Badger Meter Industrial Turbo Operating Manual

4 (1)
Badger Meter Industrial Turbo Operating Manual

Industrial Turbo Meters

Sizes 2 in. through 6 in.

TUR-UM-00530-EN-21 (October 2017)

User Manual

Industrial Turbo Meters, Sizes 2 in. through 6 in.

Page ii

TUR-UM-00530-EN-21

October 2017

 

User Manual

 

 

 

CONTENTS

 

 

Scope of the Manual

5

 

Specifications

5

 

Product Unpacking and Inspection

5

 

Installation

5

 

Preliminary Considerations

5

 

Installing the Meter

6

 

Performance Checks

6

 

Operation

7

 

General Operating Instructions

7

 

Manual Operation

7

 

Accessory Controlled Operation

7

 

Shutdown Instructions

7

 

Maintenance

8

 

Maintenance Equipment

8

 

Preventive Maintenance

8

 

Periodic Inspection

8

 

Cleaning

8

 

Calibration Check and Adjustment

8

 

Accuracy Test

8

 

Change Gear Corrections

9

 

Electronic Scaling Correction

9

 

Calibrating 2 in. and 3 in. Meters

10

 

Register Base Replacement

10

 

Servicing

12

 

Change Gear Replacement

12

 

Instructions for Removing the Gear Train Assembly with Magnet

13

 

Instructions for Removing the Local Register

14

 

October 2017

TUR-UM-00530-EN-21

Page iii

Industrial Turbo Meters, Sizes 2 in. through 6 in.

Page iv

TUR-UM-00530-EN-21

October 2017

Scope of the Manual

SCOPE OF THE MANUAL

This manual contains information concerning the installation, operation and maintenance of Badger Meter® magnetic drive turbo meters. To efficiently operate the meters, you must read and understand the instructions given in this manual. Retain the manual in a location where it is readily available for reference.

SPECIFICATIONS

Maximum Operating Temperature

250.5° F (120.5° C)

 

 

 

 

 

 

Maximum Operating

 

 

 

Pressure

150 psi (10 bar)

 

 

 

 

 

 

 

Optional: 300 psi (bronze), 250 psi (cast iron)

 

 

 

 

 

 

 

 

 

 

 

Accuracy Over Entire Range*

± 1.5%

 

 

 

 

 

 

Repeatability

0.5 or better

 

 

 

 

 

 

Connections

Round flange ASA or DIN

 

 

 

 

 

 

Body Materials

SS 316, bronze, cast iron

 

 

 

 

 

 

Rotor and Nose Cone Materials

Ryton

 

 

 

 

 

 

Head Assembly Materials

SS 316 or bronze

 

 

 

 

 

 

Straightening Vane Material

SS 316

 

 

 

 

 

 

Head Gasket Materials

Asbestos, Nitrile or Chloroprene

 

 

 

 

 

 

O-Ring Materials

EPR, Buna, Viton A

 

 

 

 

 

 

Bearing and Magnet Material

Ceramic

 

 

 

 

 

 

Spindle

SS 316

 

 

 

 

 

 

PRODUCT UNPACKING AND INSPECTION

Upon opening the shipping container, visually inspect the product and applicable accessories for any physical damage such as scratches, loose or broken parts, or any other sign of damage that may have occurred during shipment.

NNOTE: If damage is found, request an inspection by the carrier’s agent within 48 hours of delivery and file a claim with the carrier. A claim for equipment damage in transit is the sole responsibility of the purchaser.

INSTALLATION

The procedures for installing Badger Meter turbo meters are essentially the same for all meter sizes. Any special instructions required for the installation and/or electrical connection of meter-mounted or free-standing accessory devices such as registers, pulse transmitters, valves and remote batch controllers are provided with those devices.

Preliminary Considerations

The Badger Meter 2…6 in. industrial turbo meters are designed for operation in HORIZONTAL piping arrangements.

If solid material is present in the liquid to be metered, a strainer may be required in the facility piping upstream of the meter. The 2 in., 3 in. and 4 in. meters require a strainer with 1/16 in. diameter holes and the 6 in. meter requires a strainer with 1/8 in. diameter holes.

To permit periodic cleanout of the meter and to provide a convenient means of stopping fluid flow during maintenance, incorporate a flushing system into the facility piping arrangement.

October 2017

TUR-UM-00530-EN-21

Page 5