American Standard 3636Y1.SR-.XXX, 3838Y1.SR-NEO.XXX, 4242Y1.SR-NEO.XXX User Manual

INSTALLATION INSTRUCTIONS
Acrylux Builder Series Shower Pans
Model 3636Y1.SR.XXX Model 3838Y1.SR-NEO.XXX Model 4242Y1.SR-NEO.XXX
Thank you for selecting American Standard – the benchmark of fine quality for over 100 years. To ensure this product is installed properly, please read these instructions carefully before you begin. Local building codes vary by location. Observe all local plumbing and building codes.
3636Y1.SR.XXX
36"
914mm
3838Y1.SR-NEO.XXX
38"
965mm
36"
914mm
38"
965mm
5"
127mm
127mm
3636 STUD LAYOUT
6"
(152mm)
37-1/2"
(953mm)
39-1/2"
(1003mm)
5"
18"
(457mm)
(152mm x 152mm)
(914mm)
= stud location
3838 STUD LAYOUT
6"
(152mm)
12"
(305mm)
Floor
Cutout
18"
(457mm)
Drain C
Floor
Cutout
(6" x 6")
36"
12"
(305mm)
10"
(254mm)
L
39-1/2"
(1003mm)
4242Y1.SR-NEO.XXX
42"
1067mm
Product names listed herein are trademarks of AS America, Inc. © AS America, Inc. 2008
1067mm
42"
5"
127mm
43-1/2"
(1092mm)
= stud location
4242 STUD LAYOUT
6"
(152mm)
12"
(305mm)
Floor
Cutout
= stud location
12"
(305mm)
(254mm)
43-1/2"
(1092mm)
10"
754287-100 Rev. A
IMPORTANT
• Allow pan to reach room temperature before installation.
• Before you begin, locate appropriate product reference (see page 1).
• Read installation instructions carefully before starting project.
• Keep instructions for warranty information
RECOMMENDED TOOLS AND MATERIALS
Tape Measure Pencil Saber Saw Screws, 1" Flathead, Stainless
Safety Glasses Drill 24" Level
INSTALLATION INSTRUCTIONS
STEP 1. PREPARING ALCOVE
• Strip alcove to bare studs.
• Shower stud pocket should be constructed as shown above.
• Floor must be clean, smooth, and level (check with level). Sub floor must be installed. Do not install shower base on open floor joists.
• Cut hole in sub floor as shown on page 1 to accommodate drain.
STEP 2. INSTALLING PAN
• Trial fit base in prepared alcove. With pan sitting flat on floor, check with level on top of pan. Pan should be level from front-to-back and side-to-side (Fig 1). If pan is not level, remove pan and level floor using leveling compound.
• A floor leveling compound (smooth mortar) or a similar quick-setting compound specifically made for leveling floors may be used to fully support and level base.
• After pan is leveled, if alcove is larger than pan, shim between pan and studs to create a tight fit. Drill 3/16" holes in pan flange at each stud. Screw pan flange to studs (Fig. 2).
CLEANING
• Do not use any abrasive cleaners or metal scrapers.
• If drywall mud or plaster gets on your shower, it may be carefully removed with a wooden scraper made from a piece of scrap wood.
• Adhesive may be removed with mineral spirits.
®
• Ideal cleaners are Soft Scrub Gel
or Comet Gel®.
FIGURE 1. Check to assure pan is level.
FIGURE 2. If necessary, shim between pan and
studs for tight fit and screw to each stud.
WARNING: Some cleaning products are not suitable for use. Read all labels carefully.
DO NOT USE if they say “not suitable for use with ABS, acrylic or polystyrene”.
754287-100 Rev. A-2-
Loading...
+ 1 hidden pages