P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 800.BRADLEY (800.272.3539) FAX 262.251 5817
bradleycorp.com
S19-130, S19-130A Installation
IMPORTANT
Installation
R
WI 53051
alls,
HENTLICH ZU
WEEK
WÖC
P.O. Box 309, Menomonee F
DAIRE
e(s) each week and sign
UNIT EACH
y malfunctions immediatel
hentlich im
TEST THIS
hrift. Jeglic
DIESES GERÄT 1ST
ESSAI HEBDOMA
Test-operate valv
Report an
Ventil(e) wöc
t immédiatement.
durch Untersc
Test le fonctionnement des v
signe en bas. S'il y à quelqu
un rappor
Date
Datum
Date
114-051
PRÜFEN.
Testbetrieb prüfen,
he Störung sofor
Signed
Unterschrift
below.
bestätigt
t melden.
y.
alves chaque semaine et
e chose qui ne v
Date Signed
Signe
THIS
SIDE
UP
a pas fait
Signed
Signed
Date
Date
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
Packing List
•
•
•
•
Read this installation manual completely to ensure proper installation, then file it with the
owner or maintenance department. Compliance and conformity to drain requirements and
other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
any packaging material. If any parts are missing, do not begin installation until you obtain
the missing parts.
Flush the water supply lines before beginning installation and after installation is complete.
Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be
“ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure.
Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with
ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.
com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under ”Products” on our
30 gallons (115 liters) per minute discharge
for shower waste
• Sign-mounting hardware
Local codes may require the installation of a
backflow prevention valve to complete proper
installation. Compliance with local codes is the
responsibility of the installer. Valve must be
tested annually to verify that it is functioning
properly. Backflow prevention valves are not
included with the fixture and may be supplied
by the contractor or purchased from Bradley
Corporation.
Step 1: Assemble components
1. 1Assemble the components as shown on page 4
(S19-130) or page 5 (S19-130A).
• Apply pipe sealant to all male-threaded pipe
joints.
• Use the rubber grip pad provided or a strap
wrench around pipes when tightening to
prevent marring. Place the grip pad on the
pipe, then put the wrench over the grip pad
and turn the pipe with the wrench.
• Bottom edge of showerhead should be 84"
(2134mm) from the floor.
(203mm)
(2134mm) to
9³⁄₈"
(238mm)
(195mm)
8"
84"
Floor
7¾"
S19-130
6¼"
(158mm)
Ø 3¹⁄₁₀"
(79mm)
S19-130A
Ø 10¾"
(273mm)
25½"
(648mm)
9"
(229mm)
25½"
(648mm)
Step 2: Connect water supply
84"
IMPORTANT! Do not rely on Bradley’s Drench
Shower to support supply piping.
1. Connect water supply piping to 1" NPT inlet
on unit (piping supplied by installer). Provide
adequate supports (supplied by installer) for
supply pipe using pipe hangers or other means.
2. Mount the safety sign to the wall using signmounting hardware supplied by installer.
engagement. Variations in manufacturing allow
for +/- ¹⁄₈” (3mm) per threaded joint. To find
the tolerance of a dimension, add the number
of thread joints in between a dimension and
multiply it by ¹⁄₈” (3mm).
9"
(229mm)
3
S19-130, S19-130A Installation
Assembly of Components and Parts List - S19-130
1" NPT
Supply Inlet
3.1
3.2
3.3
3.4
3.5
3.11
2
3
5
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
NOTE: Use
teflon tape
only.
ItemPart No.Qty.Description
1S24-1881Plastic Showerhead Assembly
2128-156A1Pull Rod - 25½" Long
3S30-0601Stay-Open Ball Valve Assembly
3.1S27-2781Ball Valve with Jam Nut
3.11110-2141Jam Nut (only)
3.2140-7201Stop Bracket
1
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
4
un rapport immédiatement.
Date
Signed
Date Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
Items 3.1–3.5 come preassembled as Item 3.
ItemPart No.Qty.Description
3.3124-0481Washer
3.4128-1321Handle
3.5142-002DC1Lockwasher
4204-4211Emergency Inspection Tag
5114-0501Safety Sign