Recommended Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
Teflon Tape
FINISHED WALL
4"
TOP OF TUB RIM
BOTTOM OF TUB
74" FOR HEAD
CLEARANCE
4-1/4" REF.
1-5/8" TO 3"
18" OPTIONAL
4-7/8" REF.
1/2" NPT
1/2" COPPER
FOR SLIP-ON
SPOUT
7-1/2"
1-1/2"
6" REF.
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 78'
"SEE ILLUSTRATION "
Certified to comply with ANSI A112.18.1
ROUGHING-IN DIMENSIONS (For reference only)
To assure proper positioning in relation to wall, note roughing-in dimensions.
PRESSURE BALANCING BATH
AND SHOWER TRIM KITS
COPELAND
Installation
Instructions
T005.5XX
THREADED INLETS (STOPS)
INLETS
1/2" NPT
5-7/8"
INLETS 1/2" NPT
OUTLETS
1/2" NPT
OUTLETS
1/2" NPT
3-3/8"
3-3/8"
3-3/8"
THREADED INLETS
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
4-1/16"
5-7/8"
INLETS
4-1/16"
4-1/16"
INLETS
1/2" NOM.
COPPER
SWEAT
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
2"
SWEAT
INLETS
SWEAT
INLETS (STOPS)
INLETS
1/2" NOM.
COPPER
SWEAT
M968636 Rev 1.1
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
M968636 Rev 1.1 M968636 Rev 1.1 M968636 Rev 1.1
7
8
1
INSTALL VALVE TRIM
1
Figure 1.
Figure 2. Figure 3.
3
5
6
4
2
1
Figure 1. Remove plaster guard from valve. Push CAP (1)
over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1)
and attach with LONG SCREWS (4). Mount ESCUTCHEON
SUPPORT (5) to ESCUTCHEON HOLDER (3) with 4 SHORT
SCREWS (6).
Figure 3. Align PINS (7) on back side of ESCUTCHEON (8)
with the FOUR HOLES (9) in ESCUTCHEON SUPPORT (5)
and press ESCUTCHEON (8) flush against finished wall.
PLSTER
GUARD
9
5
PIPE
PLUG
PIPE
CAP
1
4
3
2
SHR.
ELBOW
TUB FILLER
NIPPLE
1-1/2" REF.
Remove pipe cap and plug from shower and tub
rough piping.
Slip TUB SPOUT (1) onto tub nipple and tighten with
4mm Hex Wrench.
CAUTION: Protect finish on TUB SPOUT when
installing.
Install SHOWER ESCUTCHEON (2) onto SHOWER
ARM (3). Apply sealant or Teflon tape to threads on
both ends of SHOWER ARM (3) and thread longer
leg of SHOWER ARM (3) into shower elbow.
Thread SHOWER HEAD (4) onto SHOWER ARM (3).
2
INSTALL TUB SPOUT, SHOWER HEAD,
SHOWER ARM WITH FLANGE
CAUTION: Protect finish on SHOWER HEAD and
ARM when installing.
CAUTION: Protect finish on SHOWER
HEAD and TUB SPOUT when installing.
4MM HEX
WRENCH