Installation
T M
BATH AND SHOWER TR I M KITS
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.
RECOMMENDED TOOLS
Instructions
T480.508
T480.507
Certified to comply with ANSI A112.18.1
U.S. Patent No. D403,750
M 9 6 8 6 9 8
Phillips Screwdriver
Flat Blade Screwdriver
ROUGHING-IN DIMENSIONS
FOR REFERENCE ONLY
4" REF.
74" FOR HEAD
CLEARANCE
Plumbers' Putty or Caulking
FINISHED WALL
7" REF.
Adjustable Wrench
Teflon Tape
1-5/8" TO 3-1/4"
1/2" NPT
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 78''
5-1/8" REF.
TOP OF TUB RIM
BOTTOM OF TUB
7-5/8" REF.
4" REF.
1/2" COPPER
INSTALL TRIM
1
Remove PLASTER GUARD (1).
Push CAP (2) on valve, place ESCUTCHEON (3) and attach with SCREWS (4).
Install HANDLE (5) by pushing it onto CARTRIDGE STEM (6) and tightening SET SCREW
(7) from below.
Install SHOWER ARM (8) with FLANGE (9). Install SHOWER HEAD (10). See Step 2.
9
8
1
Check proper operation of HANDLE (5) and DIVERTER SPOUT (11).
INSTALL SHOWER HEAD ASSEMBLY
2
REMOVE SHOWER HEAD FROM HOUSING
Hold SHOWERHEAD (1) with one hand and HOUSING (2)
with the other as illustrated.
Rotate SHOWERHEAD (1) clockwise while holding HOUSING (2)
stationary. NOTE: The thread connection is a left hand
thread. Keep turning SHOWERHEAD (1) until it can be
removed from the HOUSING (2).
3
10
5
2
7
4
11
2
1
6
2a
2c
INSTALL HOUSING
Slide HOUSING (2) onto
SHOWER ARM (3).
3
2
INSTALL HOUSING TO SHOWER HEAD
Install HOUSING (2) onto SHOWER HEAD (1). Thread
HOUSING (2) counter-clockwise to install onto SHOWER
HEAD (1). Hand tighten only.
2b
INSTALL SHOWER HEAD
Rap SHOWER ARM (3) threads with Teflon tape.
Tighten SHOWERHEAD (1)
with an adjustable wrench.
Do not over tighten.
TEFLON TAPE
1
1
3
2
M 9 6 8 6 9 8 M 9 6 8 6 9 8 M 9 6 8 6 9 8