American Standard 2555.652 User Manual

0 (0)
American Standard 2555.652 User Manual

Installation

Instructions

TOWNSQUARE

2555.652

PRESSURE BALANCING BATH AND

 

SHOWER with Built-in Diverter for

 

RIM MOUNT TUB FILLER

 

with EverClean™ Finish

 

Congratulations on purchasing your American Standard faucet with EverClean finish found only on American Standard faucets.

EverClean Finish

One wipe effortlessly removes spots

Eliminates the need for cleaners and scrubbing

Permanent surface protectant remains beautiful for the life of the faucet

EverClean™ available on: Polished Chrome, Satin Nickel,

Stainless Steel, Polished Brass (or any combination of these finishes)

Certified to comply with ANSI A112.18.1

. 3FW

To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.

 

ROUGHING-IN DIMENSIONS

 

 

Required Tools

To assure proper positioning in relation to wall, note

 

roughing-in dimensions.

 

 

 

 

FINISHED WALL

1-5/8" TO 3-1/4"

 

 

 

 

 

Phillips Screwdriver

 

1

1/2" I.P.S.

 

 

 

 

 

 

 

 

 

2" REF.

 

 

 

Flat Blade Screwdriver

 

 

OPTIONAL TO

 

 

 

FINISHED FLOOR

 

 

 

 

USUALLY BETWEEN

 

 

 

 

65'' AND 78''

 

 

 

8" REF.

 

OUTLETS 1/2" NPT

 

74" FOR

 

 

 

 

 

 

 

HEAD CLEARANCE

 

 

 

 

 

 

"SEE ILLUSTRATION"

 

 

 

 

SHW

 

Plumbers' Putty or Caulking

 

7-1/2"

5-5/8"

 

 

 

 

 

TUB

 

 

42 to 54"

 

 

 

 

OPTIONAL

 

 

 

 

 

 

 

1-3/4"

Channel Locks

 

8-1/4"

INLETS

5-5/8"

 

 

 

 

 

 

1/2" NPT

 

 

 

 

 

THREADED INLETS (STOPS)

 

 

 

SPOUT MTG.

 

 

3-11/16"

 

SURFACE

 

 

 

1-1/4

 

 

Adjustable Wrench

 

MAX.

 

 

BOTTOM OF

 

 

 

1/2" NPT

 

 

TUB

1/2" NPT

 

 

 

 

 

 

 

 

1

ROUGHING-IN

CAUTION

Turn off water at main supply.

 

 

 

 

 

 

 

 

 

5

NOTE When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering,

7

 

flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread

 

sealant or Teflon tape on threaded connections.

See Roughing-in diagram before starting. Connections are:

1/2" female NPT for threaded inlets Connect RISER PIPE (1) to MANIFOLD (2) top outlet marked "SHR".

Connect TUB FILLER PIPE (3) at bottom outlet marked "TUB".

For proper positioning the finished wall must be within side wall of PLASTER GUARD (4).

 

 

If the valve is installed on a fiberglass

1

 

 

 

or other thin wall application, the

 

 

 

PLASTER GUARD (4) can be used as a support.

2

 

 

 

Cut a 4" dia. hole in the shower stall.

 

 

 

 

 

 

 

 

 

 

 

 

Drill two additional 1" holes to allow access

 

 

 

 

 

 

 

 

 

 

 

 

to the stops.

HOT

 

 

 

Remove PLASTER GUARD (4), rotate 90˚

 

 

 

 

 

 

 

 

 

 

 

so that indicated screw holes fit MANIFOLD (2).

 

 

 

 

Push CAP on valve, place ESCUTCHEON on and

3

 

 

 

 

 

 

 

 

 

attach with screws.

 

 

Connect hot and cold water supplies.

 

 

 

 

 

Cap off shower pipe (5) and tub filler pipe (6).

 

 

 

For support, use pipe BRACES (7) secured to wooden braces. With valve turned off, turn on water supplies. Check for leaks.

COLD 4

6

Loading...
+ 2 hidden pages