Assembly Instructions
5
Step 3
Step 4
Prepare the right end
Refer to step 1 and, if
you have chosen to fit 1
hanging rail or, an
internal chest or, a
shelf pack, screw 2
metal dowels into the
right end .
Note: Tighten the metal
dowels up fully against
the panels.
To fit the rail holder ,
screw through its top
hole with screw and
into the shallow mark
hole drilled in the right
end . Make sure that
it is fitted straight, in line
with the panel edges and
then fit another screw
using the lower hole.
B
K
J
J
1
1
B
B
K
1
Finished
front edge
Finished
front edge
Prepare the left end
Refer to step 1 and, if
you have chosen to fit 2
hanging rails, screw 2
metal dowels into the
left end .
Note: Tighten the metal
dowels up fully against
the panels.
To fit the 2 rail holders
screw through the top
hole with screw and
into the shallow mark
hole drilled in the left end
. . Make sure that they
are fitted straight, in line
with the panel edges and
then fit another screw
using the lower hole.
B
K
J
J
B
B
1
1
J
K
J
K
B
K
1
K
Only follow Steps 4 and 5 if you are fitting 2 hanging rails.
If you are just fitting 1 rail, follow Step 2 and 3.
Note: If you have purchased a shelf pack,
do not fit the rail holder.
Only follow Steps 2 and 3 if you are only fitting
1 hanging rail or, an internal chest or, a shelf pack.
If you are fitting 2 hanging rails, follow Step 4 and 5.