American Standard T010.5XX User Manual

Page 1
Recommended Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
Teflon Tape
4"
TOP OF TUB RIM
BOTTOM OF TUB
74" FOR HEAD CLEARANCE
3-1/8" REF.
1-5/8" TO 3"
18" OPTIONAL
4-5/8" REF.
5-7/8" REF.
1/2" NPT
1/2" NPT
7-1/2"
9-1/2" REF.
OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 65'' AND 78'
"SEE ILLUSTRATION "
Certified to comply with ANSI A112.18.1
ROUGHING-IN DIMENSIONS (For reference only)
To assure proper positioning in relation to wall, note roughing-in dimensions.
PRESSURE BALANCING BATH AND SHOWER TRIM KIT
GREEN TEA
Installation
Instructions
T010.5XX
THREADED INLETS (STOPS)
INLETS
1/2" NPT
5-7/8"
INLETS 1/2" NPT
OUTLETS 1/2" NPT
OUTLETS 1/2" NPT
3-3/8"
3-3/8"
3-3/8"
THREADED INLETS
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM. COPPER SWEAT
4-1/16"
5-7/8"
INLETS
4-1/16"
4-1/16"
INLETS 1/2" NOM. COPPER SWEAT
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
2"
SWEAT INLETS
SWEAT INLETS (STOPS)
INLETS 1/2" NOM. COPPER SWEAT
Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.
4-3/16"
Page 2
M968592 Rev.1.1 M968592 Rev.1.1 M968592 Rev.1.1
1
INSTALL VALVE TRIM
1
Figure 1.
Figure 2. Figure 3.
3
5
6
4
2
1
Figure 1. Remove plaster guard from valve. Push CAP (1) over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1) and attach with LONG SCREWS (4). Mount ESCUTCHEON SUPPORT (5) to ESCUTCHEON HOLDER (3) with 4 SHORT SCREWS (6).
Figure 3. Align PINS (7) on back side of ESCUTCHEON (8) with the FOUR HOLES (9) in ESCUTCHEON SUPPORT (5) and press ESCUTCHEON (8) flush against finished wall.
PLSTER GUARD
9
5
PIPE PLUG
PIPE CAP
1
4
3
2
SHR. ELBOW
1/2" NPT TUB NIPPLE
4-1/8"
REF.
Remove pipe cap and plug from shower and tub rough piping. Apply Sealing tape to SHOWER ARM (3) and tub filler pipe.
Install SPOUT ESCUTCHEON (5) onto SPOUT (1) and thread SPOUT (1) onto tub nipple. Tighten SPOUT (1) and slide ESCUTCHEON (5) flush agasinst finished wall.
CAUTION: Protect finish on TUB SPOUT (1) when installing.
Install SHOWER ESCUTCHEON (2) onto SHOWER ARM (3). Thread SHOWER ARM (3) into shower elbow and tighten. Slide ESCUTCHEON (2) flush agasinst finished wall.
Thread SHOWER HEAD (4) onto SHOWER ARM (3).
5
2
INSTALL TUB SPOUT, SHOWER HEAD, SHOWER ARM WITH FLANGE
CAUTION: Protect finish on SHOWER HEAD and ARM when installing.
CAUTION: Protect finish on SHOWER HEAD and TUB SPOUT when installing.
7
8
Page 3
SERVICE
5
Remove HANDLE (1), CAP (2) and CARTRIDGE (4). Clean inlets and MANIFOLD (5).
Reassemble CARTRIDGE (4), alternately tightening SCREWS (3). Replace CAP (2) and HANDLE (1). Check flow.
If faucet drips, operate handle several times from "off" to "on". Do not apply excessive force.
Clogged CARTRIDGE (4) inlets may cause reduced flow in "full on" hot or cold. To clean inlets, first turn off water supply, then:
5
4
3
2
1
6
"B"
"B"
3
ADJUST HOT LIMIT STOP
By restricting handle rotation and limiting the amount of hot water allowed to mix with the cold, the HOT LIMIT SAFETY STOP reduces risk of accidental scalding. To set the maximum hot water temperature of your faucets, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP.
Use a flat blade screwdriver or your fingers to pull up and rotate red HOT LIMIT SAFETY STOP (1). Follow Step "A" or "B" to adjust min./max. discharge temperature. "0" being the hottest to "7" the coldest temperature setting. Factory set at "0".
HOT LIMIT SAFETY STOP ADJUSTMENT
PRY RED RING
FORWARD AND ROTATE
COUNTER-CLOCKWISE
ONE CLICK
PRY RED RING
FORWARD AND
ROTATE CLOCKWISE
"A"
"A"
ADJUSTMENT WHEN
WATER IS TOO HOT
ADJUSTMENT WHEN
WATER IS TOO COLD
"RED RING"- HOT LIMIT SAFETY STOP
TEMPERATURE
SETTING
NUMBERS
1
0
1
2
3
4
5
6
1
2.5MM HEX WRENCH
4
HANDLE INSTALLATION
3
Install HANDLE (1) by pushing it onto CARTRIDGE STEM (2) and tightening SET SCREW (3) from below with 2.5mm Hex Wrench supplied.
2
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A CLOTH WITH A COARSE SURFACE.
CARE INSTRUCTIONS:
Page 4
PRESSURE BALANCE
BATH/SHOWER TRIM KIT
MODEL NUMBER
M962627-YYY0A
SHOWER ARM
AND FLANGE
M950203-YYY0A
DIVERTER SPOUT (1/2" NPT)
M950204-YYY0A
SHOWER HEAD
GREEN TEA
T010.5XX
M907050-YYY0A
CAP
M962625-YYY0A
ESCUTCHEON AND SEAL
M962626-YYY0A
HANDLE
M962427-0070A
ESCUTCHEON HOLDER
HOT LINE FOR HELP
For toll-free information and answers to your questions, call:
1 (800) 442-1902
Weekdays 8:00 a.m. to 6:00 p.m. EST
IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)
Weekdays 8:00 a.m. to 7:00 p.m. EST
Pr od uct n ame s li ste d her ei n are t rad em ar ks of Am er ic an St and ar d Inc . © AS Am er ica , In c. 20 07
IN MEXICO 01-800-839-12-00
CHROME 002
Replace the "YYY" with appropriate finish code
Loading...