DOCUMENT NO.: I845200
REVISION LEVEL: B
ISSUED BY: Chad Nicolay DATE:08/21/13
APPROVED BY: __________ DATE: _______
APOLLO® ACTUATOR READY 3-PIECE BALL VALVES IOM GUIDE Page 2 of 7
2
Introduction
This manual presents guidelines for the Installation, Operation and Maintenance of manual and
automated Apollo Actuator Ready 3-Piece ball valves.
Storage & Protection
Valve should be stored in its original shipping container until just prior to installation with any
protection means in place and protected from the environment or any other potentially damaging effects.
Valve should be properly supported and secured before moving to prevent possible damage to valve,
property or harm to personnel.
Limitations
In-line service only, not recommended for end of line service.
Service to be compatible with the materials of construction. Prior to selection it is the user’s
responsibility to determine that the valve is appropriate for the intended application. Application not
to allow corrosion >.002"/year (.05mm/year).
The possibility of material deterioration in service and need for periodic inspections is the
responsibility of the user.
Mechanical supports are not to be welded directly to the valve, however may be fitted to the associated
piping.
It is the piping system designer’s responsibility to implement appropriate protection measures to
minimize reaction forces and moments, which result from supports, attachments, piping, etc.
Laws of the state must be observed as they apply.
Some National/Local authorities may require periodic hydrostatic testing and inspections.
Only use Conbraco replacement parts.
On-off service only (not to be used for throttling).
Valves are primarily intended for industrial use.
Level of training, experience or ability of users should be at least that of trained and skilled
maintenance personnel or technicians.
Installation
Valves must be installed in piping systems that comply with the applicable portions of ANSI B31.
Special consideration should be taken with respect to expansions and contractions of the piping system
and media flowing through it.
WARNING: All installations shall be provided with pressure relief devices in accordance with
the requirements of the Pressure Equipment Directive 97/23/EC. Proper installation prior to
initial operation is the user’s responsibility. Furthermore where an additional hazard can
occur due to valve exposure to fire or other unexpected external heat source, a supplemental
pressure relief device shall be installed to protect against excessive pressure. This device shall
prevent the pressure from rising more than 21% above the maximum allowable working
pressure.
Pre-Installation Inspection
Inspect the piping system prior to valve installation whenever possible, to insure that it has been
properly flushed and cleared of construction and fabrication debris. The seating surfaces in soft-seated
valves are particularly susceptible to weld slag and sand blasting grit. Pipe scale, metal chips and other
foreign materials should be avoided.
Just prior to installation, remove each valve from its packing, install handle and other parts if shipped
loose and remove any end covers. Examine the flow bore for debris. All Apollo ball valves are shipped in
the open position to prevent damage to the ball surface. Any grit or foreign matter must be removed. Do
not install a damaged valve.
It is also important to check for valve operation clearances. Valves can be installed at angles other than
upright or vertical.
I8452001418 S. Pearl Street Pageland SC USA 29728
APOLLO® ACTUATOR READY 3-PIECE BALL VALVES IOM GUIDE Page 3 of 7
3
Threaded end Valves
1) Pipe connections to be threaded into these valves should be accurately threaded, and free of dirt
and metal shavings. Two full wraps of PTFE thread sealant (Teflon tape) should be applied to the
threaded portion of the pipe prior to installation in the valve.
2) Use two wrenches when making the pipe joint. Apply one wrench on the end cap nearest the joint
being tightened to prevent transmitting torque through the body bolts.
Weld End Valves; Butt-weld and Socket-welding
1) Only personnel qualified per ASME BPVC Section IX should weld pressure-containing components.
Only qualified weld procedures should be employed.
2) Place the valves in fully open position and remove handles, operator or actuators.
3) Align in the piping system. For socket-weld valves, slip into the piping system retracting the pipe
approximately 1/16” (1.5mm) from the bottom of socket weld connections.
4) Wrap the center section of valve with wet rags to minimize heat transfer to the seats and seals. Do
not allow the valve center section temperature to exceed 400°F (204°C) as monitored by either a
Tempil® Stick or other suitable method.
5) Use multiple passes with a bead size of 1/8” (3mm) or less. Stop after each pass and allow the valve
to cool so as not to exceed the body temperature limit noted above. Maintain wet rags.
6) After the valve has fully cooled, reinstall the handle, operator or actuator.
7) Alternately: The valve may be partially disassembled for welding
8) Place the valve in the open position.
9) Tack-weld the valve in place in the piping.
10) Remove all four body bolts and slide the center section subassembly out of line. Protect the seats
and seals from damage. Protect the exposed face of the end pieces from weld splatter.
11) Complete the welds using personnel qualified per ASME BPVC Section IX utilizing qualified weld
procedures.
12) Seats and gaskets are intended to be reused. If damaged, contact the factory for replacements.
13) Reinstall the body sub-assembly. Replace the body bolting and hand-tighten all four hex nuts. Using
a criss-cross pattern, in three approximately equal steps, torque the body bolts to the value given in
Table 2. Cycle the valve open and closed between each step to assure continued smooth operation.
Complete the fastener torquing sequence with one final check going around the bolt pattern
clockwise at the specified torque level.
14) Reinstall the operator. Check for smooth operation.
Operation
Apollo valves are shipped with a name tag fastened to the stem and an attached warning tag. Although
each valve is thoroughly tested and inspected before it leaves the factory, name tag and/or warning tag
could be lost or destroyed during shipment or while in storage. If either is missing or not legible, contact
your distributor or the factory for assistance before operating valve.
WARNING: Provide means to monitor filling valve to prevent over pressurization and instability.
Ball valves are intended to be on-off devices operating through 90o rotation of the stem. Operation is
clockwise to close.
The most common service failures not related to the installation and start-up processes are:
* Exceeding the operating temperature or pressure limits of the valve due to a process upset condition.
* A chemical attack on valve components due to either misapplication or changes in the service.
Violating temperature and pressure limits can result in immediate valve failure where chemical attack or
corrosion generally occurs gradually.
I8452001418 S. Pearl Street Pageland SC USA 29728
APOLLO® ACTUATOR READY 3-PIECE BALL VALVES IOM GUIDE Page 4 of 7
The valve is “ON” when the red indicator plugs on the actuator are aligned (i.e. parallel) with the piping
and actuator body. Conversely, when the red indicator plugs are perpendicular to the piping and
actuator body, the valve is “OFF” and a no flow condition is indicated.
Maintenance
Preventive Maintenance Schedule
Automated valves generally see high cyclic duty. A regularly scheduled and documented preventive
maintenance program needs to be established for this type of valve.
Initially, it is recommended that valves be inspected every 5,000 cycles for smooth operation and leak
free performance. Thereafter, every 20,000 cycles should be sufficient.
Problems, if they occur, most frequently appear immediately following initial start-up or following a restart after a shutdown period. Particular attention needs to be paid to valves and other critical
equipment during these times. Once the system has stabilized and is in operation, fewer problems tend
to occur.
Valve Adjustments
At some point in the service life of the valve, leakage may occur. This should be noted in the
maintenance history log of the valve. The stem packing was adjusted at the factory to provide a leak
tight seal when the valve was new, but compaction can occur within these seals that may make readjustment necessary. Stem leakage should be stopped as soon as it is detected. On actuated valves,
most mounting hardware allows access to the packing adjustment screws. If this is not the case, it may
be necessary to remove the actuator to gain adequate access to make the packing adjustment.
Packing adjustment can be accomplished by turning the stem packing adjustment screws clockwise to
the maximum torque shown in Table 1.
CAUTION: Never back off the stem packing adjustment screws when the valve is under pressure.
Table 1: Stem Packing Adjustment Screw Torque
(1) Increase adjustment screw torque’s by 25% for valves with graphoil packing (-24 option)
Do not over tighten the adjustment screws. Over-tightening will result in excessive operating torque and
shorten the packing’s service life. If stem leakage continues, or operating torque becomes excessive, depressurize the valve and replace the stem seals.
Valves with high operating torque not resulting from stem seal over-tightening or valves which have
leakage by the seats, may have damaged seats or ball surfaces. These valves should be de -pressurized,
disassembled, and inspected for damage.
I8452001418 S. Pearl Street Pageland SC USA 29728
APOLLO® ACTUATOR READY 3-PIECE BALL VALVES IOM GUIDE Page 5 of 7
5
Valve Overhaul
As part of planned maintenance or as a result of a problem that cannot be adjusted away, a valve may
require a complete overhaul. Due to the uncomplicated design of the Apollo ball valves this can easily be
accomplished.
The first step is to contact your distributor to acquire an appropriate rebuild kit. These kits typically
contain a complete set of seats, seals, and gaskets. If ball or stem damage is suspected, it is wise to
order these parts when the seal kit is purchased. Most of these items will be in stock on your
distributor’s shelves or at the factory. To properly order spare parts, you will need the valve model
number as shown on the nameplate.
Disassembly
1) Once the spare parts are on hand, the first step in the valve disassembly is to isolate the valve from
line pressure.
WARNING: do not attempt to work on any valve under pressure, and depending on the service,
valve surface temperature may be hot, use proper protective gear to protect against burns. Also
provide safe means for uncontrolled release of fluid.
2) Using an adjustable wrench, valve lever, or properly sized open end wrench, rotate the stem until the
valve is in the one half open, one half closed position. Be careful not to damage the stem. This will
allow any cavity pressure to be released into the pipeline. Place the valve in the open position afte r
this is done.
3) Loosen each of the body joint nuts approximately one turn only initially. This will allow a second
chance for any cavity pressure stored within the valve to be released. Leakage may occur outside of
the pipeline.
4) Before removing the valve body bolting, take precautions to assure the safety of maintenance
personnel. Make sure the valve and piping system are properly stabilized.
5) Carefully remove the valve body bolting. Verify the valve is in the open position. Remove the valve
body center section from the piping system. It may be necessary to spread the endcaps slightly to
overcome compressive loads imparted by the piping system.
6) If only seat or ball damage is suspected, one body fastener may be left loosely assembled between the
endcaps and body and the valve “swung out of line” for service. In this case, proceed to step 9.
7) Set the body center section on a suitable clean solid work surface.
8) Remove the lock plate, lever, external grounding spring (if applicable), stem packing adjustment
screws and the packing gland. Do not attempt to remove the stem packing at this time.
9) The gaskets can now be removed from the recesses in the ends of the body.
10) Using the stem, rotate the ball to the closed position. Pressing either by hand or with a non-marring
soft face tool on the spherical surface of the ball, remove one seat.
11) Press in the opposite direction to remove the other seat.
12) The ball can now be easily removed from the body cavity.
13) Once the ball is removed, the stem can be pressed down into the body and removed.
14) Finally, remove the stem packing using care not to scratch or scar the stem packing box.
Inspection
1) Thoroughly clean all the components in preparation for inspection.
2) Inspect the sealing face of endcaps left on the piping system for scratches and pits. If either of these
is apparent and can be removed with #120 or finer grit emery cloth, replacement will not be
necessary. If replacement of the endcaps becomes necessary then replacement of the entire valve is
recommended.
3) Inspect stem packing contact surfaces for scratches and pits. If either of these is apparent and can
be removed with #120 or finer grit emery cloth, body replacement will not be necessary. Deep
scratches running down the side of the stuffing box or excessive pitting will necessitate the
replacement of the valve body.
4) Inspect the ball in the same manner. Replace the ball if necessary.
I8452001418 S. Pearl Street Pageland SC USA 29728
APOLLO® ACTUATOR READY 3-PIECE BALL VALVES IOM GUIDE Page 6 of 7
5) Inspect remainder of body interior for pitting or corrosion and replace either if excessive.
6) Inspect all parts for wear due to erosion or abrasion and replace if excessive.
Note: Many carbon steel component parts are Melonite treated and oil dipped to improve fatigue
properties and increase wear and corrosion resistance.
Reassembly
1) Begin the re-assembly process by cleaning each of the component parts with a clean towel or cloth.
2) Place the stem bearing on the stem, and insert the stem into the valve body stem bore. Place the flats
on top of the stem perpendicular to the centerline of the body.
3) Install the stem packing, packing gland, gland plate, and stem packing adjustment screws in the
order given. Install the screws finger tight at this time.
4) Place the internal grounding spring on the stem and carefully insert the ball into the body. Using the
stem rotate it to the open position.
5) Apply a small amount of service compatible lubricant to the new seats and install them in the valve
body. Seats may be installed dry however some assembly lubricant is desirable and acts to hold the
seats in place during the assembly process.
6) Apply a small amount of compatible grease to the body side of the gasket. Again this acts to hold the
gasket in place for the assemble process but is optional.
7) Slip the body subassembly into the endcaps in the pipeline. Lubricate and install the body bolts and
nuts finger tight at this time.
8) Cycle the valve open and closed several times to assure all components are properly aligned.
9) Using a criss-cross pattern, in three approximately equal steps, torque the body bolts to the value
given in Table 2. Cycle the valve open and closed between each step to assure continued smooth
operation.
10) Complete the fastener torquing sequence with one final check going around the bolt pattern
clockwise at the specified torque level.
11) Tighten the stem packing adjustment screws to the values shown in Table 1 under the Maintenance
Section. Do not over-tighten the stem packing adjustment screws.
12) Complete the re-assembly by installing the lever, lock plate and stops or actuator as applicable
Table 2: Body Bolting Torque
Final Adjustments
Cycle the valve from open to close several times to verify free operation. Occasionally, after testing or
initial startup, a minor body joint or stem packing leak may occur. Re-adjust the body bolt torque or
stem packing torque as necessary.
I8452001418 S. Pearl Street Pageland SC USA 29728
APOLLO® ACTUATOR READY 3-PIECE BALL VALVES IOM GUIDE Page 7 of 7
7
AMENDMENT REGISTER
DATE REV SECTION PAGE DESCRIPTIONECN _
08/21/13 BAll AllUpdate Format & M13855
add I845300
I8452001418 S. Pearl Street Pageland SC USA 29728
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.