BoonDocker POLARIS RZR XP 1000 Turbo System User Manual

Polaris RZR XP 1000 Turbo
Installation Instructions
BoonDocker RZR 1000 Turbo
1. Remove muffler, air filter to air box tube, air box, and header.
3. Install turbo support bracket to turbo. Leave bolts loose, so bracket can be adjusted once installed.
2. Clean header flange at head and install turbo header and new header gasket.
4. Remove these 2 bolts from the driver side front engine mount.
5. Install turbo assembly and steel gasket to header using 4 8mm x 25mm bolts and lock nuts. Leave bolts loose so adjustments can be made when turbo bracket is tightened.
Revised 3/28/2014 Page 2 of 7
www.boondockers.com……………….....
BoonDocker
6. Install the 2 stock engine mount bolts through the turbo bracket. Tighten engine mount bolts turbo to header bolts and turbo bracket to turbo bolts simultaneously.
……….………………....877-522-7805
BoonDocker RZR 1000 Turbo
7. Cut engine oil cooler coolant hoses at mid point and T turbo coolant hose into each hose.
9. Remove plug and install AN fitting located above magneto cover on passenger side of engine.
8. Remove plug from engine case located just in front of the clutch cover. Install AN fitting, route turbo drain hose to fitting and attach.
10. Install oil feed hose. Be sure to route feed hose away from header.
11. Install waste gate actuator and adjust rod tension so that the waste gate door is held barely closed.
Revised 3/28/2014 Page 3 of 7
www.boondockers.com……………….....
BoonDocker
12. Install air intake tube from stock air box to turbo. Attach stock crank case vent hose to air intake tube.
……….………………....877-522-7805
BoonDocker RZR 1000 Turbo
13. Install silicone hose to throttle bodies and secure with hose clamps.
15. Install air box intercooler assembly. Adjust transmission bracket to position air box assembly so that there is clearance on all sides and corners.
14. Install air box transmission mount bracket using stock bolts and steel spacer from stock air box. Leave bolts loose so air box can be adjusted later.
16. Fasten air box assembly to transmission bracket using 5/16”x1” bolts washers and lock nuts and tighten transmission bracket bolts.
17. Remove grill and install water cooler to stock radiator. Secure firmly using 4 push through zip ties.
Revised 3/28/2014 Page 4 of 7
www.boondockers.com……………….....
BoonDocker
18. Remove grommet from fire wall.
……….………………....877-522-7805
BoonDocker RZR 1000 Turbo
19. Install coolant bottle and pump assembly. And install hose from coolant bottle to water cooler.
21. Route coolant hose from water pump to air box cooler inlet. Lower rear connection.
20. Remove belly pans and install coolant hose to water pump.
22. Connect remaining coolant hose to water cooler.
23. Route coolant hose from water pump to air box cooler outlet. Upper front connection. Se­cure all coolant hoses using zip ties.
Revised 3/28/2014 Page 5 of 7
www.boondockers.com……………….....
BoonDocker
24. Connect water pump fused power wire to stock ACC Terminal and connect black ground to stock GRD terminal.
……….………………....877-522-7805
BoonDocker RZR 1000 Turbo
25. Cut valance and reinstall grill and belly pans.
27. Rotate stock fuel fitting 90 degrees so that it points up. You can twist this fitting inside the hose with your hands.
26. Connect auxiliary fuel line to stock fuel rail.
28. Connect stock fuel line to auxiliary connector.
29. Install charge tube.
Revised 3/28/2014 Page 6 of 7
www.boondockers.com……………….....
BoonDocker
30. Connect 3/16” boost hose from charge tube fitting to metal fitting on boost solenoid. Secure hose to solenoid with zip tie.
……….………………....877-522-7805
BoonDocker RZR 1000 Turbo
31. Connect 3/16” boost hose from waste gate actuator fitting to perpendicular plastic fitting on boost solenoid. Secure hose to solenoid with zip tie.
33. Install turbo outlet pipe and muffler.
32. Secure boost solenoid with a zip tie to stock harness bellow sway bar.
34. Install Boondocker Control Box as per con­trol box instructions.
35. Check all fluids and Enjoy!
Revised 3/28/2014 Page 7 of 7
www.boondockers.com……………….....
BoonDocker
……….………………....877-522-7805
Loading...