Arrow NK1162 Installation Instructions

Page 1
It is important that the entire
floor frame be anchored after
the building is erected.
INTRODUCTION
This anchor kit is intended for use on all Arrow storage buildings.
TOOLS AND MATERIALS REQUIRED
Carpenter's Level ● 1/4" Masonary Drill Bit(Supplied)
Drill (Electric) #2 Phillips Head Screwdriver
Safety Glasses Tape Measure
1/4" (6,4mm) Drill Bit Hammer
Work gloves & long sleeves
ASSEMBLY INSTRUCTIONS:
Read the instructions and study the illustrations carefully. Follow the step by step instructions to properly Anchor your Storage Building.
RETAIN THIS MANUAL AND PARTS LIST AFTER ASSEMBLY FOR FUTURE REFERENCE.
CHECK THE CONTENTS:
Check the contents of carton against the Parts List. Identify parts to those shown in the illustrations. This will help you become
familiar with the parts on sight.
SAFETY RULES:
Make sure no one is in path while drilling.
Wear safety glasses, work gloves and long sleeves
while drilling.
ANCHORING THE STORAGE BUILDING TO A CONCRETE PATIO OR SLAB
This concrete Anchor Kit comes complete with masonary drill bit, fasteners and easy to follow instructions. For proper installation, it is important that the overall size of the patio/slab has approxi­mately 9/16" (1,4cm) clearance between frame and edge of con­crete around entire perimeter.
PARTS LIST
ANCHOR KIT #AK100
Key # Part # Description (Quan.)
1 8397 Corner Gusset (4) 2 8398 Hold Down Clip (11)
Anchor Bolt (16)
3 66159 #10 x 1/2" (13mm) Screw (39)
Masonary Drill Bit-1/4" (1)
- 704960309 Instructions (1)
1 2 3 Hardware Kit
Anchor Bolt Location
Floor Frame Assembly
of Storage Building
Equally Spaced Along Floor Frame
IMPORTANT: Make sure Floor Frame is level and square
before proceeding with the anchoring.
One Anchor Kit is recommended for most buildings. Anchors are used at each corner and spaced evenly along the Floor Frame.
NOTE: The following must be considered before starting to drill
concrete for installation of Hold Down Clips:
1. If your building has Floor Frame Splices.
A. Assemble and position Floor Frame. B. Mark and drill hole location as described above.
This kit contains four Gussets to anchor the Floor Frame corners. If your building is supplied with Gussets (some models have them), disregard the ones supplied with the building.
Limits of
Floor Frame
Anchor Bolt
Corner Gusset
ENTRANCE
Slab To Extend 9/16" (1,4cm)
Beyond Floor Frame
Page 2
Drill 1/8" (3,2mm) diameter hole
Floor Frame
Slab/Patio
Anchor Bolt
Corner Gusset
9/16" (1,4cm)
(All Around)
STEP 1
Corner Gusset Installation
1. Position Gussets into corners of Floor Frame with flanged edges "UP".
2. Attach Gussets through aligning holes, or drill 1/8" (3,2mm) holes.
3. Through hole in center of Gusset, drill 1/4" (6,4mm) diameter hole in concrete using the Masonary Drill Bit supplied.
IMPORTANT: Holes drilled in concrete must be at right
angle to surface and 2" (5,1cm) deep. Use drill bit furnished. Holes must not be more than 1/32" (0,1cm) over size or anchor bolts will not hold.
4. Place Anchoring Bolt in hole drilled and tap head
with hammer to set into place. Tighten nut with wrench.
Hold Down Clip
FIGURE 1
Anchor Bolt
Hold Down Clip
Anchor Bolt
Drill 1/8" (3,2mm)
diameter hole
Floor
Frame
Drill 1/8" (3,2mm)
diameter hole
Wall Panel Rib
Floor Frame
FIGURE 3
Ref. Size 25/32" (2,0cm)
Ref. All Other Sizes
FIGURE 2
STEP 2
Hold Down Clip Installation
1. Position Clips on Floor Frame (by panel rib) at equally spaced intervals and attach using screws through existing holes or drill 1/8" (3,2mm) holes. See Figure 1, 2 or 3.
2. NOTE: If other size Floor Frames (Figure 2) are to be
anchored, you must bend Hold Down Clips "UP" before attaching to Floor Frame. (Figure 3) is for buildings 12'x10' (3,7m x 3,0m) through 14'x31' (4,3m x 9,4m) with channel style floor frames. Additional kits may be required.
3. Drill holes in concrete and anchor Clips to concrete in same manner as described in Step 1.
STEP 3
Front Frame Anchor Installation
1. Drill 1/4" (6,4mm) hole at center of Front Floor Frame as shown. Switch to Masonary Bit supplied and continue drilling to a 2" (5,1cm) depth.
2. Anchor Frame to concrete with an Anchoring Bolt in the same manner as described in Step 1.
704960309
Front Floor Frame
with Ramp
For replacement parts or any questions concerning your anchor kit, include the model no. of your kit and contact: