Installation
S19-125BF
S19-125FMBF
Barrier Free Recess-Mounted Drench
Shower
Table of Contents
Pre-Installation Information.........................2
Supplies Required ...............................3
Assembly of Components..........................3
Service Parts ...................................3
Cabinet Dimensions ..............................4
Rough-Ins ......................................5
Installation....................................6–7
PUSH
TO
ACTIVATE
SHOWER
215-1567 Rev. D; ECN 16-05-039
© 2016 Bradley
Page 1 of 7 8/8/2016
Menomonee Falls, WI 53052 USA
P.O. Box 309
800 BRADLEY (800 272 3539)
+1 262 251 6000
bradleycorp.com

S19-125BF, S19-125FMBF Installation
WARNING
Flush the water supply lines before beginning installation and after installation is complete. Test
the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all
times. Provisions shall be made to prevent unauthorized shutoff.
CAUTION
Emergency equipment must be supplied with tepid water (60°F to 100°F/15.6°C to 37.8°C). Any
prolonged exposure to near freezing water affects the body's ability to maintain body temperature,
increasing the risk of hypothermia.
NOTICE
Before installing this product, ensure that there are adequate clearances around the product and
activation of the product does not interfere with other products or obstructions.
Avoid cleaners containing organic solvents, alcohols and hydrocarbons. Rinse with water after
cleaning.
IMPORTANT
The installation and location of all safety drench showers, eye and eye/face washes must comply
with the requirements of ANSI/ISEA Z358.1.
Read this installation manual completely to ensure proper installation, then file it with the owner or
maintenance department. Compliance and conformity to drain requirements and other local codes
and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any
packaging material. If any parts are missing, do not begin installation until you obtain the missing
parts.
The ANSI/ISEA Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed
emergency fixtures require a minimum of 30 PSI (0.21MPa) flowing pressure.
Self-closing spring-loaded valves are not UL classified to ANSI/ISEA Z358.1.
Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable
flushing fluid supply is present and any sediment build-up in the supply line is cleared. Emergency
equipment should be inspected monthly to address any maintenance issues ensuring the
equipment is in good operating condition and that there are no signs of wear.
Workers who may come in contact with potentially hazardous materials should be trained regarding
the placement and proper operation of emergency equipment per ANSI/ISEA Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.com or
call 800-BRADLEY (272.3539).
Product warranties and parts information may also be found under ”Products” on our web site at
bradleycorp.com.
2
8/8/2016 Bradley • 215-1567 Rev. D; ECN 16-05-039

Installation S19-125BF, S19-125FMBF
Supplies Required
• Teflon tape and Pipe sealant
• Piping to 1” NPT water supply inlet on unit
• Adequate supply pipe supports
• Hardware to mount escutcheon to ceiling
• Minimum 4” (102 mm) drain to accommodate 30 gallons per minute discharge for drench shower waste
• Sign-mounting hardware
Assembly of Components and Parts List
114-090
www.bradleycorp.com
114-090
PUSH
TO
ACTIVATE
SHOWER
w
ww.bradleycorp.com
Service Prepacks
150-212
(S19-125BF only)
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Datum
Unterschrift
Date
Date
Signe
Date
204-421
169-1076
(S19-125BF only)
R
Signed
Signed
Signed
113-864
(S19-125BF only)
S24-197
(S19-125FMBF only)
S24-189
(S19-125BF only)
Valve Mounting Hardware Prepack
(includes Valve Mounting Bracket,
U-Bolt, Nuts and Washers)
S45-2236
Screw Prepack
(includes six screws and
Torx Power Bit)
S45-2235
Valve/Handle Prepack
(includes Handle and Valve Assembly)
S45-2237
Bradley • 215-1567 Rev. D; ECN 16-05-039 8/8/2016
3