Bakbar E1100 Service Manual

E1100 TURBOFAN OVEN
-1-
MANUFACTURED BY
Moffat Limited PO Box 10001 Christchurch New Zealand Ph: (03) 389 1007 Fax: (03) 389 1276
WORLD-WIDE BRANCHES
UNITED KINGDOM
Blue Seal Unit 67, Gravelly Business Park Gravelly Park Birmingham West Midlands B24 8TQ Ph: (121) 327 5575 Fax: (121) 327 9711
UNITED STATES
Moffat Inc 3765 Champion Blvd Winston-Salem North Carolina 27115 Ph: (336) 661 0257 Fax: (336) 661 9546
CANADA
Serve Canada 22 Ashwarren Road Downview Ontario M3J1Z5
Toll Free:800 263 1455 Ph: (416) 631 0601 Fax: (416) 631 0315
info@servecanada.com www.servecanada.com www.moffat.com
NEW ZEALAND
Christchurch
Moffat Limited Moffat Limited PO Box 10-001 4 Waipuna Road 16 Osborne Street Mt Wellington Christchurch Auckland Ph: (03) 389 1007 Ph: (09) 574 3150 Fax: (03) 389 1276 Fax: (09) 574 3159
AUSTRALIA
Victoria
Moffat Pty Limited Moffat Pty Limited 740 Springvale Road 3/142 James Ruse Drive, Rose Hill Mulgrave, Melbourne PO Box 913, Smithfield Victoria 3171 Sydney, N.S.W. 2142 Ph: (03) 9518 3888 Ph: (02) 8833 4111 Fax: (03) 9518 3838 Fax: (02) 8833 4133
Western Australia
Moffat Pty Limited Moffat Pty Limited 67 Howe Street 30 Prosperity Place Osbourne Park Geebung, Brisbane WA 6017 Queensland 4034 Ph: (08) 9202 6820 Ph: (07) 3630 8600 Fax: (08) 9202 6836 Fax (07) 3630 8623
Auckland
New South Wales
Queensland
The reproduction or copying of any part of this manual by any means whatsoever is strictly forbidden unless authorized previously in writing by the manufacturer.
© Copyright Moffat Ltd. December 2007.
-2-
E1100 TURBOFAN OVEN
CONTENTS PAGE
INTRODUCTION 5
INSTALLATION 6
OPERATION 8
COOKING GUIDE 10
CLEANING 12
SERVICING 13
SPARES 16
DOUBLE UNIT ASSEMBLY 17
CIRCUIT SCHEMATIC 18
Date Purchased.................................................................................... Serial No......................................
Dealer...........................................................................................................................................................
Service Agent..............................................................................................................................................
F15058-12
-3-
-4-
INTRODUCTION
We are confident that you will be delighted with your TURBOFAN OVEN, and it will become the most valued appliance in your kitchen.
Your new oven may seem very complex and confusing at first glance. To ensure you receive the most benefit from your new turbofan, there are two important things you can do.
Firstly Please read the instruction book carefully and follow the directions given. The time taken will be well spent.
Secondly If you are unsure of any aspect of the installation, instructions or performance of your oven, contact your BLUE SEAL dealer promptly. In many cases a phone call could answer your questions.
-5-
INSTALLATION
It is most important that the oven is installed correctly and that the operation is correct before use. Installation must comply with local gas, electrical, health and safety requirements.
BEFORE CONNECTION
Unpack oven and check for damage. Report any damage to the carrier and dealer. Report any deficiencies to your dealer.
To Fit Legs - Single Unit Tilt the oven over on one side and fit both the front and rear legs to the side now off the ground. Fit them into the base frame under the chassis base and secure to the base with the bolts, spring washers and flat washers provided. Lift up the other side of the oven, fit legs, bolts and washers, but do not tighten yet. Position leg tray (flat side facing up) between legs and secure with 4 screws provided, then tighten all leg bolts. Level the oven by adjusting the feet.
To Fit Legs - Double Unit Fit and secure 4 short legs onto the bottom unit by the method described above. NOTE: There is no leg tray for the double unit. Lay the top unit on its side and fit the spacers provided to the base of the oven.
Lift the top unit onto the bottom unit and secure around the spacer panel flanges with self-tapping screws provided. Fit chimneys over the duct assembly of the bottom unit. Screw in place and pull down chimney surrounds onto the duct assembly. Level the oven by adjusting the feet.
ELECTRICAL CONNECTION
This E1100 convection oven can be supplied as single or twin deck unit and are to be connected to a 400 - 415V A.C. 3 phase, neutral and earth supply. Refer to the rating plate for loading per phase.
The mains terminal block is positioned at the left rear of the unit. Access is provided by a detachable panel on the back panel. Each oven should be connected to a circuit breaker (or switch and fuses). These should be mounted on the wall adjacent to the oven and should be readily accessible and clearly marked.
Bring the connecting cable up through the base panel and tighten the conductor strands securely to the terminal block studs. The earth screw is located in the base panel next to the cable entry hole.
WARNING - THIS APPLIANCE MUST BE EARTHED
IMPORTANT - FIXED WIRING INSTALLATIONS MUST INCORPORATE AN ALL- POLE DISCONNECTION SWITCH.
IF SUPPLY CORD IS DAMAGED, IT MUST BE REPLACED BY A SUITABLY QUALIFIED PERSON IN ORDER TO AVOID A HAZARD.
-6-
Loading...
+ 14 hidden pages