Balboa Water Group 1 Air Control User Manual

1” AIR CONTROL INSTRUCTIONS
The correct hole size for the 1” air control is 1-3/4”
Before drilling hole to install the air control, make sure mounting surface is flat. This will help assure 1. the best seal. Drill one 1-3/4” hole for the air control.2. Remove nut (#4) and gasket (#3) from air control. 3. Place silicone on backside of flange of air control body (#2) and install air control through hole in 4. spa/bathtub. Place gasket (#3) onto body (#2) on the outside of spa/bathtub. 5. Hand tighten nut (#4) onto body (#2). 6. Remove excess silicone from around flange of air control and surface of spa/bathtub. 7. Glue 1” pipe to bottom of air control. 8.
DO NOT USE ANY TYPE OF PETROLEUM BASED LUBRICANTS ... THEY WILL DAMAGE THE PRODUCT.
#1 1” AIR STEM ASSEMBLY 30-2108 #2 1” AIR BODY ASSEMBLY 30-2107 #3 1” GASKET 30-3705 #4 1” NUT 30-3706
Loading...