Bosch Worcester Greenstar CDi Conventional, Worcester Greenstar 30CDi Conventional, Worcester Greenstar 40CDi Conventional Instruction Manual

GREENSTAR CDi CONVENTIONAL
WALL HUNG RSF GAS-FIRED CONDENSING REGULAR BOILER
FOR OPEN VENTED DOMESTIC HOT
AND
WATER
SEALED CENTRAL HEATING SYSTEMS
AND
INDIRECT
NATURAL
LIQUID PETROLEUM
INSTRUCTION
IS
FOR USE WITH
OR
L.P.G.
(Cat
II
2H3P TYPE C13 & C33)
GAS:
WORCESTER
WORCESTER GREENSTAR 40CDi Conventional
GAS:
WORCESTER GREENSTAR 30CDi Conventional
WORCESTER GREENSTAR 40CDi Conventional
GREENSTAR 30CDi Conventional
GC
NUMBER
GC
NUMBER
GC
NUMBER
GC
NUMBER
MANUAL
41-311-71
41-311-72
41-311-73
41-311-74
INSTALLATION, COMMISSIONING
&SERVICING
(}enchmarf)
CONTACT INFORMATION
INSTALLATION & SERVICING INSTRUCTIONS
WORCESTER
TECHNICAL: 08705 266241 SERVICE: 08457 SPARES: 01905 752571 LITERATURE: 01905 752556 TRAINING: 01905 752526 SALES: 01905 752640 WEBSITE:
WATER TREATMENT:
OX 01799 550811
FERN www.fernox.com
SENTINEL www.betzdearborn.com/sentinel
TERMINAL GUARD:
FLUE
TOWER FLUE VALE
RISE TONBRIDGE TN9 1TB
BOSCH:
256206
www.worcester-bosch.co.uk
0151
420
9595
COMPONENTS
PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION.
THESE MODEL(S) USED WITH ANY OTHER MAKE
THE INSTRUCTIONS APPLY STATUTORY OBLIGATION.
THIS APPLIANCE MUST CORRECTLY
IF YOU
DISTANCE LEARNING BOSCH.
PLEASE LEAVE BENCHMARK (EIRE ONLY) WITH THE USER OR
INSTRUCTIONS
STATED
COULD
ARE
IN
ANY DOUBT CONTACT WORCESTER
LOG
ARE
APPLICABLE
ON THE FRONT COVER OF THIS MANUAL ONLY AND MUST NOT BE
OR
MODEL
IN
THE UK ONLY AND MUST BE FOLLOWED EXCEPT FOR ANY
BE INSTALLED
LEAD
TO
PROSECUTION.
AND TRAINING
THESE
INSTRUCTIONS,
BOOK OR A CERTIFICATE CONFIRMING COMPLIANCE WITH IS
AT
TO THE
OF APPLIANCE.
BY
A COMPETENT PERSON. FAILURE
COURSES
THE
THE
GAS
WORCESTER
BOSCH
ARE AVAILABLE FROM
USER
TECHNICAL HELPLINE.
GUIDE
METER AFTER INSTALLATION OR SERVIC-
AND
BOSCH
THE
APPLIANCE
TO
INSTALL
WORCESTER
COMPLETED
813
ING.
ABBREVIATIONS USED
IN
THIS MANUAL:
0 Diameter
NG LPG Liquid Petroleum Gas CH DHW IP Ingress Protection SEDBUK
Natural Gas
Central Heating Domestic Hot Water
Seasonal Efficiency of Domestic Boilers
in
the United Kingdom
STORE THE APPLIANCE IN A DRY AREA PRIOR
TO
INSTALLATION.
LIFTING AND CARRYING PRECAUTIONS:
Lift only a manageable weight, or ask for
• help. When lifting the boiler, bend the knees,
• and keep the back straight and feet apart.
• Do not lift and twist at the same time.
• Lift and carry the boiler close to the body
• Wear protective clothing and gloves to protect from
any
sharp edges
SYMBOLS USED IN
Central heating
Hot water storage cylinder
Electricity supply
f
supply
Gas
THIS
MANUAL:
Time
clock
Programmer/timer
Room
thermostat
Wait time period
INSTALLATION & SERVICING INSTRUCTIONS
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
6 720
614
556a
(2007/07)
~ORCESTER
Bosch
Group
CONTENTS
SAFETY & REGULATIONS
SAFETY PRECAUTIONS INSTALLATION REGULATIONS
APPLIANCE INFORMATION
GENERAL INFORMATION TECHNICAL LAYOUT & COMPONENTS
PRE-INSTALLATION
CLEANING PRIMARY SYSTEMS MAINS SUPPLIES WATER SYSTEMS & PIPEWORK CONDENSATE PIPEWORK BOILER LOCATION PLUMBING MANIFOLD FLUE TERMINAL POSITIONS FLUE OPTIONS
DATA
& CLEARANCES
4 4
5 6
7
8 9
10 11
12-13
14
15
16-17
INSTALLATION
UNPACKING WALL FRAME AND ANCILLARY ITEMS WALL MOUNTING
PLATE
I FLUE OPENING
PIPEWORK UNPACKING FITTING
THE APPLIANCE
THE APPLIANCE I BOILER
CONNECTIONS FLUE INSTALLATION CONDENSATE CONNECTION ELECTRICAL POSITION OF WIRED COMPONENTS
COMMISSIONING
PRE-COMMISSIONING
CHECKS FILLING THE SYSTEM STARTING
THE APPLIANCE WATER TREATMENT COMMISSIONING FINISHING
COMMISSIONING
SERVICING & SPARES
INSPECTION AND SERVICE REPLACEMENT OF SETTING THE GAS/AIR SHORT
PARTS
PARTS
RATIO
LIST
18
19 20
21
22
23-25
26
27-28
29
30
31 32
33 34
35
36-40
41-47
48
49
CONVERSION KITS
L.P.G.
CONVERSION
FAULT
FINDING & DIAGNOSIS
FAULT
FINDING HEATING FUNCTION PROTECTION FUNCTION
~ORCESTER
Bosch
Group
INSTALLATION & SERVICING INSTRUCTIONS 6 720 614 556a (2007/07)
FOR
WORCESTER BOSCH GREENSTAR
30COi/40CDI
50
51 52 53
Conven\1onal
CONTENTS
SAFETY PRECAUTIONS
IF YOU SMELL GAS:
X DON'T
X DON'T TURN
V' V' V' V'
V'
(/Jenc!Jmorl()
A Benchmark Log including commissioned and serviced according to the manufacturer's instructions.
HEALTH &
COMBUSTIBLE
FITTING & MODIFICATIONS
SERVICING
SMOKE
DO PUT DO
OPEN
DO KEEP DO TURN
TELEPHONE
their CORGI registration number
IMPORTANT: The completed Benchmark Checklist will be required
warranty
ELECTRICAL
OUT
NAKED
DOORS PEOPLE OFF
THE
Book
work
OR
STRIKE
MATCHES
SWITCHES
FLAMES
AND
WINDOWS
AWAY
FROM
THE
CONTROL
NATIONAL
is provided by the manufacturer for the installer
and may be required by the local Building Control Inspector.
VALVE AT
GAS
ON OR
OFF
THE
AREA
AFFECTED
THE
METER
EMERGENCY
to
confirm that the boiler has been installed,
SERVICE
ON
0800111999
to
complete
in
SAFETY
The
appliance construction process that contravene the Hazardous
Do not store or use any combustible materials (paper, thinners, paints etc.) inside or within the vicinity Chemically chlorine or fluorine
Fitting the appliance and any controls competent Regulations 1998. Flue systems must instructions. associated accepts
Advise engineer (such as British to
help maintain the economy, safety and reliability
IMPORTANT­Benchmark section after each service.
contains
to
Health Regulations 1988).
AND
of
aggressive
engineer
Any
components
no liability arising from any such actions, excluding statutory rights.
the
user
no
asbestos
and
no
COSHH
substances
Regulations (Control
have
been
CORROSIVE MATERIALS
the appliance.
substances,
compounds
in
accordance
not
be modified
misuse
or
and systems could invalidate the warranty. The manufacturer
to
have
the
Gas
such as
can corrode the appliance and invalidate any warranty.
in
unauthorised
system
or
CORGI
halogenated
to
the appliance may only be carried out
with
the
Gas
any way other than as described
modifications
serviced
annually
registered personnel) using approved spares,
of
hydrocarbons
Safety
(Installation
to
the
appliance,
by a competent, qualified
the appliance.
The service engineer must complete the Service Record
the event
used
of
Substances
containing
and
in
the fitting
of
in
Use)
flue
in
any
the
by
the
or
INSTALLATION REGULATIONS
Gas
Safety
(Installation
All
gas
appliances competent person regulations. Failure to install appliances correctly could lead
The with,
Regulations, Regulations, (Consolidation), Building Regulations (Northern
Ireland), local
Document Regulations
requirements.
British Standards: The including:
BS7074:1 water
BS6891 : Installation pipework up to 28mm
BS5546 domestic purposes
EN:12828:
BS5440:1 ances of rated heating not exceeding
Flues
BS5440:2 ances of rated heating not exceeding Air
BS7593 water central heating systems
a
BS input up to Where no specific instruction is given, reference should be made to the relevant British Standard codes
L.P.G. An a room or internal space below ground level unless one side of the building
Timber framed buildings: Where the boiler building the guidelines laid down
1 and
Buildings" should be adhered to.
to prosecution.
appliance must be installed
and
comply
IE E Regulations,
Building
water
635
1989)
relevant British Standards should be followed,
:Code
supply
: Installation of gas hot water supplies for
Central heating for domestic premises : Flues and ventilation for gas appli-
: Flues and ventilation for gas appli-
Supply
: Treatment
6798 : Installation of gas fired boilers of rated
70kW
(net)
of
Practice.
Installation:
appliance using
is
IGE
"Gas
& Use)
Regulations:
must
be
installed
in
accordance with the above
in
to, the
current:
Standards
by-laws, Health &
(The
Electricity
and
any
of practice for domestic and hot
of
low
pressure
(R1)
of
water
in
L.P.G.
must not be installed
is
open to the ground.
to be fitted to a timber framed
in
Installations
in
Timber Frame
accordance Gas
Safety
Building
(Scotland)
Safety
at
Work
other
local
70kW
(net) :
70kW
(net) :
domestic
BS5440:
by
gas
hot
Part
a
in
SAFETY PRECAUTIONS
& INSTALLATION REGULATIONS
INSTALLATION & SERVICING INSTRUCTIONS
CHwater: Artificially softened water must not be used to fill the central heating system.
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
6 720
614
556a
(2007/07)
~ORCESTER
Bosch
Group
GENERAL INFORMATION
STANDARD A-
Wall hung central heating and indirect domestic hot water
B -
Wall mounting plate
- Hanging bracket
C D - Hardware E - Hardware F - Literature G -
Bottom
H - Trap I Syphon Outlet Connection
(22 mm
J - Flow pipe
K - Return pipe L - Return pipe 2 M - Pipework mounting bracket N - Gas
0 - Braising template
PACKAGE:
gas
pack pack
pack
panel
Plastic Pipe)
cock
support
1
c
B
fired condensing boiler for
1 2 (gas cock)
plate
max.
760mm
~
~
~
' L H
0
&N~M
"" ""
""'
0
SPECIFICATIONS:
Pre-wired and pre-plumbed Galvanised steel Digital control system
Automatic ignition
Direct burner ignition Built-in frost thermostat (boiler protection) Built-in fault finding diagnostics Modulating automatic gas valve Combustion air fan with speed regulator temperature sensor & control External Flue
gas
Condensate trap & syphon
inner frame
pump
anti-seizure protection
temperature limiter
~ORCESTER
Bosch
Group
INSTALLATION & SERVICING 6
720
614 556a (2007/07)
INSTRUCTIONS
FOR
WORCESTER
BOSCH
GREENSTAR
30CD,/40CD'
Conven\1onal
GENERAL INFORMATION
TECHNICAL
NATURAL GAS L.P.G. DESCRIPTION UNITS 30CDi 40CDi 30CDi 40CDi Heating Max.
rated heat input
Max.
rated heat output net
Max.
rated heat output net
Max.
rated heat output net
40/30°C 50/30°C 80/60°C
kW kW kW kW
30.9 42.0 30.9 42.0
32.1
31.8 43.3 31.8 43.3
30.0 40.8
43.7
DATA
32.1
30.0
43.7
40.8 Min. rated heat output net Min. rated heat output net Min. rated heat output net Min. rated heat input net Max.
flow temperature
Max.
permissible operating pressure bar 3.0 3.0 3.0 3.0
flow
rate-
G20
Temp. Temp.
Max.
80/60°C, 40/30°C,
max. min.
Gas Natural Gas Propane Gas (LPG) Flue Flue
Gas
Flue
Gas
C02
level at
C02
level at
NOx-
class Condensate Max.
condensation rate
40/30°C 50/30°C 80/60°C
10
minutes
rated min. load rated min. load
rated heat output
rated heat output
from
lighting
kW kW kW kW
•c
m3/h kg/h 2.4 3.3
•c
•c
% 9.6 9.7 % 9.0
1/h
8.6 10.6 12.4 15.7
8.6 10.5 12.3 15.5
7.7
8.0 9.8
nom. 90 nom. 90
3.2 4.4
76/58 55/33 58/35 55/33
5 5 5 5
2.7 3.7 2.7 3.7
9.4 11.0 13.9
11.5
nom.
90 nom.
87/58
9.1
76/58
11.5
10.5 10.5
14.5 90
87/58
58/35
11.5
pH
value, approx. 4.8 4.8 4.8 4.8 Electrical Electrical Frequency Max. General SEDBUK Appliance protection rating IP X4D X4D X4D X4D Permissible ambient temperatures Nominal Noise output Total Packaged boiler weight SEDBUK
power supply voltage
power consumption w approx. 70 approx. 100 approx. 70 approx. 100
Data
capacity of appliance I 3.5 3.5 3.5 3.5
level
boiler weight (lift weight)
AC
..
.V
Hz
band A A A A
•c
dB(A)
kg kg
%
230
50
0-50 0-50 0-50 0-50
43
39.5 39.5 39.5 39.5 48
90.1
230 230 230
50 50
47 43 47
48 48 48
90.2
90.1
50
90.2
TECHNICAL
DATA
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
6 720
614
556a
(2007/07)
~ORCESTER
Bosch
Group
23
--
22
21
20 ------------------------------
---
------ 7
LAYOUT &
The
diagram opposite shows the controls
servicing position
FLAME VIEWING
2
3
2 IGNITION ELECTRODE AND FLAME
SENSE ELECTRODE
3 HEAT EXCHANGER
COMPONENTS
and
excludes the outer
WINDOW
in
case.
the
4 OVERHEAT THERMOSTAT
5 ACCESS POINT FOR CLEANING HEAT
4
EXCHANGER
6 CONDENSATE
HOSE
7 DRAIN POINT
TRAP I SYPHON OUTLET
8
TION (22
mm
PLASTIC PIPE)
CONNEC-
9 RETURN
5
10 GAS INLET CONNECTION
COMPRESSION
11
COVER FOR EXTERNAL CONNECTIONS
12
CONTROL PANEL
POSITION
IN
22
WIRING
SERVICE
mm
13 ACCESS COVER FOR TRANSFORMER
&PCB
14 FLOW 15
INLET PRESSURE TEST POINT
16 TRAP I SYPHON 17
GAS
VALVE
18 AIR I GAS ADJUSTMENT 19
TESTING POINT FOR
20
FAN
21
PRIMARY
SENSOR
SCREW
FAN
PRESSURE
22 AUTO AIR VENT 23
REMOVABLE TOP CASE PANEL FOR
8
SERVICING
9
48 49
'11
:::;-->(
-o
'
---------57
I ·-----·56
I
I
_'·->·60
---55
48
TEMPERATURE CONTROL MAINS
49
51 52 53
54 55 56 57
60
ON/OFF
TIC LIGHT
BOOST
SERVICE BUTTON
BURNER ON INDICATOR LIGHT (GREEN)
MASTER SWITCH
NOT USED NOT USED FAULT
RESET BUTTON
DISPLAY
INDICATOR/DIAGNOS-
(BLUE)
BUTTON
ON/OFF
~ORCESTER
Bosch
Group
INSTALLATION & SERVICING INSTRUCTIONS 6 720 614 556a (2007/07)
FOR
WORCESTER BOSCH GREENSTAR
30COi/40CDI
Conven\1onal
LAYOUT &
COMPONENTS
CLEANING PRIMARY SYSTEMS
IMPORTANT:
requirements
CAUTION: ISOLATE OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.
All
met
the
following
before
THE
MAINS SUPPLIES BEFORE STARTING ANY WORK AND
starting
Pre-Installation
boiler
or
flue
1
2
sections
installation.
4
5
must
be
read
and
IMPORTANT: Debris from damage Failure to the ance will invalidate the appliance warranty.
BEFORE CLEANING THE SYSTEM: ENSURE
IN KEEP
CIRCULATING PUMP OR USE TO
BEFORE INSTALLING A NEW BOILER.
CLEANING
2 Open
3
~
4
5
the
boiler and reduce efficiency.
comply
use
of
water treatment with the appli-
THE
SYSTEM
GOOD
WORKING ORDER
THE EXISTING BOILER/
A POWER FLUSHING MACHINE
AID
THE
CLEANSING
THE PRIMARY SYSTEM:
Fill
the
system with cold water
for
leaks.
all
drain cocks
Close drain cocks
agent
at
flushing the
system condition
the
manufacturer's instructions. Circulate boiler
is
fired
Run
the
boiler/system at temperature of
the
flushing agent.
Drain
and
remove
the flushing agent
the
the
flushing agent before
up.
as
directed
thoroughly flush
the
system can
with
the
guidelines
AND PIPEWORK
WHERE
and
and
add a suitable
correct strength for
in
accordance with
POSSIBLE
PROCEDURE
and
drain
the
normal
operating
by
the manufacturer
the
system to
and
debris.
check
system.
the
for
IS
3
@
Valve
Flushing Agent
~
KEY
CLEANING PRIMARY SYSTEMS
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
6 720
614
556a
(2007/07)
~ORCESTER
Bosch Group
MAINS SUPPLIES
ELECTRIC
Supply:
SUPPLY:
230V-
50Hz (See Technical Data for IP ratings.) Cable:
PVC
insulated 0. 75mm2
(24
x 0.2mm) temperature rated
External
3A
fuse
to
BS1362.
The appliance must be earthed.
• All pipes
to
the boiler must be cross­bonded. Wiring
must comply with
lEE
wiring regula­tions and any local regulations which may apply to fixed wiring
to
a stationary appli-
ance.
GAS
SUPPLY:
Boilers
using
NG
must be
connected governed meter. LPG
boilers must be
connected regulator. Installation
to
the boiler must be
ply
and connection
of
the gas sup-
in
accordance with BS6891. Under no circumstances should the size the
gas
supply pipe be less than that appliance inlet connection. The meter or meter must be checked,
supplier,
gas order and can meet the gas sure requirements from any other does meter to the For olive connections gas pipes with minimum 0.9
not
include the
regulator and
pipework
preferably by the
to
ensure it is
in
good
flow
in
addition
to
the demand
appliance being served. This
pipework
from the
boiler.
we
recommend using
mm
ness.
to
90°C.
to
to
a
of
to the
working
and pres-
wall thick-
a
of
the
~ORCESTER
Bosch
Group
INSTALLATION & SERVICING 6
720
614 556a (2007/07)
INSTRUCTIONS
FOR
WORCESTER
BOSCH
GREENSTAR
30COi/40CDI
Conven\1onal
MAINS SUPPLIES
'
E
----~
'
--------------F
S PLAN LAYOUT
Y PLAN LAYOUT
SEALED SYSTEM LAYOUT
WATER SYSTEMS &
PI
PEWORK
PLASTIC PIPEWORK:
Any plastic pipework must
• barrier with
copper or
Plastic must be
600
mm
steel pipe connected to the boiler.
pipework used for underfloor heating
correctly controlled with a thermo-
have
a polymeric
(minimum) length of
static blending valve limiting the temperature of the circuits to approx. The
pipework from the boiler to the blending
valve
must be
in
50°C.
copper or steel (protected
from corrosion).
CONNECTIONSNALVES:
• All
system connections, taps and mixing valves must be capable of sustaining a pres­sure up to 3
bar. Radiator valves should conform to BS2767:10. Do not use galvanised pipes or radiators.
• All other valves should conform to BS1010. On
new installations, or extensions to exist­ing systems where a radiator previously did not exist, each radiator
TRV,
except the one fitted
a
room/area
as
the room thermostat.
should be fitted with
in
the same
On boiler only replacement jobs, it is recom­mended, (but not mandatory,) to fit a TRV
each radiator. It for energy conservation purposes, to
mend to the customer that a
is,
however, a requirement,
TRV
is fitted to
recom-
each radiator.
• An automatic bypass (downstream
of
the pump),
may
be required,
in
order to main­tain the minimum flow-rate through the appli­ance.
• A drain
cock
should
be
fitted
at
the
low-
est
point
of
the
beneath
the
appliance.
heating
circuit
and
An air vent is required at the highest point on
the system.
on
L
SYSTEM FILL
Heating return
Hose
...
------D
Heating
return
Cylinder return
SYSTEM
Heating return
Mains
supply
Stop
cock
MAKE
Auto
UP
Heating flow
Make up
vessel
SandY
PLAN SYSTEM:
A Static Head - Minimum static head 250mm
measured from the highest point
in
the heat-
ing system (top surface of the appliance or
in
highest point
level
water
B Heating
C Primary Cold Feed
D Diverter
the heating system) to the
in
the feed and expansion tank.
Vent (22mm minimum)
(15mm
minimum)
Valve E Pump F Automatic Bypass
G Radiator
H Lockshield
FULLY
The WRAS the diagram opposite for
Valve (Flow)
Valve
(Return)
PUMPED SEALED SYSTEM:
sealed system must be filled using a
approved filling loop or comply with
System fill Do not use galvanised pipes or radiators. Expansion Pressure Relief
K L Stop
Vessel
Gauge
Valve
Valve
Fixed Cylinder Type or sealed
systems approved connection
WATER
SYSTEMS
& PIPEWORK
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
6 720
614
556a
(2007/07)
~ORCESTER
Bosch
Group
3
5
ri : ,/
-----------
,E
,./
~1
lnvectlb
G
25mm
m1n.
~
~
~-~
~
__ j __
Ir-------K
-------J
+
-- H
400mm
m1n.
4
A+
~
~
/, /,/,
/, /,/,
/,
/,
~
/,
~-
/,
D
CONDENSATE PIPEWORK
CONDENSATE PIPEWORK:
The
condensate pipe must be a minimum of
22mm0 The condensate 50 should The shown opposite into trap machine) and discharge direct into a vent stack into a the water Wherever possible the condensate dis­charge pipe work should minated internally. Should this not be possi­ble, the following conditions should be observed:
IMPORTANT: ages
2 Internal 3
4 External
5 External
plastic pipe.
pipework
mm
per
metre
take
the
shortest
pipework must follow one of the options
(min.
75
mm)
(E)
min.
450
gulley (D) below ground but above
level.
and the only available route is external,
Pipe work length should be kept to a minimum and the route as possible. Where pipe work could be subjected to
cold or wind chill, a weather
extreme
insulation should be used.
proof Alternatively the condensate pipework could
be
increased to a minimum
without the requirement to insulate.
Ensure
in
the
pipe
run.
Internal
sink/washing waste
drainage
Soil/vent
stack drainage condensate
must
towards
such
the
outlet
practicable route.
an
internal serviceable­as
a sink/washing
mm
above pipe invert or
be
routed and ter-
vertical
there
are
machine
system
system
absorption
fall
no
drain
at
and
as
32
block-
point
least
mm
A - Condensate from boiler
B-
Sink
C-
22
mm
0 plastic condensate pipe
D-
Gulley E - Internal soil and vent stack F
- Serviceable waste trap (75
G-
300
mm
x 100
mm
0 sealed plastic tube
H
- Ground level
J - Drainage holes
(12
mm
from
building
K - Limestone chippings
0 at 25
50
mm
from base of tube
mm
centres) facing away
mm
min)
~ORCESTER
Bosch
Group
INSTALLATION & SERVICING 6
720
614 556a (2007/07)
INSTRUCTIONS
FOR
WORCESTER
BOSCH
GREENSTAR
30COi/40CDI
Conven\1onal
CONDENSATE PIPEWORK
SERVICING
Using 1
-1112 Using 1 25 mm
-1152
CLEARANCES
00
mm flue kit
mm
flue kit
mm
~-
'20mm
'
to
removable door
600mm
'
front
clearance
'
for
service
-
+30mn
above elbow
'
200
mm '
5mm
BOILER LOCATION &
CLEARANCES
This boiler is only suitable for installing internally
within a
fixed, rigid
same size as the
ing the
COMPARTMENTS:
Follow BS5440
• An
• If fitting the boiler into
BOILER CLEARANCES:
The
space required
property
boiler weight.
the
Minimum
access and maintain the equipment.
use a non-combustible perforated material (maximum hole sizes the boiler from the airing space.
diagram
at a suitable location
non-combustible surface at least the
boiler and capable
requirements
Part 2 and note:
clearances must
door
is required to install, service
boiler and any ancillary
opposite
to
install and service the boiler.
an
of
of
be
airing
13mm)
shows
onto
of
support-
BS6798
maintained
cupboard
to
separate
the
m1n1mum
and
a
VENTILATION
This is a room sealed appliance and require any air for property. board appliance ment must be separated from the boiler by a described
Notwithstanding and openings because casing, if the clearances
Do fitted on the outside wall or
If the
or a compartment
perforated
in
BS
5440
to
of
not
operate the appliance if the flue terminal
damaged.
combustion
appliance
after installation, then the
non-combustible
BS
6798. the requirements
there is no need for ventilation
be
provided
the
low
is
fitted
is
in
the
heat loss from the appliance
shown
or
roof is
does
from inside the
into a cup-
built
around
compart-
partition
of
BS
compartment
are maintained.
obstructed
not
the
space
as
6798
CONDENSATE PIPEWORK
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
6 720
614
556a
(2007/07)
~ORCESTER
Bosch
Group
®
CD
CD
®
2250mm
BOILER LOCATION & CLEARANCES
BATHROOMS:
The
boiler can mechanical or boiler can only
A Non mechanical timer can be installed in
2.
zone
See lEE wiring regulations.
(See Technical Data for
be
installed
RF
mechanical timer
be
installed
IP
in
zones 2 or
in
zone
ratings.}
is
3.
3.
If a
fitted the
600mm
radius
®
6
2250mm
720
611
927-13.10
IMPORTANT: control using 230 V mains electricity not
be
using
the
Electrical switches, fused outlets room.
able
bath
must
any
to
or
not
switch
be
touched
shower.
be
situated
or
appliance
by a person
spur
and
in
the
must
socket
bath-
~QRCESTER
Bosch
Group
INSTALLATION & SERVICING INSTRUCTIONS 6 720 614 556a (2007/07)
FOR
WORCESTER BOSCH GREENSTAR
30COi/40CDI
Conven\1onal BOILER LOCATION & CLEARANCES
Flow
22
mm
Return 22
Mains Gas
mm
Supply
22
mm
PLUMBING MANIFOLD
CONNECTIONS:
Heating System: 22 mm compression fittings
mm
Gas: 22
Use the 22mm
the
appliance. Use the fittings supplied pack.
Use the ance vertically gramm on the left side) or use alternative con­nection method (as shown the the pipes for
supplied
upwards
right
side). For alternative
flow
compression fittings
copper
pipes provided with
in
pipes
to
connect
(as
in
and return.
the Lit/Hardware
the appli-
shown
in
the dia-
the diagramm on
connection
cut
PLUMBING MANIFOLD
INSTALLATION & SERVICING INSTRUCTIONS
Flow 22 mm
Mains Gas
22
mm
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
6 720
614
556a
0
Supply
(2007/07)
Return
22
mm
~ORCESTER
Bosch
Group
FLUE TERMINAL POSITIONS
Minimum fanned
DRWG. REF:
A'
B' C' D E
F2
G From a vertical drain pipe or soil pipe 150mm
H From I Above ground, roof or balcony
J From a surface facing the terminal
K From a terminal facing the terminal
L2
M Vertically from a terminal on the same wall
N Horizontally from a terminal on the same wall
dimensions
draught:
TERMINAL
Directly Above Horizontally Below Below Below
From
of
flue
terminal
POSITION
below
an
opening, air brick, opening windows, etc.
an
opening, air brick, opening window, etc.
to
an
opening, air brick, opening window, etc. gutters, soil pipes eaves balconies
an
an
opening
or
car port roof (lowest point)
internal or external corner
in
the car port
positions
or
drain pipes 75mm
(e.g.
door, window) into the dwelling
for
balanced
room
sealed
flues
DISTANCE
300mm 300mm 300mm
200mm 200mm
300mm 300mm
600mm 1200mm 1200mm 1500mm
300mm
0 From a non combustible vertical structure on the roof
p
Above intersection with roof
0 Adjacent
R
Below
windows
to
windows
or openings on pitched and flat roofs
or openings on pitched roofs
* *
600mm 2000mm
with
The flue must be fitted and terminated accordance with the recommendations BS5440 The flue must not cause Discharge and any noise from the must not cause a nuisance. Flue gases have a tendency certain weather conditions a white plume condensation will be discharged from the flue outlet. for nate position should be found. The air the boiler must not be closer than any Detailed combustible materials are given BS
• A protective terminal guard must be fitted if the which The guard must be spaced mum the wall with plated screws. See Information (inside front cover).
: Part
1.
an
obstruction.
to
Where
this could be a nuisance,
example, near security lighting,
inlet/outlet
combustible material.
recommendations on protection
5440:1
terminal
people have access.
50
mm) around the flue and fixed
duct
and the terminal
is
2m or less above a surface to
equally (mini-
in
flue outlet
plume and
an
alter-
25mm
in
to
Contact
of
of
in
of
to
of
In
addition, the terminal should not
in
the building
window
frame.
fabric
formed
2 Not recommended.
*
See
instructions supplied with vertical
be
for
the purpose
nearer than 150mm (fanned draught}
of
accommodating a built-in element such as a
flue
kits.
to
an
opening
~ORCESTER
Bosch
Group
INSTALLATION & SERVICING INSTRUCTIONS 6 720 614 556a (2007/07)
FOR
WORCESTER BOSCH GREENSTAR 30CD•/40CD• Conven\•onal
FLUE TERMINAL POSITIONS
STANDARD FLUE HORIZONTAL
0100 MAX
686
mm
Ax
1
MIN 250 0125
MAX 1070 MIN 250 * Requires cutting
MAXIMUM FLUE HORIZONTAL
0100-
Ax1+Bx8
0125-
Ax1+Bx18
MAXIMUM FLUE VERTICAL START+ 1 BEND
mm
mm
mm
7goo
18500
Ax
Ax
mm
mm
Ax
1*
1
1*
0 c
0100-
7goo
mm
Ax1+Cx1+Bxg
+
Fx
1
0125-
18500
mm
Ax1+Cx1+Bx1g
+
Fx
1
MAXIMUM FLUE VERTICAL START+
F 8 d
B
2 BENDS
~---~
I
IPA
co
0100-
5goo
mm
Ax1+Cx2+
+
Fx
1
0125-
16500
A X 1 + c X 2 + B X
+
Fx
1
MAXIMUM FLUE VERTICAL START+
F
B
3 BENDS
c 0
0100-
3goo Ax1+Cx3 +Bx7+Fx1
0125-
14500 Ax1+Cx3 +Bx17+Fx1
MAXIMUM FLUE VERTICAL
2 X 45° BENDS
WITH
E
B
D
0100-
7400 (including terminal) Bx8+Dx2+Ex1
0125-
16500 (including terminal) Bx17+
Dx2
Bx8
mm
18
mm
mm
mm
mm
+Ex1
FLUE OPTIONS 30CDi
CONVENTIONAL
The
diagrams (opposite) show the compo-
nents used and the maximum flue length for
100
mm
each configuration of 125
mm
0 flues.
• Shaded flue components indicate the stan­dard 100
• Only straight flue sections can be reduced in
The inside or outside of the building. Fixing kits sion kits. Horizontal125 and 125 separate instructions. Contact your supplier or Worcester Bosch.
QH
B
A - Standard horizontal flue
B - Straight flue extension C -
Flue
D -
Flue
E - Vertical terminal (vertical adaptor supplied
with terminal)
F-
Vertical adaptor (used with horizontal terminal)
Calculating the flue length: Measure the total flue length required, noting that the maximum straight flue the terminal is: Horizontal
Horizontal 80/125 Vertical 60/100 Vertical 80/125
mm
0 horizontal flue.
length and cut.
flue terminal end can be fitted from the
are
supplied with the flue exten-
mm
0 and Vertical100
mm
0 flue kits
A c D
iP
bend,
goo
bends, 45°
60/100
mm
0:
mm
0:
mm
0:
g400
mm
0:
18500
and
are
available with
0
EB
(1
00
mm
length including
7goo
mm
18500
mm
mm
mm
mm
v
F
Q
0 shown)
MAXIMUM FLUE
bJ) 0
'-----_
'---ll<CI
IP A
0 c
0100-
5goo
mm
Ax1 + Bx7+Cx1
0125-
16500
mm
Ax1 + Bx17+Cx1
FLUE
OPTIONS 30CDi
CONVENTIONAL
HORIZONTAL+
B
1 BEND
VERTICAL FLUE WITH
2 X
goo
BENDS
E
B
c 0
0100-5400 (including terminal) Bx7+
0125­(including terminal) Bx16+
INSTALLATION & SERVICING INSTRUCTIONS
Cx2
14500
Cx2
mm
+Ex1
mm
+Ex1
Then reduce the total straight flue length for
each extra flue bend (excluding the turret) by:
2000
mm
for
1000
mm
for 45°
Flue
extension total lengths: Horizontal Horizontal & Vertical 80/125
Flue Horizontal Horizontal 80/125
Vertical60/100 Vertical 80/125
6
720
611
927-08.10
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
& Vertical 60/100
terminal total lengths:
60/100
6 720
614
556a
goo
mm mm
(2007/07)
mm
0:
g5o
mm
mm
0:
1000
mm
mm
0:
800
mm
mm
0:
1200
mm
0:
1140
mm
0:
1365
mm
~ORCESTER
Bosch
Group
STANDARD FLUE HORIZONTAL
Q
O{_
_ _j[_
_uiVY
A
0100 MAX
686
mm
Ax
1
MIN 250 0125
MAX 1070 MIN 250 * Requires cutting
MAXIMUM FLUE HORIZONTAL
Q
0100-
Ax1+Bx2
0125-
Ax1+Bx12
MAXIMUM FLUE VERTICAL START+ 1 BEND
O{_
_ _j[_
2600
12500
mm
mm
mm
Ax
Ax
_R
IV?
mm
mm
Ax
1*
1
1*
0 c
0100-
2600
mm
Ax1+Cx1+Bx3
+
Fx
1
0125-
12500
mm
A X 1 + c X 1 + B X
+
Fx
1
13
MAXIMUM FLUE VERTICAL START+
F
B
2 BENDS
.bJ.
0
II
iPA
'-----~
co
0100-
N/A
0125-
10500
mm
A X 1 + c X 2 + B X
+
Fx
1
MAXIMUM FLUE VERTICAL START+
F Q q
B
3 BENDS
c 0
0100-
N/A
0125-
8500 Ax1+Cx3 +Bx11
MAXIMUM FLUE VERTICAL WITH
E
B
D
0100­(including terminal) Bx3+
0125­(including terminal) B X
+Fx1
2 X 45° BENDS
B
2goo
Dx2 + Ex1
14000
14
+ D X 2
mm
mm
mm
+EX
12
1
FLUE OPTIONS 40CDi CONVENTIONAL
The
diagrams (opposite) show the compo­nents used and the maximum flue length for each configuration of
mm
0 flues.
125 Shaded flue dard 100 Only in
length and cut.
The inside or outside of the Fixing sion kits. Horizontal 125 and 125 separate instructions. Contact your or Worcester Bosch.
A c D
components indicate the stan-
mm
straight flue sections can be reduced
flue terminal end can
kits
are
mm
.b]H
B
A - Standard horizontal flue B - Straight C ­D ­E - Vertical terminal (vertical adaptor supplied
F-
Calculating Measure the total flue length required, noting that the the terminal is: Horizontal 60/100 Horizontal 80/125 Vertical 60/100 Vertical 80/125
flue extension
Flue
bend,
goo
Flue
bends, 45°
with terminal) Vertical adaptor (used with horizontal terminal)
the flue length:
maximum
mm mm
100
mm
and
0 horizontal flue.
be
fitted from the
building.
supplied with the flue exten-
mm
0 and Vertical 100
0 flue kits
I
are
available with
supplier
&-'
straight flue length including
mm mm
0: 0:
0
EB
(1
0:
2600
0:
12500
4goo
mm
16000
00
mm
mm
mm
mm
v
F
Q
0 shown)
mm
MAXIMUM FLUE
bJ
'L_O
_ _j[_.uiP A
HORIZONTAL+
B
0 c
0100-600
Ax1 + Bx1
0125-
Ax1 + Bx11
~ORCESTER
10500
Bosch
mm
Group
+Cx1
mm
+Cx1
INSTALLATION & SERVICING 6
720
614 556a (2007/07)
1 BEND
INSTRUCTIONS
VERTICAL FLUE WITH 2 X
goo
BENDS
E
B
B
c 0
0100-
N/A
0125-
12000
mm (including terminal) Bx13+
Cx2
+Ex1
FOR
WORCESTER
BOSCH
GREENSTAR
6
720
611
30CD•/40CD•
927-08.1 0
Conven\1onal
Then reduce the total straight flue length for each extra 2000 1000
Flue Horizontal Horizontal & Vertical 80/125
Flue Horizontal 60/100 Horizontal 80/125 Vertical 60/100 Vertical 80/125
flue bend (excluding the turret)
mm
for
goo
mm
for 45°
extension total lengths:
& Vertical 60/100
terminal total lengths:
mm
0:
mm
0:
mm
0:
1140
mm
0:
1365
FLUE
OPTIONS 40CDi
mm mm
800 1200
mm
mm
0: 0:
mm
mm
g5o 1000
by:
mm
mm
CONVENTIONAL
Loading...
+ 39 hidden pages