Bloomfield 8542-D1, 8543-D2 User Manual

WELLS BLOOMFIELD, LLC
2 ERIK CIRCLE, P. O. Box 280 Verdi, NV 89439 telephone: 775-689-5707
www.wellsbloomfield.com
fax: 775-689-5976
OWNERS MANUAL
MODULAR
BREWING SYSTEMS
MODELS
POUR OVER AUTOMATIC AUTOMATIC
UNITS UNITS UNITS
WITH FAUCET
8542 8541 8540 8543 8573 8572 8571 8574
Installation Use & Care
Servicing Instructions
Includes:
611
Model 8574 Brewer
8900-Series Glass Decanters
PRINTED IN UNITED STATES OF AMERICA
p/n 75804 Rev. F ECN-13387 M611 071115 cps
with optional
WARRANTY STATEMENT
All electrical equipment manufactured by WELLS BLOOMFIELD, LLC is warranted against defects in materials and workmanship for a period of one year from the date of original installation or eighteen (18) months from the date of shipment from our factory, whichever comes first, and is for the benefit of the original purchaser, except that: a. airpots carry a 30 day parts warranty only. b. dispensers; i.e., tea and coffee carry a 90 days parts warranty only, excludes decanters.
THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WHICH ARE HEREBY EXCLUDED.
WELLS BLOOMFIELD, LLC FOR INDIRECT, INCIDENTAL OR DA MAGE S OR LO SSES FR O M AN Y CAUSE WHATSOEVER.
This warranty is void if it is determined that upon inspection by an Authorized Service Agency that the equipment has been modified, misused, misapplied, improperly installed, or damaged in transit or by fire, flood or act of God.
SHALL
NOT BE LIABLE
CONSEQUENTIAL
It also does not apply if the serial nameplate has been removed or unauthorized service personnel perform service. The prices charged by Bloomfield Industries for its products are based upon the limitations in this warranty. Seller’s obligation under this warranty is limited to the repair of defects without charge by a Bloomfield Authorized Service Agency or one of its sub-agencies. This service will be provided on customer’s premises for non-portable models. Portable models (a device with a cord and plug) must be taken or shipped to the closest Authorized Service Agency, transporta­tion charges prepaid, for services.
In addition to restrictions contained in this warranty, specific limitations are shown below (Additional Warranty Exclusions). Bloomfield Industries Authorized Service Agencies are located in principal cities.
This warranty is valid in the United States and void elsewhere. Please consult your classified telephone directory or your food service equipment dealer; or, for information and other details concerning warranty, write to:
Phone: (775) 689-5707 Fax: (775) 689-5976
SERVICE POLICY AND PROCEDURE GUIDE
ADDITIONAL WARRANTY EXCLUSIONS
1. Resetting of safety thermostats, circuit breakers, overload protectors, or fuse replacements unless warranted conditions are the cause.
2. All problems due to operation at voltages other than specified on equipment nameplates; conversion to correct voltage must be the customer’s responsibility.
3. All problems due to electrical connections not made in accordance with electrical code requirements and wiring diagrams supplied with the equipment.
4. Replacement of items subject to normal wear, to include such items as knobs and light bulbs. Normal maintenance
functions including adjustment of thermostats, microswitches,
and replacement of fuses and indicating lights are not
covered under warranty.
5. All problems due to inadequate water supply, such as
fluctuating, or high or low water pressure.
6. All problems due to mineral/calcium deposits, or
contamination from chlorides/chlorines. De-liming is considered a preventative maintenance function and is not covered by warranty.
7. Full use, care and maintenance instructions are supplied with each machine. Those miscellaneous adjustments noted are customer responsibility. Proper attention will prolong the life of the machine.
8. Travel mileage is limited to sixty (60) miles from an authorized Service Agency or one of its sub-agencies.
9. All labor shall be performed during normal working hours. Overtime premium shall be charged to the customer.
10. All genuine Bloomfield replacement parts are warranted for ninety (90) days from date of purchase on non­ warranted equipment. Any use of non-genuine Bloomfield parts completely voids any warranty.
11. Installation, labor and job check-out are not considered warranty.
12. Charges incurred by delays, waiting time or operating restrictions that hinder the service technicians ability to perform services are not covered by warranty. This includes institutional and correctional facilities.
Service Parts Department
Wells Bloomfield, LLC
P.O. Box 280
Verdi, NV 89439
M611 75804 Owners Manual Koffee-King™ Brewers
SHIPPING DAMAGE CLAIMS PROCEDURE
NOTE: For your protection, please note that equipment in
this shipment was carefully inspected and packaged by skilled personnel before leaving the factory. Upon acceptance of this shipment, the transportation company assumes full responsibility for its safe delivery. IF SHIPMENT ARRIVES DAMAGED:
1. VISIBLE LOSS OR DAMAGE: Be certain that any visible loss or damage is noted on the freight bill or express receipt, and that the note of loss or damage is signed by the delivery person.
2. FILE CLAIM FOR DAMAGE IMMEDIATELY: Regardless of the extent of the damage.
3. CONCEALED LOSS OR DAMAGE: if damage is unnoticed until the merchandise is unpacked, notify the transportation company or carrier immediately, and file “CONCEALED DAMAGE” claim with them. This must be done within fifteen (15) days from the date the delivery was made to you. Be sure to retain the container for inspection.
Wells Bloomfield cannot assume liability for damage or loss incurred in transit. We will, however, at your request, supply you with the necessary documents to support your claim.
xi
TABLE OF CONTENTS
WARRANTY STATEMENT xi SPECIFICATIONS 1 FEATURES & OPERATING CONTROLS 2 PRECAUTIONS & GENERAL INFORMATION 3 AGENCY APPROVAL INFORMATION 3 INSTALLATION INSTRUCTIONS 4 OPERATION 6 BREWING COFFEE 8 CLEANING INSTRUCTIONS 9 TROUBLESHOOTING SUGGESTIONS 10 SERVICING INSTRUCTIONS 11 Deliming Instructions 16 EXPLODED VIEWS & PARTS LISTS 18 WIRING DIAGRAMS 22
SPECIFICATIONS
MODEL TYPE WARMERS FAUCET VOLTS
In-Line,
8540
8541
Automatic,
Plumbed-In
In-Line,
Automatic,
Plumbed-In
2 YES 120VAC
2 NO 120VAC
Thank You for purchasing this Wells Bloomfield appliance.
Proper installation, professional operation and consistent maintenance of this appliance will ensure that it gives you the very best performance and a long, economical service life.
This manual contains the information needed to properly install this appliance, and to use, care for and maintain or repair the appliance in a manner which will ensure its optimum performance.
AMPS WATTS POWER
CORD
14.1
(11.7)
14.1
(11.7)
1700
(1400k)
1700
k)
(1400
NEMA 5-15P
NEMA 5-15P
8542
8543
8571
8572
8573
8574
M611 75804 Owners Manual Koffee-King™ Brewers
k Canadian brewers are 1500W maximum.
In-Line,
Pour-Over
In-Line,
Pour-Over
3-Station,
Pour-Over
3-Station,
Automatic,
Plumbed-In
3-Station,
Automatic,
Plumbed-In
3-Station,
Automatic,
Plumbed-In
1 NO 120VAC 13.3 1600 NEMA 5-15P
2 NO 120VAC
3 NO 120VAC 15.0 1800 NEMA 5-15P
3 YES 120VAC
3 NO 120VAC
3 YES 115/230VAC 17.0 3700 not provided
1
14.1
(11.7)
15.0
(12.5)
15.0
(12.5)
1700
(1400k)
1800
k)
(1500
1800
k)
(1500
NEMA 5-15P
NEMA 5-15P
NEMA 5-15P
FEATURES AND OPERATING CONTROLS
ACCESS
TIMER
Fig. 1 Features & Operating Controls
M611 75804 Owners Manual Koffee-King™ Brewers
2
PRECAUTIONS AND GENERAL INFORMATION
WARNING: ELECTRIC SHOCK HAZARD
All servicing requiring access to non-insulated components must be performed by qualified service personnel. Do not open any access panels which require the use of tools. Failure to
heed this warning can result in electrical shock.
WARNING: INJURY HAZARD
All installation procedures must be performed by qualified personnel with full knowledge of all applicable electrical and plumbing codes. Failure could result in property damage and personal injury.
WARNING: ELECTRIC SHOCK HAZARD
Brewer must be properly grounded to prevent possible shock hazard. DO NOT assume a plumbing line will provide such a ground. Electrical shock will cause death or serious Injury.
WARNING: BURN HAZARD
This appliance dispenses very hot liquid. Serious bodily injury from scalding can occur from contact with dispensed liquids.
This appliance is intended for commercial use only.
This appliance is intended for use to brew beverage products for human consumption. No other use is recommended or authorized by the manufacturer or its agents.
This appliance is intended for use in commercial establishments, where all operators are familiar with the appliance use, limitations and associated hazards. Operating instructions and warnings must be read and understood by all operators and users.
Except as noted, this piece of equipment is made in the USA and has American sizes on hardware. All metric conversions are approximate and can vary in size.
The following trouble shooting, component views and parts lists are included for general reference, and are intended for use by qualified service personnel.
This manual should be considered a permanent part of this appliance. The manual must remain with the appliance if it is sold or moved to another location.
AGENCY APPROVAL INFORMATION
These brewer are listed under UL file E9253, and
listed under LR21315.
M611 75804 Owners Manual Koffee-King™ Brewers
This brewer meets
Standard 4 only when installed,
CAUTION:
EQUIPMENT DAMAGE
DO NOT plug in or energize this
appliance until all Installation Instructions are read and followed.
Damage to the Brewer will occur if these instructions are not followed.
CAUTION:
BURN HAZARD
Exposed surfaces of the appliance, brew chamber and decanter may be HOT to the touch, and can cause serious burns.
E9253
LR21315
operated and maintained in accordance with the enclosed
instructions.
3
STD 4
INSTALLATION INSTRUCTIONS
READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION
IMPORTANT:
To enable the installer to make a quality installation and to minimize installation time, the following suggestions and tests should be done before the actual unit installation is started:
CAUTION:
EQUIPMENT DAMAGE
DO NOT plug in or energize this appliance until all Installation Instructions are read and followed. Damage to the Brewer will occur if these instructions are not followed.
CAUTION:
UNSTABLE
It is very important for safety and for proper operation that the brewer is level and stable when standing in its final operating position. Provided adjustable, non-skid legs must be installed at each corner of the unit. Failure to do so will result in movement of the brewer which can cause personal Injury and/ or damage to brewer.
NOTE: Water supply inlet line
must meet certain minimum criteria to insure successful operation of the brewer. Bloomfield recommends 1/4" copper tubing for installation of less than 25 feet and 3/8" for more than 25 feet from a 1/2"
water supply line.
EQUIPMENT HAZARD
REFER TO EXPLODED VIEWS PAGES 18 thru 22 FOR COMPONENT NAMES/NUMBERS
Unpack the unit. Inspect all components for completeness and condition. Ensure that all packing materials have been removed from the unit.
Verify that the Spray Head Gasket (#33) and Spray Disk (#34) are properly installed.
LEVELING THE UNIT
Verify that an adjustable leg is installed at each corner of the brewer.
Set Brewer in its operating location. Level the Brewer. A spirit level should be placed on the top of the unit, at the edge, as a guide when making level adjustments.
Level the unit from left to right and front to back by turning the adjustable feet. Be sure all four feet touch the counter to prevent tipping.
PLUMBER’S INSTALLATION INSTRUCTIONS Brewer should be connected to a POTABLE WATER, COLD
WATER line. Flush water line before connecting to Brewer.
DO NOT use a saddle valve with a self-piercing tap for the water line connection. Such a tap can become restricted by waterline debris. For systems that must use a saddle tap, shut off the main water supply and drill a 3/16” (minimum) tap for the saddle connection, in order to insure an ample water supply. Remember to flush the line prior to installing the saddle.
The brewer must be installed on a water line with average pressure between 20 PSI and 90 PSI. If your water pressure exceeds 90 PSI at anytime, a pressure regulator must be installed in the water supply line to limit the pressure to not more than 90 PSI in order to avoid damage to lines and solenoid.
A water shut-off valve should be installed on the incoming water line in a convenient location (Use a low restriction type valve, such as a 1/4-turn ball valve, to avoid loss of water flow thru the valve.
The provided water line strainer must be installed in the supply line, between the shutoff valve and inlet fitting. Note FLOW arrow marking on strainer body.
M611 75804 Owners Manual Koffee-King™ Brewers
4
INSTALLATION INSTRUCTIONS (continued)
NSF requires that the brewer be able to be moved for cleaning underneath. A flex line or loops of copper tubing will satisfy this requirement. See Figure 2 below.
In some areas, local codes require a backflow preventer (check valve) to be installed on the inlet water line. If a backflow
preventer is used, you must install a water hammer arrester in
the incoming line, between the backflow preventer and the brewer inlet, as far away from the brewer as space will allow. This will relieve the excessive back pressures that can cause faucet leaks and solenoid malfunctions.
ELECTRICIAN’S INSTALLATION INSTRUCTIONS
REFER TO ELECTRICAL SPECIFICATIONS - Page 1 Check the nameplate to determine correct electrical service required for the Brewer to be installed.
IMPORTANT: Before connecting to electricity, make sure
automatic brewers are connected to the water supply.
All models (except 8574) are equipped with a cord and plug.
They require a 115 - 125 volt 20 amp circuit (50/60 Hz, 2 wire plus ground, with NEMA 5-15R or 5-20R Receptacle).
IMPORTANT: The ground prong of the plug is part of a system
designed to protect you from electrical shock in the event of internal damage. Never cut off the ground prong nor twist a blade to fit an existing receptacle. Contact a licensed electrician to install the proper circuit and receptacle.
Model 8574 must be wired by an electrician, and requires a
115/230V 20A circuit (50/60 Hz, 2 hot legs / 1 neutral leg, plus ground). Remove front panel to gain access to terminal block. Green terminal must be connected to a suitable building ground. Circuit must be capable of 3800 Watts. See figure 3 at right.
IMPORTANT: Wiring must be installed in approved solid or
M611 75804 Owners Manual Koffee-King™ Brewers
flexible conduit, and must be secured to the brewer with a strain relief (to be provided by the installer).
Fig. 2 Water Supply Installation New-style shown
NOTE: This equipment must be
installed to comply with applicable federal, state and local plumbing codes and ordinances.
WARNING:
SHOCK HAZARD
Brewer must be properly grounded to prevent possible shock hazard. DO NOT assume a plumbing line will provide such a ground. Electrical shock will cause death or serious injury.
IMPORTANT: Do not connect
brewer to electrical power until the tank is filled with water. Pour water into the pour-over opening until water flows from the brew head.
IMPORTANT:
Supply power must match nameplate for voltage and phase. Connecting to the wrong voltage will damage the brewer or result in decreased performance. Such damage is
not covered by warranty.
5
Fig. 3 115/240 Volt Terminal Block
OPERATION
Fig. 4 Brewer Operation Diagram
IMPORTANT:
Tank must be full of water before connecting brewer to electrical power. Heating elements will be damaged if allowed to operate without being fully submerged in water. Damage caused by operating the brewer without water in the tank
is NOT COVERED BY WARRANTY.
A. START-UP
For initial start-up, or if the brewer has not been used for an extended period of time:
Be sure spray disk and brew gasket are properly installed in the brew head.
Be sure the water supply is properly connected and the water
supply valve is turned ON.
Be sure the WATER TANK IS FILLED
BEFORE plugging the brewer into a receptacle, or otherwise connecting brewer to electrical power THE WATER TANK MUST BE FILLED. Place an empty decanter under the brew head. Lift
the pour-over cover then pour warm tap water into the pour-over opening until water flows from the brew head. When water stops dripping from the brew head, empty the container.
Once the tank is full of water, connect the brewer to electrical power. The heating elements will begin heating the water in the tank. When the water has reached the proper temperature, the “READY To BREW” light will glow.
M611 75804 Owners Manual Koffee-King™ Brewers
6
WATER HEATER
Water temperature is sensed by a thermobulb inserted into the water tank. This temperature signal is fed to the thermostat, which controls line power to the heating element.
The setpoint temperature is adjustable at the thermostat.
The element is protected from over­temperature by a hi-limit thermostat.
WATER FLOW
POUR-OVER FEATURE
Pouring any amount of cold water into the pour-over opening and into the basin pan forces an identical amount of hot water out of the tank and through the spray head into the brew chamber.
AUTOMATIC OPERATION
Pressing BREW button energizes the solenoid valve, allowing water from an external water supply to flow into the basin pan and then into the hot water tank. This forces an identical amount of hot water out of the tank and through the spray head into the brew chamber
The solenoid uses a flow control device so that flow is consistent between 20 p.s.i. and 90 p.s.i.
Length of time the solenoid is open is controlled by the timer.
HOT WATER FAUCET
The faucet water coil is submerged in the hot water tank and draws heat from the brew water. Water going to the water coil is not controlled by the solenoid valve.
The faucet is at supply water pressure any
M611 75804 Owners Manual Koffee-King™ Brewers
time the faucet shut-off valve is OPEN.
OPERATION (continued)
Fig. 5 Heat Control Diagram
Fig. 6 Water Flow Diagram
7
BREWING COFFEE
CAUTION:
BURN HAZARD
Exposed surfaces of the brewer, brew chamber and decanter may be HOT to the touch, and can cause serious burns.
CAUTION:
BURN HAZARD
To avoid splashing or over­flowing hot liquids, ALWAYS place an empty decanter under the brew chamber before starting the brew cycle. Failure to comply can cause serious burns.
CAUTION:
BURN HAZARD
After a brew cycle, brew chamber contents are HOT. Remove the brew chamber and dispose of used grounds with care. Failure to comply can cause serious burns.
NOTE: Water for the hot
water faucet is heated in a coil inside of the water tank. Use of the faucet will not affect the volume of water delivered for a brew. However, overuse of the faucet during a brew may lower the temperature of the brew water.
B. PREPARATION
Place one (1) genuine Bloomfield paper filter in the brew chamber.
PAPER FILTER
Add a pre-measured amount of fresh coffee grounds. Gently shake the brew chamber to level the bed of grounds. Slide the
BREW CHAMBER
brew chamber into place under the brew head.
Fig. 7 Brew Chamber
C. POUR-OVER OPERATION
NOTE: Any Integrity™ brewer can be used in the pour-over mode.
BE sure “READY TO BREW” light is lit.
Place the appropriate EMPTY decanter in place under the brew
chamber.
Fill a decanter with tap water. Lift the pour-over cover and pour the entire contents of the decanter into the pour-over opening, which will fill the basin.
Water from the basin will displace a like amount of heated water from the tank. The hot water will be forced into the brew head where it will spray over the bed of grounds. Freshly brewed coffee will begin to fill the container under the brew chamber. When the flow and all dripping stops, the coffee is ready to serve.
Discard the contents of the brew chamber. Rinse the brew chamber in a sink. When the ”READY TO BREW” light glows, the brewer is ready for another brew cycle.
C. AUTOMATIC OPERATION
BE sure “READY TO BREW” light is lit.
Place an EMPTY decanter in place under the brew chamber.
Press the “BREW” switch. The solenoid will open for an amount of time determined by the timer setting, admitting a measured quantity of water into the basin.
Water from the basin will displace a like amount of heated water from the tank. The hot water will be forced into the brew head where it will spray over the bed of grounds. Freshly brewed coffee will begin to fill the decanter under the brew chamber. When the coffee flow and all dripping stops, the coffee is ready to serve.
Discard the contents of the brew chamber and rinse it in a sink. When the ”READY TO BREW” light glows, the brewer is ready for another brew cycle.
M611 75804 Owners Manual Koffee-King™ Brewers
8
CLEANING INSTRUCTIONS
PROCEDURE: Clean Coffee Brewer
PRECAUTIONS: Disconnect brewer from electric power. Allow brewer to cool.
FREQUENCY: Daily
TOOLS: Mild Detergent, Clean Soft Cloth or Sponge Bristle Brush.
1. Disconnect brewer from electric power. Allow brewer to cool before cleaning.
2. Remove and empty decanters.
3. Remove and empty brew chamber.
4. Remove the spray disk from the brew head (See figure 8): Press up on the spray disk ears, then turn the disk to the left to unlatch. Remove the gasket from inside the brew head.
5. Wipe inside of brew head and area around the brew head with a soft clean cloth or sponge moistened with clean water.
6. Wash the spray disk in a sink using warm water and a mild detergent. A bristle brush may be used to clear clogged spray holes. Rinse the spray disk with clean water and allow to air dry.
7. Wash the brew chamber in a sink using warm water and a mild detergent. A bristle brush may be used to clean the inside. Rinse with clean water and allow to air dry. For stainless steel brew chambers, be sure the wire rack is properly reinstalled.
8. Wipe the exterior of the brewer with a soft clean cloth or sponge moistened with clean water.
10. Reinstall the gasket INSIDE the brew head, then reinstall the
spray disk.
11. Reinstall the brew chamber.
12. Decanters may be washed in a dishwasher or sink.
Procedure is complete
CAUTION:
BURN HAZARD
Brewing and serving temperatures of coffee are extremely hot. Hot coffee will cause serious skin burns.
CAUTION:
SHOCK HAZARD
Do not submerge or immerse brewer in water.
IMPORTANT:
DO NOT use steel wool, sharp objects, or caustic, abrasive or chlorinated cleansers to clean the brewer.
Fig. 8 Cleaning
M611 75804 Owners Manual Koffee-King™ Brewers
9
TROUBLESHOOTING SUGGESTIONS
SYMPTOM
Water won’t heat
Coffee level low (pour-over)
Coffee level too high or low (automatic)
Brew chamber overflows
Sprays water from brew head
No brew (automatic)
No flow from hot water faucet
Poor coffee quality
POSSIBLE CAUSE
Brewer unplugged or circuit breaker tripped
Thermostat set too low
Hi-Limit thermostat tripped
Damaged internal component or wiring
Pourover - no water or too little water added at startup
Not enough water poured in
Too much coffee grounds
Timer out of adjustment
Too many filter papers or wrong filter paper
Brew chamber dispense hole plugged
Too much coffee or too fine a grind
Spray gasket improperly installed
Spray disk plugged
Water supply OFF
Water line strainer plugged
Water filter (if used) plugged
Bad BREW switch
Damaged internal component or wiring
Faucet valve turned OFF
Faucet plugged
Water not hot enough
SUGGESTED REMEDY
Check power supply cord Check / reset circuit breaker
Set for desired temperature
Allow to cool Reset hi-limit (8786, 8788)
Examine wiring & connectors, thermostat and heating element Repair/replace as needed
Be sure to add sufficient water
Increase water amount
Adjust amount of grounds
Adjust timer
Use one (1) genuine Bloomfield filter per brew
Thoroughly clean brew chamber
Adjust coffee amount and grind
Check/reinstall gasket on INSIDE of brew head
Clean spray disk
Turn water supply ON
Clean strainer (see pg. 14)
Replace filter element
Replace switch
Examine wiring & connectors, brew switch and solenoid Repair/replace as needed
Turn faucet valve ON
Disassemble faucet, clean
Adjust water temp 195-205ºF
M611 75804 Owners Manual Koffee-King™ Brewers
Keep brewer, and decanters clean. Install a taste and odor filter in water supply, and replace cartridges regularly. Use a quality coffee with a consistent roast. Use proper grind and amount of coffee per brew.
10
ACCESS PANELS
Each warmer plate has a center stud which screws into a bracket. Warmer plates on Canadian brewers are secured with a nut. Remove button plug on bottom of brewer to access nut on warmer plate. Remove warmer plates by turning counter­clockwise.
Solenoid door is held by two screws and a retaining lip.
Front Panel (In-Line Models) and Top / Rear Panel (3-Station Models): a. Remove warmer plate by turning counter-clockwise until it unscrews. b. Remove screws from two retaining clips under warmer plate. c. Lift off panel.
Front Panel (3-Station Models): a. Remove warmer plates by turning counter-clockwise until they unscrew. b. Remove screws from two retaining clips under each warmer plate. c. Remove three screws from bottom-side of front lip. d. Pull bottom of panel forward until it clears.
Top Panel (All Models): a. Remove two screws from rear of top panel. b. Lift rear of panel, remove to rear.
SERVICING INSTRUCTIONS
CAUTION:
SHOCK HAZARD
Opening access panels or removing warmer plates on this brew may expose uninsulated electrical components. Disconnect brewer from electrical power before removing any panel or warmer plate.
M611 75804 Owners Manual Koffee-King™ Brewers
Fig. 9 Access Panels
11
SERVICING INSTRUCTIONS (continued)
CAUTION:
SHOCK HAZARD
These procedures involve exposed electrical circuits. These procedures are to be performed by qualified technical personnel only.
NOTE:
Optimum brewing temperature range is 195ºF to 205ºF (90ºC to 96ºC).
IMPORTANT:
A mechanical thermostat will maintain temperature within ±5ºF. To prevent boiling water in the brewer, thermostat should be adjusted to a maximum temperature equal to the local boiling temperature minus 5ºF.
NOTE: 1/8 turn = approximately 10ºF (5.6ºC).
TEMPERATURE ADJUSTMENT
Unplug power cord or turn circuit breaker OFF. Remove top panel.
Pull vent tube out of tank lid and insert a thermometer of known accuracy in vent hole. Reconnect brewer to electrical power.
Fig. 10 Checking and Adjusting Brew Temperature
Place an empty decanter under brew chamber. Energize brewer and pour one decanter (64 oz.) of cold water into pour-over opening. When READY TO BREW light comes on, read temperature displayed on thermometer.
Adjust thermostat by turning shaft; clockwise increases temperature. 1/8 turn = approximately 10ºF. Refer to Table 1 below for proper brewing temperature based on altitude.
BOILING
0
0
0
5
,
6
POINT OF WATER
IDEAL BREWING TEMPERATURE
MAXIMUM TEMPERATURE SETTING
) F
º
(
.
P M
E T
210 205
200
195 190
0
0
0
0
0
0
0
5
,
1
0
0
0
0
5
0
,
,
1
2
0
0
0
5
0
,
,
2
3
0
0
0
0
0
0
5
0
5
,
,
,
4
4
3
0
0
0
0
0
0
5
0
,
,
,
6
5
5
ELEVATION (feet above seal level)
M611 75804 Owners Manual Koffee-King™ Brewers
Fig. 11 Adjust Thermostat
0
0
5
9
.
1
BOILING POINT OF WATER
IDEAL BREWING TEMPERATURE RANGE
MAXIMUM TEMPERATURE SETTING
) C
º
(
.
P M
E T
100
97 94
88
91
0
0
0
0
5
3
1
0
0
0
5
6
4
0
0
0
5
9
7
0
0
0
5
2
0
.
.
1
1
0
0
5
3
.
1
0
0
5
0
8
6
5
.
.
.
1
1
1
ELEVATION (meters above seal level)
Table 1 Boiling Temperature by Altitude
Upon completion, remove thermometer and reinstall vent tube.
12
SERVICING INSTRUCTIONS (continued)
TIMER ADJUSTMENT
The amount of water dispensed automatically during a brew cycle is controlled by the timer.
Place empty decanter under brew chamber. Press BREW button. Brewer should dispense one decanter of water. To adjust amount:
Remove brew chamber and button plug. Adjust knob on timer; clockwise increases time. Run several cycles to check amount of water delivered. Replace button plug.
REMOVE TANK LID ASSEMBLY
Unplug brewer or turn circuit breaker OFF. Turn OFF water
supply. Remove top panel. Pull vent tube and inlet elbow out of basin pan.
Pull water inlet tube out of basin pan. Remove basin pan.
On models with faucet, disconnect inlet pipe at faucet shut-off valve and outlet pipe at faucet.
Disconnect all wiring from thermostat, hi-limit, and heating element.
Loosen center screw on tank hold-down bracket. Remove hold-down bracket by sliding short slotted end off of locking stud and lifting it off. Remove cover assembly by lifting it straight up.
Reassemble in reverse order.
REPLACE THERMOSTAT
Unplug brewer or turn circuit breaker OFF. Turn OFF water
supply. Remove top panel.
Disconnect all wiring from thermostat only. Loosen and free jam nut from pass-thru fitting securing temperature sensing bulb. Remove two screws holding thermostat to bracket.
Lift out thermostat, sensing bulb and thermostat gasket.
Push sensing bulb into tank lid thermowell until fitting seats. Tighten capillary lock nut only enough to ensure no water leakage. Excessive tightening is not necessary.
Reassemble in reverse order.
IMPORTANT: Water pressure
must be between 20 p.s.i and 90 p.s.i. flowing pressure. If water pressure exceeds this value, or if water pressure varies greatly, a pressure regulator must be installed in
the water supply line.
IMPORTANT: Before setting
assembly into tank, make sure tank lid gasket is properly seated on flange of lid.
DO NOT OVER-TIGHTEN.
IMPORTANT:
If mounting thermostat p/n 8512-51, be sure to place a new seal washer below the fitting on the capillary line.
If replacing gray-bodied thermo with p/n 8512-51, be sure to remove tube from thermowell.
M611 75804 Owners Manual Koffee-King™ Brewers
13
SERVICING INSTRUCTIONS (continued)
IMPORTANT: When replacing
heating element, also replace seal gaskets.
Fig. 11 Remove Faucet Supply from Solenoid
Fig. 12 Clean Strainer Screen
REPLACE HEATING ELEMENT
Remove tank lid assembly as described on page 13.
Remove two hex nuts holding element to cover. Pull element from mounting holes.
Reassemble in reverse order.
REPLACE SOLENOID
Symptom: Automatic brewer will not flow water; or, automatic brewer drips continuously from brew head.
NOTE: Wrench p/n 86660 is designed to allow easy removal of
the hoses from the plastic solenoid valve.
IMPORTANT: Shut-off water and electric supply to brewer
before removing hoses or wiring.
Remove water supply flare fitting: a. Slide the 5/8" end of the wrench over the flats on the inlet fitting of the valve. b. Hold the wrench to prevent the inlet fitting from turning while installing or removing the inlet water supply flare nut.
Remove braided hose: a. Slide the 7/16" end of the wrench between the valve body and the white ring on the extreme end of the metal hose fitting. b. Pressure on the white ring toward the metal ferrule releases the clinch ring, allowing the hose to be easily slid off of the solenoid bypass outlet. c. Install hose on new valve by pressing end of hose onto bypass outlet until it is fully seated.
Disconnect wiring.
Remove two screws holding solenoid to access door.
Reassemble in reverse order.
CLEAN SOLENOID SCREEN
Symptom: Automatic brewer will not flow water.
Unplug power cord or turn circuit breaker OFF. Turn OFF and
disconnect water supply from brewer inlet fitting.
Unscrew water inlet fitting from solenoid.
Using needle-nose pliers, withdraw strainer screen from solenoid. Clean screen under faucet. A stiff bristle brush may be used if necessary.
Reinsert screen in solenoid. Be careful to maintain correct
orientation. (The OPEN END of the screen goes in FIRST.)
Reassemble in reverse order.
M611 75804 Owners Manual Koffee-King™ Brewers
14
SERVICING INSTRUCTIONS (continued)
REPLACE TIMER ASSEMBLY
Unplug power cord or turn circuit breaker OFF.
Remove front panel. Remove knob and three screws holding timer to bracket. Disconnect wiring to timer.
Reassemble in reverse order. Adjust timer as described on page 13
REPLACE HOT WATER FAUCET COIL
Symptom: Brewer drips continuously from brew head, except when faucet valve is turned OFF.
Remove tank lid assembly per above.
Remove two hex nuts hot water coil to cover. Pull coil from mounting holes.
Reassemble in reverse order.
REPAIR HOT WATER FAUCET
Remove top panel and turn faucet valve OFF.
Unscrew aerator cap from faucet and remove handle retaining clip. Do not let faucet body turn.
Pull bonnet assembly from faucet body.
Examine the interior of the faucet body and the surface of the seat cup. Clean out any debris in the faucet body, using a stiff bristle brush if necessary.
Examine the aerator. Clean any debris from the screen or flow straightener, using a stiff bristle brush if necessary.
Reassemble in reverse order.
REPLACE BREW READY LIGHT or BREW BUTTON
Unplug power cord or turn circuit breaker OFF.
Using Switch Removal Tool (p/n 83209) or a thin screwdriver, pry light or switch from mounting hole. Disconnect leads.
Reassemble in reverse order.
IMPORTANT: When replacing
water faucet coil, also replace seal gaskets.
NOTE: Any abrasion or
roughness on the flat end of the seat cup will require replacing the seat cup:
Work the seat cup out of the bonnet and off of the end of the stem.
Install a new seat cup, making sure the knob on the stem is fully inserted into the pocket of the seat cup, and the skirt of the seat cup is fully inserted into the bonnet.
M611 75804 Owners Manual Koffee-King™ Brewers
15
SERVICING INSTRUCTIONS (continued)
CAUTION:
CHEMICAL BURN HAZARD
Deliming chemicals are caustic. Wear appropriate protective gloves and goggles during this procedure. Never siphon deliming chemicals or solutions by mouth. This operation should only be performed by qualified and ex-
perienced service personnel.
IMPORTANT: DO NOT spill,
splash or pour water or deliming solution into or over any internal component other than the inside of the water tank.
IMPORTANT: DO NOT allow
any internal components to come into contact with the deliming solution. Take care to keep all internal components dry.
NOTE: Repeat steps 4 thru 5
as required to remove all scale and lime build-up.
PROCEDURE: Delime the Water Tank
PRECAUTIONS: Disconnect brewer from electric power. Allow brewer to cool.
FREQUENCY: As required (Brewer slow to heat)
TOOLS: Deliming Solution Protective Gloves, Goggles & Apron Mild Detergent, Clean Soft Cloth or Sponge Bristle Brush, Bottle Brush Large Sink (or other appropriate work area)
1. Disconnect brewer from the electrical supply. Turn off the water shut-off valve and disconnect the water supply line from the brewer inlet fitting.
2. Remove the tank lid assembly as described on page 13.
3. Remove the water tank from the brewer body by lifting straight up. Empty all water from the tank. Set the tank back into the brewer.
4. Mix 2 quarts of deliming solution according to the
manufacturer’s directions. Carefully pour the deliming solution into the water tank. Lower the lid assembly back onto the tank. Allow to sit for 30 minutes, or as directed by the manufacturer.
5. At end of soaking period, remove lid assembly from tank.
Thoroughly rinse internal components of lid assembly with clear water. Using a stiff bristle brush, scrub the heating element (and faucet water coil on automatic brewers) to remove lime and calcium build-up. Rinse with clean water. Store lid assembly in a safe location .
6. Remove the tank from the brewer and empty. Using a stiff
bristle brush, scrub the interior of the water tank to remove lime and calcium build-up. Rinse with clean water.
M611 75804 Owners Manual Koffee-King™ Brewers
16
SERVICING INSTRUCTIONS (continued)
7. Set the tank back into the brewer. Reassemble the tank lid to the water tank. Make sure the gasket is properly in place, then reinstall the hold-down strap.
8. Reinstall wiring to heating element and thermostat. Reinstall the hi-limit thermostat (if removed). For brewers with hot water faucet, reassemble faucet piping. Verify that all internal components are dry, then reinstall the top panel.
10. Reconnect brewer to electrical supply and, for automatic brewers, reconnect water supply.
11. Install the brew chamber without filter paper or grounds.
Run at least three full brew cycles and discard all water generated.
12. Brewer is ready to use.
NOTE: Normally, silicone
hoses do not need to be delimed. Should deliming hoses become necessary, Bloomfield recommends replacing the hoses.
M611 75804 Owners Manual Koffee-King™ Brewers
17
Koffee-King™ EXPLODED VIEW & PARTS LIST
CABINET & RELATED COMPONENTS
18
M611 75804 Owners Manual Koffee-King™ Brewers
Koffee-King™ EXPLODED VIEW & PARTS LIST (continued)
ITEM PART NO. DESCRIPTION USED ON
1 8700-16 COVER PLATE, WARMER, BLACK ALL
4 8543-80 CLIP, PANEL RETAINING ALL 20 8543-23 NUT, #8SMS, TINNERMAN (not shown) ALL 23 8543-69 BUSHING, HEYCO ALL 33 8543-42 GASKET, SPRAY HEAD ALL 34 82727 SPRAY DISK, EMBOSSED ALL
34a 8543-45 RETAINER, SPRAY HEAD (REQUIRES DRILL/RIVETS TO INSTALL) ALL
35 85089 DOOR, SOLENOID ACCESS, PLASTIC 8540, -41, -72, -73, -74 38 8574-10 DOOR, ELECTRIC ACCESS 8574 40 8706-76 BUTTON PLUG, 1-1/8" DIA, METAL (WARMER PLATE RETAINER) ALL (Canadian) 41 18-50 NUT, WARMER PLATE RETAINING, 1/4-28 ALL (Canadian) 47 8810-12 BUTTON PLUG, 1/2" DIA, PLASTIC (NON FAUCET MODELS) 8541, -42, -43, -71, -73
47a 8033-60 BUTTON PLUG, 3/8" DIA, METAL (HI-LIMIT RESET) 8574
48 81732 ASSEMBLY, ADJUSTABLE LEG ALL 70 8706-75 BUTTON PLUG, 2" DIA, METAL (TIMER) 8540, -41, -71, -72, -73
101 8572-13 ASSEMBLY, BREWER TOP (BASIN) ALL
8512-56
102 103 86666 ASSEMBLY, POUR-OVER PLASTIC ALL 108
110
111
112
114
115 8572-16 PANEL, COVER W/WARMER MOUNT 8571, 8572, 8573, 8574
200
201 POF FILTER PAPER, COFFEE (CASE OF 1000) ALL
8542-6
8541-21 8543-29
8542-110 8543-160 8541-160 8572-110
8571-20 8542-25
8540-25 8571-13 8572-33
(none)
8541-155
8543-48
8571-3
8572-10 8718-61
8549-26 8752-66 8571-19
8942-6B
8942-6 8707-6
BASIN COVER W/WARMER MOUNT BASIN COVER, W/O WARMER MOUNT
BASIN PAN (AUTOMATIC) BASIN PAN (POUR-OVER)
LABEL, CONTROL PANEL DECAL (IN-LINE POUR-OVER 1W) LABEL, CONTROL PANEL DECAL (IN-LINE POUR-OVER 2W) LABEL, CONTROL PANEL DECAL (IN-LINE AUTOMATIC 2W) LABEL, CONTROL PANEL DECAL (STEP-UP AUTOMATIC 3W) LABEL, CONTROL PANEL DECAL (STEP-UP POUR-OVER 3W)
ASSEMBLY, BREWER BASE (IN-LINE POUR-OVER) ASSEMBLY, BREWER BASE (IN-LINE AUTOMATIC) ASSEMBLY, BREWER BASE (STEP-UP POUR-OVER) ASSEMBLY, BREWER BASE (STEP-UP AUTOMATIC) ASSEMBLY, BREWER BASE (STEP-UP AUTOMATIC)
PANEL, FRONT (IN-LINE AUTOMATIC) PANEL, FRONT (IN-LINE POUR-OVER) PANEL, FRONT (STEP-UP POUR-OVER) PANEL, FRONT (STEP-UP AUTOMATIC)
PANEL, BOTTOM PLATE (IN-LINE) PANEL, BOTTOM PLATE (IN-LINE W/ACCESS HOLE) PANEL, BOTTOM PLATE (STEP-UP) PANEL, BOTTOM PLATE (STEP-UP W/ACCESS HOLE)
BREW CHAMBER, BLACK PLASTIC BREW CHAMBER, BROWN PLASTIC BREW CHAMBER, STAINLESS W/ WIRE BASKET (OPTIONAL)
(OPTIONAL limited to stock on hand)
8540, 8541, 8543 8542, -71, -72, -73, -74
8540, -41, -72, -73, -74 8542, 8543, 8571
8542 8543 8540, 8541 8572, 8573, 8574 8571
8542, 8543 8540, 8541 8571 8572, 8573 8574
8540, 8541 8542, 8543 8571 8572, 8573, 8574
IN-LINE (exc. Canadian) IN-LINE (Canadian STEP-UP (exc. Canadian) STEP-UP (Canadian)
ALL
M611 75804 Owners Manual Koffee-King™ Brewers
19
Koffee-King™ EXPLODED VIEW & PARTS LIST (continued)
HOT WATER TANK ASSEMBLY
60
61
68
55
62
54
63
56
57
56
70
58
67
59
50
52
66a
66b
66
50
ALTERNATE
14
13
FAUCET MODELS ONLY
ALL MODELS
ITEM PART NO. DESCRIPTION USED ON
13 8043-5 HOLD-DOWN STRAP ALL 14 83457 NUT, HEX 8-32 KEPS ALL
50 52 8512-41 SEAL WASHER, THERMO CAP TUBE (ONLY) ALL
54 8043-12 TANK COVER GASKET ALL 55 8043-28 NUT HEX 1/2-20 BRASS ALL 56 8043-30 SEAL GASKET, ELEMENT OR WATER COIL ALL 57 8941-21 NUT HEX 7/16-20 BRASS 8540, 8572, 8574 58 8540-6 HOT WATER COIL 8540, 8572, 8574 59 8043-8 TUBE, BASIN OUTLET/TANK INLET, SILICONE ALL 60 8043-15 TUBE, VENT, SILICONE ALL 61 8043-11 ELBOW, TANK OUTLET, SILICONE ALL
62
63
66 8043-24 WATER INLET TUBE ALL 66a 8543-74 NUT, HEX 4-40 SS ALL 66b 8543-73 SCREW 4-40 x 1 PAN HEAD ALL
67
68 8043-10 TANK BODY ALL
70 80625 BRACKET, HI LIMIT THERMOSTAT 8574
8512-51
86280
8512-45 8514-68
8043-83 8552-50
8043-93 8043-14
8716-1
TANK COVER ASSEMBLY
8541WF-
300
8543-300
THERMOSTAT (BLACK BODY - INCL. SEAL & MOUNTING SCREWS) THERMO (ALT) (GRAY BODY - INCL. TUBE & MOUNTING SCREWS)
TAN COVER, PLATE ONLY, 6 HOLES TAN COVER, PLATE ONLY, 8 HOLES
THERMOSTAT, HI-LIMIT THERMOSTAT, HI-LIMIT RESET
HEATING ELEMENT (120V, 1200W) HEATING ELEMENT (120V, 1500W) HEATING ELEMENT (240V, 3500W)
INCLUDES: MOUNTED THERMO, HI-LIMIT, 120V 1500W HEATING ELEMENT & HOT WATER COIL)
INCLUDES: MOUNTED THERMO, HI-LIMIT, 120V 1500W HEATING ELEMENT. NO HOT WATER COIL)
ALL
8541, 8542, 8543, 8571, 8573 8540, 8572, 8574
ALL, except 8574 8574
ALL Canadian ALL, exc. Canadian & 8574 8574
20
M611 75804 Owners Manual Koffee-King™ Brewers
Koffee-King™ EXPLODED VIEW & PARTS LIST (continued)
INTERNAL PLUMBING COMPONENTS
11
10
61
9
60
59
18
29a
29b
29c
29d
108
12
43
24
45
TANK ASSY
see PAGE 20
ITEM PART NO. DESCRIPTION USED ON
8 8540-3 FORMED TUBE, FAUCET OUTLET ASSEMBLY 10-7/8" LONG 8540, 8572, 8574
9 8540-4 FORMED TUBE, FAUCET COIL INLET ASSEMBLY 8540, 8572, 8574 10 8551-30 ADAPTER, 1/4" MALE FLARE x 1/8" FPT BRASS 8540, 8572, 8574 11 8514-26 VALVE, FAUCET SHUT OFF, NEEDLE SEAT 8540, 8572, 8574 12 85681 BRAIDED TUBE, FAUCET INLET 6MM x 299MM (11-3/4") LONG 8540, 8572, 8574 18 8540-30 ELBOW, BASIN INLET DIVERTER POLYPROPYLENE 8540, -41, -72, -73, -74 24 8043-26 TUBE, BREW OUTLET, METAL 4-3/4" LONG ALL 25 8043-13 ELBOW, SPRAYER, SILICONE ALL 26 82680 LOCK NUT, HEX 7-16-20 8540, 8572, 8574 27 8551-100B LOCK WASHER 7/16" EXT SEMS (FAUCET) 8540, 8572, 8574 28 82681 WASHER, FLAT 15/32" x 1-1/8" x 1/16" SS 8540, 8572, 8574 29 82556 FAUCET ASSEMBLY, PRESSURE 8540, 8572, 8574 33 8543-42 GASKET, SPRAY HEAD ALL 34 82727 SPRAY DISK, EMBOSSED ALL
34a 8543-45 RETAINER, SPRAY HEAD (REQUIRES DRILL/RIVETS TO INSTALL) ALL
43 8541-46 TUBE, BASIN INLET, SILICONE 13" 8540, -41, -72, -73, -74 45 59 8043-8 TUBE, BASIN OUTLET/TANK INLET, SILICONE ALL
60 8043-15 TUBE, VENT, SILICONE ALL 61 8043-11 ELBOW, TANK OUTLET, SILICONE ALL
108
M611 75804 Owners Manual Koffee-King™ Brewers
83612 85685
8541-21 8543-29
FAUCET REPAIR KITS 82573 HANDLE, FAUCET RED (29a) 82575 SEAT CUP (29c)
82576
82682 RETAINER CLIP (29b) 84804 AERATOR REPLACEMENT, INCL: O-RING (29e), DISK (29f) & CAP (29g)
84870 AERATOR REPAIR KIT, INCL: O-RING (29e) & DISK (29f)
SOLENOID, SINGLE, 120V, .75 GPM SOLENOID W/BYPASS, 120V, .75 GPM
BASIN PAN (AUTOMATIC) BASIN PAN (POUR-OVER)
FAUCET REPAIR KIT, INCL: HANDLE (29a), SEAT CUP (29c), SPRING (29d), STEM (29h), PIN (29j) & BONNET (29k)
25
34a
33
34
8
26
27
28
29
29e
29f
29g
29j
29h
8541, 8573 8540, 8572, 8574
8540, -41, -72, -73, -74 8542, 8543, 8571
29k
21
Koffee-King™ EXPLODED VIEW & PARTS LIST (continued)
ELECTRICAL COMPONENTS
120V
63
50
35
ALTERNATE
30
240V
63
43
32
31
2
45
36
37
ITEM PART NO. DESCRIPTION USED ON
2 8572-18 HEATING ELEMENT, WARMER 120V 100W ALL
30 6710-23 SWITCH, WARMER ON/OFF 120V ALL 31
8572-24 8707-55
32 8718-31 INDICATOR, 120V, READY-TO-BREW ALL 35 8718-1 TIMER, 2-MINUTE (WITH DIAL & KNOB) 120V 8540, -41, -72, -73, 74 36 6407-15 POWER CORD ASSEMBLY, 120V NEMA 5-15P ALL (exc. 8574) 37 35-210 STRAIN RELIEF ALL (exc. 8574) 43 8552-18 TERMINAL BLOCK, 4P 8574
45
50
63
83612 85685
8512-51
86280
8043-83 8552-50
8043-93
67
8043-14
8716-1
SOLENOID REPAIR KITS 83612 SOLENOID 120V SINGLE .75GPM, COMPLETE 85685 SOLENOID 120V W/BYPASS .75GPM, COMPLETE
85218
85219 INLET STRAINER ( 45d ONLY)
SWITCH, MOMENTARY PUSH-BUTTON, BREW SWITCH, MOMENTARY ROCKER, BREW
SOLENOID, SINGLE, 120V, .75 GPM SOLENOID W/BYPASS, 120V, .75 GPM
THERMOSTAT (BLACK BODY - INCL. SEAL & MOUNTING SCREWS) THERMO (ALT) (GRAY BODY - INCL. TUBE & MOUNTING SCREWS)
THERMO, HI-LIMIT THERMO, HI-LIMIT, RESET
HEATING ELEMENT (120V, 1200W) HEATING ELEMENT (120V, 1500W) HEATING ELEMENT (240V, 3500W)
INLET FITTING KIT INCLUDES: CAP (45a), FITTING (45b), GASKET (45c) & STRAINER (45d)
45d
45c
8572, 8573, 8574 8540, 8541
8541, 8573 8540, 8572, 8574
ALL
ALL (exc. 8574) 8574
ALL Canadian ALL, exc. Canadian & 8574 8574
120V
240V
50
67
67
M611 75804 Owners Manual Koffee-King™ Brewers
22
45b
45a
Koffee-King™ WIRING DIAGRAMS
M611 75804 Owners Manual Koffee-King™ Brewers
23
Koffee-King™ WIRING DIAGRAMS (continued)
24
M611 75804 Owners Manual Koffee-King™ Brewers
Koffee-King™ WIRING DIAGRAMS (continued)
M611 75804 Owners Manual Koffee-King™ Brewers
25
Genuine Parts
Protect - YOU - All - Ways
SERVICE TRAINING - QUALITY SERVICE
CUSTOMER SATISFACTION
Commercial Food Equipment Service Association
Wells Bloomfield proudly supports CFESA
Commercial Food Equipment Service Association
SERVICE TRAINING - QUALITY SERVICE
CUSTOMER SATISFACTION
WELLS BLOOMFIELD, LLC
2 ERIK CIRCLE, P. O. Box 280 Verdi, NV 89439 telephone: 775-689-5707
fax: 775-689-5976
www.wellsbloomfield.com
PRINTED IN UNITED STATES OF AMERICA
Loading...