A.R.I. D023 User Manual

M
A
I
N
T
E
N
A
N
C
E
I
N
S
T
R
U
C
T
I
O
N
M
A
I
N
T
E
N
A
N
C
E
I
N
S
T
R
U
C
T
M
A
I
N
T
E
N
A
N
C
E
I
N
S
T
R
U
C
T
I
I
O
O
N
N
S
S
S
MODEL D-023
A. Installation
1. The SAV (sewage air valve) should be installed vertically on a riser on the crown of the pipeline.
2. An inlet isolating valve should be installed underneath the SAV.
B. Periodic Maintenance
1. Shut off the isolating valve underneath the air valve.
2. Open the pressure relief valve (21) and make sure internal pressure is released.
3. Open and remove all four bolts (20) on the top cover of the air valve.
4. Pull out and remove the float and cover assembly as one piece. (1- 3, 5 - 17).
5. Rinse with water and wipe clean the float and cover assembly as well as the inner
6. Insert the float and cover assembly into the valve body in the correct direction
7. Close the pressure relief valve (21) and re-open the isolating valve.
The frequency for periodic maintenance depends on suspended solids and grease-load conditions. With high loads, the frequency should be once a month. In low loads, it should be at least once every year.
surface of the valve body.
(see fig. 1) and tighten the bolts (20).
NOTE: Make sure that the O-ring (4) is properly seated in its groove on the valve body (4).
Fig. 1
A.R.I FLOW CONTROL ACCESSORIES
KIBBUTZ KFAR CHARUV 12932 WWW.ARIVALVES.COM TEL. 972-4-6761988 FAX. 972-4-6763402 E.MAIL: ari@ari.co.il
Loading...