Safety considerations are emphasized by the placement of safety symbol icons on the product or next to important text,
pictures or drawings throughout this manual. The symbols are:
SymbolExplanation
When and where this symbol is attached to the product, it indicates a potential hazard. It means that
documentation must be consulted to determine the nature of the potential hazard and any actions
that need to be taken.
Warning indicates the potential for severe personal injury, death or substantial property damage.
Comply with the instructions and proceed with care.
Caution indicates the potential for minor personal injury or property damage. Comply with the
instructions and proceed with care.
Unpacking and Inspection
Follow these guidelines when unpacking the M-Series equipment.
• If a shipping container shows any sign of damage, have the shipper present when you unpack the meter.
• Follow all unpacking, lifting and moving instructions associated with the shipping container.
• Open the container and remove all packing materials. Store the shipping container and packing
materials in the event the unit needs to be shipped for service.
• Verify that the shipment matches the packing list and your order form.
• Inspect the meter for any signs of shipping damage, scratches, or loose or broken parts.
OTE:NIf the unit was damaged in transit, it is your responsibility to request an inspection report from the carrier within
48 hours. You must then file a claim with the carrier and contact Badger Meter for appropriate repairs or replacement.
• All detectors with PTFE liners are shipped with a liner protector to maintain proper form of the PTFE material during
shipping and storage.
OTE:NDo not remove the liner protectors until you are ready to install.
• Storage: If the meter is to be stored, place it in its original container in a dry, sheltered location. Storage temperature
ranges are: –4…158° F (–20…70° C).
Rigging, Lifting and Moving Large Units
WHEN RIGGING, LIFTING OR MOVING LARGE UNITS, FOLLOW THESE GUIDELINES:
• DO NOT lift or move a meter by its amplifier, junction box or cables.
• Use a crane rigged with soft straps to lift and move meters with flow tubes that are between two inches and
eight inches (50 mm and 200 mm). Place the straps around the detector body, between the flanges, on each side
of the detector.
• Use the lifting lugs when lifting meter flow tubes that are 10 inches (250 mm) in diameter or larger.
MAG-UM-00158-EN-07Page 5 June 2018
®
Safety Precautions and Instructions
Place straps between flanges.Use lifting lugs with 10-inch or larger meters.
®
Figure 1: Rigging large units
• Use the sling-rigged method to lift large detectors into a vertical position while they are still crated. Use this method to
position while they are still crated. Use this method to position large detectors vertically into pipelines.
Figure 2: Sling-rigged lifting methods
• Do not lift a detector with a forklift by positioning the detector body on the forks, with the flanges extending beyond the
lift. This could dent the housing or damage the internal coil assemblies.
• Never place forklift forks, rigging chains, straps, slings, hooks or other lifting devices inside or through the detector's flow
tube to hoist the unit. This could damage the isolating liner.
MAG-UM-00158-EN-07Page 6 June 2018
Do not lift detector with forklift.Do not lift or rig lifting devices through detector.
Figure 3: Lifting and rigging cautions
Instructions Specific to Hazardous Area Installations
These instructions apply to equipment covered by FM Certificate Number IAB-182-01.
• The temperature range for fluids passing through the detector is –4…248° F (–20…120° C).
• The ambient temperature range surrounding the amplifier is –4…122° F (–20…50° C).
Safety Precautions and Instructions
• The ambient temperature range surrounding the junction box must not exceed 122° F (50° C).
• During any installation or repair, perform all procedures in accordance with the applicable code of practice.
• Suitably trained personnel shall perform all installation or repair procedures.
• If the equipment is likely to come into contact with aggressive substances, it is the responsibility of the user to take
suitable precautions that prevent it from being adversely affected, thus ensuring that the type of protection is not
compromised.
◊ Aggressive Substances such as acidic liquids or gases that may attack metals, or solvents that may affect
polymeric materials.
◊ Suitable Precautions are regular checks as part of routine inspections or establishing, from the material’s data sheet,
that it is resistant to specific chemicals.
MAG-UM-00158-EN-07Page 7 June 2018
Safety Precautions and Instructions
Additional Information
Certification markings are noted on the product label. Markings include:
M SERIES MAG METER
Model #: 3000...........
Serial #:....................
Tag #:........................
Power: 85-240 VAC/50-60 Hz/15VA
Type 4X/6P/IP66/IP67
Suitable for CLI Div2 GP ABCD T3
CLII Div2 GP FG T3
Class I, Zone 2, AEx/ nA ia IIC T3
Provides intrinsically safe electrode circuits
Warning - Substitution of components may impair Instrinsic Safety
-20 C < Tamb < +50 C
Ex nA ia IIC T3
®
Badger Meter Brno Czech Republic
FM
APPROVED
!
Exia
M SERIES MAG METER
Model #: 3000...........
Serial #:....................
Tag #:........................
Power: 85-240 VAC/50-60 Hz/15VA
Type 4X/6P/IP66/IP67
Suitable for CLI Div2 GP ABCD T3
CLII Div2 GP FG T3
Class I, Zone 2, AEx/ nA [ia] IIC T3
Provides intrinsically safe electrode circuits
Warning - Substitution of components may impair Instrinsic Safety
-20 C < Tamb < +50 C
FM CONTROL DWG [Exia] CSA CONTROL DWG
MAG-AS-00801-EN MAG-AS-00801-EN
Ex nA [ia] IIC T3
®
Badger Meter Brno Czech Republic
FM
APPROVED
!
Figure 4: Mounted amplifier 85…240V ACFigure 5: Remote mount 85…240V AC
M SERIES MAG METER
Model #: 3000...........
Serial #:....................
Tag #:........................
Power: 24 VDC/5W
Type 4X/6P/IP66/IP67
Suitable for CLI Div2 GP ABCD T3
CLII Div2 GP FG T3
Class I, Zone 2, AEx/ nA ia IIC T3
Provides intrinsically safe electrode circuits
Warning - Substitution of components may impair Instrinsic Safety
-20 C < Tamb < +50 C
Ex nA ia IIC T3
®
Badger Meter Brno Czech Republic
FM
APPROVED
!
Exia
M SERIES MAG METER
Model #: 3000...........
Serial #:....................
Tag #:........................
Power: 24 VDC/5W
Type 4X/6P/IP66/IP67
Suitable for CLI Div2 GP ABCD T3
CLII Div2 GP FG T3
Class I, Zone 2, AEx/ nA [ia] IIC T3
Provides intrinsically safe electrode circuits
Warning - Substitution of components may impair Instrinsic Safety
-20 C < Tamb < +50 C
FM CONTROL DWG [Exia] CSA CONTROL DWG
MAG-AS-00801-EN MAG-AS-00801-EN
Ex nA [ia] IIC T3
®
Badger Meter Brno Czech Republic
FM
APPROVED
!
Figure 6: Mounted amplifier 24V DCFigure 7: Remote mount 24V DC
OTE:NTable 1 below refers to the data plate codes per the configured meter order. The data plate code string follows the
model number on the data plate.
A = Mounting Type
B = Liner Material
C = Electrodes
D = End Flange
E = Entry
F = Number of Electrodes
G = Detector Size (DN Size MM)6, 8, 10, 15 and so on
H = Voltage
Table 1: Data plate codes
MMeter mount
RRemote mount
RHard rubber
TPTFE
HAlloy C
S316 stainless steel
GGold/platinum
TTantalum
RPlatinum/rhodium
DDIN flange
SSAE flange
MMetric
NNPT
TThree
FFour
H110/220V AC
L24V DC
Contact Badger Meter for information on the dimensions of the flameproof joints.
For additional information regarding importation, equipment installation, equipment repair, equipment return or renewal
parts, contact:
Badger Meter, Inc.
P.O. Box 245036
Milwaukee, WI 53222
Telephone: (414) 355-0400 or (800) 876-3837
On the Web: www.badgermeter.com or contact your local Badger Meter representative.
MAG-UM-00158-EN-07Page 8 June 2018
System Description
SYSTEM DESCRIPTION
The Badger Meter M-Series® model M3000 electromagnetic flow meters are FM approved for Class I, Div 2 hazardous
locations. To achieve hazardous location ratings, electrodes in the flow tube are Intrinsically Safe, designed according to
Factory Mutual (FM) standards. Those standards limit the amount of energy that can be sent to electrodes to prevent a spark
from occurring.
Empty Pipe Detection
Badger Model M3000 meters are equipped with an Empty Pipe Detection feature. Empty Pipe Detection is accomplished by
positioning a third electrode close to the 12 o’clock position. Any time this electrode is not covered by fluid, for a minimum
of five seconds, the meter displays an Empty Pipe Detection condition, sends out an error message if desired, and stops
measuring to maintain accuracy. When the electrode is again covered with fluid, the error message disappears and the meter
continues measuring.
Amplier Mounting Conguration Options
Two amplifier-mounting configuration options are available to meet a variety of meter placement and
environmental conditions.
Meter Mount Configuration
The Meter Mount configuration has the amplifier mounted directly on the detector. This compact, self-contained
configuration minimizes installation wiring.
Figure 8: Meter mount
Remote Mount Configuration
• Remote Mount configuration places the amplifier and its functions at a location separate from the fluid flow and detector.
This configuration is necessary in situations where process fluid temperature or environment exceeds amplifier ratings. A
remote mounting bracket is supplied.
• The detector and amplifier are connected by wires, run through conduit, between junction boxes on the detector and
remote mounted amplifier. The distance between the detector junction box and amplifier junction box can be up to 100
feet (30 m).
• This configuration can also provide a more convenient amplifier programming and display placement for monitoring
meter readings.
Figure 9: Remote mount
MAG-UM-00158-EN-07Page 9 June 2018
Meter/Amplier Location, Orientation and Applications
METER/AMPLIFIER LOCATION, ORIENTATION AND APPLICATIONS
Remote Amplier Outdoor Location
The amplifier can be installed and operated outdoors. However, it must be protected from the elements, as follows:
• The ambient environment/temperature rating for the unit is – 4…122° F (–20…50° C).
• If an indoor location is within 100 feet (30 meters) of the detector, consider increasing the cable length and
mounting the amplifier indoors.
• At minimum, fabricate a roof or shield over and/or around the amplifier to protect the LCD display screen from
direct sunlight.
Temperatures
To prevent meter damage in any environment, minimum and maximum temperature ranges must be observed.
• The ambient temperature range surrounding the amplifier is – 4…122° F (–20…50° C).
• The ambient temperature range surrounding a remote junction box mounted to the detector is – 4…248° F
(–20…120° C).
ApplicationFluid Temperature RangeMax. Ambient TemperatureLiner Materials
Remote amplifier– 4…248° F (–20…120° C)122° F (50° C)PFA, PTFE and Halar®
Remote amplifier32…178° F (0…80° C)122° F (50° C)Hard rubber
Meter mounted amplifier– 4…212° F (–20…100° C) 122° F (50° C)PFA, PTFE and Halar
Meter mounted amplifier32…178° F (0…80° C)122° F (50° C)Hard rubber
Pipelines and Fluid Flow Conditions
Pipeline and fluid flow conditions that should be avoided:
• Do not install the meter where extreme pipe vibrations exist. If vibrations are present, secure piping before and
after the meter with appropriate pipe supports. If vibrations cannot be restrained, consider mounting the amplifier
remotely.
• Avoid installing the detector close to pipeline valves, fittings or impediments that can cause flow disturbances.
• For detectors with PTFE liners, avoid installing the detector on suction sides of pumps.
• Avoid installing the detector on outlet sides of piston or diaphragm pumps. Pulsating flow can affect meter
performance.
• Avoid locations near equipment producing electrical interference such as electric motors, transformers, variable
frequency, and power cables.
• Verify both ends of the signal cables are securely fastened.
• Place power and signal cables in separate conduit.
• Place the meter where there is enough access for installation/maintenance purposes.
MAG-UM-00158-EN-07Page 10 June 2018
RIGHT
WRONG
FORWARD FLOW
MINIMUM STRAIGHT PIPE
MINIMUM STRAIGHT PIPE
ELBOW
TEE
GATE VALVE
(FULLY OPEN)
MINIMUM STRAIGHT PIPE
CHECK VALV E
GLOBE VALV E
BUTTERFLY VALVE
PUMP
ELBOW
TEE
ANY VALV E
M-3000 Mag FLOWMETER
3 x D
7 x D
2 x D
D (Pipe Size)D (Pipe Size)
STANDARD CONCENTRIC
REDUCERS
(NO DISTANCE REQUIRED)
Meter/Amplier Location, Orientation and Applications
Meter Orientation
Mag meters can operate accurately in any pipeline orientation and can measure volumetric flow in forward and
reverse directions.
OTE:NA Forward Flow direction arrow is printed on the detector label.
Vertical Placement
Mag meters attain optimal performance when placed vertically, with liquid flowing upward and meter electrodes in a closed,
full pipe.
Figure 10: Vertical placement
Vertical placement allows the pipe to remain completely full, even in low flow, low pressure applications and it prevents any
solids build-up or sediment deposit or accumulation on the liner and/or electrodes.
OTE:NCarefully observe the “Forward Flow” label on the meter body and install the meter accordingly.
Horizontal Placement
In a horizontal piping orientation, mount the detector to piping with the flow measuring electrode axis in a horizontal plane
(3 and 9 o’clock).
This arrangement prevents solids build-up or sediment deposit or accumulation on the electrodes.
Electrode
Plane
Electrode
Plane
Figure 11: Horizontal placement
Straight Pipe Requirements
Sucient straight pipe runs are required at the detector inlet and outlet for optimum meter accuracy and performance. An equivalent of three
(3) diameters of straight pipe is required on the inlet (upstream) side. Two (2) diameters are required on the outlet (downstream) side.
Figure 12: Minimum piping requirement
MAG-UM-00158-EN-07Page 11 June 2018
WRONG
RIGHT
Meter/Amplier Location, Orientation and Applications
Pipe Reducer Requirements
With pipe reducers a smaller size meter can be mounted in larger pipelines. This arrangement may increase low flow accuracy.
There are no special requirements for standard, concentric pipe reducers.
Custom fabricated pipe reducers must have an approximate slope angle of 15 degrees to minimize flow disturbances and
excessive loss of head. If this angle is not possible, install the custom pipe reducers as if they were fittings and install the
amount of straight pipe stated previously.
Figure 13: Pipe reducer requirements
Chemical Injection Applications
For water line applications with a chemical injection point, install the meter upstream of the injection point. This eliminates
any meter performance issues.
Figure 14: Meter installed upstream of chemical injection point
If a meter must be installed downstream of a chemical injection connection, the recommended distance between the meter
and the injection point must be significant; 50…100 feet (15…30 meters). When the water/chemical solution reaches the
meter it must be a complete, homogeneous mixture. If the injection point is too close, the meter senses two (2) different
liquids (conductivity is different for each) and correct data output cannot be assured. The injection method: spaced bursts,
continuous stream of drips, a liquid or gas can also affect downstream readings by the meter.
Figure 15: Meter installed downstream of chemical injection point
Sometimes it’s difficult to specify the exact downstream placement distances because of the number of variables. Contact
Badger Meter Technical Support, 877-243-1010, to review your application if necessary.
Partially Filled Pipe Situations
In some locations, the process pipe may be momentarily only partially filled. Examples include: lack of backpressure,
insufficient line pressure and gravity flow applications.
To eliminate these situations, do not install the meter at the highest point of the pipeline.
FLOW
FLOW
Figure 16: Meter placement in the pipeline
Do not install the meter in a vertical, downward flow section of pipe.
MAG-UM-00158-EN-07Page 12 June 2018
Always position the ON/OFF valves on the downstream side of the meter.
Meter/Amplier Location, Orientation and Applications
RIGHT
FLOW
Position On/Off valves on downstream side.
Do not install in a vertical, downward position.
WRONG
FLOW
Figure 17: Position valves on downstream side
To minimize the possibility of partially-full pipe flows in horizontal, gravity or low pressure applications, create a pipe
arrangement that ensures the detector remains full of liquid at all times.
Figure 18: Pipe positioned to keep water in detector
Meter Gaskets and Grounding
Two other considerations to meter location, orientation and application are gasket and grounding requirements
and placement.
Two other considerations to meter location, orientation and application are gasket and grounding requirements
and placement.
Meter/Pipeline Connection Gaskets
Gaskets (not provided) must be installed between the detector isolating liner and the pipeline flange to ensure a proper and
secure hydraulic seal. Use gaskets compatible with the fluid flow. Center each gasket on the flange to avoid flow restrictions
or turbulence in the line.
Do not use graphite or any electrically conductive sealing compound to hold gaskets during installation. Measuring signal
accuracy could be affected.
If a grounding ring is used in the detector/pipeline connection, place the ring between two gaskets. (See
“Non-Conductive Pipe Grounding” on page 14.)
Meter Grounding
Process pipeline material can be either electrically conductive (metal) or not electrically conductive (made of or lined with
PVC, fiberglass or concrete).
TO ENSURE PROPER UNIT OPERATION, THE MAG METER IMPACT GROUND ZERO VOLTAGE REFERENCE MUST BE
CONNECTED TO THE LIQUID MEDIA AND TO A GOOD, SOLID EARTH GROUND. PERFORM GROUNDING PROCEDURES
AFTER THE METER IS CONNECTED TO THE PIPELINE.
Conductive Pipe Grounding
A grounding bolt is located on each mag meter flange. Drill and tap the pipeline flanges on each side of the meter and install
a grounding bolt to each.
To ground the unit, attach a ground strap (provided) of copper wire, at least 12 AWG size, between the grounding bolts on the
meter flanges and the bolts on the pipeline flanges. Do this on the inlet and outlet sides of the meter.
Meter/Amplier Location, Orientation and Applications
Non-Conductive Pipe Grounding
If the process pipeline material is not electrically conductive and your meter was not ordered with an optional grounding
electrode, place a grounding ring (available from Badger Meter) between two gaskets on both ends of the meter.
After the grounding rings, gaskets and meter are assembled to the pipeline, attach ground straps (provided) of copper wire, at
least 12 AWG size, to grounding bolts on meter flanges and to the grounding rings.
If your meter was ordered with an optional grounding electrode, the use of grounding rings is not necessary.
Figure 20: Non-conductive pipe grounding
MAG-UM-00158-EN-07Page 14 June 2018
5.12
Meter Installation Plans and Execution
METER INSTALLATION PLANS AND EXECUTION
Plan meter layout, location and installation. During installation, remember these important points:
• Heed all safety notifications.
• Select a detector location with room for installation and maintenance procedures.
• Use proper lifting, rigging, moving and procedures for large units.
• Consider the meter environment; particularly ambient and process flow temperatures.
• Consider the process pipeline (vibrations) and its flow characteristics (valve and pump locations).
• Meter orientation to the pipeline (vertical or horizontal).
• Straight pipe requirements.
• Pipe reducer requirements.
• Special applications and/or situations.
For Remote Mount Units, consider:
• Amplifier location.
• Remote amplifier mounting bracket.
• Proper conduit and conduit fittings.
• Wiring and conduit locations.
Remote Mount Amplier
OTE:NScrews are supplied to attach the remote mount bracket to the amplifier. Screws are not supplied to attach bracket at
mounting location.
Remote Mount Amplifier Location Requirements
• A sturdy and safe mounting surface capable of holding the amplifier weight of 20 pounds (9 kg).
• Within the allowable temperature range: – 4…122° F (–20…50° C).
• Access to amplifier covers, ports, terminals, screen and adjustments.
• As close to the detector as possible.
• Determine length and route of cable and conduit runs.
Mount Bracket to Amplifier
1. Align bracket-mounting holes with amplier mounting holes.
2. Attach bracket to amplier with supplied screws. Torque the screws to 80 in. lb.
2.56
2.56
Figure 21: Mounting the bracket to the amplifier
3.75
.39
3.75
7.50
Mount Amplifier with Bracket to Location
1. Position the amplier with the bracket attached in the desired orientation.
2. Secure the bracket to the location.
MAG-UM-00158-EN-07Page 15 June 2018
Meter Installation Plans and Execution
Remote Mount Amplier/Detector Wiring
Remote Mount Amplifier
The remote mount amplifier has three chambers and five wire ports. The junction box and connections chambers and wiring
ports provide amplifier openings for wire, conduit, tool and hand access to amplifier terminal blocks. Detector to amplifier
wires connect in the junction box chamber. Amplifier AC power and customer signal wires attach in the connections chamber.
The Display/Programming Chamber provides access to fuses and circuit boards.
Figure 22: Remote mount amplifier
Detector Junction Box
The detector junction box has one chamber and two wire ports. The junction box, chamber and wiring ports provide
openings for wire, conduit, tool and hand access to terminal blocks. Detector to remote mount amplifier electrode and coil
wires connect to the detector through the chamber wire ports.
Figure 23: Detector junction box
• SUITABLY TRAINED PERSONNEL SHALL PERFORM ALL INSTALLATION OR REPAIR PROCEDURES.
• DISCONNECT POWER TO THE UNIT BEFORE ATTEMPTING ANY INSTALLATION OR MAINTENANCE.
• DO NOT BUNDLE OR ROUTE SIGNAL WIRES WITH POWER WIRES.
• USE PROPER CONDUIT, CONNECTIONS AND SUPPLIED CABLES IN ALL WIRING PROCEDURES.
• OBSERVE ALL LOCAL APPLICABLE ELECTRICAL CODES WHEN WIRING ANY EQUIPMENT.
MAG-UM-00158-EN-07Page 16 June 2018
Loading...
+ 36 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.