTICE
Improper treatment of power management system can damage it and shorten its life.
• Do not touch bare wires.
• Do not use power management system with worn, frayed, bare or otherwise damaged wiring.
• Do not handle electrical cords while standing in water, while barefoot, or while hands or feet are wet.
• If you must work around a unit while it is operating, stand on an insulated dry surface to reduce shock hazard.
• Do not allow unqualified persons or children to operate or service power management system.
• In case of an accident caused by electrical shock, immediately shut down all sources of electrical power and contact local authorities. Avoid direct contact with the victim.
WARNING
Failure to properly ground power management system can result in electrocution.
• Despite the safe design of the power management system, operating this equipment imprudently, neglecting its maintenance or being careless can cause possible injury or death.
WARNING
Power management system contains high voltage that can cause personal injury or death.
• Failure to follow above warning could cause personal injury, damage and/or malfunction of equipment.
WARNING
Low voltage wire cannot be installed in same conduit as power voltage wiring.
WARNING
Only qualified electricians should attempt installation of
this system, which must strictly comply with applicable
codes, standards and regulations.
5
Introduction
Your Briggs & Stratton Power Management System is supplied with this combined “Installation and Operator’s Manual”. This is an important document and should be retained by the owner after the installation has been completed.
Every effort has been expended to make sure that the information in this manual is both accurate and current. However, the manufacturer reserves the right to change, alter or otherwise improve the system at any time without prior notice.
For the Home Owner
To help you make informed choices and communicate effectively with your installation contractor(s),
Read and understand the Owner Orientation Section
of this manual before contracting or starting your
power management system installation.
To arrange for proper installation, contact the store at which you purchased your power management system, your dealer, or your utility power provider.
The power management system warranty is VOID
unless the system is installed by a
licensed electrical professional.

Owner Orientation

The illustrations provided are for typical circumstances and are meant to familiarize you with the installation options available with your power management system.
Local codes, appearance, and distances are the factors that must be considered when negotiating with an installation professional. As the distance from the existing electrical service increases, compensation in wiring materials must be allowed for. This is necessary to comply with local codes and overcome electrical voltage drops.
The factors mentioned above will have a direct effect on the overall price of your power management system installation.
NOTE: Your installer must check local codes AND obtain
permits before installing the system.
• Read and follow the instructions given in this manual.
• Follow a regular schedule in caring for and using your power management system, as specified in this manual.

Installer Responsibilities

• Read and observe the safety rules.
• Read and follow the instructions given in this manual.
• Check federal, state and local codes.
• Consult with owner to determine loads to be controlled and their priorities.
NOTE: A worksheet for determining which loads are to be transferred and their priorities is provided on page 11.
• The installer may need to provide appropriate rated contactors based on loads to be controlled.

Equipment Description

The power management system is designed to control six priority loads and up to two air conditioner loads that are being supplied by power from the home standby system. This power management system goes into a STANDBY mode and does not control any loads when utility power is present.
The power management system consists of a relay board with 6 relays to control loads rated up to 120 VAC, 20 Amps, 1 hp, and a control module that has 2 relays for central air conditioner loads. The circuit boards are housed in a NEMA 3R enclosure that is suitable for both indoor and outdoor installations.
Two (2) current transformers monitor generator current at the transfer switch to ensure that the loading of the generator does not exceed 85 percent. Should load exceed 85 percent, the power management system will shed loads to keep the generator from overloading. The power management system will add load back once sufficient current is available.
The control module has a green LED for each relay to indicate when the relays are supplying power to the loads when on generator power. There is also a status LED that flashes when the power management system is functioning properly.

Installation

Unpacking

Delivery Inspection
After removing the carton, carefully inspect the power management system components for any damage that may have occurred during shipment.
IMPORTANT: If loss or damage is noted at time of delivery, have the person(s) making delivery note all damage on the freight bill and affix his signature under the consignor's memo of loss or damage. If loss or damage is noted after delivery, contact the carrier for claim procedures. Missing or damaged parts are not warranted.
Shipment Contents
• Power Management System
• Installation and Operator’s Manual
• Wire Connectors (4)
• 1/4” Double Male, Single Female Lugs (2)

Mounting Guidelines

The power management system is enclosed in a NEMA Type 3R enclosure suitable for indoor/outdoor use. Guidelines for mounting the power management system include:
• Install power management system on a firm, sturdy supporting structure.
• The power management system must be installed with minimum NEMA 3R hardware for conduit connections.
• Level and plumb the enclosure. This can be done by placing washers between the power management system enclosure and the mounting surface.
• Never install the power management system where any corrosive substance might drip onto the enclosure.
• Protect the power management system at all times against excessive moisture, dust, dirt, lint, construction grit and corrosive vapors.
A typical installation of the power management system is depicted below. It is best if it is mounted near the main breaker panel, either inside or outside. Discuss layout suggestions/changes with the owner before beginning the system installation process.
6 BRIGGSandSTRATTON.COM
Main
Breaker
Panel
Transfer
Switch
Hot Water Heater
Air
Conditioner
Service Disconnect
Generator
Watt -
Hourmeter
Branch Circuits
Disconnect Switch
Power
Manage-
ment
System
Contactor
7

Power Wiring Interconnections

All wiring must be the proper size, properly supported and protected by conduit. All wiring should be done per applicable federal, state and local codes, standards and regulations.
Complete the following connections between the transfer switch, power management system and main breaker panel. Also see the Wiring Decal on page 10.
1. Set generator’s system switch to OFF position.
2. Set generator’s main circuit breaker to OFF (open)
position.
3. Identify loads and their priorities (using list developed with owner) to be transferred to power management system in main breaker panel.
4. In main breaker panel, turn selected load circuit breakers to OFF position.
5. Connect “GND” lug to an approved ground.
NOTE: Assure grounding electrode conductor is connected and bonded per applicable federal, state and local codes, standards and regulations.
6. Using installer supplied 300VAC or greater wire and supplied 1/4” double male, single female lugs, connect generator 240VAC from transfer switch to relay board in power management system.
7. Unplug current transformers from control module in transfer switch.
Ground Lug
To Transfer Switch
Air Conditioner
Relays
Load
Connection
Control Module
Test
Button
Generator
Connection
Air Conditioner
Connections
Relay Board
To Air Conditioners
Transfer Switch
Connections
Green LED’s
Wireways
• Failure to follow above warning could cause personal injury, damage and/or malfunction of equipment.
WARNING
Low voltage wire cannot be installed in same conduit as power voltage wiring.
• Remove all power prior to installing this power management system. Failure to do so could cause internal damage to the board when making electrical connections.
• Turn generator to OFF position.
• Turn off utility power to the home standby generator and transfer switch.
NOTICE
Improper installation can cause damage to the circuit boards and shorten their life. Installing circuit boards in live circuits will damage the board and is not a warranty condition. ALWAYS disconnect ALL sources of power prior to servicing.
8. Cut two pin connector ends off of current transformer leads and discard. Strip wires and place in supplied wire connectors.
9. Using installer supplied 300VAC or greater wire, run wires from wire connectors to control module terminal block labeled “CT1A” through “CT2B” in power management system.
10. Using installer supplied 300VAC or greater wire, connect C (Common) and NO (Normally Open) terminals on terminal strip J9 of control module in transfer switch to control module terminal block labeled “TXSF” and “TXFG” in power management system.
11. Wire the air conditioner thermostat control wiring to the control module labeled “AC1A-AC2B” in power management system.
NOTE: AC1A and AC1B is for the priority 1 air conditioner. AC2A and AC2B is for the priority 2 air conditioner.
12. For 120VAC selected loads, remove wire from selected load circuit breaker.
13. Using installer supplied 300VAC or greater wire, connect selected load circuit breaker to terminal block at power management system labeled “CB/B1” for priority 1 load.
14. Using installer supplied 300VAC or greater wire and a wire nut, connect the selected load wire to terminal block in power management system labeled “RLY/B1” for priority 1 load.
15. Repeat steps 12 through 14 for all other 120VAC priorities using terminals “CB/C1” through “RLY/D2”.
16. For 240VAC selected loads, remove both wires from selected load circuit breaker and place in load side of installer supplied contactor.
17. Using installer supplied 300VAC or greater wire, connect circuit breaker to line side of contactor.
18. Using installer supplied 300VAC or greater wire, connect one pole of the circuit breaker to terminal block in power management system labeled “CB/B1” for a priority 1 load.
19. Using installer supplied 300VAC or greater wire, connect Neutral in main breaker panel to contactor coil.
20. Using installer supplied 300VAC or greater wire, connect contactor coil to terminal block in power management system labeled “RLY/B1” for a priority 1 load.
21. Repeat steps 16 through 20 for all other 240VAC priorities using terminals “CB/C1” through “RLY/D2”.
22. Tighten all wire connections/fasteners to proper torque. See inside power management system enclosure for proper torque values.
System Setup
You must perform the following before operating the system:
• Place the switch labeled “SW2” on the control module
in the NG or LP position, whichever is appropriate for the installed home standby system.
• Place the switch labeled “SW3” on the control module
to match the rating of the home standby system.
• In main breaker panel, turn selected load circuit breakers to the ON position.
IMPORTANT: After installation of the power management system is complete, turn on utility power to the home standby generator and transfer switch. Wait one minute before turning generator to AUTO.
8 BRIGGSandSTRATTON.COM
SW3
SW2
Location of J9 Terminal Strip in Transfer Switch
Testing the Power Management System
With the generator in “AUTO“ position, turn the service disconnect feeding the transfer switch contactor to the “Off” position. The generator will start and the transfer switch will transfer to generator power.
Press the test button on the control module of the power management system. As the button is pressed, a relay will energize. Each time the button is pressed, the previous relay that was energized, will de-energize and the next relay will energize.
Press the test button once and relay B2 will energize. Press the test button again and B2 will de-energize and relay C1 will energize. This will proceed until all relays have been tested or if the test button has not been pressed for a period of 30 seconds, the test sequence will halt and the system will go back to automatic control.
To go back to utility power, turn the service disconnect feeding the transfer switch contactor to the “On” position.

Controls

There are no operator controls in this Power Management System.

Operation

When the home standby system is providing power to the transfer switch, the power management system is constantly monitoring generator power to control loads. The power management system monitors both incoming generator lines and keeps the home standby system loaded to a maximum of 85-86 percent of rated load. When the current transformers on any line start to see current reach 85-86 percent of rated load, the power management system will start shedding loads based on the lowest priority and work its way to the highest priority. When current has dropped below 85-86 percent of rated load, the power management system will start to add loads based on the highest priority first, followed by the second highest until the generator reaches 85-86 percent load or all priorities are back on line. The power management system will operate this way until the transfer switch transfers back to utility position.
The power management system waits 5 seconds between adding or shedding each load to permit the system to stabilize. When a relay is opened, the relay will stay opened for a minimum of 5 minutes or until the load can be added without putting the generator over 85-86 percent of rated load. If a large load demand is seen, the power management system will shed all loads in less than 1.5 seconds to prevent the generator from overloading. Once the demand has stabilized, the power management system will start with the highest priority, wait 5 seconds and then add the next priority. The unit will continue to do this until all loads are added or 85-86 percent of rated load is reached.
When the generator is powering loads, the A/C relays are open. When one or both of the relays sense 24VAC from the thermostat(s), the controller will shed loads B1-D2, and then will allow only one A/C relay to close. A1 has priority over A2. A2 can close when the signal for A1 has expired. When the A/C’s are being called to run, all loads are to be shed before the A/C unit can be added. Should A/C 1 call while A/C 2 is running, A/C 2 shall open, all relays would open and then A/C 1 can close. When the A/C relays open, they are to be locked out for a minimum of 5 minutes or until they receive a call to start the A/C.
9
10 BRIGGSandSTRATTON.COM

Wiring Decal

11
Priority 120VAC Electrical Appliances Priority 240VAC Electrical Appliances
Window Air Conditioner 1 Central Air Conditioner 1 Window Air Conditioner 2 Central Air Conditioner 2 Window Air Conditioner 3 Range/Stove Refrigerator 1 Dryer Refrigerator 2 Well Pump Freezer 1 Hot Tub Freezer 2 Pool Heater Microwave Water Heater Bathroom Other:________________________ Auxiliary Heater Other:________________________ Home Theater System Other:________________________ Garage Heater Sink Water Heater Sewage Lift Pump Other:________________________ Other:________________________ Other:________________________
IMPORTANT: DO NOT connect furnace, sewage pump and sump pump to power management system.

Electrical Load Worksheet

12 BRIGGSandSTRATTON.COM

Maintenance

The power management system is designed to be maintenance free under normal usage. However, inspection and maintenance checks should be made on a regular basis. Maintenance will consist mainly of keeping the power management system clean.
Visual inspections should be done at least once a month. Access to power management system must not be obstructed. Keep 3 feet (92 cm) clearance around power management system. Check for an accumulation of dirt, moisture and/or corrosion on and around the enclosure, loose parts/hardware, cracks and/or discoloration to insulation, and damaged or discolored components.
Exercise the power management system at least once every three months as described in the previous section Testing the Power Management System unless a power outage occurs and Home Generator System has gone through automatic sequence. Allow generator to run for at least 30 minutes.
Contact a licensed electrical professional to inspect and clean the inside of your power management system at least once a year.
When Calling the Factory
Before contacting Briggs & Stratton regarding service or repair of this power management system, obtain the Model Number and Serial Number from the unit data decal located on or inside the enclosure.
To contact Briggs & Stratton call (800) 743-4115, between 8:00 AM and 5:00 PM CT.

Specifications

Rated AC Voltage . . . . . . . . . . . . . . . . . . . . . . .125/250 Volts
Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50/60 Hz
Relay Contacts
Rating . . . . . . . . . .125 VAC, 20A, 1 HP, 768 VA Pilot Duty
Dimensions . . . . . .Approximately 16” H X 12” W X 6” Deep
Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34 lbs.
13

Troubleshooting

Problem Cause Correction
Supervised loads (air conditioner, etc.) are not operating when generator is supplying power
1. AC1A-AC2B contacts not operating correctly.
2. Too much load on generator.
3. Current transformer not connected.
4. Broken current transformer.
5. Status LED stays lit constantly.
1A. Check AC1A-AC2B contacts for
proper operation.
B. Check control wiring to external
load.
C. Check harness between boards is
properly connected.
D. Check that there is 24 VAC to one of
the terminals.
E. Be sure 5 minute lock out has
elapsed.
F. Be sure air conditioner start time
delay has elapsed.
2. Decrease load to generator.
3. Connect current transformer.
4. Replace current transformer.
5. Contact an authorized service center.
14 BRIGGSandSTRATTON.COM

Illustrated Parts List

Item Part # Description
1 NSP ENCLOSURE 2 196616GS BOARD, Load Control Center Relay 3 197979GS SPACER, PCB Board, 1/2" 4 198112GS HARNESS, Wire, Load Control
Center 5 204056GS BOARD, Load Control Center 6 198431GS CLIP, Latching Wire 7 * NUT, 1/4 - 20 8 * WASHER, Lock 1/4 9 186345GS TERMINAL
10 * WASHER, Shakeproof, Ext M6 - 1/4 11 192150GS SPACER 12 202426GS DECAL
Item Part # Description
13 198655GS DECAL, Warning 14 * PPHMS, 8-32 x 1 15 200574GS SPACER, 4 x 25 16 200576GS NUT, Hex, 8 - 32, w/Locking Insert
Parts Not Illustrated
203420GS MANUAL, Load Control Center 197956GS BLOCK, Terminal w/ Levers 74094GS LUG, 1/4 Tab 77211GS LUG, 1/4, 18-22
* - Items without part numbers are common fasteners and are available at local hardware stores.