Argos 803159F ASSEMBLY INSTRUCTIONS

Seattle 4Ft6
Assembly Instructions- Please keep for future reference
DR82532
2177450
2376000
Dimensions
Width - 166,9cm
Depth - 195,4cm
Height - 95,0cm
Important Please read these instructions fully before starting assembly
If you need help or have damaged or missing parts, call the Customer Helpline:
03456 400 800
we recommend that you
build your unit on the
carton(s) it was packed in.
Issue 1.1 - 05/11/14
Safety and Care Advice
Important – Please read these instructions fully before starting assembly
• Check you have all the components and tools listed on pages 2 and 3.
• Remove all fittings from the plastic bags and separate them into their groups.
• Keep children and animals away from the work area, small parts could choke if swallowed.
• Make sure you have enough space to layout the parts before starting.
• Do not stand or put weight on the product, this could cause damage.
• Assemble the item as close to its final position (in the same
room) as possible.
• Assemble on a soft level surface to avoid damaging the unit or your floor.
• Parts of the assembly will be easier with 2 people.
power drill is set on a low torque setting.
• Dispose of all packaging carefully and responsibly.
Glue safety - Take care when using glue, please follow the advice below
Skin contact: Remove
contamination by washing with soap and water. This procedure should also be followed prior to eating and drinking.
Eye contact: Rinse immediately with clean water for 15 minutes and seek medical advice.
If swallowed: Seek medical advice immediately.
•To reduce the likelihood of damaging your product please ensure that your
Care and maintenance
• Only clean using a damp cloth and mild detergent, do no use bleach or abrasive cleaners.
Handy Hints
• Assemble all parts and bolts loosely during assembly, only once the product is complete should you fully tighten the bolts
• From time to time check that there are no loose screws on this unit.
• Regularly check and ensure that all bolts and fittings are tightend properly.
• This product should not be discarded with household waste. Take to your local authority waste disposal centre.
Note: if required the next page can be cut out and used as reference throughout the assembly. Keep this page with these instructions for future reference.
2
Components - Panels
If you have damaged or missing parts, call the
Customer Helpline:
Please check you have all the panels listed below
Left & Right plinth x 2
2
(191,0x15,0cm)
FA2530
Head board
1
(136.5x 51.7cm)
FA2533
Left & right rail X2
3
(191.0x 22,0cm)
P2040
03456 400 800
leg head end right
6
(95,0x 15,2cm)
P6007
Support rail X2
10
(189,7x 3,2cm)
MA2251
Drawerfront x 2
11
(94,6x 23,0 cm)
P4105
leg head left side
7
(95,0x 15,2cm)
P6006
Drawer left & right side x 4
12
(57,0x 14,5cm)
P4107
Head pannel
4
(136,5x 43,0cm)
P2038
leg foot right side
8
(43.4 x 15.2cm)
P6009
Foot board
5
(136,5x 43,2cm)
FA2536
9
leg foot left side
(43.4 x 15.2cm)
P6008
Drawer Back x 2
13
(90,0x 14,5cm)
P4109
Drawer Base x 2
14
(86,8x 57,0cm)
P4110
15
mid plinth
(191,4x 6,0 cm)
P7047
16
mid rail
(191,4x 22cm)
P2042
3
Components - Fittings
105
Please check you have all the fittings listed below
Note: The quantities below are the correct amount to complete the assembly. In some cases more fittings may be supplied than are required.
1/1
FK1012
A
15mm
Large locking nut x 68 (15x12mm) Wood dowel x 40 (8x30mm)
FK1400
D
Backpannelscrew x 28 (4x15mm)
FK1311
G
Chipboardscrew x 20 (3x15mm)
FK1236
J
Connecting plate x 3
FK1314
M
Chipboardscrew x 8 (4x25mm)
B
Locking screw x 32 (5x24mm)
E
Carcase screw x 52
(4x40mm)
H
Glue x 1
K
Double locking screw x 18
N
Wood dowel x 4 (5x30mm)
FK1011
FK1006
FA1510
FK1052
(24/24mm)
FK1410
C
F
Wheel x 10
I
Chipboardscrew x 18 (5x35mm)
L
Corner bracket x4
FK1411
FK1244
FK1326
FA15040
Tools required
Phillips screwdriver
(medium & large)
Flatblade screwdriver
(medium)
Setsquare
Eye protection (when using a hammer or drill)
Ruler - Use this ruler to help correctly identify the screws
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
The screws length is measured from the head to the point (30mm screw shown).
4
Small hammer
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
0 1 2 3 4 5 6
Ruler/tape measure
Scissors
110 115 120 125 130 135 140 145 150 155 160 165 170
Assembly Instructions
8
A
AAA
A
KKKKK
K
A
A
9
Step 1
a:
Foot end assembly
a: Insert 6x wood dowel
C with a smal amount of glue H into the holes of foot board 5.
b: Insert 3x large locking
nut A lockinginto screw K into leg foot right side 8. Use a screwdriver to turn 3x large locking nut A clockwise to lock.
and 3x double
C
C
b:
C
5
C
C
C
C: Insert 3x large locking
nut A lockinginto screw K into leg foot left side 9. Use a screwdriver to turn 3x large locking nut K clockwise to lock.
Continued on next page.
and 3x double
c:
5
Assembly Instructions
AAAAA
A
Step 1 - continued
d:
Foot end assembly
d: Attach leg foot right
side 8 and leg foot left side 9 on foot board 5 using 6x Large locking nut A.
Use a screwdriver to turn 6x large locking nut A clockwise to lock.
8
5
9
e: Screw 8x locking screw
B
into the holes on leg
foot side right 8, foot board 5 and leg foot side left 9
Step 2
Side assembly
next few steps must be done 2 times! (one assembly is left side other is right side.)
a:
e:
C
B
B
B
8
C
B
B
5
B
B
9
B
a: Insert 4x wood dowel
C with a smal amount of glue H into the holes of left & right plinth 2.
2
2x
Continued on next page.
6
C
C
Assembly Instructions
10
3
IIIIIIIII
2
EEEEE
3
3
Assembly Instructions
Step 2 - continued
Step x
Side assembly
Xxxxxx
x: x b: Insert 4x wood dowel
C with a smal amount of glue H into the holes of left & right rail 3.
c: Attach support rail
0 with 9x chipboard srews I to left & right rail
3
.
x: xx
b:
c:
C
C
2x
C
C
d: Attach left & right plinth
2 with 5x carcase srew E to left & right rail 3
x: xxx
Note: This step requires
2 people.
.
2x
d:
2x
7
Assembly Instructions
Assembly Instructions
Step x
Step 3
a:
Xxxxxx
Mid pannels assembly
x: x
a: Insert 2x wood dowel
C with a smal amount of glue H into the holes of mid rail ^.
Insert 4x large locking nut A into the holes of mid rail ^.
C
A
A
16
A
A
C
b: Insert 4x wood dowel
N with a smal amount of glue H into the holes of mid plinth %.
b:
N
N
15
N
N
8
Assembly Instructions
1
4
CCCCCCCCKKKKKKKKKKK
K
4
1
AAAAAAAAAAA
A
Step 4
Head end assembly
a: Insert 8x wood dowel
C with a smal amount of glue H into the holes of head board 1 and head pannel 4.
Note: We recommend to build this part on the packiging cartons to prevent damage to your product.
a:
b: Insert 12x large locking
nut A and12x double lockinginto screw K head board 1 and head pannel
4. Use a screwdriver to turn 12x large locking nut K clockwise to lock.
b:
Continued on next page.
9
Assembly Instructions
416
7
AAAAAAAAAAA
A
Step 4 - continued
Head end assembly
c: Apply a smal amount of
glue H onto wood dowel C already fixed into head board 1 and head pannel 4. Attach leg head right side 6 and leg head left side 7 to head panel 4 and head board 1 with 12x large locking nut A. Use a screwdriver to turn 12x large locking nut A clockwise to lock.
c:
Head end assembly
Turn the head end on the other side.
2 people required!
d: Screw 8 locking screws
into the holes on leg
B
head right side 6 , head pannel 4 and leg head left side 7.
d:
B
B
B
7
B
B
4
1
B
B
B
6
10
Assembly Instructions
AAAAA
Step 5
Final assembly
2 people required!
a: Glue dowels.
Attach the left and right rail and mid pannels to the foot board with 8x locking nuts A.
Use a screwdriver to turn 8x locking nut A clockwise to lock.
a:
2x
Continued on next page.
11
Loading...
+ 23 hidden pages