Arrow NP8667, SA8667, RMW86 User Manual

5 (3)
Arrow NP8667, SA8667, RMW86 User Manual

Owner's Manual & Assembly Instructions

T01et

Model No. NP8667

RMW86

SA8667

R

Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds.com

Do not return to dealer, they are not equipped to handle your requests.

717970215

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAUTION: SOME PARTS HAVE SHARP EDGES. CARE

 

 

 

 

 

 

 

 

 

 

Storage Area:

43 Sq. Ft.

255 Cu. Ft.

 

 

 

 

 

 

 

MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES

 

 

4,0 m2

 

7,2 m3

 

 

 

TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ

 

 

 

 

 

 

 

 

 

SAFETY INFORMATION PROVIDED IN THIS MANUAL

 

 

 

 

 

 

 

 

 

BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES

 

 

 

 

 

 

 

 

 

BUILDING DIMENSIONS * Size rounded off to the nearest foot

WHEN HANDLING METAL PARTS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Exterior Dimensions

Interior Dimensions

 

Door

 

*Approx.

 

Base

 

(Roof Edge to Roof Edge)

(Wall to Wall)

 

Opening

 

Size

 

Size

 

Width

Depth

Height

Width

Depth

Height

Width

Height

 

8' x 6'

97 1/2" x 68 3/4"

99 3/4"

 

71 1/4"

74 7/8"

94 3/4"

66"

73 5/8"

43 1/2"

65"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2,4 m x 1,7 m 247,7 cm x 174,6 cm

253,4 cm

181,0 cm

190,2 cm

240,7 cm

167,6 cm

187,0 cm

110,5 cm

165,1 cm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BEFORE YOU BEGIN....

A03

Owner's Manual

Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual.

Important information and helpful tips will make your construction easier and more enjoyable.

Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model. Review all instructions before you begin, and during assembly, follow the step sequence carefully for successful results.

Flooring and Anchoring: Your storage building must be anchored to prevent wind damage. A base is necessary to construct a square and level building. Anchoring and base materials are not included with your building. We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available at your local dealer, Arrow's website arrowsheds.com or call Arrow's Customer Service department 1-800-851-1085) or you may construct a base and anchoring system of your choice. Your assembly instructions provide information on a few methods commonly used to secure and level a storage building.

Parts and Parts List: Check to be sure that you have all the necessary parts for your building.

•All part numbers can be found on the parts. All of these numbers (before the -) must agree with the numbers on the Parts List page.

•If you fi nd that a part is missing, include the model number of your building and contact:

Arrow Shed, LLC

Customer Service Department

1101 North 4th Street

Breese, Illinois 62230

1-800-851-1085

or assist@arrowsheds.com

•Separate contents of the carton by the part number while reviewing parts list. The fi rst few steps show how to join related parts to make larger sub assemblies which will be used later.

•Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience.

PLAN AHEAD....

A04

Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground.

Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.

Tools and Materials: These are some basic tools and materials you will need for the construction of your building. Decide which method of anchoring and the type of base you wish to use in order to form a complete list of the materials you will need.

Required

Eye Goggles

No. 2 Phillips Screwdriver

(With Hardened Magnetic Tip)

Note: A power screwdriver or variable speed drill with Phillips-tip attachment can speed assembly by as much as 40%.

Required

 

 

• Work Gloves

Optional Time-Savers

Base Preparation

• Step Ladder

• Utility Knife / Scissors

• Wrench / Nut Driver

• Hammer and Nails

• Pliers

• Electric / Cordless Drill

• Spade or Shovel

• Carpenter's Level

• Square

• Hand Saw / Power Saw

• Tape Measure

• String (for squaring frame)

• Lumber and/or Concrete

Selecting and Preparing Your Site: Before assembly, you will want to decide on a location for your building. The best location is a level area with good drainage.

•Allowenoughworkingspaceforeaseofmovingpartsintopositionduringassembly. Besurethere will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside.

•Before you begin the fi rst steps in assembling your parts, a base should be constructed and an anchoring system should be ready to use.

SAFETY FIRST....

A05

Safety precautions are important to follow throughout the construction of your building.

•Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building.

safety edge

sharp edge

sharp edge

safety edge

•Keep children and pets away from worksite to avoid distractions and any accidents which may occur.

•Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.

•Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds. Call 1-800-851-1085 or assist@ arrowsheds.com

•Never concentrate your total weight on the roof of the building. When using a step ladder make sure that it is fully open and on even ground before climbing on it.

•Do not attempt to assemble the building on a windy day, because the large panels acting as a "sail", can be whipped about by the wind making construction diffi cult and unsafe.

CARE & MAINTENANCE....

A06

Finish: For long lasting fi nish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation.

Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation. Contact Arrow as outlined on the Ordering Accessories page to place an order.

Doors: Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily. Lubricate door track annually with furniture polish or silicone spray. Keep doors closed and locked to prevent wind damage.

Fasteners: Use all washers supplied to protect against weather infi ltration and to protect the metal from being scratched by screws. Regularly check your building for loose screws, bolts, nuts, etc. and retighten them as necessary.

Moisture: A plastic sheet (vapor barrier) placed under the entire fl oor area with good ventilation will reduce condensation.

Other Tips....

Wash off inked part numbers on coated panels with soap and water.

Silicone caulking may be used for watertight seals throughout the building.

Do not store swimming pool chemicals in your building. Combustibles and corrosives must be stored in air tight approved containers.

Keep this Owner's Manual and Assembly Instructions for future reference.

ACCESSORIES....

A07

ROOF STRENGTHENING (heavy snow load) KITS

Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%.

ANCHOR KITS

Model No. AK4

Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground. For buildings

larger than 10'x9' (3,0 m x 2,6 m), use 2 kits.

Model No. AK100

New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab. Each kit contains heavy-duty, hot-dipped galvanized steel corner gussets and perimeter clips which fi t over the fl oor frame and lag bolt into a concrete slab. Full assembly instructions and a 1/4" masonary drill bit are included.

FLOOR FRAME KITS

MODELS FB47410, FB5465, FB106-A

FB109-A and FB1014-A

Asimplenewfl oorframesystemmadeofheavy-duty,hot-dipped galvanized steel. Use as base for plywood, sand or stone.

ATTIC KIT / WORKBENCH KIT

Model No. AT101

Heavy-duty galvanized steel bars that

fi t all 10' (3,0 m) wide Arrow buildings.

They install quickly and easily to help organize space and create more useable space as an attic or workbench. Will hold up to 250 lbs. (113 kg) evenly distributed.

Some drilling required to fi t buildings without mid-wall bracing.

Model No. AK600

Earth Anchor Kit anchors any size Arrow building to the ground. Each kit contains heavy duty, hot-dipped galvanized steel

corner gussets and 4 earth anchors.

TOOL HANGING RACK

Model No. TH100

The perfect tool organizer. Twin 25 1/2" (64,8 cm) steel channels plus fi ve heavy-duty snap-in hangers and a small tool holder screwdrivers, pliers, etc. Holders slide along channel for fully adjustable spacing. Great for garage, basement, or the back of any door. Fits all Arrow storage buildings.

SHELF UNITS

Heavy-duty, galvanized steel shelf units help organize storage space. They easily mount on the wall or sit on the fl oor. Fits all

Arrow buildings.*

Model No. SS404

Model No. SS900-B

Makes 8" to 12" (20,3-30,5 cm) •

Grey color

 

wide shelves in any length.

3 shelves

Brackets, braces,

Holds up to 85 lbs. (38 kg)

 

hardware included.

 

(even weight distribution)

 

Lumber is not included.

 

 

* Some drilling required to fi t buildings without mid-wall bracing.

 

A08

....ORDERING ACCESSORIES

02/13

 

 

 

 

 

 

 

 

 

 

 

We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is offering them to you on a direct basis.

There are two ways to order Arrow Storage Building Accessories:

 

 

 

 

 

 

 

 

Option 1

Option 2

 

 

 

 

Accessories can be purchased

Order accessories by telephone

 

 

 

 

through

using your MasterCard or Visa credit card.

 

 

 

 

arrowsheds.com

Call toll free 1-800-851-1085

 

 

 

 

 

(Customer Service).

 

 

 

 

 

Allow 2 weeks for delivery.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SPECIAL NOTE:

If your accessory is shipped via truck line a day time phone number is required to arrange delivery. If no one is available to sign for the delivery, you may be subject to a re-delivery charge assessed by the carrier.

Base

B09

The Base For Your Building

No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete.

OPTION 1: Directly on ground (earth)

Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). If you choose this option Arrow has a simple kit available to provide a fl oorinside the shed to keep stored items off the ground. This kit can be used to support a plywood fl oor (wood not included) or be fi lled with sand/rock to provide a solid surface. (Order No. FB106-A or 68381-A)

Allow 1 - 2 hours for construction.

OPTION 2: Wood Platform

If you decide to build your own base, be sure to select the appropriate materials. These are the recommended materials for your base:

2 x 4's (38 mm x 89 mm) Pressure Treated Lumber

5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade NOTE: Pressure Treated Lumber must not be used where it will make contact with your storage building. The properties of Pressure Treated Lumber will cause accelerated corrosion.

If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided.

10 & 4 penny Galvanized Nails Concrete Blocks (optional)

The platform should be level and fl at (free of bumps, ridges etc.) to provide good support for the building. The necessary materials may be obtained from your local lumber yard.

To construct the base follow instructions and diagram.

Construct frame (using 10 penny galvanized nails) Measure 16"/24" (40,6 cm/61,0 cm) sections to construct inside frame (see diagram)

Secure plywood to frame (using 4 penny galvanized nails)

FRONT (DOOR)

97

1/2"

247,7

cm

 

 

40,6

16"/24"

 

 

cm/61,0

cm

 

 

3/4"

68

cm

174,6

Allow 6 - 7 hours for construction.

Note: Platform/Slab will extend 9/16"

(1,4 cm) beyond fl oor

 

frame on all four sides. Seal this 9/16"

(1,4 cm) of wood with a

roofi ng cement (not included), or bevel this 9/16" (1,4 cm) of

concrete when pouring, for good water drainage.

OPTION 3: Concrete Slab

The slab should be at least 4" (10,2 cm) thick. It must be level and fl at to provide good support for the frame.

The following are the recommended materials for your base.

1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures) Concrete Sheet of 6 mil plastic

We recommend for a proper strength concrete to use a mix of:

1 part cement 3 parts pea sized gravel 2 1/2 parts clean sand

Prepare the Site/Construct a Base

1.Dig a square, 6" (15,2 cm) deep into the ground (remove grass).

2.Fill up to 4" (10,2 cm) in the square with gravel and tamp fi rm.

3.Cover gravel with a sheet of 6 mil plastic.

4.Construct a wood frame using four planks of 1x4 (19 mm x 89 mm) lumber.

5.Pour in concrete to fi ll in the hole and the frame giving a

total of 4" (10,2 cm) thick concrete. Be sure surface is level.

97 1/2" 247,7 cm

3/4" 68 cm 174,6

Allow 3 - 5 hours for construction and a week for concrete curing time. Note: Finished Slab dimensions, with lumber removed.

9

Anchoring

A10

Anchoring Down The Building

It is important that the entire fl oor frame be anchored after the building is erected.

Below are recommended ways of anchoring.

Arrow Anchoring Kit: (Model No. AK4 or 60298) Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction.

Anchoring into Wood/Post:

Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) dia. holes provided in the frames for proper anchoring.

1.

2.

OVER THE BEAMS

 

AND INTO THE GROUND

 

Arrow Anchoring Kit: (Model No. AK100 or 68383) Recommended for use with the concrete base. Contains: Corner gussets, perimeter clips, hardware, 1/4" masonary drill bit and installation instruction.

Anchoring into Concrete:

1.For poured concrete slab or footing or patio blocks:

Use 1/4" x 2" (6 mm x 51 mm) Lag Screws.

2.For Anchor Post of Concrete poured after building is erected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws.

1.

2.

10

Loading...
+ 22 hidden pages