Arrow YS47, TSCYS47H4, YS47EU, YS47Z Owner's Manual

Owner's Manual & Assembly Instructions
AK01
Model No.
TSCYS47H4
YS47
A A
697.68601 YS47EU
YS47Z
A A A
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085 or assist@arrow-
sheds.com
Do not return to dealer, they are not
equipped to handle your requests.
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
Storage Area: 26 Sq. Ft. 154 Cu. Ft.
2,4 m
BUILDING DIMENSIONS
Exterior Dimensions Interior Dimensions Door *Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening Size Size Width Depth Height Width Depth Height Width Height
4' x 7' 50 1/2" x 80 1/4" 49" 79 3/4" 82" 47 3/4" 77 1/2" 81 1/4" 38 1/2" 60 1/4"
1,2 m x 2,0 m 128,3 cm x 203,8 cm 124,5 cm 202,6 cm 208,3 cm 121,3 cm 196,9 cm 206,4 cm 97,8 cm 153,0 cm
2
4,4 m3
* Size rounded o to the nearest foot
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES WHEN HANDLING METAL PARTS.
GB: Assembly manual in additional languages available online. Scan QR code below to access.
FR: Manuel de montage disponible en ligne dans d’autres langues. Pour y accéder, scannez le code QR ci-dessous.
SP: Manual de montaje en idiomas adicionales disponible online. Escanee el código QR a continuación para acceder.
DE: Montageanleitung in zusätzlichen Sprachen online verfügbar. Scannen Sie den QR-Code unten, um darauf zuzugreifen.
I T: Manuale dell’assemblea in altre lingue disponibile online. Per accedere effettua la scansione del codice QR in basso.
P T: Manual de montagem disponível em outros idiomas online. Digitalize o código QR abaixo para obter acesso.
D T: Samlingshåndbog i yderligere sprog til rådighed online. Scan QR kode nedenunder for at få adgang.
SK:Nainternetejekdispozíciinávodnazostavenievďalšíchjazykoch.
Dostanete sa k nemu naskenovaním kódu QR.
CZ:Návodkmontáživdalšíchjazycíchjekdispozicivonlineverzi.  PřístupzískáteponaskenováníQRkóduníže.
HU: Azösszeszerelésiútmutatótovábbinyelvekeniselérhetőonline.
A hozzáféréshez olvassa be az alábbi QR-kódot.
GR: Υπάρχειδιαθέσιμοστοδιαδίκτυοτοεγχειρίδιοσυναρμολόγησης  σεπερισσότερεςγλώσσες.Σαρώστετονπαρακάτωκώδικα   QRγιανααποκτήσετεπρόσβαση.
P/N 6PP722621216
A03
BEFORE YOU BEGIN....
Owner's Manual
Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable.
Assembly Instructions: Instructions are supplied in this manual and contain all
appropriate information for your building model. Review all instructions before you begin, and during assembly, follow the step sequence carefully for successful results.
Flooring and Anchoring: Your storage building must be anchored to prevent wind
damage. A base is necessary to construct a square and level building. Anchoring and base materials are not included with your building. We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available at your local dealer, Arrow's website arrowsheds.com or call Arrow's Customer Service department 1-800-851-1085) or you may construct a base and anchoring system of your choice. Your assembly instructions provide information on a few methods commonly used to secure and level a storage building.
Parts and Parts List: Check to be sure that you have all the necessary parts for
your building.
•All part numbers can be found on the parts. All of these numbers (before the -) must agree with the numbers on the Parts List page.
•If you  nd that a part is missing, include the model number of your building and contact:
Arrow Shed, LLC Customer Service Department 1101 North 4th Street Breese, Illinois 62230
•Separate contents of the carton by the part number while reviewing parts list. The  rst few steps show how to join related parts to make larger sub assemblies which will be used later.
•Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience.
1-800-851-1085 or assist@arrowsheds.com
A04
PLAN AHEAD....
Watch the Weather: Be sure the day you select to install your building is dry and calm.
Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground.
Teamwork: Whenever possible, two or more people should work together to assemble
your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.
Tools and Materials: These are some basic tools and materials you will need for the
construction of your building. Decide which method of anchoring and the type of base you wish to use in order to form a complete list of the materials you will need.
Required
• Eye Goggles
• No. 2 Phillips Screwdriver
(With Hardened Magnetic Tip) Note: A power screwdriver or vari­able speed drill with Phillips-tip attachment can speed assembly by as much as 40%.
• Work Gloves
• Step Ladder
• Utility Knife / Scissors
• Pliers
• Carpenter's Level
• Tape Measure
Required
Optional Time-Savers
• Wrench / Nut Driver
• Electric / Cordless Drill
• Square
• String (for squaring frame)
Base Preparation
• Hammer and Nails
• Spade or Shovel
• Hand Saw / Power Saw
• Lumber and/or Concrete
Selecting and Preparing Your Site: Before assembly, you will want to decide on a
location for your building. The best location is a level area with good drainage.
•Allow enough working space for ease of moving parts into position during assembly. Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside.
•Before you begin the  rst steps in assembling your parts, a base should be constructed and an anchoring system should be ready to use.
A05
Safety precautions are important to follow throughout the construction of your building.
SAFETY FIRST....
•Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building.
safety edge
sharp edge
sharp edge
safety edge
•Keep children and pets away from worksite to avoid distractions and any accidents which may occur.
•Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
•Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds. Call 1-800-851-1085 or assist@ arrowsheds.com
•Never concentrate your total weight on the roof of the building. When using a step ladder make sure that it is fully open and on even ground before climbing on it.
•Do not attempt to assemble the building on a windy day, because the large panels acting as a "sail", can be whipped about by the wind making construction di cult and unsafe.
A06
CARE & MAINTENANCE....
Finish: For long lasting  nish, periodically clean and wax the exterior surface. Touch-up
scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation.
Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy
amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation. Contact Arrow as outlined on the Ordering Accessories page to place an order.
Doors: Always keep the door tracks clear of dirt and other debris that prevent them from
sliding easily. Lubricate door track annually with furniture polish or silicone spray. Keep doors closed and locked to prevent wind damage.
Fasteners: Use all washers supplied to protect against weather in ltration and to protect
the metal from being scratched by screws. Regularly check your building for loose screws, bolts, nuts, etc. and retighten them as necessary.
Moisture: A plastic sheet (vapor barrier) placed under the entire  oor area with good
ventilation will reduce condensation.
Other Tips....
• Wash o inked part numbers on coated panels with soap and water.
• Silicone caulking may be used for watertight seals throughout the building.
Do not store swimming pool chemicals in your building. Combustibles and corrosives must be stored in air tight approved containers.
Keep this Owner's Manual and Assembly Instructions for future reference.
A07
BEFORE
AFTER
ACCESSORIES....
ROOF STRENGTHENING (heavy snow load) KITS
Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof.
ANCHOR KITS
Model No. AK4
Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground. For buildings larger than 10'x9' (3,0 m x 2,6 m), use 2 kits.
Model No. AK100
New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab. Each kit contains heavy-duty, hot-dipped galvanized steel corner gussets and perimeter clips which  t over the  oor frame and lag bolt into a concrete slab. Full assembly instructions and a 1/4" masonary drill bit are included.
FLOOR FRAME KITS
MODELS FB47410, FB5465, FB106-A
FB109-A and FB1014-A
A simple new  oor frame system made of heavy-duty, hot-dipped galvanized steel. Use as base for plywood, sand or stone.
ATTIC KIT / WORKBENCH KIT
Model No. AT101
Heavy-duty galvanized steel bars that  t all 10' (3,0 m) wide Arrow buildings. They install quickly and easily to help organize space and create more useable space as an attic or workbench. Will hold up to 250 lbs. (113 kg) evenly distributed.
Some drilling required to  t buildings without mid-wall bracing.
Model No. AK600
Earth Anchor Kit anchors any size Arrow building to the ground. Each kit contains heavy duty, hot-dipped galvanized steel corner gussets and 4 earth anchors.
TOOL HANGING RACK
Model No. TH100
The perfect tool organizer. Twin 25 1/2" (64,8 cm) steel channels plus  ve heavy-duty snap-in hangers and a small tool holder for screwdrivers, pliers, etc. Holders slide along channel for fully adjustable spacing. Great for garage, basement, or the back of any door. Fits all Arrow storage buildings.
SHELF UNITS
Heavy-duty, galvanized steel shelf units help organize storage space. They easily mount on the wall or sit on the  oor. Fits all Arrow buildings.*
Model No. SS404
• Makes 8" to 12" (20,3-30,5 cm) wide shelves in any length.
• Brackets, braces, hardware included. Lumber is not included.
* Some drilling required to  t buildings without mid-wall bracing.
Model No. SS900-B
• Grey color
• 3 shelves
• Holds up to 85 lbs. (38 kg) (even weight distribution)
A08 02/13
We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is o ering them to you on a direct basis.
There are two ways to order Arrow Storage Building Accessories:
ORDERING ACCESSORIES....
Option 1
Accessories can be purchased
through
arrowsheds.com
SPECIAL NOTE:
If your accessory is shipped via truck line a day time phone number is required to arrange delivery. If no one is available to sign for the delivery, you may be subject to a re-delivery charge assessed by the carrier.
Order accessories by telephone
using your MasterCard or Visa credit card.
Call toll free 1-800-851-1085
Allow 2 weeks for delivery.
Option 2
(Customer Service).
BR9
Base
The Base For Your Building
OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB47410)
Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A. To support a plywood deck B. To be  lled with sand. We recommend the combined use of
1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground. Allow 1 - 2 hours for construction.
OPTION 2: Wood Platform
If you decide to build your own base, be sure to select the appropriate materials. These are the recommended materials for your base:  2 x 4's (38 mm x 89 mm) Pressure Treated Lumber  5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade NOTE: Pressure Treated Lumber must not be used where it will make contact with your storage building. The properties of Pressure Treated Lumber will cause accelerated corrosion.
If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided.
 10 & 4 penny Galvanized Nails  Concrete Blocks (optional)
16"/24"
The platform should be level and  at (free of bumps, ridges etc.) to provide good support for the building. The necessary materials may be obtained from your local lumber yard.
40,6 cm/61,0 cm
To construct the base follow instructions and diagram. Construct frame (using 10 penny galvanized nails) Measure 16"/24" (40,6 cm/61,0 cm) sections to construct inside frame (see diagram) Secure plywood to frame (using 4 penny galvanized nails)
Allow 6 - 7 hours for construction.
Note: Platform/Slab will extend 9/16" (1,4 cm) beyond  oor
frame on all four sides. Seal this 9/16" (1,4 cm) of wood with a
roo ng cement (not included), or bevel this 9/16" (1,4 cm) of
80 1/4"
203,8 cm
concrete when pouring, for good water drainage.
OPTION 3: Concrete Slab
The slab should be at least 4" (10,2 cm) thick. It must be level and  at to provide good support for the frame. The following are the recommended materials for your base.  1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures)  Concrete  Sheet of 6 mil plastic  We recommend for a proper strength concrete to use a mix of: 1 part cement  3 parts pea sized gravel  2 1/2 parts clean sand
Prepare the Site/Construct a Base
1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).
2. Fill up to 4" (10,2 cm) in the square with gravel and tamp  rm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm) lumber.
5. Pour in concrete to  ll in the hole and the frame giving a total of 4" (10,2 cm) thick concrete. Be sure surface is level.
80 1/4"
203,8 cm
Note: Finished Slab dimensions, with lumber removed.
50 1/2"
128,3 cm
50 1/2"
128,3 cm
FRONT
(DOOR)
FRONT
(DOOR)
Allow 3 - 5 hours for construction and a week for concrete curing time.
9
Loading...
+ 19 hidden pages