Küppers Elektromechanik GmbH
Flow Meters
Liebigstraße 2 • D-85757 Karlsfeld • Tel. +49 81 31/59 39 10 • Fax +49 81 31/9 26 04
SRZ 400
Disassembly Instructions
Quality system certified to DIN EN ISO 9001
Slacken the M12 Allen screws on the outlet side and unscrew, but keep two opposed screws engaged by
1–2 turns (those green ones shown on the picture) Now remove all others.
Hold onto the righthand housing and tap the opposing bolts gently with a hammer/mallet to part the housing in parallel direction. Do not attempt to use screwdrivers or similar to split the housing, as otherwise
the shafts, bearings and locating pins may be damaged.
Put the housing in an upright position. Unscrew the four M4 Allen screws to remove the spindle pair. The
screws are fixed with Loctite 648. Clean all parts also remove the O-rings and clean the groove before fitting the new O-rings. Please also check the bearing bolt. It must be replaced in case of any damage.
SRZ 400 Disassembly Instructions
Küppers Elektromechanik GmbH
Flow Meters and Electronics: Design • Manufacture • Distribution
Internet
Copyright KEM, subject to change without notice, Zi Rev. 001/11/07
http://www.kem-kueppers.com