Installation
S19-125SBF
S19-125SFMBF
Barrier Free Recess-Mounted
Drench Shower
Table of Contents
Pre-Installation Information.........................2
Assembly of Components..........................3
Service Parts ...................................3
Cabinet Dimensions ..............................4
Rough-Ins ......................................5
Installation....................................6–7
TO
ACTIVATE
SHOWER
www.bradleycorp.com
PUSH
TO
ACTIVA
SHOWER
www
.bradleycorp.com
TE
215-1568 Rev. D; ECN 15-05-010
© 2015 Bradley
Page 1 of 7 3/31/2015
P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817
bradleycorp.com

S19-125SBF, S19-125SFMBF Installation
IMPORTANT
Installation
R
WI 53051
alls,
HENTLICH ZU
WEEK
WÖC
P.O. Box 309, Menomonee F
DAIRE
e(s) each week and sign
UNIT EACH
y malfunctions immediatel
hentlich im
TEST THIS
hrift. Jeglic
DIESES GERÄT 1ST
ESSAI HEBDOMA
Test-operate valv
Report an
Ventil(e) wöc
t immédiatement.
durch Untersc
Test le fonctionnement des v
signe en bas. S'il y à quelqu
un rappor
Date
Datum
Date
114-051
PRÜFEN.
Testbetrieb prüfen,
he Störung sofor
Signed
Unterschrift
below.
bestätigt
t melden.
y.
alves chaque semaine et
e chose qui ne v
Date Signed
Signe
THIS
SIDE
UP
a pas fait
Signed
Signed
Date
Date
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
Packing List
•
•
•
•
Read this installation manual completely to ensure proper installation, then file it with the
owner or maintenance department. Compliance and conformity to drain requirements and
other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
any packaging material. If any parts are missing, do not begin installation until you obtain
the missing parts.
Flush the water supply lines before beginning installation and after installation is complete.
Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be
“ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure.
Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with
ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.
com or call 1-800-BRADLEY.
Product warranties and parts information may also be found under ”Products” on our web
site at www.bradleycorp.com.
Supplies Required:
• Teflon tape and Pipe sealant
• Piping to 1” NPT water supply inlet on unit
• Adequate supply pipe supports
• Hardware to mount escutcheon to ceiling
• Minimum 4” (102 mm) drain to accommodate 30 gallons per minute discharge for drench shower waste
• Sign-mounting hardware
2
3/31/2015 Bradley • 215-1568 Rev. D; ECN 15-05-010

Installation S19-125SBF, S19-125SFMBF
Assembly of Components and Parts List
186-1495
(COVER PLATE)
PUSH
TO
ACTIVATE
SHOWER
www.bradleycorp.com
204-605
(LABEL)
150-212
(S19-125SBF ONLY)
113-864
(S19-125SBF ONLY)
169-1027
(S19-125SBF only)
S24-189
(S19-125SBF only)
(includes Handle and Valve Assembly)
Valve/Handle Prepack
S45-2238
www.bradleycorp.com
114-090
114-090
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date Signed
Datum
Unterschrift
Date
Date
Signed
Signe
Date
Signed
204-421
R
S24-197
(S19-125SFMBF only)
Bradley • 215-1568 Rev. D; ECN 15-05-010 3/31/2015
3