American Standard T005.5XX User Manual

Recommended Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
Teflon Tape
4"
TOP OF TUB RIM
BOTTOM OF TUB
74" FOR HEAD CLEARANCE
4-1/4" REF.
1-5/8" TO 3"
18" OPTIONAL
4-7/8" REF.
1/2" NPT
1/2" COPPER
FOR SLIP-ON
SPOUT
7-1/2"
1-1/2"
6" REF.
OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 65'' AND 78'
"SEE ILLUSTRATION "
Certified to comply with ANSI A112.18.1
ROUGHING-IN DIMENSIONS (For reference only)
To assure proper positioning in relation to wall, note roughing-in dimensions.
PRESSURE BALANCING BATH AND SHOWER TRIM KITS
COPELAND
Installation
Instructions
T005.5XX
THREADED INLETS (STOPS)
INLETS
1/2" NPT
5-7/8"
INLETS 1/2" NPT
OUTLETS 1/2" NPT
OUTLETS 1/2" NPT
3-3/8"
3-3/8"
3-3/8"
THREADED INLETS
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM. COPPER SWEAT
4-1/16"
5-7/8"
INLETS
4-1/16"
4-1/16"
INLETS 1/2" NOM. COPPER SWEAT
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
2"
SWEAT INLETS
SWEAT INLETS (STOPS)
INLETS 1/2" NOM. COPPER SWEAT
M968636 Rev 1.1
Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.
M968636 Rev 1.1 M968636 Rev 1.1 M968636 Rev 1.1
7
8
1
INSTALL VALVE TRIM
1
Figure 1.
Figure 2. Figure 3.
3
5
6
4
2
1
Figure 1. Remove plaster guard from valve. Push CAP (1) over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1) and attach with LONG SCREWS (4). Mount ESCUTCHEON SUPPORT (5) to ESCUTCHEON HOLDER (3) with 4 SHORT SCREWS (6).
Figure 3. Align PINS (7) on back side of ESCUTCHEON (8) with the FOUR HOLES (9) in ESCUTCHEON SUPPORT (5) and press ESCUTCHEON (8) flush against finished wall.
PLSTER GUARD
9
5
PIPE PLUG
PIPE CAP
1
4
3
2
SHR. ELBOW
TUB FILLER NIPPLE
1-1/2" REF.
Remove pipe cap and plug from shower and tub rough piping.
Slip TUB SPOUT (1) onto tub nipple and tighten with 4mm Hex Wrench.
CAUTION: Protect finish on TUB SPOUT when installing.
Install SHOWER ESCUTCHEON (2) onto SHOWER ARM (3). Apply sealant or Teflon tape to threads on both ends of SHOWER ARM (3) and thread longer leg of SHOWER ARM (3) into shower elbow.
Thread SHOWER HEAD (4) onto SHOWER ARM (3).
2
INSTALL TUB SPOUT, SHOWER HEAD, SHOWER ARM WITH FLANGE
CAUTION: Protect finish on SHOWER HEAD and ARM when installing.
CAUTION: Protect finish on SHOWER HEAD and TUB SPOUT when installing.
4MM HEX WRENCH
Loading...
+ 2 hidden pages