Bradley Corporation S19-130, S19-130A Installation Manual

S19-130
Installation
S19-130
Douche d’urgence verticale avec douche en plastique
Ducha de alto flujo de suministro vertical con cabezal rociador de plástico
S19-130A
Douche d’urgence verticale avec douche en acier inox
S19-130A
Ducha de alto flujo de suministro vertical con cabezal rociador de acero inoxidable
Table of Contents
Pre-Installation Information ......................... 2
Installation Instructions ............................ 3
S19-130 Components and Parts List ................. 4
S19-130A Components and Parts List ................ 5
Table des matières
Avant l’installation ................................ 6
Instructions d’installation ........................... 7
S19-130 Composantes et Liste des pièces............. 8
S19-130A Composantes et Liste des pièces ........... 9
Contenido
Información previa a la instalación .................. 10
Instrucciones de instalación ....................... 11
S19-130 Componentes y Lista de piezas ............. 12
S19-130A Componentes y Lista de piezas............ 13
215-152 Rev. R; ECN 12-05-016G © 2012 Bradley Page 1 of 13 11/8/2012
P.O. Box 309, Menomonee Falls, WI USA 53052-0309 PHONE 800.BRADLEY (800.272.3539) FAX 262.251 5817 bradleycorp.com
S19-130, S19-130A Installation
IMPORTANT
Installation
R
WI 53051
alls,
HENTLICH ZU WEEK WÖC
P.O. Box 309, Menomonee F
DAIRE
e(s) each week and sign
UNIT EACH
y malfunctions immediatel
hentlich im
TEST THIS
hrift. Jeglic
DIESES GERÄT 1ST ESSAI HEBDOMA
Test-operate valv Report an
Ventil(e) wöc
t immédiatement.
durch Untersc
Test le fonctionnement des v signe en bas. S'il y à quelqu
un rappor
Date
Datum Date
114-051
PRÜFEN.
Testbetrieb prüfen, he Störung sofor
Signed Unterschrift
below.
bestätigt t melden.
y.
alves chaque semaine et e chose qui ne v
Date Signed
Signe
THIS SIDE UP
a pas fait
Signed Signed
Date Date
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
Packing List
Read this installation manual completely to ensure proper installation, then file it with the
owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is complete.
Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.
com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under ”Products” on our
web site at www.bradleycorp.com.
2
11/8/2012 Bradley • 215-152 Rev. R; ECN 12-05-016G
Installation S19-130, S19-130A
Installation
Supplies Required:
• Teflon tape and pipe sealant
• Piping to 1" NPT water supply inlet
• Adequate supply pipe supports
• Minimum 4" (102 mm) drain to accommodate
30 gallons (115 liters) per minute discharge for shower waste
• Sign-mounting hardware
Local codes may require the installation of a
backflow prevention valve to complete proper installation. Compliance with local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly. Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from Bradley Corporation.
Step 1: Assemble components
1. 1Assemble the components as shown on page 4 (S19-130) or page 5 (S19-130A).
• Apply pipe sealant to all male-threaded pipe joints.
• Use the rubber grip pad provided or a strap wrench around pipes when tightening to prevent marring. Place the grip pad on the pipe, then put the wrench over the grip pad and turn the pipe with the wrench.
• Bottom edge of showerhead should be 84" (2134mm) from the floor.
(203mm)
(2134mm) to
9³⁄₈"
(238mm)
(195mm)
8"
84"
Floor
7¾"
S19-130
6¼"
(158mm)
Ø 3¹⁄₁₀"
(79mm)
S19-130A
Ø 10¾"
(273mm)
25½"
(648mm)
9"
(229mm)
25½"
(648mm)
Step 2: Connect water supply
84"
IMPORTANT! Do not rely on Bradley’s Drench
Shower to support supply piping.
1. Connect water supply piping to 1" NPT inlet on unit (piping supplied by installer). Provide adequate supports (supplied by installer) for supply pipe using pipe hangers or other means.
2. Mount the safety sign to the wall using sign­mounting hardware supplied by installer.
Bradley • 215-152 Rev. R; ECN 12-05-016G 11/8/2012
(2134mm) to
Floor
All dimensions assume standard thread
engagement. Variations in manufacturing allow for +/- ¹⁄₈” (3mm) per threaded joint. To find the tolerance of a dimension, add the number of thread joints in between a dimension and multiply it by ¹⁄₈” (3mm).
9"
(229mm)
3
S19-130, S19-130A Installation
Assembly of Components and Parts List - S19-130
1" NPT
Supply Inlet
3.1
3.2
3.3
3.4
3.5
3.11
2
3
5
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
NOTE: Use
teflon tape
only.
Item Part No. Qty. Description
1 S24-188 1 Plastic Showerhead Assembly 2 128-156A 1 Pull Rod - 25½" Long 3 S30-060 1 Stay-Open Ball Valve Assembly
3.1 S27-278 1 Ball Valve with Jam Nut
3.11 110-214 1 Jam Nut (only)
3.2 140-720 1 Stop Bracket
1
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN. ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait
4
un rapport immédiatement.
Date
Signed
Date Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
Items 3.1–3.5 come preassembled as Item 3.
Item Part No. Qty. Description
3.3 124-048 1 Washer
3.4 128-132 1 Handle
3.5 142-002DC 1 Lockwasher 4 204-421 1 Emergency Inspection Tag 5 114-050 1 Safety Sign