A.R.I. DG 101 User Manual

MAINTENANCE INSTRUCTIONS
COMBINATION AIR VALVE BARAK, MODEL DG-10 1”
GENERAL INSTRUCTIONS
Routine service is an integral part of the standard procedure for maintenance of a water supply system. Recommended routine maintenance– once or twice a year, according to the quality and type of the uids in the system.
Close the service valve under the valve base before servicing. Turn the valve body (1) counterclockwise, release and remove. From inside the valve body (1), remove the clamping stem (4) and carefully pull out the oat (5) with the attached rolling seal (3). Check the soundness of the rolling seal (3) by washing it with water and examining it. Replace the rolling seal in case it is torn. Wash the body (1) and the oat (5) with clean water and examine it for damage. Replace the oat (5) if it is damaged. Clean the drainage elbow (2) to remove insects and debris. Return the oat (5) with the attached rolling seal (3) to its original position in the valve body (1) and lock them into place with the clamping stem (4). Return the valve body (1) to the base (7) and close by turning it clockwise, making sure that the O-ring (6) is situated in its place in the base of the valve (7). Remember to open the service valve after the servicing.
PARTS SPECIFICATION
NO. DESCRIPTION MATERIAL
1. Body Reinforced Nylon
2. Drainage Elbow Polypropylene
3. Rolling Seal E.P.D.M.
4. Clamping Stem Reinforced Nylon
5. Float Foamed Polypropylene
6. O-ring Buna-n
7. Base Reinforced Nylon / Brass
1
2
3
4
5
6
7
TROUBLESHOOTING
SYMPTOM
Outlet thread size needed in order to attach a drainage hose.
Built-in plastic screen is not accepted by health department.
Plastic body and/or base not acceptable.
CAUSE
Valve was hit or mishandled.Right angle outlet is broken.
End user needs to connect a drainage pipe from the valve outlet in order to drain excess water.
is is an above ground installation.
Oer the cast iron or stainless steel body. Also oer the bronze or stainless steel base.
CORRECTIVE ACTION
Easy to replace: gently pry o the outlet with screwdriver Pressure insert the new right angle using a plastic hammer. Replacement part can be ordered from A.R.I. Note: e part is not mandatory for the function of the valve.
D040 has 3/8” female thread. 2” D040 has 1¼” female thread. End of pipe must be left open in order for valve to function.
ARI oers an approved 316 stainless screen that threads into the 2" valve. GSM in California has made one for the 1” valve.
We provide several alternatives for those who do not want plastic.
Valve spits water.
Valve is continuously leaking.
is is normal at start up and during pressure test. Could be debris in the sealing mechanism.
Line pressure issues, (inadequate pressure), or debris lodged in seal or o-rings.
Plastic threads stripped.Valve leaks from threads.
Open the valve. Clean and check integrity of the sealing mechanism and O-ring seals.
Check line pressure. It needs at least 3 psi to seal tight. Is the valve on a booster pump? Can be installation issue if valve is level with the water level in a tank ­there is no pressure to seal. Open valve and clean sealing mechanism, check the rolling seal and o-rings for wear or tear. Replace if necessary.
Check for cross-threading. Replace bottom of valve or oer the cast metal base.
A.R.I FLOW CONTROL ACCESSORIES Ltd.
Kfar Charuv 12932 Israel Tel. 972-4-6761803 Fax. 972-4-6763402 WWW.ARIVALVES.COM ari@ari.co.il
MAINTENANCE INSTRUCTIONS DG-10 1”
EnM-DG101-10
Loading...