Amprobe Telaris-ISO-PRO User Manual [en, de, fr, es, it]

ISO-PRO
Series
Insulation Tester
Users Manual
• Bedienungshandbuch
• Mode d’emploi
• Manual de uso
• Istruzioni d'uso
2
ISO-PRO
Series Insulation Tester
Users Manual
l a u n a M s r e s U
©2007 Amprobe
2
Table of Contents ..............................................................................................................Page
Repair ................................................................................................................................4
In-Warranty Repairs and Replacement – All Countries....................................................4
References marked on instrument or in instruction manual:..........................................6
Introduction/Scope of Supply............................................................................................7
Scope of Supply..................................................................................................................7
Transport and Storage ......................................................................................................7
Safety Measures ................................................................................................................8
Appropriate Usage ............................................................................................................8
General Information regarding Insulation Measurement ..............................................9
Display and Operation Elements Display..........................................................................10
Display................................................................................................................................10
Operation Elements ..........................................................................................................10
Performance of Measurements ........................................................................................12
Insulation Measurement ..................................................................................................12
Timer Measurement ..........................................................................................................14
Acoustic control during Timer Measurement Timer measurement ..............................15
Limit Value (LIMIT) ............................................................................................................15
Resistance Measurement LOW-Ω ....................................................................................16
Test Lead Compensation....................................................................................................17
Function UProtection Level ..............................................................................................18
AC/DC Voltage Measurement ..........................................................................................19
Data Transfer via Infrared Interface..................................................................................20
Clear/Display saved Measurement Values........................................................................20
Display of the Total Amount of Measurement Values:....................................................20
Delete the Last Value Saved: ............................................................................................20
Clearing all Measurement Values Saved:..........................................................................21
LCD Backlight ....................................................................................................................21
Indications on the LCD ......................................................................................................22
Acoustic Signals..................................................................................................................24
Energy Management ........................................................................................................24
Maintenance......................................................................................................................24
Cleaning ............................................................................................................................24
Battery Replacement ........................................................................................................25
Built-in Fuse........................................................................................................................26
Calibration Interval............................................................................................................26
Technical Data....................................................................................................................27
3
Limited Warranty and Limitation of Liability
Your Amprobe product will be free from defects in material and workmanship for 2 years from the date of purchase. This warranty does not cover fuses, disposable batteries or damage from accident, neglect, misuse, alteration, contamination, or abnormal conditions of operation or handling. Resellers are not authorized to extend any other warranty on Amprobe’s behalf. To obtain service during the warranty period, return the product with proof of purchase to an authorized Amprobe Service Center or to an Amprobe dealer or distributor. See Repair Section for details. THIS WARRANTY IS YOUR ONLY REMEDY. ALL OTHER WARRANTIES - WHETHER EXPRESS, IMPLIED OR STAUTORY - INCLUDING IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY, ARE HEREBY DISCLAIMED. MANUFACTURER SHALL NOT BE LIABLE FOR ANY SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES OR LOSSES, ARISING FROM ANY CAUSE OR THEORY. Since some states or countries do not allow the exclusion or limitation of an implied warranty or of incidental or consequential damages, this limitation of liability may not apply to you.
Repair
All test tools returned for warranty or non-warranty repair or for calibration should be accompanied by the following: your name, company’s name, address, telephone number, and proof of purchase. Additionally, please include a brief description of the problem or the service requested and include the test leads with the meter. Non-warranty repair or replacement charges should be remitted in the form of a check, a money order, credit card with expiration date, or a purchase order made payable to Amprobe.
In-Warranty Repairs and Replacement – All Countries
Please read the warranty statement and check your battery before requesting repair . During the warranty period any defective test tool can be returned to your Amprobe distributor for an exchange for the same or like product. Please check the “Where to Buy” section on www.amprobe.eu for a list of distributors near you. Additionally, in the United States and Canada In-Warranty repair and replacement units can also be sent to a Amprobe Service Center (see next page for address).
4
Non-Warranty Repairs and Replacement – US and Canada
Non-warranty repairs in the United States and Canada should be sent to a Amprobe Service Center . Call Amprobe or inquire at your point of purchase for current repair and replacement rates.
In USA In Canada Amprobe Test Tools Amprobe Test Tools Everett, WA 98203 Mississauga, ON L4Z 1X9 Tel: 877-993-5853 Tel: 905-890-7600 Fax: 425-446-6390 Fax: 905-890-6866
Non-Warranty Repairs and Replacement – Europe
European non-warranty units can be replaced by your Amprobe distributor for a nominal charge. Please check the “Where to Buy” section on www.amprobe.eu for a list of distributors near you.
European Correspondence Address BEHA-AMPROBE GmbH In den Engematten 14 79286 Glottertal Germany Tel. +49 7684 8009 - 0 Fax. +49 7684 8009 - 410 www.amprobe.eu info@amprobe.eu
5
References marked on instrument or in instruction manual:
Warning of a potential danger, comply with instruction manual.
Reference. Please use utmost attention.
Caution! Dangerous voltage. Danger of electrical shock.
Continuous double or reinforced insulation complies with Category II IEC 61140.
Symbol for the marking of electrical and electronic equipment (WEEE Directive 2002/96/EC).
Conformity symbol, the instrument complies with the relevant Directives. It complies with the EMC Directive (89/336/EEC). It also complies with the Low Voltage Directive (73/23/EEC).
Conforms to relevant Australian standards.
N10140
WARNING
• The instruction manual contains information and references, necessary for safe operation and maintenance of the instrument.
Prior to using the instrument (commissioning / assembly) the user is kindly requested to thoroughly read the instruction manual and comply with it in all sections.
• Failure to read the instruction manual or to comply with the war nings and refe rences contained herein can result in serious bodily harm or instrument damage.
6
Introduction/Scope of Supply
Y ou have acquired a high standard measurement instrument by the company BEHA-Amprobe GmbH which allows to carry out reproducible measurements over a very long time period.
The instrument Amprobe ISO-PRO is characterised by the following features:
• Determination of the insulation resistance for electrical systems, conductors, and machines
• Four integrated measurement voltages 100V, 250V, 500V and 1000V
• Built-in low-ohm measurement at a test current of 200mA, in compliance with DIN VDE 0413, Part 4
• AC and DC voltage measurements up to 500V
• Allows limit value pre-setting for the insulation measurement range
• Test lead compensation for precise zero adjustment in the event of low-ohm measurement
• Bargraph
• Backlight allows reading the screen even under unfavourable lighting conditions
• Timer measurement for fast testing of several conductors/leads
• Plug-in test probe
• Infrared interface for recording the measurement results on the PC
• Measurement data memory for up to 500 measurement values
• Energy management
• Constructed in compliance with DIN VDE 0413, EN 61557, IEC 61557, DIN VDE 0411, EN 61010, IEC 61010
Scope of Supply
1 Amprobe ISO-PRO 2 Safety test leads, black, red 2 Alligator clamps, black, red 3 test probes pluggable 1 Holster 1 Carrying holster 6 Batteries, 1.5 V IEC LR6, Mignon 1 Instruction manual
Transport and Storage
Please keep the original packaging for later transport, e.g. for calibration. Any transport damage due to faulty packaging will be excluded from warranty claims.
In order to avoid instrument damage, it is advised to remove accumulators when not using the instrument over a certain time period. However , should the instrument be contaminated by leaking battery cells, you are kindly requested to return it to the factory for cleaning and inspection.
Instruments must be stored in dry and closed areas. In the case of an instrument being transported in extreme temperatures, a recovery time of minimum 2 hours is required prior to instrument operation.
7
Safety Measures
The Amprobe ISO-PRO has been designed and checked in accordance with the safety regulations for Electronic test and Measurement Instruments EN 61010 and IEC 61010, and left our factory in a safe and perfect condition.
WARNING
• The respective accident prevention regulations established by the professional associations for electrical systems and equipment must be strictly met at all times.
• In order to avoid electrical shock, the valid safety and VDE regulations regarding excessive
contact voltages must receive utmost attention, when working with voltages exceeding 120V (60V) DC or 50V (25V)rms AC. The values in brackets are valid forlimited ranges (as for example medicine and agriculture).
• Measurements in dangerous proximity of electrical installations are only to be executed
when instructed by a responsible electrical specialist, and never alone.
• Prior to usage, inspect the instrument and used test leads for external damage. Prior to any
operation, ensure that connecting leads used and instruments are in perfect condition.
• If the operator’s safety is no longer ensured, the instrument is to be put out of service and
protected against use. The safety is no longer insured, if the instrument:
- shows obvious damage
- does not carry out the desired measurements
- has been stored for too long under unfavourable conditions
- has been subjected to mechanical stress during transport.
• The instrument may only be used within the operating ranges as specified in the technical
data section.
• Avoid any heating up of the instrument by direct sunlight to ensure perfect functioning
and long instrument life.
Appropriate Usage
The instrument may only be used under those conditions and for those purposes for which it was conceived. For this reason, in particular the safety references , the technical data including environmental conditions and the usage in dry environments must be followed.
WARNING
• When modifying or changing the instrument, the operational safety is no longer ensured.
• The instrument may only be opened by an authorised service technician, e.g. for fuse
replacement.
• Service and maintenance may only be carried out by an authorised service technician.
8
General Information regarding Insulation Measurement
For electrical installations the insulation measurement has to be carried out prior to final commissioning. This measurement is of basic importance as the insulation measurement (protection against dangerous body currents) is considered to be the only measurement for fire protection. If, due to an insulation error, a limited fault current flows between two conductors, this leads to a heating up or even to a fire. Only the insulation measurement procedure can detect such a fault.
According to DIN VDE 0100 Part 610 the insulation resistance measurement is carried out:
from all external conductors (e.g. B. L1, L2, L3) towards ground or towards the grounded protective earth (PE)
between protective earth (PE) and neutral (N)
Additionally, it is advised to perform the following measurements:
between all active conductors (e.g. L1, L2, L3, N).
This measurement has to be carried out separately for every individual current circuit. This measurement is performed using a DC voltage of 500 V.
Table 1 Test Voltages
Description of the System Nominal voltag Test Voltage Limit Value Test of other signal systems 50 V Derivation ability of floor covering in compliance with
DIN 51953 SELV / PELV system 250 V 0.25 MΩ
Systems up to 500 V (except SELV /PELV) 500 V 0.5 MΩ Systems above 500 V up to 1000 V 1000 V 1MΩ
100 V 1 MΩ
-
9
Display and Operation Elements Display Display
1) Attention warning symbol
2) External voltage, external voltage present
3) Bargraph display
4) Battery status display
5) Unit display
6) Timer symbol
7) COMP symbol for test lead compensation
8) LIMIT display for the respectively selected limit value
9) LCD symbol for backlight
10) Symbol for memory entry
11) Measurement unit display for voltage measurement
12) Symbol for measurement value higher than the specified measurement range
13) Measurement value display
Operation Elements
14) Connection sockets for test leads: yellow - RISO (insulation measurement) black - COM (common connection) blue - LOW-Ω (resistance measurement) red - UAC/DC (voltage measurement)
15) LCD
16) "LIMIT” key: limit value setting (0.5/1/2 MΩ) within RISO range
17) ”AC/DC” key: AC/DC selection within UAC/DC range
18) "Timer” key
19) "Measurement function” selection dial: OFF UAC/DC voltage measurement RISO 1000 V insulation measurement RISO 500 V insulation measurement RISO 250 V insulation measurement RISO 100 V insulation measurement LOW-Ω - low-ohm measurement UProtection Level – Display of response voltage for overvoltage protection device
20) "Start” key
21) "Store” key to store measurement values
22) "Send” key to transfer saved data via IR interface to the PC
23) Battery case (instrument rear)
24) Infrared interface
25) -"Clear” key to delete saved measurement data
26) "COMP” key to compensate the test lead resistance within LOW-Ω measurement function
27) LCD backlight on/off
10
1 2 3 4
13
12
11
9
10
5
68 7
14
15
27
26
25
24
16
17
18
19
20
21
22
23
11
Performance of Measurements Insulation Measurement
The Amprobe ISO-PRO generates the test voltage as pre-set via the measurement function selection dial (19) at the connection socket RISO (14). A current-voltage measurement is used to determine the respective insulation resistance.
A built-in automatic device calculates the current measurement value within a few seconds. Thus, a multitude of measurements may be carried out saving time and battery power. The measurement time depends on the insulation resistance measured and on the capacity.
WARNING
• Prior to any insulation measurement ensure that the system parts to be tested are not live.
Failure to respect this prescription can cause instrument damage.
• During insulation measurement all loads must be disconnected from the mains.
Furthermore, ensure that all interrupters of the system being tested are switched on.
• During the measurement the UUT/the system being tested may not be touched. Danger of
electrical shock!
• The insulation measurement causes the capacitance UUTs to be charged by test voltage.
The Amprobe ISO-PRO automatically discharges the UUT after the completion of measurement. When interrupting the measurement or when removing the test leads prior to the completion of measurement, a dangerous voltage may be present and remain at UUT. If a dangerous voltage is detected during voltage measurement, the UUT must be discharged manually, using a high-resistant load (not via short-circuit!).
• The RISO connection socket is supplied from the instrument with a voltage of < 1kV within
the RISO 1000 V measurement range.
1) Set the measurement function selection dial (19) to one of the four ”RISO measurement functions" (1000 V/ 500 V/ 250 V/ 100 V).
2) Connect the red test lead to the ”RISO" socket and the black test lead to the ”COM" socket.
• 3 different limit values (0.5/1.0/2.0 MΩ) can be set using the ”LIMIT" key (16).
• Resistance values between 0.005 MΩ and 1.999 GΩ can be measured within all four
insulation measurement ranges.
4) Now connect the test leads to UUT.
5) Press the ”Start" key (20). The measurement is started.
12
• Ensure correct and clean contact to UUT . A bad contact to UUT may cause the interruption of the measurement.
• The test voltage remains present at UUT until the ISO-PRO has determined the insulation resistance value or as long as the "Start” key (20) is pressed.
• During the measurement the symbol of the measurement unit (MΩ/GΩ) is displayed.
• If the measurement value falls below the pre-set limit value, a signal is audible after the end of the measurement and the ""-symbol appears.
• To store the measurement result, press the "Save” key (21).
• The measurement value remains displayed until the start of a new measurement procedure or until a different measurement range is selected.
• The UUT is automatically discharged after the measurement. During this time the symbol of the measurement unit is blinking.
External voltage protection for insulation resistance measurement range.
If a external voltage of maximum 1200 V is connected by mistake to the insulation measurement socket, the ISO-PRO will not be damaged.
The instrument display indicates +”UEXT". After removal of the external voltage wait for approx. 30 seconds. Only then correct measurement results will be indicated.
13
Timer Measurement
The Timer measurement, in particular together with the limit value monitoring, is a capable tool to quickly test the insulation resistance of a multitude of conductors with reference to the protective conductor.
To carry out the Timer measurement, press the Start key. The measurement is carried out until the pre-set timer period has elapsed. Three different measurement times are available: 10 s, 30 s, 180 s.
1) For the measurement procedure, please refer to the insulation measurement.
2) The pre-set measurement time (0 s, 10 s, 30 s or 180 s) is indicated briefly when pressing the "Timer” key (18).
• During the Timer period display, this time can be extended by pressing again the "Timer”
key (18) (respectively 0-10-30-180-0, etc.).
• During active timer function the ‘Timer‘ symbol is displayed on the screen.
3) The timer function is switched off by selecting the time 0s. The ‘Timer‘ symbol goes out. The pre-set time is maintained even after the instrument is switched off.
• Connect the UUT to the measurement instrument. In case a limit value monitoring has to
be performed, select the respective limit value by means of the ‘Limit‘ key.
• The Timer measurement is started pressing the "Start” key. During the time that the test
voltage is present at UUT the symbol of the measurement unit (MΩ/GΩ) is blinking.
• The limit value monitoring is permanently carried out during limit value monitoring, i.e. if
the measurement value falls below the limit value. This condition is indicated by an acoustic signal and the display of the respective symbol.
• The Timer measurement is interrupted when pressing the "Start” key . A confirmation signal
is audible. The UUT is automatically discharged upon completion of the measurement,. The measurement unit symbol is also blinking during this procedure.
14
Acoustic control during Timer Measurement Timer measurement
If the measurement value changes for the first time from the overflow (>1.999 GΩ) to a value < 2.000 GΩ, a brief signal sound is audible as confirmation for having connected a UUT . If the insulation resistance falls below the pre-set limit value, an additional signal (continuous signal) is audible, whereby the signal level is clearly different from the first signal sound. Thus, it is possible to test the insulation of several current circuits. The ISO-PRO is connected to a protective conductor via a cable. The second cable will be equipped with a test probe. Test voltage and Timer duration will be set. The limit value will be selected. Then, the measurement is started pressing the Start key. The user hears a brief acoustic sound when connecting the test probe to a current circuit. During the measurement of the subsequent current circuit, a further brief signal sound is audible, etc. If the insulation resistance of a current circuit is too low, the user hears a continuous sound during the time, the test probe is measuring the faulty current circuit.
• If no brief signal sound is audible during the measurement of a current circuit, either the timer duration has already elapsed, or the measurement value amounts to > 1.999 GΩ, or the measurement instrument has not yet displayed the overflow between two measurements.
• The last measurement value remains displayed until a new measurement procedure is started or a different measurement range is selected.
Limit Value (LIMIT)
Repeated pressing of the ”LIMIT" key (16) allows the setting of 3 limit values for the insulation measurement, or to switch off the limit value monitoring. The set limit value is displayed. If the measurement value falls below a pre-set value, a warning signal is audible and the respective symbol is displayed.
15
Resistance Measurement LOW-Ω
The Amprobe ISO-PRO generates a test voltage at the connection socket LOW-Ω (10). A current-voltage measurement is used to determine the respective resistance. The measurement is used to check protective earth conductors, ground conductors, or equipotential bonding conductors for low-ohm continuity.
WARNING
Prior to any resistance measurement, it must be ensured that the system parts to be tested are not live. Failure to respect this prescription can lead to instrument damage.
• Prior to any resistance measurement it is possible to compensate the test leads, please refer to section 6.2.1.
1) Set the measurement function selection dial (19) to measurement function
”LOW-Ω".
2) Connect the red test lead to the ”LOW-Ω" socket and the black test lead to the
”COM" socket.
3) Connect the test leads to the UUT.
4) Press the ”Start" key (20) to start the measurement.
5) Read the measurement value displayed on the screen.
• The measurement value remains displayed until starting a new measurement procedure or until selection of a different measurement range.
• Erroneous measurements results may be generated by impedance installed in parallel of
additional operation current circuits and by compensation currents.
16
External voltage protection for LOW-Ω measurement range
If a external voltage of maximum 600 V is connected by mistake to the LOW-Ω measurement socket, the LOW-Ω measurement will not be carried out. The instrument display indicates +”UEXT".
• For voltages > 600V AC/DC the internal fuse will trip.
Test Lead Compensation
The ISO-PRO allows the compensation of the test lead resistance and the additional measurement accessories. Proceed as follows:
1) Set the measurement function selection dial (19) to measurement function ”LOW-Ω".
2) Connect the black test lead to the "COM” socket and the red test lead to the ”LOW­Ω" socket.
3) Short-circuit both test leads connected.
4) Press the "COMP” key (26).
5) The measurement is started. The test lead resistance is measure and compensated. The "COMP” symbol (7) is displayed. 0,00 Ω appears on the display and an acoustic signal is audible
• If a value exceeding 1.99 Ω is measured, no test lead compensation is carried out. In lieu of
the measurement ">1.99 Ω” is displayed together with the respective symbol and a double acoustic signal is audible.
• To delete the test lead compensation, press again the ”COMP" key (26). The "COMP”
symbol disappears.
17
Function UProtection Level
The ISO-PRO allows the measurement of the protection level or the response voltage of overvoltage protection devices. The measurement consists in the DC voltage measurement. The resulting DC value agrees with the actually measured DC voltage.
Signification of AC voltage value:
The AC value displayed agrees with the rms value of the AC voltage allowing the connection of verified overvoltage protection devices. To calculate the maximum AC voltage, a safety factor of approx. 14 % is considered, resulting in the formula UAC = UDC / 1.6.
WARNING
• A measurement may only be carried out on system parts not being live!!
• During protection level measurement, all loads must be disconnected from the mains.
1) To carry out this measurement, connect the overvoltage protection module to ‚Riso‘ and ‚COM‘ sockets.
2) Set the measurement function selection dial (19) to position UProtection Level.
3) Start the measurement pressing the "Start” key (20).
• The ‚AC DC‘ key ( 17) is used to choose between the measurement result display as DC or
as AC voltage.
• The measurement value displayed after completed measurement can be saved pressing
the ‘Save’ key (21) .
• The instrument is resistant against external voltages up to a value of 1200 V.
18
AC/DC Voltage Measurement
Connected loads generating EMV disturbance or harmonic waves may impair the display quality.
1) Select the ”UAC/DC" measurement range using the measurement function selection dial (19).
2) Connect the red test lead to the "UAC/DC" socket and the black test lead to the "COM" socket.
3) Connect the test leads to the UUT.
4) Select between AC or DC voltage pressing the ”AC/DC" key (17).
• When switching on or changing to the "UAC/DC" measurement function, the default
setting is always "AC".
5) Read the measurement result on the display screen.
Overvoltage Protection for Voltage Measurement
If a external voltage of maximum 600 V AC/DC is connected by mistake to the UAC/DC measurement socket, ISO-PRO will not be damaged. The instrument displays ">600V”. After removal of the overvoltage wait for approx. 20 s to obtain correct measurement values.
• If an AC voltage >25 V is measured within the DC voltage range, the instrument displays
"Uext”.
• This is also valid for the AC range if measuring a DC voltage > 25 V.
19
Data T ransfer via Infrared Interface
It is possible to realise the data transfer (or data filing) of all measurement data saved to the PC via infrared interface. The respective "Report-Studio” software is required together with the interface adapter (Order No. 1203). The data transfer procedure is quite easy, please proceed as follows:
1) Connect interface adapter to the ISO-PRO.
2) Connect the adapter cable via 9pole-D-Sub-Plug (RS232) to the PC (e.g. Com2).
3) Open ”Report-Studio" (please refer to the ”Report-Studio" instruction manual).
4) Select menu point ”Read-in data" or click with the mouse the button ”read files from measurement instrument".
The message "send data" appears on the PC screen.
5) Press the ”Send” key (22).
The data transfer is started. After a few seconds, all memorised data is available on the PC for further processing.
For further information, please refer to the "Report-Studio” instruction manual.
Clear/Display saved Measurement V alues
It is possible to delete individual data or all data by means of the "Clear” key (25). Furthermore, it is possible to display the total amount of all measurement values on the screen.:
Display of the Total Amount of Measurement V alues:
1) Set measurement function selection dial (19) to one of the 7 measurement functions.
2) Briefly press the ”Clear" key (25). An acoustic signal is audible.
3) The number of all saved measurement values is briefly displayed.
Delete the Last Value Saved:
1) Set measurement function selection dial (19) to one of the 7 measurement function.
2) Briefly press the ”Clear" key (25).
3) An acoustic signal is audible and the amount of measurement values saved is displayed.
4) Press again briefly the ”Clear” key (25) until the number of saved measurement values displayed is reduced by 1 and a further acoustic signal is audible.
• Now release the Clear key (25) to prevent the total memory from being cleared.
• Clearing of the last value saved can be repeated as often as desired as long as data is still
contained within the memory.
20
Clearing all Measurement V alues Saved:
1) Set measurement function selection dial (19) to one of the 7 measurement functions.
2) Press the ”Clear" key (25) for approx. 5 seconds
3) An acoustic signal is audible. The number of all measurement data saved is displayed. The number of the measurement values is reduced by 1.
4) After approx. 2 s the last measurement value saved is deleted and an acoustic signal is audible.
5) After further 2 seconds another acoustic signal is audible and all data is cleared. "0” is briefly displayed in the small result window. The memory is now completely cleared. The symbol "M" disappears from the display.
LCD Backlight
The key (27) is used to switch the backlight on or off. After approx. 20s following the last key pressing or the last measurement function selection dial operation, the backlight is automatically switched off to reduce battery consumption.
21
Indications on the LCD
Measurement Function Display Signification
UAC Overflow, voltage present exceeds
600VAC. Immediately disconnect voltage from measurement instrument!
UDC Overflow, voltage present exceeds
+600VAC. Immediately disconnect voltage from measurement instrument!
UDC Overflow, voltage present exceeds -
600VAC. Immediately disconnect voltage from measurement instrument!
Low Ω Overflow, resistance > 19,99 Ω.
Low Ω Test lead resistance compensated.
Low Ω The internal fuse has tripped and must
be replaced by an authorised person.
Riso UProtection Level
UAC, UDC, Low Ω, UProtection Level
Riso Overflow display, insulation resistance
External voltage present, consequently, the Low Ω measurement cannot be carried out. Immediately disconnect voltage from measurement instrument!
Warning symbol, reference to limit value excess or- Measurement range excess in one measurement function
> 1.999 GΩ
22
Measurement Function Display Signification
Riso MΩ/GΩ (blinking) Test voltage present at output sockets.
Measurement running.
Riso Limit value for Riso is 0.5 MΩ Riso Limit value for Riso is 1 MΩ
Riso Limit value for Riso is 2 MΩ
Riso Function-Timer measurement is
switched
UProtection Level Overflow, either no overvoltage
protection device connected or the measurement value is exceeding 625 VAC.
UProtection Level Overflow, either no overvoltage
protection device available or the measurement value is exceeding 1000 VDC.
All LC backlight is switched on.
All Overflow display, insulation resistance
> 1.999 GΩ
All (blinking)-batteries are empty,
instrument operation is no longer possible, the instrument will switch off shortly.
All Minimum one measurement result is
stored into the memory.
All The saved data is presently sent via the
serial interface.
All
The instrument is ready for operation.
---
All
-
The instrument is currently running a measement.
23
Acoustic Signals
Confirmation Signal
The confirmation signal is a brief sound, audible e.g. when starting a measurement. It is audible as confirmation that the key pressing has been recognised.
Error Signal
The error signal consists in two short sounds. It indicates the occurrence of an error or that a function can currently not be carried out. For example, when pressing the "clear” key, the error signal is emitted, if no measurement value has been stored in the memory.
Limit Value Signal
The sound level of this signal is different from the confirmation signal or from the error signal, the sound level is higher . It indicates that the measurement value falls below the pre­set limit value. It is audible either at the end of a measurement or during Timer measurement.
Energy Management
Approximately 5 minutes after the last key pressing the instrument switches off automatically . (auto power off). The instrument returns in operation mode when turning the measurement function selection dial (14) from position "OFF” or when pressing the "Start” key (20).
Maintenance
When operating the instrument in compliance with the instruction manual, no particular maintenance is required.
Cleaning
If the instrument is dirty after daily usage, it is advised to clean it by using a humid cloth and a mild household detergent.
WARNING
Prior to cleaning, ensure that instrument is switched off and disconnected from external voltage supply and any other instruments connected (such as UUT , control instruments, etc.). Never use acid detergents or dissolvants for cleaning.
After cleaning, do not use the voltage tester for a period of approx. 5 hours.
24
Battery Replacement
WARNING
• If the battery symbol appears on the display, the battery must be replaced.
• Prior to battery replacement disconnect the instrument from all connected measurement
circuits and test leads.
1 ) Switch off the instrument by means of the measurement function selection dial (19)
and disconnect from all measurement circuits.
2) Unscrew the screws on the instrument rear.
3) Lift battery case cover (by slightly knocking with the ??ball of thumb).
4) Remove discharged batteries.
5) Insert new batteries respecting correct polarity (indicated on the bottom of the battery case) !
• Never use other batteries than specified in the Technical Data section (1.5V Type IEC LR6,
Mignon).
6) Replace battery case cover and retighten the screws.
7) The instrument is ready for operation.
• Only use accumulators as described in the technical data section!
• Please consider your environment when you dispose of your one-way batteries or
accumulators. They belong in a rubbish dump for hazardous waste. In most cases, the batteries can be returned to their point of sale.
• Please, comply with the respective valid regulation regarding the return, recycling and
disposal of used batteries and accumulators..
If an instrument is not used over an extended time period, the accumulators or batteries must be removed. Should the instrument be contaminated by leaking battery cells, the instrument has to be returned for cleaning and inspection to the factory.
25
Built-in Fuse
The built-in fuse protects the Low Ohm function if the instrument is connected to voltage during running measurement. This fuse may also trip if voltages > 600 V AD/DC are connected to the measurement instrument.
WARNING
• The fuse replacement may only be carried out by authorised staff.
• Exclusively use fuses of voltage, current and breaking capacity values in compliance with the technical data section.
• Using temporary fuses, in particular short-circuiting fuse holders is prohibited and can cause instrument destruction or serious bodily injury of operator.
• Prior to fuse replacement disconnect the instrument from all measurement circuits and test leads.
Error Message after Fuse T ripping
If the message 'Fus' appears on the LCD during the measurement in the Low Ohm function, the fuse has tripped and must be replaced. Please contact our repair service department.
Description of Appropriate Fuse
Fuse Type F 500 mA / 500 V, 6.3 x 32 mm
Calibration Interval
We suggest a calibration interval of one year. If the instrument is used very often or if it is used under rough conditions we recommend shorter intervals. If the instrument is used few times only the calibration interval can be extended on to 3 years.
26
Technical Data
Insulation Resistance Measurement
Measurement Range Resolution Tolerance 0,010...1,999 MΩ 1 kΩ ±(5% rdg. +10 Digits) 2,00...19,99 MΩ 10 kΩ ±(5% rdg. +5 Digits) 20,0...199,9 MΩ 100 kΩ ±(5% rdg. +5 Digits) 0,200...1,999 GΩ 1 MΩ ±(10% rdg. +5 Digits)
Battery Life
Nominal test number of measurements with 1mA - Load Voltage UN (1 measurement - 25 s pause) 100 V DC approx. 6000 250 V DC approx. 4000 500 V DC approx. 3000 1000 V DC approx. 1000
Max. open voltage Uo UN +25%
Test current IN: 1 mA at UN Short-circuit current IK: < 2 mA
Measurement duration: 1 - 3 s (automatic function)
1 - 10 s (automatic function for capacitance loads) optional (continuous measurement) 10 s, 30 s, 180 s (Timer mode)
Overload protection: 1200 V AC/DC Automatic measurement range selection. UUT is automatically discharged after the measurement.
Low Ohm Measurement (Low Ω)
Measurement Range Resolution Tolerance 0,03...19,99 Ω 0,01 Ω ±(3% rdg. +3 Digits)
Open voltage Uo: 5 V...9 V DC Measurement current: 200 mA (at resistance ≤ 4 Ω) Measurement duration: approx. 1 s Number of measurements: approx. 3000 (for 1 Ω, 1 measurement - 25 s pause)
Test Lead Compensation
Up to test lead resistance: max. 1,99 Ω Overload protection: 1200 V AC/DC, as from 600 V AC/DC the internal fuse
trips.
27
AC/DC Voltage Measurement (U AC/DC)
Measurement Range UAC: 1 ... 600 VAC (Frequency f: 40 Hz ... 500 Hz) Measurement Range UDC: 1 ... ±600 VDC Resolution: 1 V Tolerance: ±(3% rdg. +3 Digits) Internal resistance: 660 kΩ Overload protection: 600 V AC/DC UProtection Level Measurement Range Resolution Tolerance
10...1000 VDC 1 V ±(10% rdg. +5 Digits)
6 ... 625 VAC 1 V ±(10% rdg. +5 Digits)
Test voltage: 1 ... 1000 V DC Test current: approx. 1 mA Overload protection: 1200 V AC/DC
General
Display: 3
1
/2 digit LCD with bargraph Battery type: 6 x 1,5 V, Type IEC LR6, Mignon Current consumption: approx. 20 mA (standby) Battery life: for average use approx. 1 year Auto Power Off: approx. 5 min LCD backlight: off after approx. 20 s Fuse: 500 mA / 500 V - 6,3 x 32 mm
For input protection at Low-Ω function Data Memory: up to 500 measurement values IR/RS-232 interface: 9600 Baud, 1 start bit, 8 data bits,
Pair parity, 1 atop bit Casing: Protection class II Overvoltage category: CAT III / 600V or CAT II / 1000V towards ground Degree of contamination: 2 Type of protection IP: IP 50 Dimensions (LxBxH): 235 x 105 x 68 mm Weight: approx. 660 g incl. batteries
Environmental Conditions
Reference temperature range: +17°C..22 ..27°C, max. 70% rel. humidity Operation temperature range: 0 °C...40 °C max. 80% relative humidity without
dewing Height above sea level: up to 2000 m
Subject to technical changes without notice! 10/2008 PAEB30872322
28
Loading...
+ 114 hidden pages