Model 8752 Brewer
with optional
8900-Series Decanters
p/n DD-70988 Rev. EM605 090713
Servicing Instructions
NOTE: For your protection, please note that equipment in
this shipment was carefully inspected and packaged by
skilled personnel before leaving the factory.
Upon acceptance of this shipment, the transportation
company assumes full responsibility for its safe delivery.
IF ShIPMENT ARRIVES DAMAGED:
1. VISIBLE LOSS OR DAMAGE: Be certain that any
visible loss or damage is noted on the freight bill
or express receipt, and that the note of loss or damage
is signed by the delivery person.
2.FILE CLAIM FOR DAMAGE IMMEDIATELY: Regardless of the extent of the damage.
3.CONCEALED LOSS OR DAMAGE: if damage is
unnoticed until the merchandise is unpacked, notify the
transportation company or carrier immediately, and file
“CONCEALED DAMAGE” claim with them. This
must be done within fifteen (15) days from the date the
delivery was made to you. Be sure to retain the
container for inspection.
Wells Bloomfield cannot assume liability for damage or loss
incurred in transit. We will, however, at your request, supply
you with the necessary documents to support your claim.
WARRANTY STATEMENT
SERVICE POLICY AND PROCEDURE GUIDE
ADDITIONAL WARRANTY EXCLUSIONS
ShIPPING DAMAGE CLAIMS PROCEDURE
1. Resetting of safety thermostats, circuit breakers,
overload protectors, or fuse replacements unless
warranted conditions are the cause.
2. All problems due to operation at voltages other than
specified on equipment nameplates; conversion to
correct voltage must be the customer’s responsibility.
3. All problems due to electrical connections not made in
accordance with electrical code requirements and
wiring diagrams supplied with the equipment.
4. Replacement of items subject to normal wear, to include
such items as knobs and light bulbs. Normal maintenance
functions including adjustment of thermostats, microswitches,
and replacement of fuses and indicating lights are not
covered under warranty.
5. All problems due to inadequate water supply, such as
fluctuating, or high or low water pressure.
6. All problems due to mineral/calcium deposits, or
contamination from chlorides/chlorines. De-liming is
considered a preventative maintenance function and is
not covered by warranty.
All electrical equipment manufactured by WELLS
BLOOMFIELD is warranted against defects in materials and
workmanship for a period of one year from the date of original
installation or eighteen (18) months from the date of shipment
from our factory, whichever comes first, and is for the benefit
of the original purchaser, except that:
a. airpots carry a 30 day parts warranty only.
b. dispensers; i.e., tea and coffee carry a 90 days parts
warranty only, decanters excluded.
THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN
LIEU OF ANY OTHER WARRANTIES, EXPRESSED OR
IMPLIED, INCLUDING ANY IMPLIED WARRANTY OF
MERCHANTABILITY OR FITNESS FOR A PARTICULAR
PURPOSE, WHICH ARE HEREBY EXCLUDED.
BLOOMFIELD INDUSTRIES DIVISION / SPECIALTY
EQUIPMENT MANUFACTURING CORPORATION SHALL
NOT BE LIABLE FOR INDIRECT, INCIDENTAL OR
CONSEQUENTIAL DAMAGES OR LOSSES FROM ANY
CAUSE WHATSOEVER.
This warranty is void if it is determined that upon inspection by
an Authorized Service Agency that the equipment has been
modified, misused, misapplied, improperly installed, or
damaged in transit or by fire, flood or act of God.
It also does not apply if the serial nameplate has been
removed or unauthorized service personnel perform service.
The prices charged by Wells Bloomfield for its products are
based upon the limitations in this warranty. Seller’s obligation
under this warranty is limited to the repair of defects without
charge by a Wells Bloomfield Authorized Service Agency or
one of its sub-agencies. This service will be provided on
customer’s premises for non-portable models. Portable
models (a device with a cord and plug) must be taken or
shipped to the closest Authorized Service Agency,
transportation charges prepaid, for services.
In addition to restrictions contained in this warranty, specific
limitations are shown below (Additional Warranty Exclusions).
Wells Bloomfield Authorized Service Agencies are located in
principal cities.
This warranty is valid in the United States and void elsewhere.
Please consult your classified telephone directory or your food
service equipment dealer; or, for information and other details
concerning warranty, write to:
Service Parts Department
Wells Bloomfield, LLC
10 Sunnen Dr. P.O. Box 430129
St. Louis, MO 63143 USA
Phone: 1-800-807-9054 Fax: 1-800-396-2677
7. Full use, care and maintenance instructions are supplied
with each machine. Those miscellaneous adjustments
noted are customer responsibility. Proper attention will
prolong the life of the machine.
8. Travel mileage is limited to sixty (60) miles from an
authorized Service Agency or one of its sub-agencies.
9. All labor shall be performed during normal working hours.
Overtime premium shall be charged to the customer.
10. All genuine Bloomfield replacement parts are warranted
for ninety (90) days from date of purchase on
non- warranted equipment.
Any use of non-genuine Wells Bloomfield parts
completely voids any warranty.
11. Installation, labor and job check-out are not considered
warranty.
12. Charges incurred by delays, waiting time or operating
restrictions that hinder the service technicians ability
to perform services are not covered by warranty.
This includes institutional and correctional facilities.
xi
605 p/n 2M-70988 8752 Owmers Manual
TABLE OF CONTENTS
WARRANTY STATEMENT xi
SPECIFICATIONS 1
FEATURES & OPERATING CONTROLS 2
PRECAUTIONS & GENERAL INFORMATION 3
AGENCY LISTING INFORMATION 3
INSTALLATION INSTRUCTIONS 4
OPERATION 6
BREWING COFFEE 8
CLEANING INSTRUCTIONS 9
TROUBLESHOOTING SUGGESTIONS 10
SERVICING INSTRUCTIONS 11
Deliming Instructions 16
EXPLODED VIEW & PARTS LIST 18
WIRING DIAGRAMS 23
SPECIFICATIONS
MODELSTYLEVOLTSWATTSAMPS
1ø
8752
8752KFT
Decanter Brewer
5 Warmers
115/230400019.4None provided
Thank You for purchasing this
Wells Bloomeld appliance.
Proper installation, professional
operation and consistent
maintenance of this appliance will
ensure that it gives you the very
best performance and a long,
economical service life.
This manual contains the
information needed to properly
install this appliance, and to use,
care for and maintain or repair the
appliance in a manner which will
ensure its optimum performance.
POWER SUPPLY
CORD
Wire directly to circuit
APPLICABILITY
This manual applies to the following Bloomeld products:
Model 8752 Integrity 5-Warmer Coffee Brewer
Model 8752KFT 5-Warmer Coffee Brewer
605 p/n 2M-70988 8752 Owmers Manual
1
FEATURES AND OPERATING CONTROLS
IL1636
Fig. 1 Model 8752 Features and Operating Controls
2
605 p/n 2M-70988 8752 Owmers Manual
PRECAUTIONS AND GENERAL INFORMATION
WARNING: ELECTRIC ShOCK hAzARD
All servicing requiring access to non-insulated components must be performed by qualied
service personnel. Do not open any access panels which require the use of tools.
Failure to heed this warning can result in electrical shock.
WARNING: INjURY hAzARD
All installation procedures must be performed by qualied personnel with full knowledge of all
applicable electrical and plumbing codes. Failure could result in property damage and
personal injury.
WARNING: ELECTRIC ShOCK hAzARD
Brewer must be properly grounded to prevent possible shock hazard. DO NOT assume a
plumbing line will provide such a ground. Electrical shock will cause death or serious Injury.
WARNING: BURN hAzARD
This appliance dispenses very hot liquid. Serious bodily injury from scalding can occur from
contact with dispensed liquids.
This appliance is intended for commercial use only.
This appliance is intended for use to brew beverage products for
human consumption. No other use is recommended or
authorized by the manufacturer or its agents.
This appliance is intended for use in commercial establishments,
where all operators are familiar with the appliance use,
limitations and associated hazards. Operating instructions and
warnings must be read and understood by all operators and
users.
Except as noted, this piece of equipment is made in the USA and
has American sizes on hardware. All metric conversions are approximate and can vary in size.
The following trouble shooting, component views and parts lists
are included for general reference, and are intended for use by
qualied service personnel.
This manual should be considered a permanent part of this
appliance. The manual must remain with the appliance if it is
sold or moved to another location.
AGENCY LISTING INFORMATION
This brewer is and listed under UL le E9253.
CAUTION:
EQUIPMENT DAMAGE
DO NOT plug in or energize this
appliance until all Installation Instructions are read and followed.
Damage to the Brewer will occur if
these instructions are not followed.
CAUTION:
BURN hAzARD
Exposed surfaces of the
appliance, brew chamber and
decanter may be HOT to the
touch, and can cause serious
burns.
605 p/n 2M-70988 8752 Owmers Manual
This brewer meets
operated and maintained in accordance with the enclosed
instructions.
Standard 4 only when installed,
3
INSTALLATION
READ ThIS CAREFULLY BEFORE STARTING ThE INSTALLATION
IMPORTANT:
To enable the installer to make
a quality installation and to
minimize installation time, the
following suggestions and tests
should be done before the
actual unit installation is started:
CAUTION:
EQUIPMENT
DAMAGE
DO NOT plug in or energize this
appliance until all Installation
Instructions are read and
followed. Damage to the
Brewer will occur if these
instructions are not followed.
CAUTION:
UNSTABLE
EQUIPMENT hAzARD
DO NOT operate brewer unless
factory supplied adjustable
legs are installed and properly
adjusted.
It is very important for safety
and for proper operation that the
brewer is level and stable when
standing in its nal operating
position. Provided adjustable
legs must be installed at each
corner of the unit. Failure to
do so will result in movement
of the brewer which can cause
personal Injury and/or damage
to brewer.
REFER TO EXPLODED VIEWS FOR COMPONENT NAMES/
NUMBERS
Unpack the unit. Inspect all components for completeness and
condition. Ensure that all packing materials have been removed
from the unit.
Verify that the Spray Head Gasket and Spray Disk are properly
installed.
LEVELING ThE UNIT
Verify that provided adjustable legs are installed at each corner of
the brewer.
Set Brewer in its operating location. Level the Brewer. A spirit
level should be placed on the top of the unit, at the edge, as a
guide when making level adjustments.
Level the unit from left to right and front to back by turning the
adjustable feet. Be sure all four feet touch the counter to prevent
tipping.
PLUMBER’S INSTALLATION INSTRUCTIONS
Brewer should be connected to a POTABLE WATER, COLD
WATER line. Flush water line before connecting to Brewer.
DO NOT use a saddle valve with a self-piercing tap for the water
line connection. Such a tap can become restricted by waterline
debris. For systems that must use a saddle tap,
main water supply and drill a 3/16” (minimum) tap for the saddle
connection, in order to insure an ample water supply. Remember
to ush the line prior to installing the saddle.
The brewer must be installed on a water line with average
pressure between 20 PSI and 90 PSI. If your water pressure
exceeds 90 PSI at anytime, a pressure regulator must be
installed in the water supply line to limit the pressure to not more
than 90 PSI in order to avoid damage to lines and solenoid.
shut off the
NOTE: Water supply inlet line
must meet certain minimum
criteria to insure successful
operation of the brewer.
Bloomeld recommends 1/4”
copper tubing for installation of
less than 12 feet and 3/8” for
more than 12 feet from a 1/2”
water supply line.
605 p/n 2M-70988 8752 Owmers Manual
4
INSTALLATION (continued)
IL1651
IL1652
COPPER LOOPS OR
FLEX LINES
(PROVIDED BY
PLUMBER)
SOLENOID
WATER INLET
FITTING
WATER
SUPPLY
SHUT-OFF VALVE
(PROVIDED BY
PLUMBER)
FLOW
STRAINER
WASHER
605 p/n 2M-70988 8752 Owmers Manual
A water shut-off valve should be installed on the incoming water
line in a convenient location (Use a low restriction type valve,
such as a 1/4-turn ball valve, to avoid loss of water ow thru the
valve.
NSF requires that the brewer be able to be moved for cleaning
underneath. A ex line or loops of copper tubing will satisfy this
requirement. See Figure 2 below.
Fig. 2 Water Supply Installation
In some areas, local codes require a backow preventer (check
valve) to be installed on the inlet water line. If a backow
preventer is used, you must install a water hammer arrester
in the incoming line, between the backow preventer and
the brewer inlet, as far away from the brewer as space will allow.
This will relieve the excessive back pressures that can cause
faucet leaks and solenoid malfunctions.
ELECTRICIAN’S INSTALLATION INSTRUCTIONS
REFER TO ELECTRICAL SPECIFICATIONS - Page 1
Check the nameplate to determine correct electrical service
required for this installation.
IMPORTANT: Before connecting to electricity, make sure the
brewer is connected to the water supply.
IMPORTANT:
For power supply connections use COPPER WIRE only. Wiring must be suitable for at least 75ºC. This brewer requires a
dedicated electric circuit.
Models 8752 must be wired by an electrician, and require a
115/230V 20A circuit (50/60 Hz, 2 hot legs / 1 neutral leg, plus
ground). Remove rear panel to gain access to terminal block.
Green terminal must be connected to a suitable building ground.
Circuit must be capable of 4000 Watts. See gure 3 at right.
IMPORTANT: Wiring must be installed in approved solid or
exible conduit, and must be secured to the brewer with a strain
relief (to be provided by the installer).
5
NOTE: This equipment must
be installed to comply with
applicable federal, state and local plumbing codes and ordinances.
WARNING:
ShOCK hAzARD
Brewer must be properly
grounded to prevent possible
shock hazard. DO NOT assume a plumbing line will provide such a ground. Electrical shock will cause death or
serious injury.
IMPORTANT:
Supply power must match
nameplate for voltage and
phase. Connecting to the wrong
voltage will damage the brewer
or result in decreased performance. Such damage is not
covered by warranty.
IMPORTANT:
Do not connect brewer to
electrical power until you are
ready to ll the tank. See instructions on page 6.
Fig. 3 Electrical Installation
OPERATION
IL1653
Fig. 4 Brewer Operation Diagram
IMPORTANT:
Tank must be full of water
before pressing TANK
HEATER SWITCH “on”.
START-UP
For initial start-up, or if the brewer has not been used for an
extended period of time:
Heating elements will be
damaged if allowed to
operate without being
fully submerged in water.
Damage caused by
operating the brewer
without water in the tank
is NOt COVERED BY
WaRRaNtY.
BEFORE connecting brewer to electrical power thE WatER taNk
MuSt BE FIllED. Place an empty decanter under the brew head.
Lift the pour-over cover then pour warm tap water into the pour-over
opening until water ows from the brew head. When water stops
dripping from the brew head, empty the container.
Once the tank is full of water, connect the brewer to electrical power.
Press the TANK HEATER SWITCH to “on”. The heating elements will
begin heating the water in the tank. When the water has reached the
proper temperature, the READY TO BREW light will glow.
•
Be sure spray disk and brew gasket are properly installed in the
brew head.
• Be sure the water supply is properly connected and the water
supply valve is turned ON.
• Be sure the WATER TANK IS FILLED
605 p/n 2M-70988 8752 Owmers Manual
6
IL1654
HI-LIMIT
THERMOSTAT
THERMOBULB
HEATER
ELEMENT
MANUAL
POUR-OVER
MANUAL
POUR-OVER
BASIN
PAN
BASIN
PAN
FAUCET
SHUT-OFF
VALVE
FAUCET
BYPASS
FAUCET
BYPASS
SOLENOID
SOLENOID
FAUCET
TANK
WATER
COIL
HOT
WATER
BREW
BREW
TANK
TANK
THERMOSTAT
OPERATION (continued)
Water temperature is sensed by a
thermobulb inserted into the water tank. This
temperature signal is fed to the thermostat,
which controls line power to the heating
element.
The setpoint temperature is adjustable at the
thermostat.
The element is protected from overtemperature by a hi-limit thermostat.
WATER FLOW
POUR-OVER FEATURE
Pouring any amount of cold water into the
pour-over opening and into the basin pan
forces an identical amount of hot water out
of the tank and through the spray head into
the brew chamber.
Fig. 5 heat Control Diagram
AUTOMATIC OPERATION
Pressing BREW button energizes the
solenoid valve, allowing water from an
external water supply to ow into the basin
pan and then into the hot water tank. This
forces an identical amount of hot water out
of the tank and through the spray head into
the brew chamber
The solenoid uses a ow control device so
that ow is consistent between 20 p.s.i. and
90 p.s.i.
Length of time the solenoid is open is
controlled by the timer.
hOT WATER FAUCET
The faucet water coil is submerged in the
hot water tank and draws heat from the brew
water. Water going to the water coil is not
controlled by the solenoid valve.
605 p/n 2M-70988 8752 Owmers Manual
The faucet is at supply water pressure any
time the faucet shut-off valve is OPEN.
Fig. 6 Water Flow Diagram
7
BREWING COFFEE
IL1655
IL1605
CAUTION:
BURN hAzARD
Exposed surfaces
of the brewer, brew chamber and decanter may be
HOT to the touch, and can
cause serious burns.
CAUTION:
BURN hAzARD
To avoid splashing or
overowing hot liquids,
ALWAYS place an empty
decanter under the brew
chamber before starting
the brew cycle. Failure to
comply can cause serious
burns.
CAUTION:
BURN hAzARD
After a brew cycle, brew
chamber contents are
HOT. Remove the brew
chamber and dispose of
used grounds with care.
Failure to comply can
cause serious burns.
NOTE: Water for the hot
water faucet is heated in
a coil inside of the water
tank. Use of the faucet will
not affect the volume of
water delivered for a brew.
However, overuse of the
faucet during a brew may
lower the temperature of
the brew water.
A. PREPARATION
Place one (1) genuine Bloomeld
paper lter in the brew chamber.
Add a pre-measured amount of
fresh coffee grounds.
Gently shake the brew chamber to
level the bed of grounds. Slide the
brew chamber into place under the
brew head.
Fig. 7 Brew Chamber
B. POUR-OVER OPERATION
NOTE: Any Integrity™ brewer can be used in the pour-over mode.
BE sure “READY
TO BREW” light is lit.
Place the appropriate EMPtY decanter in place under the brew
chamber.
Fill a decanter with tap water. Lift the pour-over cover and pour the
entire contents of the decanter into the pour-over opening, which
will ll the basin.
Water from the basin will displace a like amount of heated water
from the tank. The hot water will be forced into the brew head
where it will spray over the bed of grounds. Freshly brewed coffee
will begin to ll the container under the brew chamber. When the
ow and all dripping stops, the coffee is ready to serve.
Discard the contents of the brew chamber. Rinse the brew
chamber in a sink. When the ”HEAT” light goes out, the brewer is
ready for another brew cycle.
C. AUTOMATIC OPERATION
BE sure “READY TO BREW” light is lit.
Place the appropriate EMPtY decanter in place under the brew
chamber.
Press the “BREW” switch.
The solenoid will open for an amount of
time determined by the timer setting, admitting a measured quantity
of water into the tank.
Inlet water will displace a like amount of heated water from the tank.
The hot water will be forced into the brew head where it will spray
over the bed of grounds. Freshly brewed coffee will begin to ll the
container under the brew chamber.
When the ow and all dripping stops, the coffee is ready to serve.
Discard the contents of the brew chamber and rinse it in a sink.
When the ”READY TO BREW” light glows, the brewer is ready for
another brew cycle.
605 p/n 2M-70988 8752 Owmers Manual
8
CLEANING INSTRUCTIONS
IL1599
GASKET
SPRAY
DISK
LIFT EARS UP
TURN LEFT TO
REMOVE
PROCEDURE: Clean Coffee Brewer
PRECAUTIONS: Disconnect brewer from electric power.
Allow brewer to cool.
FREQUENCY: Daily
TOOLS: Mild Detergent, Clean Soft Cloth or Sponge
Bristle Brush, Bottle Brush
1. Disconnect brewer from electric power.
Allow brewer to cool before cleaning.
2. Remove and empty decanters.
3. Remove and empty brew chamber.
4. Remove the spray disk from the brew head (See gure 8):
Press up on the spray disk ears, then turn the disk to the left
to unlatch. Remove the gasket from inside the brew head.
5. Wipe inside of brew head and area around the brew head
with a soft clean cloth or sponge moistened with clean water.
6. Wash the spray disk in a sink using warm water and a mild
detergent. A bristle brush may be used to clear clogged
spray holes. Rinse the spray disk with clean water and allow
to air dry.
7. Wash the brew chamber in a sink using warm water and a
mild detergent. A bristle brush may be used to clean the
inside. Rinse with clean water and allow to air dry.
CAUTION:
BURN hAzARD
Brewing and serving
temperatures of coffee are
extremely hot.
Hot coffee will cause
serious skin burns.
CAUTION:
ShOCK hAzARD
Do not submerge or immerse
brewer in water.
IMPORTANT:
DO NOT use steel wool, sharp
objects, or caustic, abrasive or
chlorinated cleansers to clean
the brewer or airpots.
8. Wipe the exterior of the brewer with a soft clean cloth or
sponge moistened with clean water.
10.
Reinstall the gasket INSIDE the brew head, then reinstall the
spray disk.
11. Reinstall the brew chamber.
12. Decanters may be washed in a dishwasher or sink.
Procedure is complete
605 p/n 2M-70988 8752 Owmers Manual
Fig. 8 Cleaning
9
TROUBLEShOOTING SUGGESTIONS
SYMPTOMPOSSIBLE CAUSESUGGESTED REMEDY
Check power supply cord Check / reset
Brewer unplugged or circuit breaker tripped
Thermostat set too lowSet for desired temperature
Water won’t heat
Hi-Limit thermostat trippedAllow to cool, Reset hi-limit
Damaged internal component or wiring
Trips hi-limit safety at start-up
Coffee level low (pour-over)
No water or too little water added at start-up
Not enough water poured inIncrease water amount
Too much coffee groundsAdjust amount of grounds
Coffee level too high or low
(automatic)Timer out of adjustmentAdjust timer
Too many lter papers or wrong lter paper
Brew chamber overows
Brew chamber dispense hole pluggedThoroughly clean brew chamber
Too much coffee or too ne a grindAdjust coffee amount and grind
circuit breaker
Examine wiring & connectors, thermostat
and heating element, Repair/replace as
needed
Be sure to add sufcient water prior to
energizing
Use one (1) genuine Bloomeld lter per
brew
Sprays water from brew head
incorrectly
No brew (automatic)
No ow from hot water faucet
Poor coffee quality
Spray gasket missing or improperly installed
Check/reinstall gasket on INSIDE of brew
head
Spray disk pluggedClean spray disk
Water supply OFFTurn water supply ON
Water line strainer pluggedClean strainer
Water lter (if used) pluggedReplace lter element
Damaged BREW switch Replace switch
Examine wiring & connectors, brew timer
Damaged internal component or wiring
and solenoid, Repair/replace as needed
Faucet valve turned OFFTurn faucet valve ON
Faucet pluggedDisassemble faucet, clean
Water not hot enoughAdjust water temp 195-205ºF
Also:
Keep brewer, and decanters clean.
Install a taste and odor lter in water supply, and replace cartridges regularly.
Use a quality coffee with a consistent roast.
Use proper grind and amount of coffee per brew.
605 p/n 2M-70988 8752 Owmers Manual
10
SERVICING INSTRUCTIONS
IL1657
ACCESS PANELS
TOP PANEL:
Remove top panel to access hot water tank, thermostat, heating
elements, brew circuit tubing and faucet tubing.
Top panel is held by two screws at the front and a retaining lip at
the rear.
FRONT PANELS:
Remove upper front panel to access timer and hi-limit. Remove
button plugs for simple adjustments or reset.
Upper front panel is held by two screws at the bottom and a
retaining lip at the top.
SOLENOID DOOR:
Remove solenoid door to access solenoid and tubing
connections.
Solenoid door is held by two screws and a retaining lip.
TERMINAL BLOCK ACCESS:
Remove door to access wiring connections
Access door is held by two screws and a retaining lip.
WARMER PLATES:
Warmer plates unscrew counterclockwise to access warmer
elements and electrical connections.
CAUTION:
ShOCK hAzARD
Opening access panels or
removing warmer plates on this
brew may expose uninsulated
electrical components.
Disconnect brewer from
electrical power before
removing any panel.
605 p/n 2M-70988 8752 Owmers Manual
Fig. 9 access Panels
11
SERVICING INSTRUCTIONS (continued)
CAUTION:
ShOCK hAzARD
These procedures involve
exposed electrical circuits.
These procedures are to
be performed by qualied
technical personnel only.
NOTE:
Optimum brewing temperature
range is 195ºF to 205ºF (90ºC
to 96ºC).
IMPORTANT:
A mechanical thermostat will
maintain temperature within
±5ºF. To prevent boiling water
in the brewer, thermostat should
be adjusted to a maximum
temperature equal to the local
boiling temperature minus 5ºF.
TEMPERATURE ADjUSTMENT
Unplug power cord or turn circuit breaker OFF. Remove top
panel.
Pull vent tube out of tank lid and insert a thermometer of known
accuracy in vent hole. Reconnect brewer to electrical power.
Fig. 10 Checking and adjusting Brew temperature
Place an empty decanter under brew chamber. Energize
brewer and pour one decanter (64 oz.) of cold water into pourover opening. When READY TO BREW light comes on, read
temperature displayed on thermometer.
Adjust thermostat by turning shaft; clockwise increases
temperature. 1/8 turn = approximately 10ºF.
Refer to Table 1 below for proper brewing temperature based on
altitude.
NOTE: 1/8 turn = approximately
Fig. 11 adjust thermostat
10ºF (5.6ºC).
605 p/n 2M-70988 8752 Owmers Manual
table 1 Boiling temperature by altitude
Upon completion, remove thermometer and reinstall vent tube.
12
SERVICING INSTRUCTIONS (continued)
TIMER ADjUSTMENT
The amount of water dispensed automatically during a brew cycle
is controlled by the timer.
Place empty decanter under brew chamber. Press BREW
button. Brewer should dispense one decanter of water. To
adjust amount:
Remove brew chamber and button plug. Adjust knob on timer;
clockwise increases time. Run several cycles to check amount
of water delivered. Replace button plug.
REMOVE TANK LID ASSEMBLY
Unplug brewer or turn circuit breaker OFF. Turn OFF water
supply. Remove top panel. Pull vent tube and inlet elbow out of
basin pan.
Pull water inlet tube out of basin pan. Remove basin pan.
On models with faucet, disconnect inlet pipe at faucet shut-off
valve and outlet pipe at faucet.
Disconnect all wiring from thermostat, hi-limit, and heating
element.
Loosen center screw on tank hold-down bracket. Remove
hold-down bracket by sliding short slotted end off of locking stud
and lifting it off. Remove cover assembly by lifting it straight up.
Reassemble in reverse order.
REPLACE T
hERMOSTAT
Unplug brewer or turn circuit breaker OFF. Turn OFF water
supply. Remove top panel.
Disconnect all wiring from thermostat only. Loosen and free
jam nut from pass-thru tting securing temperature sensing bulb.
Remove two screws holding thermostat to bracket.
Lift out thermostat, sensing bulb and thermostat gasket.
Push sensing bulb into tank lid thermowell until tting seats.
Tighten capillary lock nut only enough to ensure no water
leakage. Excessive tightening is not necessary.
IMPORTANT: Water pressure
must be between 20 p.s.i and
90 p.s.i. owing pressure.
If water pressure exceeds this
value, or if water pressure
varies greatly, a pressure
regulator must be installed in
the water supply line.
IMPORTANT: Before setting
assembly into tank, make sure
tank lid gasket is properly
seated on ange of lid.
DO NOt OVER-tIGhtEN.
IMPORTANT:
If mounting thermostat
p/n 8512-51, be sure to place
a new seal washer below the
tting on the capillary line.
If replacing gray-bodied thermo
with p/n 8512-51, be sure to
remove tube from thermowell.
Reassemble in reverse order.
605 p/n 2M-70988 8752 Owmers Manual
13
SERVICING INSTRUCTIONS (continued)
IMPORTANT: When replacing
heating element, also replace
seal gaskets.
REPLACE hEATING ELEMENT
Remove tank lid assembly as described on page 13.
Remove two hex nuts holding element to cover. Pull element
from mounting holes.
Reassemble in reverse order.
REPLACE SOLENOID
Symptom: Automatic brewer will not ow water; or,
automatic brewer drips continuously from brew head.
NOTE: Wrench p/n 86660 is designed to allow easy removal of
the hoses from the plastic solenoid valve.
IMPORTANT: Shut-off water and electric supply to brewer before
removing hoses or wiring.
Remove water supply are tting:
a. Slide the 5/8” end of the wrench over the ats on the
inlet tting of the valve.
b. Hold the wrench to prevent the inlet tting from turning
while installing or removing the inlet water supply are nut.
Remove braided hose:
a.
Slide the 7/16” end of the wrench between the valve
body and the white ring on the extreme end of the metal
hose tting.
b. Pressure on the white ring toward the metal ferrule
releases the clinch ring, allowing the hose to be easily
slid off of the solenoid bypass outlet.
c. Install hose on new valve by pressing end of hose onto
bypass outlet until it is fully seated.
Fig. 11 Remove Faucet
Supply from Solenoid
Fig. 12 Clean Strainer Screen
Disconnect wiring.
Remove two screws holding solenoid to access door.
Reassemble in reverse order.
CLEAN SOLENOID SCREEN
Symptom: Automatic brewer will not ow water.
Unplug power cord or turn circuit breaker OFF. Turn OFF and
disconnect water supply from brewer inlet tting.
Unscrew water inlet tting from solenoid.
Using needle-nose pliers, withdraw strainer screen from solenoid.
Clean screen under faucet. A stiff bristle brush may be used if
necessary.
Reinsert screen in solenoid. Be careful to maintain correct
orientation. (The OPEN
END of the screen goes in FIRSt.)
Reassemble in reverse order.
14
605 p/n 2M-70988 8752 Owmers Manual
SERVICING INSTRUCTIONS (continued)
REPLACE TIMER ASSEMBLY
Unplug power cord or turn circuit breaker OFF.
Remove front panel. Remove knob and three screws holding
timer to bracket. Disconnect wiring to timer.
Reassemble in reverse order.
Adjust timer as described on page 13
REPLACE hOT WATER FAUCET COIL
Symptom: Brewer drips continuously from brew head, except
when faucet valve is turned OFF.
Remove tank lid assembly per above.
Remove two hex nuts hot water coil to cover. Pull coil from
mounting holes.
Reassemble in reverse order.
REPAIR hOT WATER FAUCET
Remove top panel and turn faucet valve OFF.
Unscrew aerator cap from faucet and remove handle retaining
clip. Do not let faucet body turn.
Pull bonnet assembly from faucet body.
Examine the interior of the faucet body and the surface of the
seat cup. Clean out any debris in the faucet body, using a stiff
bristle brush if necessary.
Examine the aerator. Clean any debris from the screen or ow
straightener, using a stiff bristle brush if necessary.
Reassemble in reverse order.
REPLACE BREW READY
LIGhT or BREW BUTTON
Unplug power cord or turn circuit breaker OFF.
Using Switch Removal Tool (p/n 83209) or a thin screwdriver, pry
light or switch from mounting hole. Disconnect leads.
Reassemble in reverse order.
IMPORTANT: When replacing
water faucet coil, also replace
seal gaskets.
NOTE: Any abrasion or
roughness on the at end of the
seat cup will require replacing
the seat cup:
Work the seat cup out of the
bonnet and off of the end of the
stem.
Install a new seat cup, making
sure the knob on the stem is
fully inserted into the pocket of
the seat cup, and the skirt of the
seat cup is fully inserted into the
bonnet.
605 p/n 2M-70988 8752 Owmers Manual
15
SERVICING INSTRUCTIONS (continued)
CAUTION:
ChEMICAL BURN
hAzARD
Deliming chemicals may be
caustic. Wear appropriate
protective gloves and goggles
during this procedure.
Never siphon deliming
chemicals or solutions by
mouth.
This operation should only be
performed by qualied and
experienced service personnel.
IMPORTANT:
DO NOT spill, splash or pour
water or deliming solution into
or over any internal component
other than the inside of the
water tank.
IMPORTANT:
DO NOT allow any internal
components to come into
contact with the deliming
solution. Take care to keep all
internal components dry.
NOTE: Repeat steps 4 thru 5
as required to remove all scale
and lime build-up.
NOTE: Normally, silicone
hoses do not need to be
delimed. Should deliming hoses
become necessary, Bloomeld
recommends replacing the
hoses.
PROCEDURE: Delime the Water Tank
PRECAUTIONS: Disconnect brewer from electric power.
Allow brewer to cool.
FREQUENCY: As required (Brewer slow to heat)
TOOLS: Deliming Solution
Protective Gloves, Goggles & Apron
Mild Detergent, Clean Soft Cloth or Sponge
Bristle Brush, Bottle Brush
Large Sink (or other appropriate work area)
1. Unplug power cord. Turn off the water shut-off valve and
disconnect the water supply line from the brewer inlet tting.
2.
Remove the tank lid assembly as described on page 13.
3. Remove the water tank from the brewer body by lifting
straight up. Empty all water from the tank. Set the tank back
into the brewer.
4. Mix 2 quarts of deliming solution according to the
manufacturer’s directions. Carefully pour the deliming
solution into the water tank. Lower the lid assembly back
onto the tank. Allow to sit for 30 minutes, or as directed by
the manufacturer.
5. At end of soaking period, remove lid assembly from tank.
Thoroughly rinse internal components of lid assembly with
clear water. Using a stiff bristle brush, scrub the heating
element and faucet water coil to remove lime and calcium
build-up. Rinse with clean water. Store lid assembly in a safe
location.
6. Remove the tank from the brewer and empty. Using a stiff
bristle brush, scrub the interior of the water tank to remove
lime and calcium build-up. Rinse with clean water.
7. Set the tank back into the brewer. Reassemble the tank lid
to the water tank. Make sure the gasket is properly in place,
and then reinstall lid clamps.
8. Reinstall wiring to heating element and thermostat.
Reassemble piping for the faucet. Verify that all internal
components are dry, then reinstall the top panel.
9. Reconnect brewer to electrical supply and reconnect water
supply.
10. Install the brew chamber without lter paper or grounds.
Run at least three full brew cycles and discard all water
generated.